ITEM 1A. RISK FACTORS
The following information pertains to the outlook and conditions currently known to Energy Fuels that could have a material impact on its financial condition. Other factors may arise in the future that are currently not foreseen by management of Energy Fuels that may present additional risks, including risks that the Company currently feels are immaterial. Current and prospective shareholders of Energy Fuels should carefully consider these risk factors when making investment decisions.
Our failure to successfully address any of the risks and uncertainties described below could have a material adverse effect on our business, financial condition and/or results of operations, and the trading price of our Common Shares may fluctuate widely. We cannot assure you that we have or will successfully or fully address these risks or other unknown risks that may affect our business.
Risks Related to our Industry
We are subject to the risks normally encountered by companies in the mineral extraction industry.
We are subject to the risks normally encountered by companies in the mineral extraction industry, such as:
•the discovery of unusual or unexpected geological formations;
•accidental fires, floods, earthquakes, volcanic eruptions and other natural disasters;
•unplanned power outages and water shortages;
•controlling water and other similar mining hazards;
•operating labor disruptions and labor disputes;
•the ability to obtain suitable or adequate machinery, equipment or labor;
•our liability for potential pollution or other hazards; and
•other known and unknown risks involved in the conduct of exploration, development and operation of mines, extraction and recovery facilities and mills, along with the markets for uranium, rare earths, vanadium and heavy mineral sands.
The development of mineral properties is affected by many factors, including, but not limited to: the cost of operations; variations in the grade of mineralized material; fluctuations in metal markets; costs of extraction and processing equipment; availability of equipment and labor; labor costs and possible labor strikes; government regulations, including without limitation, regulations relating to taxes, royalties, allowable extraction or production, and importing and exporting of minerals; government actions, including without limitation the establishment or expansion of mineral withdrawals, parks and monuments; land exchanges; foreign exchange; employment; worker safety; transportation; and environmental protection.
Our results of operations are significantly affected by the market prices of uranium, vanadium, rare earth elements and heavy mineral sands, which are cyclical and subject to substantial price fluctuations.
Our earnings and operating cash flow are and will be particularly sensitive to the long- and short-term changes in the market prices of uranium, vanadium and REEs, as well as heavy mineral sands and their components, including the prices for ilmenite, rutile, titanium and zircon, which could impact planned production levels or the feasibility of production of HMC and monazite from our Bahia Project and any other HMS projects and which could impact monazite supply for our RE Carbonate and planned REE oxide production. Among other factors, these prices also affect the value of our resources, reserves and inventories, as well as the market price of our Common Shares.
Market prices are affected by numerous factors beyond our control. With respect to uranium, such factors include, among others: demand for nuclear power; political and economic conditions in uranium producing and consuming countries; public and political response to a nuclear incident or fear of a nuclear incident; reprocessing of used reactor fuel, the re-enrichment of depleted uranium tails and the enricher practice of underfeeding; sales of excess civilian and military inventories (including from the dismantling of nuclear weapons; the premature decommissioning of nuclear power plants; and from the build-up of Japanese utility uranium inventories as a result of the Fukushima incident) by governments and industry participants; uranium supply, including the supply from other secondary sources; production levels and costs of production, and government actions such as, for instance, any plans included in President Biden’s 2024 fiscal budget and those taken pursuant to the U.S. Uranium Reserve Program. With respect to vanadium, such factors include, among others: demand for steel; the potential for vanadium to be used in advanced battery technologies; political and economic conditions in vanadium producing and consuming countries; world production levels; and costs of production. With respect to REEs, such factors include, among others: demand for REEs; political and economic conditions in REE producing and consuming countries; REE-bearing ore supply from secondary sources; international interest in the purchase of RE Carbonate and separated REE oxides, absent a U.S.-based separation facility; public and political response to REE initiatives at the Mill; governmental investment in domestic REE
36
infrastructure; world production levels; costs of production; risks associated with foreign governmental actions, policies, laws, rules, regulations and foreign state subsidized enterprises, with respect to REE production and sales, which could impact REE prices available to the Company and impact our access to world and domestic markets for the supply of REE-bearing ores and the sale of RE Carbonate, REE oxides, and other REE products and services to world and domestic markets; and other government actions, including licensing and import requirements. With respect to HMC and its components including the prices for ilmenite, rutile, titanium and zircon, such factors include, among others: demand for titanium and zircon; political and economic conditions in HMC producing and consuming countries; other government actions, including licensing and import requirements; geopolitical factors; world production levels; exploration, mining, processing, refining and other costs of production; grades of HMC supplies; scale of mining method; growth in end-use demand of titanium and zircon, including GDP growth in consuming countries; available mineable deposits and upgrading facilities; currency fluctuations; and other market demand and supply dynamics.
Other factors relating to the prices of uranium, vanadium, REEs and HMC include: levels of supply and demand for a broad range of industrial products; substitution of new or different products in critical applications for our existing products; expectations with respect to the rate of inflation; the relative strength of the U.S. dollar and of certain other currencies; interest rates; global or regional political or economic crises; regional and global economic conditions; and sales of uranium, vanadium, RE Carbonate, REE oxides and other REE products and services, and HMC by holders in response to such factors. If prices are below our cash costs of extraction or recovery and remain at such levels for any sustained period, we may determine that it is not economically feasible to continue commercial extraction, recovery or processing at any or all of our projects or other facilities and may also be required to look for alternatives other than cash flow to maintain our liquidity until prices recover. Our expected levels of uranium, vanadium and REE recovery and other business activity are dependent on our expectation and the industry’s expectations of uranium, vanadium, REE and HMC prices, which may not be realized or may change. In the event we conclude that a significant deterioration in expected future uranium, vanadium, REE or HMC prices has occurred, we will assess whether an impairment allowance is necessary which, if required, could be material.
The recent fluctuations in the price of many commodities is an example of a situation over which we have no control, and which could materially adversely affect us in a manner for which we may not be able to compensate. There can be no assurance that the price of any minerals recovered from or processed at our properties will be such that any deposits can be operated at a profit.
Our profitability is directly related to the market prices of uranium, vanadium, REEs and HMC recovered. We may, from time to time, undertake commodity and currency hedging programs with the intention of maintaining adequate cash flows and profitability to contribute to the long-term viability of the business. We anticipate selling forward in the ordinary course of business if, and when, we have sufficient assets and recovery to support forward sale arrangements and forward sale arrangements are available on suitable terms. There are, however, risks associated with forward sale programs. If we do not have sufficient recovered product to meet our forward sale commitments, we may have to buy or borrow (for later delivery back from recovered product) sufficient product in the spot market to deliver under the forward sales contracts, possibly at higher prices than provided for in the forward sales contracts, or potentially default on such deliveries. In addition, under forward contracts, we may be forced to sell at prices that are lower than the prices that may be available on the spot market when such deliveries are completed. Although we may employ various pricing mechanisms within our sales contracts to manage our exposure to price fluctuations, there can be no assurance that such mechanisms will be successful. There can also be no assurance that we will be able to enter into additional term contracts for future sales of uranium, vanadium or RE Carbonate at prices or in quantities that would allow us to successfully manage our exposure to price fluctuations.
The majority of our properties do not contain Mineral Reserves under S-K 1300 and NI 43-101, and some of the Company’s properties, projects and facilities may not be economic at any point in time or at all.
Only two of our properties – the Sheep Mountain and Pinyon Plain mines – contain Mineral Reserves under SEC S-K 1300 and NI 43-101 (see “Item II, Cautionary Note to Investors Concerning Disclosure of Mineral Reserve and Mineral Resource Estimates”). Depending on uranium, vanadium, REE and HMC prices, some or all of our properties, projects and facilities may not be economic for uranium, vanadium, REE or HMC extraction, recovery or processing at any point in time. Generally, we intend to continue to hold, and in certain cases advance, properties, projects and facilities which may not be economic at any point in time in anticipation of possible future increases in the prices of uranium, vanadium, REEs and/or HMC, as the case may be. However, in those circumstances, there can be no assurance at any time that such prices will ever, or within a reasonable time period, increase to the levels required to advance those properties or, in the case of projects or facilities on standby, to resume exploration, extraction, recovery or processing activities at those projects or facilities. In the event of depressed commodity prices, we would continue to hold our standby properties, projects and facilities because we believe that prices are likely to rise, to such levels within a reasonable time period to justify future production. This ability to maintain
37
scalability as commodity prices increase is a key component of our business strategy. However, as there is a cost associated with holding and, in some cases, maintaining such properties, projects and facilities on standby during periods of depressed commodity prices, in those circumstances we continuously evaluate, on a case-by-case basis, such costs against the prospects for price increases, and may from time to time sell, drop or reclaim any such properties, projects or facilities.
Mining on properties having no known Mineral Resources or Mineral Reserves is inherently speculative and may not prove to be economic at any point in time or at all.
Mining is an inherently speculative business. Some of the properties on which we have the right to mine are not known to have any Mineral Reserves or Mineral Resources. There is a possibility that we will not discover uranium, vanadium, REEs and/or HMS, or potentially copper, on any or all of our properties which can be mined or extracted at a profit at any point in time or at all. Even if we do discover and mine such minerals, the deposits may not be of the quality or size necessary for us or a potential purchaser of the property to make a profit from mining it. Few properties that are explored are ultimately developed into producing mines, and mines that are developed may not be profitable. Unusual or unexpected geological formations, geological formation pressures, fires, power outages, labor disruptions, flooding, explosions, cave-ins, landslides and the inability to obtain suitable or adequate machinery, equipment or labor, as well as all necessary licenses and permits, are just some of the many risks involved in mineral exploration programs and their subsequent development. However, we may elect, now or in the future, to proceed with the extraction of minerals on one or more of those projects without having completed the technical work required to declare a Mineral Reserve. If we are then unable to extract uranium, vanadium, REEs and/or HMC, or potentially copper, in commercially viable quantities, the capital investment of mining such properties may be lost and could materially impact our business.
Exploration, development, extraction, mining, recovery and milling of minerals, and the transportation and handling of the products recovered, are subject to extensive international, federal, state and local laws and regulations.
These regulations govern, among other things: acquisition of the property or mineral interests; maintenance of claims; tenure; expropriation; prospecting; exploration; development; construction; extraction and mining; recovery, processing, milling and production; price controls; exports and imports; taxes and royalties; labor standards; occupational health; waste disposal; toxic substances; water use; land use; American Indian or other foreign indigenous peoples consultations and accommodations; environmental protection and remediation; endangered and protected species; mine, mill and other facility decommissioning and reclamation; mine safety; transportation safety and emergency response; and other matters. Compliance with such laws and regulations has increased the costs of exploring, drilling, developing, constructing, operating and closing of our mines, mills, plants and other extraction, recovery and processing facilities. It is possible that, in the future, the costs, delays and other effects associated with such laws and regulations may impact our decision as to whether to operate existing mines or facilities, or, with respect to exploration, development or construction properties, whether to proceed with exploration, development or construction. It is also possible that such laws and regulations may result in our incurring significant costs to remediate or decommission properties if it is determined they do not comply with applicable environmental standards at such time. We expend significant financial and managerial resources to comply with applicable laws and regulations. We anticipate continuing to do so as the historic trend toward stricter government regulation may continue. However, there can be no assurance that future changes in applicable laws and regulations or attitudes and interpretations relating thereto, will not adversely affect our activities, operations or financial condition. New laws and regulations, amendments to existing laws and regulations or changes in attitudes and interpretations resulting in more stringent implementation of existing laws and regulations, including through stricter license and permit conditions or changes in enforcement attitudes and interpretations, could have a material adverse impact on us, increase costs, cause a reduction in levels of, or suspension of, extraction or recovery and/or delay or prevent the construction or development of new mineral extraction properties.
Mineral extraction is subject to potential risks and liabilities associated with impacts to the environment and the disposal of waste products occurring as a result of mineral exploration, extraction, mining, milling, recovery and production. Environmental liability may result from mining or mineral extraction activities conducted by others prior to our ownership of a property. Failure to comply with applicable laws, regulations and permitting requirements may result in enforcement actions. These actions may result in orders issued by regulatory or judicial authorities causing activities or operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment or remedial actions. Companies engaged in uranium, monazite or other exploration operations may be required to compensate others who suffer loss or damage by reason of such activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations. Should we be unable to fully fund the cost of remedying an environmental problem, the Company might be required to suspend activities or operations, declare bankruptcy or enter into interim compliance measures pending completion of the required remedy, which could have a material adverse effect on the Company. To the extent that we are subject to uninsured environmental liabilities, the payment of such liabilities would reduce otherwise available earnings and could have a material adverse effect on us. In addition, we do not have coverage for environmental losses generally or for
38
certain other risks as such coverage cannot be purchased at a commercially reasonable cost. Compliance with applicable environmental laws and regulations requires significant expenditures and increases mine and facility, construction, development and operating costs.
While the very heart of our business – uranium production, which is the fuel for carbon-free, emission-free baseload nuclear power – and our recycling programs, help address global climate change and reduce air pollution, the world’s focus on addressing climate change will require the Company to continue to conduct all its operations in a manner that minimizes the use of resources, including the unnecessary use of energy resources, in order to continue to minimize air emissions at our facilities, which can also increase mine and facility, construction, development and operating costs. Regulatory and environmental standards may also change over time to address global climate change, which could further increase these costs.
There is a risk that current and future government administrations will not support mining, uranium mining, nuclear energy or other aspects of our business and may limit, restrict or prevent the use of public lands for mining and other activities.
Worldwide demand for uranium is directly tied to the demand for electricity produced by the nuclear power industry, which is also subject to extensive government regulation and policies. The development of mineral properties and related facilities is contingent upon governmental approvals that are complex and time consuming to obtain and that, depending upon the location of the project, involve multiple governmental agencies. The duration and success of such approvals are subject to many variables outside of our control. Any significant delays in obtaining or renewing permits or licenses in the future could have a material adverse effect on us. In addition, the international marketing of uranium is subject to governmental policies and certain trade restrictions, such as those imposed by the suspension agreement between the U.S. and Russia. Changes in these policies and restrictions may adversely impact our business.
Public acceptance of nuclear energy and competition from other energy sources is unknown.
Growth of the uranium and nuclear industry will depend upon continued and increased acceptance of nuclear technology as an economic means of generating electricity. Because of unique political, technological and environmental factors that affect the nuclear industry, including the risk of a nuclear incident and fears of nuclear incidents in the event of terrorism, wars, insurrections or natural disasters, the industry is subject to public opinion risks that could have an adverse impact on the demand for nuclear power and increase the regulation of the nuclear power industry. Nuclear energy competes with other sources of energy, including oil, natural gas, coal, hydroelectricity and renewable energy sources. These other energy sources are to some extent interchangeable with nuclear energy, particularly over the longer term. Sustained lower prices of oil, natural gas, coal and hydroelectricity may result in lower demand for uranium concentrates. Increased government regulation and technical requirements may make nuclear energy uneconomic, resulting in lower demand for uranium concentrates. Technical advancements and government subsidies in renewable and other alternate forms of energy, such as wind and solar power, could make these forms of energy more commercially viable and put additional pressure on the demand for uranium concentrates.
Unfavorable media coverage of mining or nuclear energy could negatively affect our business.
The Company is subject to media coverage relating to mining and the production of uranium and other forms of nuclear energy, as well as the production of RE Carbonate, separated REE oxides, HMC and the extraction and concentration of radioisotopes for use in TAT medical treatments, some of which can be inaccurate, non-objective or politically motivated. As a result, the Company is frequently required to address or respond to such media coverage, which can be costly and time-consuming for the Company. Such inaccurate and non-objective media coverage can also negatively impact public perception of the Company’s activities, the market for the Company’s securities, government relations, permitting activities and legal challenges.
Potential impacts of public perceptions on our commercial relations.
Given the controversial nature of the mining and nuclear industries, the Company is subject to the risk that suppliers, customers, co-venturers or other business relations may be discouraged from or decline to continue commercial relations with or enter into new commercial relations or arrangements with the Company due to fear of reprisals from the media, public or special interest groups based on public perceptions of the nature of the Company’s business or the nature or location of its assets, particularly driven by the ability of the media, public and special interest groups to influence public perceptions through the media, social media and the internet.
The uranium and REE industries are highly competitive.
The international uranium industry, including the supply of uranium concentrates, is highly competitive. Our uranium business is in direct competition with: a relatively small number of publicly traded or privately funded uranium mining companies;
39
nationally subsidized uranium companies; uranium produced as a byproduct of other mining operations; excess inventories, including inventories made available from decommissioning of nuclear weapons; reprocessed uranium and plutonium; used reactor fuel; and the use of excess Russian enrichment capacity to re-enrich depleted uranium tails. A large quantity of current world production is foreign state-subsidized and appears to be relatively inelastic in that uranium market prices appear to have little effect on the quantity supplied. In the case of foreign state-subsidized production, uranium production may not be fully subject to market factors and may be sold at prices that may be less, or even significantly less, than the costs of production. The supply of uranium from Russia is to some extent (and increasingly) impeded by a number of international trade agreements and policies. These agreements and any similar future agreements, governmental policies or trade restrictions are beyond our control and may affect the supply of uranium available in North America, Europe and Australia/New Zealand.
We compete with other mining companies and individuals for capital, Mineral Resources and Mineral Reserves and other mining assets, which may increase the cost of acquiring suitable claims, properties and assets. We also compete with other mining companies to attract and retain key executives, employees and consultants. In addition, there are relatively few bona fide and legitimate customers for uranium. There can be no assurance that we will continue to be able to compete successfully with our competitors in acquiring such properties and assets or in attracting and retaining skilled and experienced employees.
The REE industry is competitive, particularly to the extent it is dominated by China, which produces nearly 90% of refined REE products according to the International Energy Agency. Many Chinese companies are state-supported or subsidized, and Chinese companies bid aggressively to acquire monazite to feed this production. The Company competes with Chinese companies, and companies from other countries that are in or trying to break into the REE market, for sources of monazite, and will be expected to compete with Chinese companies and companies from other countries as they develop production capacity at the RE Carbonate crack and leach, REE separation, REE metal and alloy making, REE magnet making, and REE product marketing and sales stages of the REE supply chain, as well as for the acquisition of monazite and other mineral properties, for mining and exploration on such properties, and for the procurement of equipment, materials and personnel necessary to explore, develop and extract monazite from such properties. There is competition for a limited number of monazite acquisition opportunities, including competition with other companies having substantially greater financial resources, staff and facilities than the Company. As a result, the Company may encounter challenges in acquiring attractive properties and exploring and advancing properties currently in the Company’s portfolio. The Company believes that competition for acquiring monazite prospects, production of REE products and completing REE product sales will continue to be intense in the future.
Mining operations involve a high degree of risk.
The exploration, construction, development, operation and other activities associated with mineral projects, along with the expansion of existing recovery operations and mining activities and restarting of projects, involve significant risks, including financial, technical and regulatory risks. The development or advancement of any of the exploration properties in which we have an interest is contingent upon obtaining satisfactory exploration results, project permitting and licensing and financing. The exploration, construction, development, operation and other activities associated with mineral projects involves significant financial risks over an extended period of time, which even a combination of careful evaluation, experience and knowledge may not eliminate. While discovery of a mine or other facility may result in substantial value, few properties that are staked and explored are ultimately developed into producing mines or extraction or recovery facilities. Major expenses may be required to establish Mineral Resources and Mineral Reserves by drilling and to finance, permit, license and construct extraction, mining, recovery and processing facilities. It is impossible to ensure that the current or proposed exploration, permitting, construction and development programs on our mineral properties will result in profitable commercial extraction, mining or recovery operations.
Whether a mineral deposit will be commercially viable depends on a number of factors, which include, among other things: the accuracy of Mineral Resource and Mineral Reserve estimates; the particular attributes of the deposit, such as its size, geology, grade and accessibility; the ability to economically recover commercial quantities of the minerals; proximity to necessary infrastructure and availability of personnel; financing costs; governmental regulations, including regulations relating to prices, taxes, reclamation bonds and royalties; the potential for litigation; land use; importing and exporting; and environmental and cultural protection, including but not limited to the governmental establishment of mineral withdrawals, parks and monuments and land exchanges. The construction, development, expansion and restarting of projects are also subject to: the successful completion of engineering studies with adequate results to proceed; the issuance of necessary governmental licenses and permits; the availability of adequate financing; engineering and construction timetables and capital costs being correctly estimated for our projects, including restarting projects on standby; and such construction timetables and capital costs not being affected by unforeseen circumstances, including but not limited to delays due to litigation/injunctions. The effect of these factors cannot be accurately predicted, but the combination of these factors, along with others, may result in our not receiving an adequate return on invested capital.
40
It is possible that actual costs and economic returns of current and new extraction, mining, or recovery operations may differ materially from our best estimates. It is not unusual in the mining industry for new mining operations and facilities to experience unexpected problems during the start-up phase, to take much longer than originally anticipated to bring them into a recovery or producing phase, to require more capital than anticipated, to operate at a higher cost than expected and/or to have reclamation liabilities that are higher than expected.
There can be no assurance that, as the Company mines its properties or disposes of properties, the reduction of existing Mineral Resources and/or Mineral Reserves through depletion or sales will be replaced with new resources of comparable value.
There is uncertainty in the estimation of Mineral Reserves and Mineral Resources.
Only two of our properties – the Sheep Mountain and Pinyon Plain mines – contain Mineral Reserves as defined under S-K 1300 and NI 43-101. See “Item II, Cautionary Note to Investors Concerning Disclosure of Mineral Reserve and Mineral Resource Estimates.”
Mineral Reserves and Mineral Resources are statistical estimates of mineral content pursuant to S-K 1300 and NI 43-101 based on limited information acquired, in large part, through drilling and other sampling techniques and require judgmental interpretations of geology. Successful extraction requires safe and efficient mining and processing. Our Mineral Reserves and Mineral Resources are estimates, and no assurance can be given that the estimated Mineral Reserves and Mineral Resources are accurate or that the indicated levels of uranium, vanadium, REEs or HMC will be produced economically or otherwise. Actual mineralization or formations may be different than predicted. Further, it may be many years from the initial phase of drilling before production is possible and, during that time, the economic feasibility of exploiting a discovery may change.
Mineral Reserve and Mineral Resource estimates for properties that have not commenced extraction, production or recovery are based, in many instances, on limited and widely spaced drill-hole information, which is not necessarily indicative of the conditions between and around drill holes. Accordingly, such Mineral Resource and Mineral Reserve estimates may require revision as more drilling information becomes available, as actual extraction, production or recovery experience is gained, and as methods and technologies develop further. It should not be assumed that all or any part of our Mineral Resources constitute, or will be converted into, Mineral Reserves. Market price fluctuations of uranium, vanadium, REEs or HMC as applicable, as well as increased production and capital costs and/or reduced recovery rates, may render our proven and probable Mineral Reserves unprofitable to develop at a particular site or sites for periods of time or may render Mineral Reserves containing relatively lower grade mineralization uneconomic.
Opposition to mining may disrupt our business activities.
In recent years, governmental agencies, non-governmental organizations, individuals, communities and courts have become more vocal and active with respect to their opposition to certain mining and business activities, including with respect to production and uranium recovery at our facilities, such as the Mill and the Pinyon Plain Project. This opposition may take on forms such as road blockades, vandalism, threats and/or slander, applications for injunctions seeking to cease certain construction, development, extraction, mining and/or milling or recovery activities, refusals to grant access to lands or to sell lands on commercially viable terms, lawsuits for damages or to revoke or modify licenses and permits, issuances of unfavorable laws and regulations, changes in regulatory attitudes and interpretations and other rulings contrary to or otherwise harming our interests. These actions can occur in response to current activities or in respect of mines or facilities that are decades old. In addition, these actions can occur in response to our activities or the activities of other unrelated entities. Opposition to our activities may also result from general opposition to nuclear energy and mining. Opposition to our business activities are beyond our control. Any opposition to our business activities may cause a disruption to our business activities and may result in increased costs and delays, which could have a material adverse effect on our business and financial condition.
We are subject to technical innovation and obsolescence.
Requirements for our products and services may be affected by: technological changes in nuclear reactors, enrichment and used uranium fuel reprocessing; facilities and processes for REE and radioisotope recovery; and substitutes for REEs, HMC and the radioisotopes the Company may potentially be producing. These technological changes could reduce the demand for our products and services and/or increase the supply of competitive products and services. The cost competitiveness of our operations may be impacted through the development and commercialization of other mining, milling, processing and other technologies. As a result, our competitors may adopt technological advancements that give them an advantage over the Company or that reduce the demand for the Company’s products and services or make them obsolete.
41
Mining, extraction, recovery, processing, construction, development and exploration activities depend, to a substantial degree, on adequate infrastructure.
Reliable roads, bridges, power sources and water supply are important determinants affecting capital and operating costs. We consider the existing infrastructure to be adequate to support our proposed operations and activities. However, unusual or infrequent weather phenomena, including drought, flooding, sabotage, government and/or other interference in the maintenance or provision of such infrastructure could adversely affect our operations and activities, financial condition and results of operations.
Mining, mineral extraction, recovery and milling are subject to a high degree of risk, and we are not insured to cover against all potential risks.
Our operations and activities are subject to all the hazards and risks normally incidental to exploration, construction, development, extraction and mining of mineral properties, and recovery, processing and milling, including: environmental hazards; industrial accidents; labor disputes, disturbances and unavailability of skilled labor; encountering unusual or unexpected geologic formations; rock bursts, pressures, cave-ins and flooding; periodic interruptions due to inclement or hazardous weather conditions; technological and processing problems, including unanticipated metallurgical difficulties, ground control problems, process upsets and equipment malfunctions; the availability and/or fluctuations in the costs of raw materials and consumables used in our production and recovery processes; the ability to procure mining and other equipment and operating and other supplies in sufficient quantities and on a timely basis; and other extraction, mining, recovery, milling and processing risks, as well as risks associated with our dependence on third parties in the provision of transportation and other critical services. Many of the foregoing risks and hazards could result in damage to, or destruction of, our mineral properties or processing or recovery facilities, personal injury or death, environmental damage, delays in or interruption of or cessation of extraction, mining, production and recovery from our mines or processing facilities or in our exploration, construction or development activities, delay in or inability to receive regulatory approvals to transport our uranium, vanadium, REE or HMC concentrates, and costs, monetary losses and potential legal liability and adverse governmental action. In addition, due to the radioactive nature of the materials handled in uranium extraction, mining, recovery, processing and transportation (both trucking and shipping), additional costs and risks are incurred by us on a regular and ongoing basis.
While we may obtain insurance against certain risks in such amounts as we consider adequate, the nature of these risks are such that liabilities could exceed policy limits or could be excluded from coverage. There are also risks against which we cannot insure or against which we may elect not to insure. The potential costs that could be associated with any liabilities not covered by insurance or in excess of insurance coverage or compliance with applicable laws and regulations may cause substantial delays and require significant capital outlays, adversely affecting our future earnings, financial position and competitive position. No assurance can be given that such insurance will continue to be available or will be available at economically feasible premiums or that it will provide sufficient coverage for losses related to these or other risks and hazards. This lack of insurance coverage could result in material economic harm to us.
Risks associated with our REE business.
There are a number of risks inherent to our REE activities, which include the following:
•The risk of achieving and maintaining an adequate supply of monazite sands for processing at the Mill. Although the Company has acquired the Bahia Project, it is currently an exploration and development project and is not an operating mine at this time. As a result, the Company does not currently own its own operating monazite-bearing mine(s) and is completely dependent on contractual arrangements for its REE feed sources at this time. There can be no guarantee that the Company will be able to secure adequate monazite supply over the long-term at suitable prices or that the Bahia Project will be developed into an operating monazite-producing mine. In addition, the price the Company may be required to pay for monazite sands is subject not only to commercial factors but also to the risk of influence by foreign policy and/or foreign state-owned enterprises. We will evaluate potential acquisitions of additional mines or resource properties and joint ventures with mine or resource property owners, but there can be no guarantee that any such acquisitions or joint ventures can be realized on acceptable terms. Further, to the extent the Company is required to purchase monazite ore sources and rely on REE separation facilities located outside the U.S., we may be at a transportation cost disadvantage compared to processing facilities in China or elsewhere that may be closer to potential ore sources and/or REE separation facilities;
•The risk of being able to contract to sell the Mill’s REE product at satisfactory prices. The Company has entered into one sales contract with an REE separation facility and intends to secure potential sales contracts with other REE separation facilities for the sale of the RE Carbonate produced at the Mill and with NdPr and other REE oxide users for any separated NdPr and other REE oxides produced by the Company, but there can be no guarantee that any such
42
contracts will be entered into on satisfactory terms, or at all, or extended, in the future. If the Company is not able to secure adequate contracts for the sale of its RE Carbonate, REE oxides or other REE products, we may be required to hold our RE Carbonate, REE oxides and other REE products in inventory until they can be sold at reasonable prices, which would require the commitment of the Company’s cash resources while the REE product is being held in inventory. We would also bear the risk that the REE product may not be able to be sold at reasonable prices in the future, either due to a lack of a market for the purchase of our RE Carbonate, REE oxides or other REE products and/or a reduction in REE commodity prices and, hence, we bear the risk of a reduction in the value of our RE Carbonate, REE oxides or other REE products. We anticipate that the U.S. government may take steps to support the development of a U.S. supply chain for REEs through price support or other mechanisms, but there can be no guarantee that any such support will be given, or if given, would benefit the Company;
•The risk of process failures in the production of RE Carbonates or separated REE oxides, such as the Company’s ability to continue producing RE Carbonate and to potentially produce separated REE oxides at commercial specifications and on a commercial scale at acceptable costs, which could prevent future commercial production of RE Carbonate and/or separated REE oxides at the Mill cost-competitively or at all;
•The risk that we may not be able to increase our sources of natural monazite sands or other ores in amounts sufficient to sustain cost-competitive production of RE Carbonate, REE oxides or other REE products at the Mill or elsewhere;
•The inability of the Company to successfully or cost-competitively process other types of REEs and uranium-bearing ores and materials at the Mill, such as those produced from coal-based resources or Alternate Feed Materials;
•The inability of the Company to successfully enhance and modify existing Mill facilities to commission or otherwise construct and operate its planned REE separation circuits at the Mill or elsewhere, and potentially other downstream REE activities, including metal-making and alloying, in the future at the Mill or elsewhere, at acceptable costs or at all;
•The risk of: permit and license challenges, the failure to obtain or retain any needed permit or license amendments, or changes in regulatory attitudes or interpretations. The Mill can produce RE Carbonate, along with uranium, from natural uranium- and REE-bearing monazite sand ores, but additional permitting or licensing may be required to permit certain of the Company’s planned REE separation circuits and facilities and potential REE metal and metal alloy facilities at the Mill or elsewhere. The existing licensing regime and any new or existing permits or licenses or amendments that may be required are subject to challenge, which could delay or prevent existing production or any new construction, as well as any separation and other activities;
•The current shortage of supply of REEs and the resulting prices for REEs, and the fear that supplies of REEs may not be forthcoming on a timely basis to meet new demands for REEs, such as for permanent magnets for EVs, may encourage end-users to substitute away from REEs to advance and use other technologies to meet consumer demands for end products, which could result in a significant reduction in demand for and prices of REEs. Sustained reductions in the price of REEs would impact the Company’s returns from its REE initiatives and could render them infeasible;
•The risk that further exploration, permitting and development work on the Bahia Project may result in a determination by the Company that developing a mine on the property is not feasible;
•The risks associated with HMC production at the Company’s Bahia Project or any other HMS project acquired by the Company in the future, and the risks associated with HMC pricing could impact the profitability of mining the Company’s Bahia Project or any such other HMS projects, which could impact the supply of monazite available to the Company from such projects;
•The risk of conducting exploration and mining activities in Brazil, including: the need to rely on English/Portuguese translations provided by third parties; variations in laws, labor practices, and social norms that could impact the Company’s ability to conduct business in a timely and effective manner; and delays caused by cross-border logistics, such as import and export processes; and
•Increases in the supply of REEs through the addition of new mines and/or REE processing facilities could increase the global supply of REEs and reduce the price of REEs and REE products. Sustained reductions in the price of REEs would impact the Company’s returns from its REE initiatives and could render them unfeasible.
Risks Associated with our TAT Radioisotope Initiatives.
There are a number of risks related to our potential recovery of radioisotopes at the Mill for use in the development and production of emerging TAT cancer treatments, including:
•The risk that the potential recovery of such radioisotopes at the Mill may not be technically feasible or that the radioisotopes may not meet commercial specifications;
•The risk that such radioisotopes may not be economically feasible to produce or may not be able to be sold on a commercial basis at a sufficient price and quantity;
•The risk that the Company is not able to enter into commercial commitments for the sale of offtake of radioisotopes that are adequate to justify the capital and other expenditures required to produce the radioisotopes;
43
•The risk that the Company may not be able to secure the reagents, materials, supplies and other components necessary for recovery of the radioisotopes on reasonable commercial terms or in adequate quantities;
•The risk that all required licenses, permits and regulatory approvals may not be obtained on a timely basis or at all;
•The risk that the medical isotopes derived from such radioisotopes produced at the Mill may not prove their efficacy at clinical trials and may not obtain all required approvals for commercial use;
•The development of competing cancer treatment therapeutics that could render the TAT therapeutics less attractive or obsolete;
•The current shortage of supply of such radioisotopes and the resulting prices for such radioisotopes, and the fear that supplies of the radioisotopes may not be forthcoming on a timely basis to meet new demands for cancer therapies, may encourage pharmaceutical companies to advance and use other technologies to meet consumer demands for end products, which could result in a significant reduction in demand for and prices of the radioisotopes the Mill is capable of producing. Sustained reductions in the price of such radioisotopes would impact the Company’s returns from its TAT initiatives and could render them infeasible; and
•Increases in the supply of such radioisotopes through the addition of radioisotope processing facilities, including the permitting and retrofitting of other uranium mills for the recovery of radioisotopes, or through the sales of radioisotopes by various U.S. or foreign governments from government production or existing government stockpiles, could increase the global supply of such radioisotopes and reduce the price of the radioisotopes. Sustained reductions in the price of such radioisotopes would impact the Company’s returns from its TAT radioisotope initiatives and could render them unfeasible.
Risks Relating to our Regulatory Environment
Our business is subject to extensive environmental regulations that may make exploring, mining or related activities expensive, and which may change at any time.
We are required to comply with environmental protection laws and regulations and permitting requirements promulgated by federal agencies and various states, provinces, counties and local governments in the countries in which we operate and conduct our activities in connection with extraction, mining, recovery and milling operations. The uranium industry is subject not only to the worker health and safety and environmental risks associated with all mining activities, but also to additional risks uniquely associated with uranium extraction, mining, recovery and milling. We expend significant resources, both financial and managerial, to comply with these laws and regulations. The possibility of more stringent regulations exists in the areas of worker health and safety, storage of hazardous materials, standards for heavy equipment used in extraction, mining, recovery or milling, the disposition of wastes, the decommissioning and reclamation of exploration, extraction, mining, recovery, milling and in-situ sites, climate change and other environmental matters, each of which could have a material adverse effect on the cost or the viability of a particular project.
We cannot predict what environmental legislation, regulations or policies will be enacted or adopted in the future or how future laws and regulations will be administered or interpreted in the countries we operate. The recent trend in environmental legislation and regulation is generally toward stricter standards, and this trend is likely to continue in the future. This recent trend includes, without limitation, laws and regulations relating to air and water quality, mine and other facility reclamation, waste handling and disposal, the protection of certain species and the preservation of certain lands and cultural resources. These regulations may require the acquisition of permits or other authorizations for certain activities. These laws and regulations may also limit or prohibit activities on certain lands. Compliance with more stringent laws and regulations, changes in regulatory attitudes and approaches, as well as potentially more vigorous enforcement policies, stricter interpretation of existing laws and stricter permit and license conditions may necessitate significant capital outlays, may materially affect our results of operations and business or may cause material changes or delays in our intended activities. There can be no assurance of our continued compliance or ability to meet stricter environmental laws and regulations and permit or license conditions or changes in attitudes or interpretations relating thereto. Delays in obtaining permits and licenses could impact expected production levels or increases in expected uranium, vanadium, REE and/or HMC extraction levels.
Our operations may require additional analyses in the future, including environmental, cultural, and social impact and other related studies. Certain activities require the submission and approval of environmental assessments or the more comprehensive environmental impact statements, and the like. We cannot provide assurance that we will be able to obtain or maintain all necessary permits that may be required to continue operations or exploration and development of our properties or, if feasible, to commence construction, development, operation or other activities relating to mining facilities at such properties on terms that enable operations or activities to be conducted at economically justifiable costs. If we are unable to obtain or maintain licenses, permits or other rights for construction, development and operation of our properties, or otherwise fail to manage adequately future environmental issues, our uranium, vanadium, REE and/or HMC recovery operations and mining activities could be materially and adversely affected.
44
Further, our business is subject to risks associated with increased regulatory requirements or changes in attitudes or interpretations relating thereto applicable to our operations in response to pressure from special interest groups or otherwise.
Changes in regulatory requirements or changes in attitudes or interpretations relating to existing regulatory requirements could have a material adverse effect on our operations and financial condition.
Our operations on U.S. federal lands may be impacted by mineral withdrawals or the designation of national monuments by the U.S. President or government, either of which could have significant impacts on the Company and our operations, as well as by other factors.
Mining claims on U.S. federal lands are subject to mineral withdrawals by the federal government or the designation of national monuments by the President of the U.S. under the Antiquities Act. In both cases, the withdrawal or the designation of a national monument withdraws the area from location and entry under the Mining Law, subject to valid existing rights. What this means is that no new mining claims may be filed on the withdrawn or designated lands and no new plans of operations may be approved, other than plans of operations on mining claims that were valid at the time of withdrawal or designation and that remain valid at the time of plan approval. Whether or not a mining claim is valid must be determined by a mineral examination conducted by BLM or USFS, as applicable. The mineral examination, which involves an economic evaluation of a project, must demonstrate the existence of a locatable mineral resource and that the mineral resource constitutes discovery of a valuable mineral deposit. We believe that all our material Arizona Strip projects are on valid mining claims that would withstand a mineral examination. Mineral claims that are in the exploration stage and upon which economic deposits have not yet been delineated are generally prevented from proceeding to the plan of operations stage during the withdrawal period or indefinitely in the case of the designation of a national monument. See the discussions under “Part I, Item 1. Description of Business - U.S. Land Tenure,” above, for a discussion on the recent Grand Canyon withdrawal and designation of the Ancestral Footprints of the Grand Canyon National Monument in Arizona and the Bears Ears National Monument in Utah, none of which are believed to have significant impacts on the Company at this time, but which have the potential to significantly impact the Company in the future.
In addition to the Grand Canyon withdrawal and the Ancestral Footprints of the Grand Canyon National Monument and Bears Ears National Monument, there are currently other designated or proposed withdrawals of federal lands for the purposes of mineral location and development and proposed designations of national monuments. While such proposals are not yet final and would require further federal action, if they were to occur, it is uncertain whether any such withdrawals or designations would affect in any manner our current mineral projects.
Any future withdrawal of mineral lands from location and entry or future designation of additional national monuments has the potential to prevent further development on exploration stage claims held by the Company in the affected area as well as the potential for the Company to lose the ability to continue to develop mining operations on other claims in the affected area if a mineral examination indicates the deposit is uneconomical and that the claim is not valid, either of which could have significant impacts on the Company.
The risks of exchanges of state-owned lands in mineral withdrawal areas or national monuments for federal lands outside the withdrawal area or national monument but that are within the boundaries of and affect any of our properties, or similar actions, could adversely impact our affected properties or our ability to operate our affected properties.
Possible amendments to the General Mining Law or other laws could make it more difficult or impossible for us to execute our business plan.
Members of the U.S. Congress have repeatedly introduced bills which would supplant or alter the provisions of the U.S. Mining Law, as amended. Such bills have proposed, among other things, to (i) either eliminate or greatly limit the right to a mineral patent; (ii) significantly alter the laws and regulations relating to uranium mineral development and recovery from unpatented and patented mining claims; (iii) impose a federal royalty on production from unpatented mining claims; (iv) impose time limits on the effectiveness of plans of operation that may not coincide with mine or facility life; (v) impose more stringent environmental compliance and reclamation requirements on activities on unpatented mining claims; (vi) establish a mechanism that would allow states, localities and American Indian tribes to petition for the withdrawal of identified tracts of federal land from the operation of the U.S. general mining laws; and (vii) allow for administrative determinations that mining or similar activities would not be allowed in situations where undue degradation of the federal lands in question could not be prevented. If enacted, such legislation could change the cost of holding unpatented mining claims and could significantly impact our ability to develop locatable mineral resources on our patented and unpatented mining claims. Although it is impossible to predict at this point what any legislated royalties might be, enactment could adversely affect the potential for construction and
45
development and the economics of existing operating mines and facilities. Passage of such legislation could adversely affect our financial performance.
The EPA has in recent years announced an intention to propose new rules that, if promulgated, could result in increases in mine surety arrangements to cover currently non-existing and unidentified potential future environmental costs, which could severely impact or render infeasible many existing or prospective mining operations. EPA dropped this proposal after considering comments received during the public participation process. Nevertheless, there is a risk that similar regulations could be proposed in the future, which could have significant impacts on the Company and the mining industry as a whole.
The SEC’s disclosure requirements for Mineral Reserves and Mineral Resources, as codified in Subpart 1300 of Regulation S-K 1300, create ambiguity for issuers required to comply with both the requirements of S-K 1300 and NI 43-101, and may result in increased compliance costs for the Company.
S-K 1300, as promulgated by the SEC and effective starting in 2021, requires that the Company disclose specific information related to its material mining operations, including its Mineral Resources and Mineral Reserves. While S-K 1300 is substantively the same as NI 43-101, it is relatively new compared to NI 43-101 and, thus, remains subject to unknown interpretations that could require the Company to incur substantial costs associated with compliance. Where substantive disclosure in one regulatory scheme is more restrictive/stringent than in the other, the Company opted to take the more restrictive/stringent approach in its technical reports. NI 43-101 has a prescribed format, whereas S-K 1300 does not; as such, the Company’s technical reports follow the formatting requirements of NI 43-101. Any further revisions to, or interpretations of, S-K 1300 or NI 43-101 could result in the Company incurring unforeseen costs associated with compliance, both in the U.S. and in Canada.
We are a “large accelerated filer” and are subject to a fully integrated audit pursuant to the Sarbanes-Oxley Act.
The Company is a “large accelerated filer,” meaning that, as of December 31, 2023 (and for the first time as of December 31, 2021): (i) we had a public float of $700 million or more as of the most recently completed second fiscal quarter; (ii) we had been subject to the requirements of the Exchange Act Section 13(a) or 15(d) for a period of at least 12 calendar months; (iii) we filed at least one annual report pursuant to the Exchange Act Section 13(a) or 15(d), and (iv) we were not eligible to use the requirements for “smaller reporting companies” under the applicable revenue test.
As such, we are subject to a fully integrated audit pursuant to Section 404(b) of the Sarbanes-Oxley Act of 2002, as amended (“SOX”), in order to assess, as of the most recent fiscal year-end, the effectiveness of the Company’s internal control structure and procedures for financial reporting, as reported in an audit report of our independent public accounting firm. As a result, there are risks that one or more significant deficiencies or material weaknesses may be identified in the Company’s internal controls and procedures requiring remediation.
Our future business and results of operations face uncertainties as a result of any action or inaction of the U.S. Government pursuant to its U.S. Uranium Reserve Program.
On December 27, 2020, the COVID-Relief and Omnibus Spending Bill, which included $75 million for the proposed establishment of a strategic U.S. uranium reserve, was signed into law. While the now established U.S. Uranium Reserve Program has made a number of appropriations, with the Company having sold some of its uranium inventory into the U.S. Uranium Reserve Program in 2023, there remains a risk that, if any future required appropriations passed by the U.S. Congress are deferred, or if they are implemented in a way that does not provide the required support for the Company’s activities, and uranium and vanadium markets do not support production activities and/or the Company’s REE and TAT initiatives are not adequate to otherwise sustain the Company’s other business activities, we may reduce our operational activities, including potentially monetizing certain non-core assets as required in order to minimize our cash expenditures while preserving our core asset base for increased production in the future as market conditions may warrant.
Participation in Industry Trade Petition and related activities could have negative repercussions.
The Company has previously participated in industry trade petitions, including in particular the filing of an industry trade petition under Section 232 of the Trade Expansion Act of 1962 (as amended) From Imports of Uranium Products that Threaten U.S. National Security with the U.S. Department of Commerce (“DOC”), and may choose to participate in similar undertakings now or in the future as it deems necessary and appropriate.
Although the Company believes the bipartisan appropriation was a significant accomplishment that has directly benefited Energy Fuels through the U.S. Uranium Reserve Program's first round of contract awards and that will ultimately strengthen the
46
U.S. uranium mining industry, bolster national defense, and improve supply diversification for U.S. utilities and their customers, there is a risk that future contract awards, if any, may be given in a way that does not benefit the Company. There is also the potential for negative responses or repercussions to Energy Fuels' receipt of any such U.S. Uranium Reserve Program contract awards from various special interest groups, government entities, consumers of uranium and participants in other phases of the nuclear fuel cycle, both domestically and abroad, which could have a negative impact on the Company and its operations. In addition, the costs of pursuing such actions have been and could continue to be significant.
Participation in the renewal of the Russian Suspension Agreement and related activities could have negative repercussions.
In October 2020, the DOC and the State Atomic Energy Corporation Rosatom, acting on behalf of the Government of the Russian Federation, together signed an amendment (the “Russian Amendment”) to the “Agreement Suspending the Antidumping Investigation on Uranium from the Russian Federation” (the “Russian Agreement”), thereby extending limitations on the import of Russian low-enriched uranium into the U.S. for use as fuel for nuclear reactors until the year 2040 and tightening restrictions in order to close loopholes identified in the original Russian Agreement. The Company participated with the DOC in its efforts to secure the Russian Amendment as an advocate for domestic uranium producers, which has the potential for negative responses or repercussions to these activities from various special interest groups, government entities, consumers of uranium and participants in other phases of the nuclear fuel cycle, both domestically and abroad, and could thereby negatively impact the Company and its operations.
The new or lasting impacts of the USMCA (formerly NAFTA) on the Company remain unclear, and any action by the President of the United States to withdraw from or materially modify certain other international trade agreements in the future could adversely affect our business, financial condition and results of operations, to the extent dependent on the jurisdiction of our incorporation.
Although our primary trading market is the NYSE American, a majority of our outstanding voting securities are held by U.S. residents, we are a U.S. domestic issuer for SEC reporting purposes, and substantially all of our assets, operations and employees are in the U.S., the Company is incorporated in Ontario, Canada. On September 30, 2018, trade representatives acting on behalf of the U.S., Mexico and Canada renegotiated the terms of the North American Free Trade Agreement (“NAFTA”) in what is known as the United States-Mexico-Canada Agreement (“USMCA”), which entered into force on July 1, 2020 after being approved by the U.S. Congress. At this time, the new or lasting impacts of the USMCA on the Company remain unclear. In addition, if the President of the United States takes action to withdraw from or materially modify certain other international trade agreements, and such actions depend on the jurisdiction of our incorporation, then our business, financial condition and results of operations could possibly be adversely affected, depending on the nature of the action.
Risks Related to Our Business
Some of our mineral properties may never be put into a state of production.
Depending on uranium, vanadium, REE and HMS prices, some of our mineral properties may never be put into a state of production. Two of our projects have Mineral Reserves as defined by S-K 1300 and NI 43-101 — the Sheep Mountain Project and the Pinyon Plain Project. Because the probability of an individual prospect ever having Mineral Reserves as defined by S-K 1300 and NI 43-101 is uncertain, our other properties may not contain any Mineral Reserves. Even if Mineral Reserves are identified, depending on commodity prices, we may not put a property into a state of production due to insufficient capital or other reasons. Any funds spent on exploration, construction, development, extraction and recovery on any properties that are not put into production may be lost. We do not know with certainty that economically recoverable uranium exists on all of our properties as defined by S-K 1300 and NI 43-101. Further, although we are undertaking uranium extraction activities at our Mill and are mining at several of our properties at current commodity prices, our lack of established Mineral Reserves on a number of our properties means that we are uncertain as to our ability to continue to generate revenue from our operations. We may never discover additional uranium in commercially exploitable quantities, and, depending on commodity prices, our identified deposits currently classified as Mineral Resources may never qualify as commercially mineable Mineral Reserves. We will continue to attempt to acquire the surface and mineral rights on lands that we think are geologically favorable or where we have historical information in our possession that indicates uranium mineralization might be present.
The exploration and, if warranted, construction relating to or development of mineral deposits involves significant financial and other risks over an extended period of time, which even a combination of careful evaluation, experience and knowledge may not eliminate. Few properties which are explored are ultimately developed into producing mines. Major expenditures are required to establish Mineral Reserves by drilling and to construct mining and processing facilities at a site. Our operations and activities are subject to the hazards and risks normally incident to exploration and production of uranium, precious and base metals, any of which could result in damage to life or property, environmental damage and possible legal liability for such
47
damage. While we may obtain insurance against certain risks, the nature of these risks is such that liabilities could exceed policy limits or could be excluded from coverage. There are also risks against which we cannot insure or against which we may elect not to insure. The potential costs which could be associated with any liabilities not covered by insurance, or in excess of insurance coverage, or compliance with applicable laws and regulations may cause substantial delays and require significant capital outlays, adversely affecting our future earnings and competitive position and, potentially, our financial viability.
The Mill has historically been run on a campaign basis as sufficient feed materials are available, and there can be no assurance that sufficient mill feed will be available in the future to sustain future campaigns.
The Mill has historically operated on a campaign basis, whereby mineral processing occurs as mill feed, cash needs, contract requirements and/or market conditions may warrant. Each milling campaign is subject to receipt of sufficient mill feed that would allow us to operate the Mill on a profitable basis and/or recover a portion of its standby costs.
Due to significantly improved uranium prices in 2023, three of the Company’s conventional mines were brought back into operation near the end of the year, with the remaining conventional properties remaining either on standby, in the evaluation and permitting phase, undertaking rehabilitation and preparedness work or inactive, and no third-party conventional properties are operating to provide mill feed. However, in times of depressed commodity prices when conventional mine production is entirely or significantly on standby, the Mill has relied primarily on processing Alternate Feed Materials and has also recycled tailings pond solutions for the recovery of uranium and vanadium. The Company continuously seeks to identify and secure additional Alternate Feed Materials and other sources of mill feed, such as materials from the cleanup of AUM sites. The Company is also continuing with its commercial production of RE Carbonate and is performing modifications and enhancements to the Mill’s circuits to allow for the separation of REE oxides. However, there can be no assurance that sufficient conventional ores, Alternate Feed Materials, suitable tailings pond solutions and/or other sources of mill feed will be available in the future, or that our planned increases to production of RE Carbonate and separated REE oxides will be successful, so as to allow us to operate the Mill on a profitable basis and/or recover a portion of the Mill’s standby costs at any time.
There can be no guarantee that we will be able to enter into additional new term sales contracts in the future for uranium, vanadium, REEs or HMC on suitable terms and conditions.
The Company secured three new long-term sales contracts with U.S. nuclear utilities in May 2022 and is continuing to strategically pursue additional uranium sales commitments with pricing expected to have both fixed and market-related components. The Company believes that recent price increases, volatility and focus on security of supply in light of Russia’s ongoing invasion of Ukraine have increased the potential for the Company to make uranium sales and procure additional term sales contracts with utilities at pricing that sustains production and covers corporate overhead. However, there can be no guarantee that the Company will be able to enter into additional long-term contracts for the delivery of significant amounts of uranium at satisfactory prices in the future. Fixed-price long-term contracts for vanadium are generally not available and the Company’s existing contract for the sale of RE Carbonate is at prices that vary with the prices of REEs. Thus, there can be no guarantee that the Company will be able to enter into long-term contracts for the delivery of significant amounts of vanadium or RE Carbonate or other REE products or HMC at satisfactory prices in the future. The failure to enter into new term sales contracts on suitable terms could adversely impact our operations and mining activity decisions and resulting cash flows and income.
Vanadium mineral resource estimates for the La Sal Complex are based in part on Mill production records.
For the Company’s La Sal Complex uranium-vanadium property, vanadium assay results are not available for all drill holes such that the vanadium mineral resource estimate is in part based on a ratio of vanadium to uranium supported by actual mill production records from the Mill. There is a risk that the use of a ratio based on Mill production records may increase the potential uncertainty in vanadium grades.
We may be unable to raise debt financing as may be required or desirable.
The Company may not be able to raise debt financing as may be required or desirable for planned expansion of our operations or for the development of projects with third parties in which we have a joint venture or other interest. The failure to raise debt financing on suitable terms or at all when required or desirable could have a material adverse effect on our operations and financial condition.
48
We may be unable to timely pay our outstanding debt obligations, which may result in us losing some of our assets covered by mortgage and/or other security arrangements, and which may adversely affect our assets, results of operations and/or future prospects.
We may from time to time enter into arrangements to borrow money in order to fund our operations and expansion plans, and such arrangements may include covenants that restrict our business in some way. We may also from time to time acquire properties whereby certain payment obligations owed to the seller are paid by us over time, with the seller’s sole remedy for non-payment by us being re-acquisition of the property. Events may occur in the future, including events out of our control, that would cause us to fail to satisfy our debt or financing instruments. In such circumstances, or if we were to default on our obligations under such debt or financing instruments, the amounts drawn in accordance with the underlying agreements may become due and payable before the agreed maturity date, and we may not have the financial resources to repay such amounts when due.
Although all our reclamation obligations are bonded, and cash and other assets have been reserved to secure a portion but not all the bonded amounts, to the extent the bonded amounts are not fully collateralized, we will be required to provide additional cash to perform our reclamation obligations when they occur. In addition, the bonding companies have the right to require increases in collateral at any time, failure of which would constitute a default under the bonds. In such circumstances, we may not have the financial resources to perform such reclamation obligations or to increase such collateral when due.
We may need additional financing in connection with the implementation of our business and strategic plans from time to time.
The exploration, construction, development and acquisition of mineral properties and the ongoing operation of mines and other facilities requires a substantial amount of capital and may depend on our ability to obtain financing through joint ventures, debt financing, equity financing or other means. We may accordingly need further capital in order to take advantage of further opportunities or acquisitions. Our financial condition, general market conditions, volatile uranium and vanadium markets, volatile interest rates, legal claims against us, a significant disruption to our business or operations, or other factors may make it difficult to secure financing necessary for the expansion of mining activities or to take advantage of opportunities for acquisitions. Further, volatility in the credit markets may increase costs associated with debt instruments due to increased spreads over relevant interest rate benchmarks, or may affect our ability, or the ability of third parties we seek to do business with, to access those markets. Continued volatility in equity markets, specifically including energy and commodity markets, may increase the costs associated with equity financings due to a low share price and may create the potential need for us to offer higher discounts and other value (e.g., warrants). There is no assurance that we will be successful in obtaining required financing as and when needed on acceptable terms, if at all.
We have experienced negative cash flows from operations and may need additional financing in connection with the implementation of our business and strategic plans from time to time.
The Company has had negative cash flow from operations in prior years, and at low commodity prices a number of our mining properties will be on standby, making it less likely that the Company will be able to generate positive cash flows from operations in those circumstances. If the Company cannot generate positive cash flows from operations, its ability to fund its operations and implement its business plans may depend on its ability to obtain financing through joint ventures, debt financing, equity financing or other means. There can be no assurance that we will be able to achieve and maintain positive cash flow from operations to fund our financing needs. Further, if cash flows from operations are negative, there is no assurance that the Company will be able to raise additional funds, if needed, or that if any such additional funds are raised, that the Company will be able to raise such funds on commercially attractive terms. If we do not achieve positive cash flows or are unable to raise additional funds when needed, we may not be able to continue to fund our operations.
We are subject to costs associated with decommissioning and reclamation of our properties.
For so long as we are and remain the owner and operator of the Mill, the Nichols Ranch Project and numerous uranium, uranium/vanadium, REE and HMS projects and other facilities located in the U.S., Brazil and elsewhere, and certain other permitting, construction, development and exploration properties, we are obligated to ultimately reclaim or participate in the reclamation of our properties upon the occurrence of certain predetermined criteria using closely monitored and carefully developed, approved methods. Our reclamation obligations are bonded, and cash and other assets have been reserved to secure a portion, but not all, of the bonded amounts. Although our financial statements will record a liability for the asset retirement obligation, and the bonding requirements are generally periodically reviewed by applicable regulatory authorities, there can be no assurance or guarantee that the ultimate cost of such reclamation obligations will not exceed the estimated liability to be
49
provided on our financial statements. Further, to the extent the bonded amounts are not fully collateralized, we will be required to come up with additional cash to perform our reclamation obligations when they occur.
Decommissioning plans for our properties have been filed with applicable regulatory authorities. These regulatory authorities have accepted the decommissioning plans in concept, not upon a detailed performance forecast, which has not yet been generated. Over time, further regulatory review of the decommissioning plans may result in additional decommissioning requirements, associated costs and the requirement to provide additional financial assurances, including as our properties approach or go into decommissioning. It is not possible to predict what level of decommissioning and reclamation (and financial assurances relating thereto) may be required in the future by regulatory authorities.
Our mineral properties may be subject to defects in title or risks of forfeiture.
We have investigated our rights to explore and exploit all our material properties and, to the best of our knowledge, those rights are in good standing. However, no assurance can be given that such rights will not be revoked, or significantly altered, to our detriment. There can also be no assurance that our rights will not be challenged or impugned by third parties, including by governments, surface owners, and non-governmental organizations.
The validity of unpatented mining claims on U.S. public lands is sometimes difficult to confirm and may be contested. Due to the extensive requirements and associated expense required to obtain and maintain mining rights on U.S. public lands, our properties are subject to various title uncertainties common to the industry with the attendant risk that there may be defects in title. In addition, certain lands have been withdrawn around the Grand Canyon National Park, including most recently in the newly established Ancestral Footprints of the Grand Canyon National Monument, from location and entry under the Mining Laws. All the Company’s properties located on the Arizona Strip, with the exception of its Wate property and certain exploration properties held by the Company’s subsidiary, Arizona Strip Partners LLC, are located within the withdrawn lands and boundaries of the Grand Canyon National Monument. No new mining claims may be filed on the withdrawn lands and no new plans of operations may be approved, other than plans of operations on mining claims that were valid at the time of withdrawal and that remain valid at the time of plan approval. Whether or not a mining claim is valid must be determined by a mineral examination conducted by BLM or USFS, as applicable. The mineral examination, which involves an economic evaluation of a project, must demonstrate the existence of a locatable mineral resource and that the mineral resource constitutes discovery of a valuable mineral deposit. We believe that all our material Arizona Strip projects are on valid mining claims that would withstand a mineral examination. Further, our Arizona 1 Project has an approved plan of operations which, absent modification, would not require a mineral examination. Although our Pinyon Plain Project also has an approved plan of operations, which, absent modification, would not require a mineral examination, the USFS performed a mineral examination at that mine in 2012, and concluded that the underlying mining claims are valid existing rights (a decision which has been involved in a court challenge). However, market conditions may postpone or prevent the performance of mineral examinations on certain other properties and, if a mineral examination is performed on a property, there can be no guarantee that the mineral examination would not result in one or more of our mining claims being considered invalid, which could prevent a project from proceeding.
Certain of our properties, or significant portions thereof, are mineral leases that have fixed terms, both with State and private parties. Certain of our properties are subject to other agreements that may affect our ability to explore, permit, develop and operate them, including surface use, access and other agreements. There can be no guarantee that we will be able to renew or extend such leases and agreements on favorable terms or at all. The failure to renew any such leases or agreements could have a material adverse effect on our operations.
The granting of mineral rights in Brazil is performed in four steps: exploration authorization, right to request a mining concession, mining concession request and mining concession grant. Each step requires that certain actions must be taken, results must be achieved by the Company, and in some circumstances approvals must be obtained, within certain time periods, which can be extended or renewed in certain circumstances by the Brazilian National Mining Agency (“ANM”). The Company’s mineral rights in Brazil are at risk of being forfeited if the Company fails to take the required actions, fails to achieve the required results or fails to obtain the required approvals, within the required time frames and ANM declines to extend or renew such time frames. The forfeiture of any such mineral rights could have a material adverse effect on our operations. See “Part I, Item 2J. The Bahia Project.”
Because we may be unable to secure access rights to certain of our properties, we may be unable to explore and/or advance such properties.
We are currently in the process of negotiating and clarifying access rights to certain of our properties, such as the Roca Honda Project and the Wate Project, with private landholders. There can be no guarantee that we will be able to negotiate or clarify
50
such access rights on favorable terms, or at all. The failure to negotiate or clarify such access rights on suitable terms could have a material adverse effect on our operations.
Risks associated with carrying on our business in foreign countries.
The Company faces a number of risks related to conducting business operations in foreign countries including heightened risks of political instability, expropriation of assets, business interruption, increased taxation, import/export controls, unilateral modification of concessions and contracts. We also face the typical risks associated with doing business in foreign countries, including: different market and economic forces, resulting from new business environments with new competitors and different consumer preferences; dealing with local suppliers who may have a strong foothold in the area; the need to build up brand awareness and trust in a new market; different customer and supplier demographics; language and cultural barriers; extreme weather events and natural disasters that can present a sustained business risk relating to supply logistics and other factors; the additional requirements of foreign legal systems; the impacts of foreign tax requirements; the need to comply with foreign regulations and operations compliance; the need to comply with foreign legal systems, including as they relate to contract enforceability; the requirement to stay abreast of and remain in compliance with changing laws and regulations; and the lack of purchasing power parity compared to domestic competitors. Any number of these risks could have a material adverse effect on our operations, liquidity and financial condition.
Our operations outside the United States and Canada require us to comply with a number of United States, Canadian and international regulations, violations of which could have a material adverse effect on our business, consolidated results of operations, and consolidated financial condition.
Our operations outside the United States and Canada require us to comply with a number of United States, Canadian and other international regulations. For example, our operations in countries outside the United States and Canada are subject to the United States Foreign Corrupt Practices Act (“FCPA”), which prohibits United States companies and their agents and employees from providing anything of value to a foreign official for the purposes of influencing any act or decision of these individuals in their official capacity to help obtain or retain business, direct business to any person or corporate entity, or obtain any unfair advantage, as well as to the Corruption of Foreign Public Officials Act (“CFPOA”), which is the Canadian equivalent of the FCPA. Our activities create the risk of unauthorized payments or offers of payments by our employees, agents, or joint venture partners that could be in violation of anti-corruption laws, even though some of these parties are not subject to our control. We have internal control policies and procedures and have implemented training and compliance programs for our employees and agents with respect to the FCPA and CFPOA. However, we cannot assure that our policies, procedures, and programs will always protect us from reckless or criminal acts committed by our employees or agents. We are also subject to the risks that our employees, joint venture partners, and agents outside of the United States may fail to comply with other applicable laws. Allegations of violations of applicable anti-corruption laws have resulted and may in the future result in internal, independent, or government investigations. Violations of anti-corruption laws may result in severe criminal or civil sanctions, and we may be subject to other liabilities, which could have a material adverse effect on our business, consolidated results of operations and consolidated financial condition.
Risks associated with a Brazilian federal or state government enacting or managing a conservation unit or environmental protection area.
There is a risk of a Brazilian federal or state government enacting or managing a conservation unit or environmental protection area or implementing a management plan in connection therewith that could impact planned production at or restrict the Company’s ability to or prevent the Company from mining significant portions of the Company’s Bahia Project. Such an action could have a material adverse effect on our operations, liquidity and financial condition.
We are subject to foreign currency risks.
Our operations are subject to foreign currency fluctuations. Our operating expenses and revenues are primarily incurred in U.S. dollars, while some of our cash balances and expenses are measured in Canadian dollars. The fluctuation of the Canadian dollar in relation to the U.S. dollar will consequently have an impact on our profitability and may also affect the value of our assets and shareholders’ equity. In addition, any strengthening of the U.S. dollar relative to other currencies makes our mineral extraction and recovery less competitive in relation to similar activities in other countries. Any strengthening of the U.S. dollar in relation to the currencies of other countries can have a material impact on our cash flows and profitability and affect the value of our assets and shareholders’ equity.
51
We may not realize the anticipated benefits of previous acquisitions.
We may not realize the anticipated benefits of acquiring: the Sheep Mountain Project in 2012; Denison Mines Corp.’s U.S. Mining Division in 2012, including the Mill, certain of the Arizona Strip Properties, the Bullfrog Project and the La Sal Project; Strathmore in 2013, including the Roca Honda Project; Uranerz in 2015, including the Nichols Ranch Project; and the Bahia Project in Brazil in 2023, due to integration, operational and uranium, REE, HMC and/or vanadium market challenges. Decreases in commodity prices have required us to place or maintain a number of acquired properties and facilities on standby and to defer permitting and construction and development activities on certain other acquired assets, until market conditions warrant otherwise, and, in some cases, we have elected to sell or abandon certain of these properties at a loss. Our success following those acquisitions will depend in large part on the success of our management in valuing the acquired assets and integrating the acquired assets into the Company. Our failure to properly value the assets and to achieve such integration and to mine or advance such assets could result in our failure to realize the anticipated benefits of those acquisitions and could impair our results of operations, profitability and financial results.
We prepare estimates of future uranium, uranium/vanadium and REE (monazite) extraction and recovery, and there are no assurances that such estimates will be achieved.
We may from time to time prepare estimates of future uranium, vanadium, monazite, HMS or other mineral extraction and recovery, or increases in uranium, vanadium, monazite, HMS or other mineral extraction and recovery, for particular operations, or relating to our ability to increase uranium, vanadium, monazite, HMS or other mineral extraction and recovery in response to increases in commodity prices, as market conditions warrant or otherwise. No assurance can be given that any such extraction and recovery estimates will be achieved, nor can assurance be given that extraction or recovery increases will be achieved in a cost effective or timely manner. Failure to achieve extraction and recovery estimates or failure to achieve extraction and recovery in a cost effective or timely manner could have an adverse impact on our future cash flows, earnings, results of operations and financial condition. These estimates are based on, among other things, the following factors: the accuracy of Mineral Resource and Mineral Reserve estimates; the accuracy of assumptions regarding ground conditions and physical characteristics of mineralized materials, such as hardness and presence or absence of particular metallurgical characteristics; the accuracy of estimated rates and costs of extraction, recovery and processing; assumptions as to future commodity prices; assumptions relating to changes in laws, regulations or policies, or lack thereof, that could impact the cost and time required to obtain regulatory approvals, licenses and permits; assumptions relating to obtaining required licenses and permits in a timely manner, including the time required to satisfy environmental analyses, consultations and public input processes; assumptions relating to challenges to or delays in the licensing and permitting process; and assumptions regarding any appeals or lack thereof, or injunctions or lack thereof, relating to any approvals, licenses or permits.
Our actual uranium, vanadium, monazite, HMC or other mineral extraction and recovery may vary from estimates for a variety of reasons, including, among others: actual mineralized material extracted, mined or recovered varying from estimates of grade, tonnage, dilution, metallurgical and other characteristics; short-term operating factors relating to the Mineral Resources and Mineral Reserves, such as the need for sequential construction or development of mineralized materials or deposits and the processing of new or different mineral grades; risk and hazards associated with extraction, mining and recovery; natural phenomena, such as inclement weather conditions, underground floods, earthquakes, pit wall failures and cave-ins; unexpected labor shortages or strikes; varying conditions in the commodities markets; and delays in obtaining or denial, challenges or appeals of regulatory approvals, licenses and permits or renewals of existing approvals, licenses or permits.
In addition, the Company is evaluating potentially recovering copper at the Mill as a byproduct with uranium from its Pinyon Plain Project. There can be no assurance that this evaluation will result in the Mill being able to recover copper at the Mill as a byproduct on an economic basis.
We depend on the issuance of license amendments and renewals, which cannot be guaranteed.
We maintain regulatory licenses and permits in order to operate our Mill and Nichols Ranch Project and conventional mines, which are subject to renewal from time to time and are required in order to operate in compliance with applicable laws and regulations. In addition, depending on our business requirements, it may be necessary or desirable to seek amendments to one or more of our licenses or permits from time to time. While we have been successful in renewing our licenses and permits on a timely basis in the past and in obtaining such amendments as have been necessary or desirable, there can be no assurance that such license and permit renewals and amendments will be issued by applicable regulatory authorities on a timely basis or at all in the future.
52
We will need to continuously add to our Mineral Reserve and Mineral Resource base and to expand our sources of Alternate Feed Materials.
The majority of our properties do not contain any Mineral Reserves under S-K 1300 and NI 43-101. See Item II, “Cautionary Note to Investors Concerning Disclosure of Mineral Reserve and Mineral Resource Estimates.”
Our material Mineral Resources are located at the Nichols Ranch Project, the Pinyon Plain Project, the Roca Honda Project, the Sheep Mountain Project, the Bullfrog Project and the La Sal Project. These projects are our primary sources (and potential sources) of current and future uranium concentrates. Unless other Mineral Resources or Mineral Reserves are discovered or extensions to existing resource bodies are found, our sources of extraction, production and recovery for uranium concentrates will decrease over time as our current Mineral Resources and Mineral Reserves (contained at the Pinyon Plain and Sheep Mountain mines) are depleted. There can be no assurance that our future exploration, construction, development and acquisition efforts will be successful in replenishing our Mineral Resources or finding or developing Mineral Reserves. In addition, while we believe that many of our properties will eventually engage in extraction or mining activities, there can be no assurance that they will be placed into such activities, or that they will be able to replace current extraction or mining activities.
We also recover uranium by processing Alternate Feed Materials at our Mill. There can be no assurance that additional sources of Alternate Feed Materials will be forthcoming in the future on commercially acceptable terms or otherwise, or that we will be successful in receiving all required regulatory approvals, licenses and permits on a timely basis to allow for the receipt and processing of any such Alternate Feed Materials.
In addition, we rely on monazite for our RE Carbonate and planned REE oxides at the Mill. There can be no assurance that additional sources of monazite will be forthcoming in the future on commercially acceptable terms or otherwise, or that the Bahia Project, which is currently in its exploration and development phase, will be commercially profitable.
Our sales of uranium, vanadium and REE products expose us to the risk of non-payment.
Our sales of uranium, vanadium, HMC and REE products expose us to the risk of non-payment. We manage this risk by monitoring the credit worthiness of our customers and requiring prepayment or other forms of payment security from customers with an unacceptable level of credit risk. Most of the Company’s uranium sales are to major nuclear utilities, which pose a relatively low risk of non-payment due to their large size and capitalization.
We are dependent on key personnel and qualified and experienced employees.
Our success will largely depend on the efforts and abilities of certain senior officers and key employees, some of whom are approaching retirement. Certain of these individuals have significant experience in the uranium and REE industries. The number of individuals with significant experience in these industries is small. While we do not foresee any reason why such officers and key employees will not remain with us, other than through retirement, if for any reason they do not, we could be adversely affected. We have not purchased key person life insurance for any of these individuals, other than for our Chief Executive Officer.
Our compensation programs include cash and equity incentive compensation components designed to attract and retain qualified personnel, which, in the case of our equity incentive programs, contain both time-vesting and performance-based requirements that also help retain qualified personnel. Further, all current and future executive officers of the Company receive, or are expected to receive, employment agreements with the Company, which also serve to attract and retain qualified personnel. In addition, the Company prioritizes the development of its existing management personnel and the advancement of existing personnel to fill vacancies as they arise, which the Company believes is an important element in developing, attracting and retaining the most qualified management personnel.
Nevertheless, our success will depend on the availability of qualified and experienced employees to work in our operations and our ability to develop, attract and retain such employees. The number of individuals with relevant mining and operational experience in the Company’s key industries, especially the U.S. uranium and REE industries, is small. As the Company grows there is a risk that we may not be able to grow our qualified workforce and management team in pace with the growth of our business and activities, which could hamper our growth efforts.
We are dependent on business partner, government and third-party consents and approvals.
We have a number of joint ventures and other business relationships from time to time relating to our properties and projects, including key projects, such as the Arkose Mining Venture, which can restrict our ability to act unilaterally with respect to those
53
projects in certain circumstances. There can be no assurances that we will be able to maintain relationships with our joint venture and business partners to allow for satisfactory exploration, permitting, construction, development, extraction, mining, recovery or milling relating to any such projects. Our operations and activities are also dependent from time to time on receiving government and other third-party consents and approvals. There can be no assurances that all such consents and approvals will be forthcoming when required.
Certain of our directors may be in a position of conflict of interest with respect to the Company due to their relationship with other resource companies.
Some of our directors are also directors of other companies that are similarly engaged in the business of acquiring, exploring and developing natural resource properties. Such associations may give rise to conflicts of interest from time to time. In particular, one of the consequences will be that corporate opportunities presented to a director may be offered to another company or companies with which the director is associated and may not be presented or made available to us. Our directors are required by law to act honestly and in good faith with a view to the best interests of the Company, to disclose any interest which they may have in any project or opportunity of the Company, and to abstain from voting on such matter. Conflicts of interest that arise will be subject to and governed by the procedures prescribed in our Code of Business Conduct and Ethics and by the OBCA.
Our relationship with our employees may be impacted by changes in labor relations.
None of our operations or activities currently directly employ unionized workers who work under collective agreements. However, there can be no assurance that our employees or the employees of our contractors will not become unionized in the future, which may impact our operations and activities. Any lengthy work stoppages may have a material adverse impact on our future cash flows, earnings, results of operations and financial condition.
U.S. investors may have difficulty bringing actions and enforcing judgments under U.S. securities laws against an Ontario corporation.
Although our primary trading market is the NYSE American, a majority of our outstanding voting securities are held by U.S. residents, we are a U.S. domestic issuer for SEC reporting purposes, and substantially all of our assets, operations and employees are in the U.S., the Company was incorporated in Ontario and, as a result, investors in the U.S. or in other jurisdictions outside of Canada may have difficulty bringing actions and enforcing judgments against us, our directors, our executive officers and some of the experts named in this Annual Report based on civil liabilities provisions of the federal securities laws or other laws of the U.S. or any state thereof or the equivalent laws of other jurisdictions of residence.
An information security incident, including a cybersecurity breach, could have a negative impact to the Company’s business or reputation.
To meet business objectives, the Company relies on both internal information technology (“IT”) systems and networks and those of third parties and their vendors to process and store sensitive data, including confidential research, business plans, financial information, process technology, intellectual property and personal data that may be subject to legal protection. The extensive information security and cybersecurity threats, which affect companies globally, pose a risk to the security and availability of these IT systems and networks, and to the confidentiality, integrity, and availability of the Company’s sensitive data. The Company continually assesses these threats and makes investments to increase internal protection, detection and response capabilities, as well as to ensure the Company’s third-party providers have the required capabilities and controls to address this risk on an ongoing basis. In addition, we provide confidential and proprietary information to our third-party business partners in certain cases where doing so is necessary to conduct our business. While we obtain assurances from those parties that they have systems and processes in place to protect such data and, where applicable, that they will take steps to ensure the protections of such data by third parties, those partners may nonetheless also be subject to data intrusion or otherwise compromise the protection of such data. Any compromise of the confidential data of our customers, consumers, suppliers, partners, employees or ourselves, or failure to prevent or mitigate the loss of or damage to this data through breach of our IT systems or other means, could substantially disrupt our operations, harm our customers, consumers, employees and other business partners, damage our reputation, violate applicable laws and regulations, subject us to potentially significant costs and liabilities and result in a loss of business that could be material. To date, the Company has not experienced any material impact to the business or operations resulting from information or cybersecurity attacks; however, because of the frequently changing attack techniques, along with the increasing volume and sophistication of the attacks paired with the increasingly high exposure of the Company due to its efforts to compete internationally in the REE industry, there is the potential for the Company to be targeted and adversely impacted. The Company may not maintain cybersecurity insurance having sufficient coverage to cover all financial losses, or any at all, in the event of an information security or cyber incident.
54
The Company may compromise or lose its proprietary technology or intellectual property in certain circumstances, which could result in a loss in the Company’s competitive position and/or the value of its intangible assets.
The increased reliance on technology, coupled with the Company’s developing REE and radioisotope initiatives, which involve novel technology developed in part by the Company and in part by others and by consultants, may expose the Company to material risks of theft or loss of proprietary technology and other intellectual property, including technical data, business processes, data sets or other sensitive information. Among the risks faced by the Company are:
•failure to obtain patents or trade rights when available;
•failure to adequately contractually establish rights to proprietary technology and other intellectual property in joint venture situations or other situations where the Company and its co-venturers, other business associates or consultants may be jointly contributing to the development of proprietary technology and other intellectual property;
•failure to adequately limit rights or access to unprotected proprietary technology and other intellectual property;
•failure to adequately identify and enforce infringements of proprietary technology and other intellectual property;
•the risk of theft of technology, data and intellectual property through a direct intrusion by private parties or foreign actors, including those affiliated with or controlled by state actors;
•the risk of reverse engineering by joint venture partners or other parties, including those affiliated with state actors, and any patents the Company may have being subsequently infringed or know-how or trade secrets being stolen; and
•the Company may be required to compromise protections or yield rights to technology, data or intellectual property in order to conduct business in or access markets in a foreign jurisdiction, either through formal written agreements or due to legal or administrative requirements in the host nation.
The Company takes what it considers to be reasonable steps to protect its proprietary technology and intellectual property, but there can be no assurance that it will successfully protect its proprietary technology and intellectual property in all circumstances. There is therefore a risk that the Company may compromise or lose its proprietary technology and intellectual property in certain circumstances, which could result in a loss in the Company’s competitive position and/or the value of its intangible assets.
We may be required to provide financial statements of one or more of our equity method investees in our annual reports on Form 10-K and rely on our equity method investees to provide us with these financial statements to fulfill our SEC reporting obligations.
We account for our economic ownership interest in our equity method investments using the equity method of accounting or at fair value using the fair value option (collectively, the “equity method investees”). Pursuant to Rule 3-09 of Regulation S-X (“Rule 3-09”), we may be required to provide in our annual reports on Form 10-K financial statements for these equity method investees (the “Regulation S-X Financial Statements”). If required to provide Regulation S-X Financial Statements for these equity method investees, we have relied, and may in the future rely, on these equity method investees to provide us with their Regulation S-X Financial Statements. In addition, we do not control the financial reporting process of our equity method investees and cannot change the way in which these equity method investees report their respective financial results.
These equity method investees may not provide us with the Regulation S-X Financial Statements necessary to enable us to complete our SEC filings on a timely basis or at all. If we are required to provide Regulation S-X Financial Statements for any of our equity method investees and are unable to do so, it may cause us to no longer be deemed timely and current with our SEC reporting obligations. In such event, we could become ineligible to use a registration statement on Form S-3. In addition, the SEC may not declare effective any registration statement that we file in connection with an offering that requires the financial statements under Rule 3-09 to be included. Any resulting inability to complete a registered offering may materially adversely impact our business, liquidity position, growth prospects, financial condition and results of operations.
Our method of accounting for equity investments in other companies held by the Company could result in material changes to the Company’s financial results that are not fully within the Company’s control.
The Company accounts for investments over which it exerts significant influence, but not control, over the financial and operating policies through the fair value option of ASC Topic 825 – Financial Instruments. Changes in the fair value of these investments are recognized in Other Income (Loss) in the Company’s Consolidated Statements of Operations and Comprehensive Income (Loss). The resulting related gains or losses are not fully within the control of the Company and could be material.
55
General Risk Factors
We are subject to global economic risks.
In the event of a general economic downturn or a recession, there can be no assurance that our business, financial condition and results of operations would not be materially adversely affected. During the global financial crisis of 2007-2008, economic problems in the U.S. and Eurozone caused deterioration in the global economy as numerous commercial and financial enterprises either went into bankruptcy or creditor protection or had to be rescued by governmental authorities. Access to public financing was negatively impacted by sub-prime mortgage defaults in the U.S., the liquidity crisis affecting the asset-backed commercial paper and collateralized debt obligation markets, and massive investment losses by banks with resultant recapitalization efforts. Moreover, the occurrence of unforeseen or extended catastrophic events, including in particular the COVID-19 pandemic, and the emergence of a future pandemic or other widespread health emergency (or concerns over the possibility of such an emergency) could create economic and financial disruptions. These types of challenges can impact commodity prices, including for uranium, vanadium and REEs, as well as currencies and global debt and stock markets. As a result of COVID-19, or in the case of a future pandemic or other widespread health emergency, quarantine or otherwise, requirements or circumstances may require the Company to change the way it conducts its business and operations, including requiring the Company to reduce or cease operations at some or all its facilities for an indeterminate period of time. Furthermore, our critical supply chains may similarly be disrupted for an indeterminate amount of time. All these factors could have a material impact on the Company’s business, operations, personnel and financial condition.
These types of challenges may impact our ability to obtain equity, debt or other financing on terms commercially reasonable to us, or at all. Additionally, these types of factors, as well as other related factors, may cause decreases in asset values that are deemed to be other than temporary, which may result in impairment losses. If these types of challenges occur, or if there is a material deterioration in general business and economic conditions, our operations could be adversely impacted and the trading price of our securities could be adversely affected.
Russia’s Invasion of Ukraine is severely and unpredictably impacting global energy markets and supply chains, and rising concerns over a second severe nuclear accident in Ukraine could seriously hurt public reception to nuclear energy.
Russia’s February 2022 invasion of Ukraine continues to severely impact global energy markets and supply chains by causing economic uncertainty, price volatility, supply shortages and national security concerns to such a degree that the International Energy Agency (“IEA”) has called it “the first truly global energy crisis, with impacts that will be felt for years to come.” As the Company is engaged in a number of energy sectors, including uranium, REEs and vanadium, it is expected that such global impacts will necessarily impact the Company, though the full extent of any such impacts are not well understood at this time. While supply and shipping impacts could materially interfere with our ability to conduct business, for example, other global responses - such as the U.S. Inflation Reduction Act’s provision of funds for energy and climate programs, including the expansion of tax credits and incentives to promote clean energy technologies (see Table 6.3 “Recent policy changes and announcements regarding electricity supply,” World Economic Forum), and an apparent shift away from global reliance on Russian exports via government sanctions and other means - could materially benefit our business by creating additional market opportunities with utilities providers attempting to lessen their reliance on Russian markets.
The uranium industry also potentially faces renewed skepticism and distrust as a result of Russia’s invasion of Ukraine. According to the World Nuclear Association (“WNA”), “In the early hours of 4 March the Zaporizhzhia plant in southeastern Ukraine became the first operating civil nuclear power plant to come under armed attack. Fighting between forces overnight resulted in a projectile hitting a training building within the site of the six-unit plant. Russian forces then took control of the plant. The six reactors were not affected and there was no release of radioactive material. Since late October [2022], Russia has repeatedly targeted Ukraine’s civilian infrastructure, including the country’s energy system, with missile strikes. Widespread blackouts have resulted, and external power supply to all four of the country’s nuclear plants has been affected.” (WNA, “Ukraine: Russia-Ukraine War and Nuclear Energy,” Feb. 6, 2023). Russia’s interference with Ukrainian nuclear plants in violation of Article 56 of the Additional Protocol of 1979 to the Geneva Conventions, which states that nuclear power plants “shall not be made the object of attack, even where these objects are military objectives, if such an attack may cause the release of dangerous forces and consequent severe losses among the civilian population” (WNA, 2023), may result in increased and serious harm to global reception to nuclear energy due to the current war’s proximity to Chrenobyl, site of the then-Soviet Union’s 1986 nuclear accident.
To date, no changes in the Company’s internal control over financial reporting resulting from the Russian invasion of Ukraine and/or supply chain disruptions have been deemed necessary.
56
The price of our Common Shares is subject to volatility.
Securities of mining companies have experienced substantial volatility and downward pressure in the recent past, often based on factors unrelated to the financial performance or prospects of the companies involved. These factors include macroeconomic conditions in North America and globally and market perceptions of the attractiveness of particular industries. The price of our securities is also likely to be significantly affected by short-term changes in uranium, vanadium, REE and HMC prices, changes in industry forecasts of uranium, vanadium, REE and HMC prices, other mineral prices including oil and natural gas, currency exchange fluctuation, or in our financial condition or results of operations as reflected in our periodic earnings reports.
Other factors unrelated to our performance that may have an effect on the price of our securities include the following: the extent of research coverage available to investors concerning our business may be limited if investment banks with research capabilities do not follow our securities; adverse proxy voting recommendations or limited portrayals of the Company’s business, operations or executive compensation practices made to shareholders by shareholder advisory firms resulting from their use of general-purpose formulas that are not suited to the Company’s business, operations or practices, and that may counteract the Company’s substantive disclosures, which often include detailed analyses specific to the Company and which are capable of mitigating apparent market concerns; lessening in trading volume and general market interest in our securities may affect an investor’s ability to trade significant numbers of our securities; the size of our public float and the exclusion from market indices may limit the ability of some institutions to invest in our securities; and a substantial decline in the price of our securities that persists for a significant period of time could cause our securities to be delisted from an exchange, further reducing market liquidity. Our exclusion from certain market indices may reduce market liquidity or the price of our securities.
If an active market for our securities does not continue, the liquidity of an investor’s investment may be limited and the price of our securities may decline. If an active market does not exist, investors may lose their entire investment. As a result of any of these factors, the market price of our securities at any given point in time may not accurately reflect our long-term value. Securities class-action litigation often has been brought against companies in periods of volatility in the market price of their securities and following major corporate transactions or mergers and acquisitions. We may in the future be the target of similar litigation. Securities litigation could result in substantial costs and damages and divert management’s attention and resources.
The issuance of additional Common Shares may impact the trading price of our Common Shares.
In times of depressed commodity prices, the Company may be required to raise additional capital to meet its liquidity requirements, through the issuance of additional Common Shares under our ATM or otherwise, and/or dispose of assets. If we raise additional funding by issuing additional equity securities or securities convertible, exercisable or exchangeable for equity securities, such financing may substantially dilute the interests of our shareholders and reduce the value of their investment. Similar dilution could result from the sale of assets to meet liquidity requirements.
We are subject to litigation and other legal proceedings arising in the normal course of business and may be involved in disputes with other parties in the future which may result in litigation.
The causes of potential future litigation and legal proceedings cannot be known and may arise from, among other things, business activities, environmental laws, permitting and licensing activities, volatility in stock prices or alleged failure to comply with disclosure obligations. The results of litigation and proceedings cannot be predicted with certainty and may include injunctions pending the outcome of such litigation and proceedings. Failure to resolve any such disputes favorably may have a material adverse impact on our financial performance, cash flow and results of operations.
If we fail to maintain an effective system of internal controls, we may not be able to accurately report financial results and/or prevent fraud.
Internal controls over financial reporting are procedures designed to provide reasonable assurance that transactions are properly authorized, assets are safeguarded against unauthorized or improper use, and transactions are properly recorded and reported. Disclosure controls and procedures are designed to ensure that information required to be disclosed by a company in reports filed with securities regulatory agencies is recorded, processed, summarized and reported on a timely basis and is accumulated and communicated to a company’s management, including its chief executive officer and chief financial officer, as appropriate, to allow timely decisions regarding required disclosure. A control system, no matter how well designed and operated, can provide only reasonable, not absolute, assurance with respect to the reliability of reporting, including financial reporting and financial statement preparation.
57
ITEM 1B. UNRESOLVED STAFF COMMENTS
None.
ITEM 1C. CYBERSECURITY
The Company maintains a cyber risk management program designed to identify, assess, manage, mitigate and respond to cybersecurity threats. This program is integrated within the Company’s enterprise risk management program. The Company regularly assesses the threat landscape and takes a holistic view of cybersecurity risks, with a layered cybersecurity strategy based on prevention, detection and mitigation. The Company has appointed an interdisciplinary team to oversee cybersecurity at the management level, as a part of which it reviews all enterprise-level cybersecurity risks at least annually, or more frequently as needed. Key cybersecurity risks, including cybersecurity threats associated with the use of third-party service providers, are incorporated into the Company’s enterprise risk management process as needed. Additionally, the Company has implemented numerous IT policies and procedures concerning cybersecurity matters, which include policies that directly or indirectly relate to encryption standards, antivirus protection, remote access, multi-factor authentication, confidential information and the use of the internet, social media, email and wireless and personal devices for both Company business and personal matters while utilizing Company resources, among other relevant topics. These policies go through an internal review process on a periodic basis and are, if needed, updated and re-approved by the appropriate members of management. In addition, the Company’s Cybersecurity Policy, which is maintained on a confidential basis to protect some of the more sensitive aspects of the Company’s cybersecurity protections in place, is reviewed and approved annually by both the Audit Committee and the full Board of Directors. Employees receive training, as appropriate, on these policies.
The underlying controls of the cyber risk management program are based on recognized best practices and standards for cybersecurity and information technology, including the National Institute of Standards and Technology (“NIST”), the Center for Internet Security Benchmark (“CIS”) and Service Organization Controls Types 1 and 2 of the American Institute of Certified Public Accountants (“SOC”).
The Company has expanded investments in IT security, including additional end-user training, using layered defenses, identifying and protecting critical assets, and strengthened its monitoring and alerting activities. Additionally, the Company has engaged an independent, third-party expert consultant to assess and analyze the Company’s enterprise cybersecurity, governance, risk and compliance operations and programs against the NIST and CIS frameworks. The third-party consultant tests the Company’s defenses by performing simulations and drills at both a technical level (including through penetration tests) and by reviewing its operational policies and procedures. These tests and assessments are useful tools for maintaining a robust cybersecurity program to protect our investors, customers, employees, vendors, and intellectual property. These tests serve as the foundation for the Company’s three-year plan to further enhance its cyber infrastructure.
The Company established its interdisciplinary team to monitor and assess cybersecurity risks on an ongoing basis, which is led by the Company’s Chief Financial Officer. It is a cross-departmental team that consists of legal, finance, internal audit and operations personnel, with all significant implementation efforts executed by our IT Manager, who has more than 20 years of experience in IT, enterprise security and cyber risk management, with support from the Company’s third-party expert consultant, as needed. This team is in charge of developing, maintaining and measuring compliance with the cyber risk management program, and dedicates significant resources to cybersecurity and risk management processes to adapt to the ever-changing cybersecurity landscape and to respond to emerging threats in a timely and effective manner.
The Company utilizes a sophisticated network monitoring service as a first line of defense for potential cybersecurity incidents, which is supplemented by employee training to ensure internal responsiveness where an incident may first be detected. When a potential incident is first detected, the matter is communicated the IT Manager as soon as possible so that the Company may work quickly and diligently to re-secure its systems and work to minimize any damage and further risk to the Company as a result thereof; to this end, a monitored email address dedicated solely to the reporting of such incidents is in place. Upon receipt, the IT Manager is charged with immediately investigating the report to ensure the existence or possibility of a cyberattack and employs every effort toward thwarting or limiting a cyberattack, if ongoing, to the fullest extent possible to avoid further damage and exposure to the Company and its systems. As soon as an immediate threat or cyberattack is sufficiently contained to permit it, the IT Manager notifies designated executive officers of the situation, who are charged to direct the IT Manager on any additional or special measures to be taken, including but not limited to a Company-wide alert or directive, which the IT Manager must follow/implement without delay. Questions or concerns relating to a directive’s validity may be confirmed only by the IT Manager or a designated executive officer through a known form of contact not questionably in breach. As soon as reasonably practicable after response efforts commence, the designated executive officers are required to notify the Chair of the Audit Committee of the situation and to thereafter keep the Chair apprised of all material developments,
58
who may escalate the matter to the full Board in the Chair’s discretion. The Company’s emergency response plan also sets forth the Company’s procedures for a transition back into normal work practices, as well as security incident investigation, remediation procedures, security incident recovery and mandatory reporting.
The Audit Committee has been delegated, by and on behalf of the Board of Directors, direct and primary oversight of the Company’s cybersecurity risk exposures and the steps taken by management to monitor, mitigate and manage/respond to cybersecurity risks and incidents. The CFO, together with the appropriate members from the Company’s interdisciplinary team as needed, brief the Audit Committee on the effectiveness of the Company’s cyber risk management program on at least a quarterly basis, or more frequently as needed basis on a wide range of topics, including recent developments, evolving standards, vulnerability assessments, third-party and independent reviews, the threat environment, technological trends and information security considerations arising with respect to the Company, its peers and third parties. In addition, cybersecurity risks are reviewed by the Board of Directors, at least annually, as part of the Company’s corporate enterprise risk mapping exercise. The Board and the Audit Committee also receive prompt and timely information regarding any cybersecurity incident that meets the SEC, OSC and stock exchange-established reporting thresholds, as well as ongoing updates and follow-up disclosures regarding any such incident until it has been wholly addressed and remediated.
The Company faces risks from “cybersecurity threats” (as defined in Item 106(a) of Regulation S-K) that could have a material adverse effect on its business, financial condition, results of operations, cash flows or reputation. The Company has experienced, and will continue to experience, immaterial “cybersecurity incidents” (as defined in Item 106(a) of Regulation S-K) in the ordinary course of its business. However, prior cybersecurity incidents have not had, and are not reasonably likely to have, a material adverse effect on the Company’s business, financial condition, results of operations, or cash flows. See “Part I, Item 1A. Risk Factors – An information security incident, including a cybersecurity breach, could have a negative impact to the Company’s business or reputation.”
59
ITEM 2. DESCRIPTION OF PROPERTIES
60
Overview
Energy Fuels is a leading U.S.-based critical minerals company. The Company mines uranium and produces natural uranium concentrates that are sold to major nuclear utilities for the production of carbon-free nuclear energy. Energy Fuels recently began production of mixed RE Carbonate, an advanced REE material at the White Mesa Mill and plans to produce commercial quantities of separated REE oxides at the White Mesa Mill in 2024. Energy Fuels also produces vanadium from certain of its projects, as market conditions warrant, and is evaluating the recovery at the Mill of radionuclides needed for emerging cancer treatments. Energy Fuels holds two of America's key uranium production centers: the White Mesa Mill in Utah and the Nichols Ranch ISR Project in Wyoming. In 2023, the Company acquired the Bahia Project in Brazil, which is believed to have significant quantities of titanium (ilmenite and rutile), zirconium (zircon) and REE (monazite) minerals.
ISR Uranium Activities
The Company conducts its ISR recovery activities through its Nichols Ranch Project in northeast Wyoming, which it acquired in June 2015 through the acquisition of Uranerz.
The Nichols Ranch Project includes: (i) the Nichols Ranch Plant (100% ownership); (ii) the Nichols Ranch Wellfields (100% ownership); (iii) the Jane Dough Property (81% ownership); (iv) the Hank Project (100% ownership), which includes the permitted but not constructed Hank Satellite Plant; (v) North Rolling Pin (100% ownership); and (vi) West North Butte (100% ownership). See “The Nichols Ranch ISR Project.” The Company also acquired through the acquisition of Uranerz the Reno Creek Property (which it has since sold) and the Arkose Mining Venture, a joint venture of ISR properties held 81% by Energy Fuels. See “Non-Material Mineral Properties - Other ISR Projects.” Production from existing wellfields at Nichols Ranch was depleted during 2021. In order for Nichols Ranch to engage in future uranium production, the Company will need to incur capital expenditures to develop additional wellfields. While production at the Nichols Ranch Project is currently being maintained on standby, the Company is undertaking exploration and development activities to expand the resources at the Nichols Ranch Project and to further develop a wellfield to be ready for potential recommencement of production in late 2024 or in 2025.
Alta Mesa Transaction and Assignment of Convertible Note
On February 14, 2023, the Company closed on its sale to enCore of three wholly-owned subsidiaries that together held the Alta Mesa ISR Project for total consideration of $120 million (the “Alta Mesa Transaction”), paid as follows:
•$60 million in cash, which included $6 million prior to closing and $54 million at closing; and
•$60 million Convertible Note, payable in two years from the closing, bearing annual interest of eight percent (8%). The Convertible Note was convertible at Energy Fuels’ election into fully paid and non-assessable enCore common shares at a conversion price of $2.9103 per share, being a 20% premium to the 10-day volume-weighted average price of enCore shares ending the day before the Closing. The Convertible Note was guaranteed by enCore and fully secured by Alta Mesa. Except in the instance of a block trade or similar distribution to sell the enCore common shares received on conversion of the Convertible Note, Energy Fuels was limited to selling a maximum of $10 million of enCore common shares per thirty (30)-day period.
As a post-closing condition of the Alta Mesa Transaction, enCore was required to replace the $3.59 million of reclamation bonds then in place for Alta Mesa. Upon replacement, the original bonds were released and the Company received back the underlying collateral during the year ended December 31, 2023.
Then, on November 13, 2023, the Company announced that, on November 9, 2023, it sold to MMCAP International Inc. SPC (“MMCAP”) the remaining unpaid balance of $20 million owed under the secured Convertible Note issued to the Company by enCore for total consideration of $21 million plus $1.5 million in unpaid accrued interest, less a sales commission of $100,000 paid to a third-party broker. As disclosed in the Company’s Form 10-Q for the quarter ended September 30, 2023, enCore previously paid $40 million toward the $60 million principal Convertible Note balance and $1.8 million of interest to the Company in partial fulfillment of its obligations under the Convertible Note. As a result of enCore’s earlier pay-down and the $22.4 million received in connection with the Convertible Note’s sale, the Company has now received payment in full for the Alta Mesa Transaction, and no further consideration is owed in connection therewith.
Conventional Uranium Activities
The Company conducts its conventional uranium extraction and recovery activities through its 100% owned White Mesa Mill, which is the only operating conventional uranium mill in the U.S. The Mill, located near Blanding, Utah, is centrally located such that it can be fed by a number of the Company’s uranium and uranium/vanadium projects in Colorado, Utah, Arizona and New
61
Mexico, as well as by ore purchase or toll milling arrangements with third party miners in the region, as market conditions warrant. The Company also owns the Sheep Mountain Project in Wyoming, which is a conventional uranium project. Due to its distance from the White Mesa Mill, the Sheep Mountain Project is not expected to be a source of feed material for the Mill. The Sheep Mountain Project consists of the Sheep Mountain Extraction Operation (both open pit and underground), which is permitted, and the proposed Sheep Mountain Processing Operation (heap leach), which is not permitted at this time.
The Company’s principal conventional uranium properties include the following:
•the White Mesa Mill (see “The White Mesa Mill”);
•the Pinyon Plain Project (see “The Pinyon Plain Project”);
•the Roca Honda Project (see “The Roca Honda Project”);
•the Sheep Mountain Project (see “The Sheep Mountain Project”);
•the Bullfrog Project (see “The Bullfrog Project”);
•the La Sal Project (see “The La Sal Project”);
•the Arizona Strip uranium properties located in north-central Arizona, including: the Arizona 1 Project, the Wate Project, and EZ Project (see “Non-Material Mineral Properties – Other Conventional Projects – Arizona Strip”); and
•the Whirlwind Project located in southwest Colorado on the Colorado and Utah border (see “Non-Material Mineral Properties – Other Conventional Projects – Colorado Plateau”).
The Company has a 100% interest in all these conventional properties.
The Mill is licensed to process 2,000 tons of mineralized material per day. It is primarily a uranium recovery facility that mills uranium mineralized materials from the Company’s uranium mines on the Colorado Plateau as well as ore purchased or toll milled from third party miners in the region, as market conditions warrant. In addition, the Mill can recycle other uranium-bearing materials not derived from natural or native ore, known as Alternate Feed Materials, for the recovery of uranium, alone or in combination with other metals. In this regard, the Company is currently evaluating a number of potential Alternate Feed Materials for the recovery of uranium. The Mill is also pursuing other opportunities to process mineralized materials from the clean-up of abandoned uranium mines on the Navajo Reservation and in the Four Corners area of the U.S. Energy Fuels recently began production of mixed RE Carbonate, an advanced REE material, at the White Mesa Mill, and plans to produce commercial quantities of separated REE oxides at the White Mesa Mill in 2024. Energy Fuels also produces vanadium from certain of its projects, as market conditions warrant, and is evaluating the recovery at the Mill of radionuclides needed for emerging cancer treatments.
The material projects are shown on the map above and are described in further detail below. Properties that the Company does not consider material are summarized at the end of this Item 2.
Conventional Activities (Other)
Bahia Project
On February 10, 2023, the Company acquired 17 Agencia Nacional de Mineracao (“ANM”) Process Areas totaling 15,089.71 hectares in the state of Bahia, Brazil comprising the Bahia Project. The primary minerals associated with the Bahia Project are ilmenite, rutile, zircon and monazite. See “Bahia Project,” below. The Company acquired the Bahia Project to expand its in-ground holdings of monazite for REE processing at the Mill. See Item I, “Material Transactions” above and Item 2, “The Bahia Project” below. Under S-K 1300 regulations, Bahia Project is an exploration stage property because there are no Mineral Resources or Mineral Reserves disclosed for the property.
In 2024, the Company plans to initiate permitting activities, finish phase I of drilling (2,250 meters) and initiate phase II drilling on the Bahia Project, which is expected to provide the necessary data to disclose Mineral Resources on a portion of the project.
Uranium, Vanadium and Rare Earth Recovery History
The following tables show the mineralized material processed and pounds of uranium and vanadium and total rare earth oxides recovered from the Company’s projects and facilities from January 1, 2019 to December 31, 2023:(1)
62
Recovery History (1)
Alternate Feed Materials(2)
Tons (000) --- 3 --- NA(2) NA(2)
Ave. % U3O8 --- 3.3 --- NA(2) NA(2)
Tailings Solution Recycle & Production from In-Circuit Material(4)
Recovered Pounds U3O8 (000) --- --- --- 47 ---
Recovered Metric Tons Total Rare Earth Oxide (TREO) --- --- 0 --- ---
Conventional Feed Materials(5)
Contained Grade % U3O8 0.46 0.5 --- --- ---
Recovered Pounds U3O8 (000)(6) --- 1 --- --- ---
Recovered Pounds V2O5 (000) --- --- --- --- ---
Recovered Metric Tons Total Rare Earth Oxide (TREO) 260 95 120 --- ---
Nichols Ranch(7)
Alta Mesa(8)
Recovered Pounds U3O8 (000) --- --- --- --- ---
Total Pounds of V2O5 Recovered (000) --- --- --- 67 1807
Total Metric Tons of TREO Recovered 260 95 120 --- ---
Notes:
(1) Mineralized material is shown as being processed and pounds recovered during the year in which the materials were processed at the Mill or at the Nichols Ranch Plant, which is not necessarily the year in which the materials were extracted from the project facilities.
(2) All Alternate Feed Materials were processed at the Mill. A number of different Alternate Feed Materials were processed during the period 2019 – 2023. The table shows the average uranium grades and the total pounds recovered from all Alternate Feed Materials processed at the Mill during each of the years in that period. Because of the variability in uranium grades, pounds recovered is considered to be the relevant metric and tons fed is not considered to be relevant.
(3) The 161,000 pounds recovered in 2022 include nil pounds recovered for the accounts of third parties. The 144,000 pounds recovered in 2020 include nil pounds recovered for the accounts of third parties.
(4) Pounds contained in tailings solutions containing previously unrecovered uranium and vanadium, together with in-circuit mineralized material from previous conventional mine material processing, were recovered at the Mill, though tons and grade are not available because they cannot be tied to any specific source.
(5) Includes uranium and TREO recovered from monazite processing.
(6) The 1,000 pounds of the 162,000 pounds of U3O8 packaged in 2022 is uranium recovered from monazite processing in 2021 and 2022. This amount does not include an additional approximately 1,000 pounds of U3O8 recovered during 2021 and 2022, which was in process and not packaged as of December 31, 2022. All uranium recovered from monazite processing in 2021 was retained in process and not packaged in 2021. A portion of uranium recovered in 2021 was packaged in 2022, with the remainder held in process as at December 31, 2022. The uranium concentration of monazite is comparable to typical Colorado
63
Plateau conventional ores processed at the Mill on a regular basis. The relatively small quantities of uranium recovered from the monazite processed in 2021 and 2022 is a reflection of the low tonnage of monazite processed through the Mill during those years.
(7) Uranium recovery commenced at the Nichols Ranch Project on April 17, 2014. Because the Nichols Ranch Project uses ISR instead of conventional extraction methods, grade and tons of mineralized material are inapplicable to it.
(8) The Alta Mesa Project was sold by the Company on February 14, 2023.
Mineral Extraction
The following table shows the extraction history from 2019 to December 31, 2023 from the mineral properties currently owned by the Company:
Nichols Ranch
Notes:
(1) All properties reported in this table were owned by the Company on December 31, 2023 and continue to be owned by the Company. Nichols Ranch was acquired by the Company in June 2015 as part of the Uranerz acquisition. Properties sold or otherwise disposed of are not included in this table. Uranium pounds recovered since 2021 are immaterial and correspond to pounds captured during standby.
Summary of Mineral Reserves and Resources
Daniel Kapostasy, a Professional Geologist licensed in Wyoming (PG-6778) and in Utah (10110615-2250), employed as the Company’s Vice President, Technical Services, is the Qualified Person responsible for the disclosure of scientific or technical information concerning mineral projects in this Annual Report. Except to the extent explicitly stated, the land tenure and permitting efforts disclosed in this Part I, Item 2 are not made in reliance on or with reference to any of the technical reports or the preliminary feasibility study referenced herein and attached hereto as Exhibits 96.1 through 96.7 and are the responsibility of Daniel Kapostasy in his capacity as a Qualified Person.
The following tables show the Company’s estimate of Mineral Reserves and Mineral Resources as defined in S-K 1300 and NI 43-101 as of December 31, 2023. Both S-K 1300 and NI 43-101 require mineral companies to disclose Mineral Reserves and Mineral Resources using the subcategories of Proven Mineral Reserves, Probable Mineral Reserves, Measured Mineral Resources, Indicated Mineral Resources and Inferred Mineral Resources. The Company reports Mineral Resources exclusive of Mineral Reserves. Except as stated below, the Mineral Reserve and Mineral Resource information shown below, which was reviewed and approved by Daniel Kapostasy, one of the Company’s non-independent Qualified Persons, is as reported in the various Technical Report Summaries prepared in accordance with S-K 1300 and NI 43-101 (the “Technical Report Summaries”) by Qualified Persons employed by SLR International Corporation (“SLR”), Woods Process Services, Consultants in Hydrogeology, Gochnour & Associate, Inc. and BRS Inc. (“BRS”), none of which is affiliated with the Company or any other entity that has an ownership, royalty, or other interest in the relevant property that is the subject of the Technical Report Summary. See “Material Properties.” Between December 31, 2022 and December 31, 2023, there were no changes to the Mineral Reserves or Mineral Resources. The Alta Mesa Project was sold on February 14, 2023, thus all Mineral Resources associated with that project have been removed from this disclosure along with the description of the Alta Mesa Project from the “Material Properties” section of this Annual Report.
Mineral Reserve Estimates - In Situ Uranium(1)(8)(9)(10)(11)
Project Proven Mineral Reserves Probable Mineral Reserves Metallurgical Recovery
64
Notes:
(1) The Mineral Reserve estimates in this table comply with the requirements of both S-K 1300 and NI 43-101.
(2) Mineral Reserves are estimated at a uranium grade x thickness (G.T.) cut-off grade of 0.10 G.T. (2 ft. of 0.05% eU3O8) for the Congo Pit.
(3) Mineral Reserves are estimated at a uranium grade x thickness (G.T.) cut-off grade of 0.45 G.T. (6 ft. of 0.075% eU3O8) for Sheep Underground.
(4) Underground Mineral Reserves were estimated by creating stope shapes. The stope shapes were created using a grade envelope of 0.15% U3O8, with a minimum mining width of 5 ft (including hanging wall and footwall dilution), on 10 ft vertical stope heights. and 0.45 G.T. (6 ft. of 0.075% eU3O8) for Sheep Underground.
(5) The breakeven cut-off grade is 0.30% U3O8.
(6) A mining extraction factor of 95% was applied to the underground stopes, while underground development assumed a 100% mining extraction factor.
(7) The density varies according to the block model.
(8) Mineral Reserves are estimated using a long-term uranium price of $65 per pound U3O8 for Sheep Mountain and a uranium price of $60 per pound for Pinyon Plain. The long-term uranium price for Sheep Mountain is based on supply and demand projections for the period 2021-2035. The uranium price for Pinyon Plain is based on anticipated spot prices from 2023-2035.
(9) Numbers may not add due to rounding.
(10) The Mineral Reserves are fully excluded from the total Mineral Resources shown below.
(11) Mineral Reserves are 100% attributable to the Company.
Mineral Resource Estimates – In Situ Uranium(1)(2)(3)(4)(10)
ISR Properties
Conventional Properties
Notes: