Skip to content
KStart free
AI InfrastructureDefenseQuantumAll studies →

UUUU US Equity

Energy Fuels IncMaterials · Mining & Quarrying of Nonmetallic Minerals (No Fuels) · CIK 1385849 · FY ends Dec 31
$15.14
+1.24 (+8.92%)
USD · as of 2026-08-21 · marketstack

UUUU · 10-K · period ended 2020-12-31

← all UUUU documents
filed 2021-03-22 · EDGAR original ↗

Our rendering of the filing — original pagination and typography are not reproduced, and tables are reduced to their short label cells (the figures live on FA). Nothing is summarized: every line below is the filing's own text.

blocks 472872 of 3,106900k characters rendered

ITEM 1A. RISK FACTORS

The following information pertains to the outlook and conditions currently known to Energy Fuels that could have a material impact on the financial condition of Energy Fuels. Other factors may arise in the future that are currently not foreseen by management of Energy Fuels that may present additional risks in the future, including risks which the Company currently feels are immaterial. Current and prospective security holders of Energy Fuels should carefully consider these risk factors.

Our failure to successfully address any of the risks and uncertainties described below could have a material adverse effect on our business, financial condition and/or results of operations, and the trading price of our Common Shares may fluctuate widely. We cannot assure you that we will successfully or fully address these risks or other unknown risks that may affect our business.

Risks Related to our Industry

We are subject to the risks normally encountered by companies in the mineral extraction industry.

We are subject to the risks normally encountered by companies in the mineral extraction industry, such as:

•the discovery of unusual, or unexpected geological formations;

•accidental fires, floods, earthquakes, volcanic eruptions, and other natural disasters;

•unplanned power outages and water shortages;

•controlling water and other similar mining hazards;

•operating labor disruptions and labor disputes;

•the ability to obtain suitable or adequate machinery, equipment, or labor;

•our liability for potential pollution or other hazards; and

•other known and unknown risks involved in the conduct of exploration, development, and operation of mines, extraction and recovery facilities, and mills, along with the market for uranium and vanadium.

The development of mineral properties is affected by many factors, including, but not limited to: the cost of operations; variations in the grade of mineralized material; fluctuations in metal markets; costs of extraction and processing equipment; availability of equipment and labor; labor costs and possible labor strikes; government regulations, including without limitation, regulations relating to taxes, royalties, allowable extraction or production, importing and exporting of minerals; foreign exchange; employment; worker safety; transportation; and environmental protection.

Our results of operations are significantly affected by the market price of uranium, vanadium and rare earth elements, which are cyclical and subject to substantial price fluctuations.

Our earnings and operating cash flow are and will be particularly sensitive to the long- and short-term changes in the market price of uranium, vanadium and REEs. Among other factors, these prices also affect the value of our resources, reserves, and inventories, as well as the market price of our Common Shares.

Market prices are affected by numerous factors beyond our control. With respect to uranium, such factors include, among others: demand for nuclear power; political and economic conditions in uranium producing and consuming countries; public and political response to a nuclear incident; reprocessing of used reactor fuel, the re-enrichment of depleted uranium tails and the enricher practice of underfeeding; sales of excess civilian and military inventories (including from the dismantling of nuclear weapons; the premature decommissioning of nuclear power plants; and from the build-up of Japanese utility uranium inventories as a result of the Fukushima incident) by governments and industry participants; uranium supply, including the supply from other secondary sources; production levels and costs of production, and government actions such as, potentially, those planned in the 2021 Budget and those taken pursuant to the 2021 Omnibus Spending Bill that appropriates funding for the proposed U.S. Uranium Reserve. With respect to vanadium, such factors include, among others: demand for steel; the potential for vanadium to be used in advanced battery technologies; political and economic conditions in vanadium producing and consuming countries; world production levels; and costs of production. With respect to REEs, such factors include, among others: demand for REEs; political and economic conditions in REE producing and consuming countries; REE-bearing ore supply from secondary sources; international interest in the purchase of REE carbonate, absent a U.S.-based separation facility; public and political response to REE initiatives at the White Mesa Mill; governmental investment in domestic REE infrastructure; world production levels; costs of production; risks associated with foreign governmental actions, policies, laws, rules and regulations, and foreign state subsidized enterprises, with respect to REE production and sales, which could impact REE prices available to the Company and impact our access to world and domestic markets for the supply of REE-bearing ores and the sale of REE carbonate and other REE products and services to world and domestic markets; and other government actions, including licensing and import requirements.

30

Other factors relating to the price of uranium, vanadium and REEs include: levels of supply and demand for a broad range of industrial products; substitution of new or different products in critical applications for our existing products; expectations with respect to the rate of inflation; the relative strength of the U.S. dollar and of certain other currencies; interest rates; global or regional political or economic crises; regional and global economic conditions; and sales of uranium, vanadium and REE carbonate by holders in response to such factors. If prices are below our cash costs of extraction or recovery and remain at such levels for any sustained period, we may determine that it is not economically feasible to continue commercial extraction, recovery or processing at any or all of our projects or other facilities and may also be required to look for alternatives other than cash flow to maintain our liquidity until prices recover. Our expected levels of uranium recovery and business activity are dependent on our expectation and the industry’s expectations of uranium, vanadium and REE prices, which may not be realized or may change. In the event we conclude that a significant deterioration in expected future uranium prices has occurred, we will assess whether an impairment allowance is necessary which, if required, could be material.

The recent fluctuations in the price of many commodities is an example of a situation over which we have no control, and which could materially adversely affect us in a manner for which we may not be able to compensate. There can be no assurance that the price of any minerals recovered from or processed at our properties will be such that any deposits can be operated at a profit.

Our profitability is directly related to the market price of uranium, vanadium and REEs recovered. We may, from time to time, undertake commodity and currency hedging programs, with the intention of maintaining adequate cash flows and profitability to contribute to the long-term viability of the business. We anticipate selling forward in the ordinary course of business if, and when, we have sufficient assets and recovery to support forward sale arrangements, and forward sale arrangements are available on suitable terms. There are, however, risks associated with forward sale programs. If we do not have sufficient recovered product to meet our forward sale commitments, we may have to buy or borrow (for later delivery back from recovered product) sufficient product in the spot market to deliver under the forward sales contracts, possibly at higher prices than provided for in the forward sales contracts, or potentially default on such deliveries. In addition, under forward contracts, we may be forced to sell at prices that are lower than the prices that may be available on the spot market when such deliveries are completed. Although we may employ various pricing mechanisms within our sales contracts to manage our exposure to price fluctuations, there can be no assurance that such mechanisms will be successful. There can also be no assurance that we will be able to enter into term contracts for future sales of uranium, vanadium or REE carbonate at prices or in quantities that would allow us to successfully manage our exposure to price fluctuations.

Our properties do not contain Mineral Reserves under SEC Industry Guide 7, and many of the Company’s properties, projects, and facilities are not economic at today’s commodity prices.

Our properties do not contain any mineral reserves under SEC Industry Guide 7 (see “Cautionary Note to United States Investors Concerning Disclosure of Mineral Reserve and Mineral Resource Estimates”). At current uranium and vanadium prices, many of our properties, projects, and facilities are not economic for uranium or vanadium extraction, recovery, or processing. At our Pinyon Plain Project, we are currently evaluating the possibility of recovering copper as a byproduct along with uranium and the impact of any recovered copper on the economics of that project at current uranium prices. We intend to continue to hold, and in certain cases advance, a number of those properties, projects, and facilities in anticipation of possible future increases in the prices of uranium and/or vanadium, as the case may be. However, there can be no assurance that uranium and/or vanadium prices will ever, or within a reasonable time period, increase to the levels required to advance those properties or, in the case of projects or facilities on standby, to resume exploration, extraction, recovery, or processing activities at those projects or facilities. Similarly, there can be no assurance that the value of any copper recovered as a byproduct at the Pinyon Plain Project will be sufficient to advance that project without increases in the price of uranium and/or copper. We continue to hold such properties, projects, and facilities because we believe that uranium and/or vanadium prices are likely to rise to such levels within a reasonable time period and that the Company could be able to demonstrate a significant copper credit at the Pinyon Plain Project, and the ability to maintain scalability as commodity prices increase is a key component of our business strategy. However, as there is a cost associated with holding and in some cases maintaining on standby such properties, projects, or facilities, we continuously evaluate, on a case-by-case basis, such costs against the prospects for price increases, and may from time to time sell, drop or reclaim any such properties, projects, or facilities. We have currently identified a number of non-core properties and projects that we may sell, drop, or reclaim depending on current market conditions.

Exploration, development, extraction, mining, recovery and milling of minerals, and the transportation and handling of the products recovered, are subject to extensive federal, state and local laws and regulations.

These regulations govern, among other things; acquisition of the property or mineral interests; maintenance of claims; tenure; expropriation; prospecting; exploration; development; construction; extraction and mining; recovery, processing, milling and production; price controls; exports; imports; taxes and royalties; labor standards; occupational health; waste disposal; toxic

31

substances; water use; land use; Native American consultations and accommodations; environmental protection and remediation; endangered and protected species; mine, mill and other facility decommissioning and reclamation; mine safety; transportation safety and emergency response; and other matters. Compliance with such laws and regulations has increased the costs of exploring, drilling, developing, constructing, operating and closing of our mines, mills, plants and other extraction, recovery and processing facilities. It is possible that, in the future, the costs, delays and other effects associated with such laws and regulations may impact our decision as to whether to operate existing mines or facilities, or, with respect to exploration, development or construction properties, whether to proceed with exploration, development or construction, or that such laws and regulations may result in our incurring significant costs to remediate or decommission properties that do not comply with applicable environmental standards at such time. We expend significant financial and managerial resources to comply with such laws and regulations. We anticipate continuing to do so as the historic trend toward stricter government regulation may continue. There can be no assurance that future changes in applicable laws and regulations will not adversely affect our activities, operations or financial condition. New laws and regulations, amendments to existing laws and regulations or more stringent implementation of existing laws and regulations, including through stricter license and permit conditions, could have a material adverse impact on us, increase costs, cause a reduction in levels of, or suspension of, extraction or recovery and/or delay or prevent the construction or development of new mineral extraction properties.

Mineral extraction is subject to potential risks and liabilities associated with impacts to the environment and the disposal of waste products occurring as a result of mineral exploration, extraction, mining, recovery and production. Environmental liability may result from mining or mineral extraction activities conducted by others prior to our ownership of a property. Failure to comply with applicable laws, regulations and permitting requirements may result in enforcement actions. These actions may result in orders issued by regulatory or judicial authorities causing activities or operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment or remedial actions. Companies engaged in uranium exploration operations may be required to compensate others who suffer loss or damage by reason of such activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations. Should we be unable to fully fund the cost of remedying an environmental problem, the Company might be required to suspend activities or operations, declare bankruptcy, or enter into interim compliance measures pending completion of the required remedy, which could have a material adverse effect on the Company. To the extent that we are subject to uninsured environmental liabilities, the payment of such liabilities would reduce otherwise available earnings and could have a material adverse effect on us. In addition, we do not have coverage for environmental losses generally or for certain other risks as such coverage cannot be purchased at a commercially reasonable cost. Compliance with applicable environmental laws and regulations requires significant expenditures and increases mine and facility, construction, development and operating costs.

While the very heart of our business – uranium production, which is the fuel for carbon-free, emission-free baseload nuclear power – and our recycling programs, help address global climate change and reduce air pollution, the world’s focus on addressing climate change will require the Company to continue to conduct all of its operations in a manner that minimizes the use of resources, including the unnecessary use of energy resources, in order to continue to minimize air emissions at our facilities, which can also increase mine and facility, construction, development and operating costs. Regulatory and environmental standards may also change over time to address global climate change, which could further increase these costs.

With the recent change in administration, there is a risk that the new administration will not support mining, uranium mining, nuclear energy or other aspects of our business, including: not supporting the proposed establishment of a U.S. Uranium Reserve included in the COVID-Relief and Omnibus Spending Bill passed by the U.S. Congress in December 2020, or any or all of the other recommendations of the U.S. Nuclear Fuel Working Group; and limiting, restricting or preventing the use of public lands for mining and other activities.

Worldwide demand for uranium is directly tied to the demand for electricity produced by the nuclear power industry, which is also subject to extensive government regulation and policies. The development of mineral properties and related facilities is contingent upon governmental approvals that are complex and time consuming to obtain and which, depending upon the location of the project, involve multiple governmental agencies. The duration and success of such approvals are subject to many variables outside of our control. Any significant delays in obtaining or renewing such permits or licenses in the future could have a material adverse effect on us. In addition, the international marketing of uranium is subject to governmental policies and certain trade restrictions, such as those imposed by the suspension agreement between the United States and Russia. Changes in these policies and restrictions may adversely impact our business.

Public acceptance of nuclear energy and competition from other energy sources is unknown.

Growth of the uranium and nuclear industry will depend upon continued and increased acceptance of nuclear technology as an economic means of generating electricity. Because of unique political, technological and environmental factors that affect the nuclear industry, including the risk of a nuclear incident, the industry is subject to public opinion risks that could have an

32

adverse impact on the demand for nuclear power and increase the regulation of the nuclear power industry. Nuclear energy competes with other sources of energy, including oil, natural gas, coal, hydro-electricity and renewable energy sources. These other energy sources are to some extent interchangeable with nuclear energy, particularly over the longer term. Sustained lower prices of oil, natural gas, coal and hydroelectricity may result in lower demand for uranium concentrates. Increased government regulation and technical requirements may make nuclear uneconomic, resulting in lower demand for uranium concentrates. Technical advancements and government subsidies in renewable and other alternate forms of energy, such as wind and solar power, could make these forms of energy more commercially viable and put additional pressure on the demand for uranium concentrates.

Unfavorable media coverage of mining or nuclear energy could negatively affect our business.

The Company is subject to media coverage relating to mining and the production of uranium and other forms of nuclear energy, some of which can be inaccurate, non-objective or politically motivated. As a result, the Company is frequently required to address or respond to such media coverage, which can be costly and time-consuming for the Company. Such inaccurate and non-objective media coverage can also negatively impact public perception of the Company’s activities, the market for the Company’s securities, government relations, permitting activities and legal challenges.

The uranium industry is highly competitive.

The international uranium industry, including the supply of uranium concentrates, is competitive. We market uranium in direct competition with supplies available from a relatively small number of uranium mining companies, from nationalized uranium companies, from uranium produced as a byproduct of other mining operations, from excess inventories, including inventories made available from decommissioning of nuclear weapons, from reprocessed uranium and plutonium, from used reactor fuel, and from the use of excess Russian enrichment capacity to re-enrich depleted uranium tails. A large quantity of current world production is foreign state subsidized and appears to be relatively inelastic, in that uranium market prices appear to have little effect on the quantity supplied. In the case of foreign state subsidized production, uranium production may not be fully subject to market factors and may be sold at prices that may be less than the cost of production. The supply of uranium from Russia is, to some extent, impeded by a number of international trade agreements and policies. These agreements and any similar future agreements, governmental policies or trade restrictions are beyond our control and may affect the supply of uranium available in the United States and Europe.

We compete with other mining companies and individuals for capital, mineral resources and reserves, and other mining assets, which may increase the cost of acquiring suitable claims, properties and assets, and we also compete with other mining companies to attract and retain key executives, employees and consultants. In addition, there are relatively few customers for uranium. There can be no assurance that we will continue to be able to compete successfully with our competitors in acquiring such properties and assets or in attracting and retaining skilled and experienced employees.

Mining operations involve a high degree of risk.

The exploration, construction, development, operation, and other activities associated with mineral projects, along with the expansion of existing recovery operations and mining activities and restarting of projects, involve significant risks, including financial, technical, and regulatory risk. Development or advancement of any of the exploration properties in which we have an interest will only follow upon obtaining satisfactory exploration results, project permitting and licensing, and financing. The exploration, construction, development, operation and other activities associated with mineral projects involves significant financial risks over an extended period of time, which even a combination of careful evaluation, experience and knowledge may not eliminate. While discovery of a mine or other facility may result in substantial rewards, few properties which are explored are ultimately developed into producing mines or extraction or recovery facilities. Major expenses may be required to establish mineral resources and mineral reserves by drilling and to finance, permit, license, and construct extraction, mining, recovery and processing facilities. It is impossible to ensure that the current or proposed exploration, permitting, construction, or development programs on our mineral properties will result in a profitable commercial extraction, mining, or recovery operations.

Whether a mineral deposit will be commercially viable depends on a number of factors, which include, among other things: the accuracy of resource and reserve estimates; the particular attributes of the deposit, such as its size, geology and grade; the ability to economically recover commercial quantities of the minerals; proximity to infrastructure and availability of personnel; financing costs; governmental regulations, including regulations relating to prices, taxes, royalties; the potential for litigation; land use; importing and exporting; and environmental and cultural protection. The construction, development, expansion and restarting of projects are also subject to: the successful completion of engineering studies; the issuance of necessary governmental permits; the availability of adequate financing; engineering and construction timetables and capital costs being

33

correctly estimated for our projects, including restarting projects on standby; and such construction timetables and capital costs not being affected by unforeseen circumstances. The effect of these factors cannot be accurately predicted, but the combination of these factors, along with others, may result in our not receiving an adequate return on invested capital.

It is possible that actual costs and economic returns of current and new extraction, mining, or recovery operations may differ materially from our best estimates. It is not unusual in the mining industry for new mining operations and facilities to experience unexpected problems during the start-up phase, take much longer than originally anticipated to bring into a recovery or producing phase, require more capital than anticipated, operate at a higher cost than expected, and/or have reclamation liabilities which are higher than expected.

There can be no assurance that as the Company mines its properties, or disposes of properties, the reduction of existing mineral resources through depletion or sales, will be replaced with new resources of comparable value.

There is uncertainty in the estimation of mineral reserves and mineral resources.

Our properties do not contain any mineral “reserves” as defined under Industry Guide 7. See “Cautionary Note to United States Investors Concerning Disclosure of Mineral Reserve and Mineral Resource Estimates.”

Mineral reserves and resources are statistical estimates of mineral content pursuant to Canadian National Instrument 43-101, based on limited information acquired through drilling and other sampling methods, and require judgmental interpretations of geology. Successful extraction requires safe and efficient mining and processing. Our mineral reserves and resources are estimates, and no assurance can be given that the estimated reserves and resources are accurate or that the indicated level of uranium or vanadium will be produced economically or otherwise. Such estimates are, in large part, based on interpretations of geological data obtained from drill holes and other sampling techniques. Actual mineralization or formations may be different from those predicted. Further, it may take many years from the initial phase of drilling before production is possible, and during that time the economic feasibility of exploiting a discovery may change.

Mineral reserve and resource estimates for properties that have not commenced extraction, production or recovery are based, in many instances, on limited and widely spaced drill-hole information, which is not necessarily indicative of the conditions between and around drill holes. Accordingly, such mineral resource and reserve estimates may require revision as more drilling information becomes available or as actual extraction, production or recovery experience is gained. It should not be assumed that all or any part of our mineral resources constitutes, or will be converted into, “reserves.” Market price fluctuations of uranium or vanadium as applicable, as well as increased production and capital costs or reduced recovery rates, may render our proven and probable reserves unprofitable to develop at a particular site or sites for periods of time or may render mineral reserves containing relatively lower grade mineralization uneconomic.

Opposition to mining may disrupt our business activities.

In recent years, governmental agencies, non-governmental organizations, individuals, communities and courts have become more vocal and active with respect to their opposition to certain mining and business activities including with respect to production and uranium recovery at our facilities, such as the White Mesa Mill and the Pinyon Plain Project. This opposition may take on forms such as road blockades, applications for injunctions seeking to cease certain construction, development, extraction, mining and/or milling or recovery activities, refusals to grant access to lands or to sell lands on commercially viable terms, lawsuits for damages or to revoke or modify licenses and permits, issuances of unfavorable laws and regulations, and other rulings contrary to our interests. These actions can occur in response to current activities or in respect of mines or facilities that are decades old. In addition, these actions can occur in response to our activities or the activities of other unrelated entities. Opposition to our activities may also result from general opposition to nuclear energy and mining. Opposition to our business activities are beyond our control. Any opposition to our business activities may cause a disruption to our business activities and may result in increased costs, and this could have a material adverse effect on our business and financial condition.

We are subject to technical innovation and obsolescence in the uranium industry.

Requirements for our products and services may be affected by technological changes in nuclear reactors, enrichment, and used uranium fuel reprocessing. These technological changes could reduce the demand for uranium. The cost competitiveness of our operations may be impacted through the development and commercialization of other uranium mining, milling, processing and other technologies. As a result, our competitors may adopt technological advancements that give them an advantage over the Company.

34

Mining, extraction, recovery, processing, construction, development, and exploration activities depend, to a substantial degree, on adequate infrastructure.

Reliable roads, bridges, power sources, and water supply are important determinants affecting capital and operating costs. We consider the existing infrastructure to be adequate to support our proposed operations and activities. However, unusual or infrequent weather phenomena including drought, sabotage, government, or other interference in the maintenance or provision of such infrastructure could adversely affect our operations and activities, financial condition and results of operations.

Mining, mineral extraction, recovery and milling are subject to a high degree of risk, and we are not insured to cover against all potential risks.

Our operations and activities are subject to all of the hazards and risks normally incidental to exploration, construction, development, extraction and mining of mineral properties, and recovery, processing and milling, including: environmental hazards; industrial accidents; labor disputes, disturbances and unavailability of skilled labor; encountering unusual or unexpected geologic formations; rock bursts, pressures, cave-ins, flooding; periodic interruptions due to inclement or hazardous weather conditions; technological and processing problems, including unanticipated metallurgical difficulties, ground control problems, process upsets and equipment malfunctions; the availability and/or fluctuations in the costs of raw materials and consumables used in our production and recovery processes; the ability to procure mining and other equipment and operating and other supplies in sufficient quantities and on a timely basis; and other extraction, mining, recovery, milling, and processing risks, as well as risks associated with our dependence on third parties in the provision of transportation and other critical services. Many of the foregoing risks and hazards could result in damage to, or destruction of, our mineral properties or processing or recovery facilities, personal injury or death, environmental damage, delays in or interruption of or cessation of extraction, mining, production and recovery from our mines or processing facilities or in our exploration, construction or development activities, delay in or inability to receive regulatory approvals to transport our uranium concentrates, or costs, monetary losses and potential legal liability and adverse governmental action. In addition, due to the radioactive nature of the materials handled in uranium extraction, mining, recovery, and processing, additional costs and risks are incurred by us on a regular and ongoing basis.

While we may obtain insurance against certain risks in such amounts as we consider adequate, the nature of these risks are such that liabilities could exceed policy limits or could be excluded from coverage. There are also risks against which we cannot insure or against which we may elect not to insure. The potential costs which could be associated with any liabilities not covered by insurance or in excess of insurance coverage or compliance with applicable laws and regulations may cause substantial delays and require significant capital outlays, adversely affecting our future earnings, financial position and competitive position. No assurance can be given that such insurance will continue to be available or will be available at economically feasible premiums or that it will provide sufficient coverage for losses related to these or other risks and hazards. This lack of insurance coverage could result in material economic harm to us.

Risks associated with our REE business.

There are a number of risks inherent to our REE activities, which include the following:

•The risk of achieving and maintaining an adequate supply of monazite sands for processing at the White Mesa Mill. The Company does not currently own its own monazite-bearing mines and is completely dependent on contractual arrangements for its REE feed sources. There can be no guarantee that the Company will be able to secure adequate monazite supply over the long-term at suitable prices. In addition, the price the Company may be required to pay for monazite sands is subject to the risk of influence by foreign policy and/or foreign state-owned enterprises. We will evaluate potential joint ventures with mine owners but there can be no guarantee that any joint ventures can be realized on acceptable terms. Further, to the extent the Company is required to purchase monazite ore sources and rely on REE separation facilities located outside the United States, we may be at a transportation cost disadvantage compared to processing facilities in China or elsewhere that may be closer to potential ore sources and/or REE separation facilities;

•The risk of being able to contract to sell the White Mesa Mill’s REE product at satisfactory prices. The Company intends to secure potential sales contracts with one or more REE separation facilities for the sale of the REE carbonate produced at the Mill, but there can be no guarantee that any such contracts will be entered into on satisfactory terms, or at all, in the future. If the Company is not able to secure adequate contracts for the sale of its REE carbonate, we may be required to hold our carbonate in inventory until it can be sold at reasonable prices, which would require the commitment of the Company’s cash resources while the REE product is being held in inventory. We would also bear the risk that the REE product may not be able to be sold at reasonable prices in the future, either due to a lack of a market for the purchase of our REE carbonate, and/or a reduction in REE commodity prices and hence a reduction in the value of the carbonate. We anticipate that the U.S. government may take steps to support the development of a U.S.

35

supply chain for REEs through price support or other mechanisms, but there can be no guarantee that any such support will be given, or if given, would benefit the Company.

•The risk of process failures in the production of REE carbonates such as the ability of the Company to produce REE Carbonate to meet commercial specifications on a commercial scale at acceptable costs, which could delay the expected commencement of commercial production of REE carbonate at the Mill in 2021 or prevent the commercial production of REE carbonate cost-competitively or at all;

•The risk that we may not be able to increase our sources of natural monazite sands or other ores in amounts sufficient to result in cost competitive production of REE carbonate at the Mill;

•The inability of the Company to successfully or cost-competitively process other types of REE and uranium bearing ores at the Mill produced from coal-based resources;

•The inability of the Company to construct and operate an REE separation facility, and potentially other downstream REE activities, including metal-making and alloying, in the future at the Mill or elsewhere in the United States; and

•The risk of permit and license challenges or the failure to obtain any needed permit or license amendments. The Mill can produce REE carbonate, along with uranium, from natural uranium- and REE-bearing monazite sand ores, but additional licensing may be required to permit and construct a separation facility and potential REE metal and metal alloy facilities at the Mill. The existing licensing regime and any new permits or licenses or amendments that may be required are subject to challenge, which could delay or prevent existing production or any new construction, as well as any separation and other activities.

Risks Relating to our Regulatory Environment

The SEC’s adoption of the “Modernization of Property Disclosures for Mining Registrants” creates uncertainty related to the Company’s existing NI 43-101 reserves and resources and may result in increased compliance costs for the Company.

The New Rule will rescind Industry Guide 7 when all registrants are required to comply with the new rules. The New Rule will require the Company to disclose specific information related to its material mining operations including concerning its mineral resources and mineral reserves. While the New Rule has similarities with NI 43-101, the Company may be required to update or revise all existing technical reports which may result in revisions (either upward or downward) to the Company’s reserves and resources. In addition, the New Rule is subject to unknown interpretations, which could require the Company to incur substantial costs associated with compliance. If the Company fails to come into compliance with the New Rule, it could be subject to enforcement actions by the SEC. The Company cannot predict the nature of any future enforcement, interpretation, or application of the New Rule. Any further revisions to, or interpretations of, the New Rule could result in the Company incurring unforeseen costs associated with compliance.

We are a “smaller reporting company” and, therefore, certain reduced disclosure and other requirements are available to us.

Currently, we are a “smaller reporting company” meaning we have (i) less than $100 million in annual revenues and our public float is less than $700 million or (ii) we have a public float less than $250 million. As a “smaller reporting company,” we may provide certain scaled disclosures, although the Company has elected not to avail itself of all of the scaled disclosure options available to “smaller reporting companies” at this time.

Our future business and results of operations face uncertainties as a result of any action or inaction of the U.S. Government pursuant to the 2021 Omnibus Spending Bill that appropriates funding for a proposed U.S. Uranium Reserve, and any further evaluations by the U.S. Nuclear Fuel Working Group.

On December 27, 2020, the COVID-Relief and Omnibus Spending Bill, which includes $75 million for the proposed establishment of a strategic U.S. Uranium Reserve, was signed into law. Because the U.S. Uranium Reserve has yet to be established at this time, however, there can be no certainty as to the outcome of a Uranium Reserve, if any, including the process for and details of its development, or for any further evaluations of the U.S. Nuclear Fuel Working Group established in July 2019 to “develop recommendations for reviving and expanding domestic nuclear fuel production.” If the required appropriations passed by Congress are deferred, or if they are implemented in a way that does not provide the required support for the Company’s activities, and uranium and vanadium markets do not improve and/or the Company’s REE initiatives are not adequate to otherwise sustain the Company’s other business activities, we may further reduce our operational activities and monetize certain non-core conventional mining assets as required in order to minimize our cash expenditures while preserving our core asset base for increased production in the future as market conditions may warrant.

36

Participation in Industry Trade Petition and related activities could have negative repercussions.

The Company previously participated in the filing of a Petition for Relief with the U.S. Department of Commerce (“DOC”) under Section 232 of the Trade Expansion Act of 1962 (as amended) From Imports of Uranium Products that Threaten U.S. National Security (the “Section 232 Petition”), which resulted in the establishment of the Working Group on July 12, 2019 to study U.S. nuclear fuel production, including uranium mining, in order “to develop recommendations for reviving and expanding domestic nuclear fuel production” and to “reinvigorate the entire nuclear fuel supply chain, consistent with United States national security and nonproliferation goals.” Based on recommendations from the Working Group, the U.S. Congress included in its COVID-Relief and Omnibus Spending Bill, which was signed into law on December 27, 2020, $75 million for the proposed establishment of a strategic U.S. Uranium Reserve. See “Proposed Establishment of a U.S. Uranium Reserve and Working Group Update.”

Although the Company believes this bipartisan appropriation is a significant accomplishment that will ultimately strengthen the U.S. uranium mining industry, bolster national defense, and improve supply diversification for U.S. utilities and their customers, there is a risk that such funds will not be allocated in a way that benefits the Company, a risk that the proposed U.S. Uranium Reserve will not be established, or will see a delay in its establishment, and the potential for negative responses or repercussions to these activities from various special interest groups, government entities, consumers of uranium and participants in other phases of the nuclear fuel cycle, both domestically and abroad, which could have a negative impact on the Company and its operations. In addition, the costs of pursuing such actions have been and could continue to be significant. It should also be noted that there can be no certainty as to the any further recommendations of the Working Group, and therefore its influence on the U.S. Congress and uranium industry going forward is uncertain.

Participation in the renewal of the Russian Suspension Agreement and related activities could have negative repercussions.

In October 2020, the DOC and State Atomic Energy Corporation Rosatom, on behalf of the Government of the Russian Federation, signed an amendment (the “Amendment”) to the “Agreement Suspending the Antidumping Investigation on Uranium from the Russian Federation” (the “Agreement”), thereby extending limitations on the import of Russian low-enriched uranium into the U.S. for use as fuel for nuclear reactors until the year 2040 and tightening restrictions in order to close loopholes identified in the original Agreement. The Company participated with the DOC in its efforts to secure the Amendment as an advocate for domestic uranium producers, which has the potential for negative responses or repercussions to these activities from various special interest groups, government entities, consumers of uranium and participants in other phases of the nuclear fuel cycle, both domestically and abroad, which could have a negative impact on the Company and its operations.

Our business is subject to extensive environmental regulations that may make exploring, mining, or related activities expensive, and which may change at any time.

We are required to comply with environmental protection laws and regulations and permitting requirements promulgated by federal agencies and various states and counties in which we operate and conduct our activities, in connection with extraction, mining, recovery and milling operations. The uranium industry is subject not only to the worker health and safety and environmental risks associated with all mining activities, but also to additional risks uniquely associated with uranium extraction, mining, recovery, and milling. We expend significant resources, both financial and managerial, to comply with these laws and regulations. The possibility of more stringent regulations exists in the areas of worker health and safety, storage of hazardous materials, standards for heavy equipment used in extraction, mining, recovery or milling, the disposition of wastes, the decommissioning and reclamation of exploration, extraction, mining, recovery, milling and in-situ sites, climate change and other environmental matters, each of which could have a material adverse effect on the cost or the viability of a particular project.

We cannot predict what environmental legislation, regulations or policies will be enacted or adopted in the future or how future laws and regulations will be administered or interpreted. The recent trend in environmental legislation and regulation is generally toward stricter standards, and this trend is likely to continue in the future. This recent trend includes, without limitation, laws and regulations relating to air and water quality, mine and other facility reclamation, waste handling and disposal, the protection of certain species and the preservation of certain lands. These regulations may require the acquisition of permits or other authorizations for certain activities. These laws and regulations may also limit or prohibit activities on certain lands. Compliance with more stringent laws and regulations, as well as potentially more vigorous enforcement policies, stricter interpretation of existing laws and stricter permit and license conditions, may necessitate significant capital outlays, may materially affect our results of operations and business or may cause material changes or delays in our intended activities. There can be no assurance of our continued compliance or ability to meet stricter environmental laws and regulations and permit or license conditions. Delays in obtaining permits and licenses could impact expected production levels or increases in expected uranium extraction levels.

37

Our operations may require additional analysis in the future including environmental, cultural, and social impact and other related studies. Certain activities require the submission and approval of environmental impact assessments. We cannot provide assurance that we will be able to obtain or maintain all necessary permits that may be required to continue operations or exploration and development of our properties or, if feasible, to commence construction, development, operation or other activities relating to mining facilities at such properties on terms that enable operations or activities to be conducted at economically justifiable costs. If we are unable to obtain or maintain, licenses, permits or other rights for construction or development of our properties, or otherwise fail to manage adequately future environmental issues, our uranium recovery operations and mining activities could be materially and adversely affected.

In December 2016, former President Obama designated the Bears Ears National Monument by executive order, which comprises 1.35 million acres of land in San Juan County, Utah. As originally mapped, the monument boundary was on the western property line of the White Mesa Mill, and the western monument boundary was very close to the permit boundary of the Daneros Mine, which could impact access to the mine. A National Monument created on land where our projects are sited, or near the Company’s projects, along with any resulting changes to rules or regulations, could significantly adversely impact any of our material projects and could have a material adverse impact on the Company.

The former Trump administration subsequently modified the designation of the Bears Ears National Monument on December 4, 2017 through Presidential Proclamation, which took effect on February 2, 2018. The revised boundaries have been moved well away from the White Mesa Mill property boundary as well as the Daneros Mine permit boundary. This revision of the monument boundaries is currently under legal challenge, but the Company does not expect that action to interfere with its operations or activities.Under the current administration, there is a risk that the boundaries of the monument may be changed, including changed to their original locations abutting the White Mesa Mill property boundary and close to the permit boundary of the Daneros Mine, which could adversely impact those properties.

The new or lasting impacts of the USMCA (formerly NAFTA) on the Company remain unclear, and any action by President Biden to withdraw from or materially modify certain other international trade agreements in the future could adversely affect our business, financial condition and results of operations, to the extent dependent on the jurisdiction of our incorporation.

Although our primary trading market is the NYSE American, we have a majority of U.S. resident shareholders, are a U.S. Domestic Issuer for SEC purposes, and all of our assets, operations and employees are in the U.S., the Company is incorporated in Ontario, Canada. On September 30, 2018, trade representatives acting on behalf of the U.S., Mexico and Canada renegotiated the terms of the North American Free Trade Agreement (“NAFTA”) in what is known as the United States-Mexico-Canada Agreement (“USMCA”), which entered into force on July 1, 2020 after being approved by the U.S. Congress. At this time, the new or lasting impacts of the USMCA on the Company remain unclear. In addition, if President Biden takes action to withdraw from or materially modify certain other international trade agreements, and such actions depend on the jurisdiction of our incorporation, then our business, financial condition and results of operations could possibly be adversely affected, depending on the nature of the action.

Possible amendments to the General Mining Law could make it more difficult or impossible for us to execute our business plan.

Members of the United States Congress have repeatedly introduced bills which would supplant or alter the provisions of the United States Mining Law of 1872, as amended. Such bills have proposed, among other things, to (i) either eliminate or greatly limit the right to a mineral patent; (ii) significantly alter the laws and regulations relating to uranium mineral development and recovery from unpatented and patented mining claims; (iii) impose a federal royalty on production from unpatented mining claims; (iv) impose time limits on the effectiveness of plans of operation that may not coincide with mine or facility life; (v) impose more stringent environmental compliance and reclamation requirements on activities on unpatented mining claims; (vi) establish a mechanism that would allow states, localities and Native American tribes to petition for the withdrawal of identified tracts of federal land from the operation of the U.S. general mining laws; and (vii) allow for administrative determinations that mining or similar activities would not be allowed in situations where undue degradation of the federal lands in question could not be prevented. If enacted, such legislation could change the cost of holding unpatented mining claims and could significantly impact our ability to develop locatable mineral resources on our patented and unpatented mining claims. Although it is impossible to predict at this point what any legislated royalties might be, enactment could adversely affect the potential for construction and development and the economics of existing operating mines and facilities. Passage of such legislation could adversely affect our financial performance.

38

In addition to the withdrawal noted in the previous risk factor, there are currently other designated or proposed withdrawals of federal lands for the purposes of mineral location and development and proposed designations of national monuments which would have a similar effect as a withdrawal. While such proposals are not yet final and would require further federal action, if they were to occur, it is uncertain whether any such withdrawals or designations would affect in any manner our current mineral projects.

Risks Related to Our Business

Because the probability of an individual prospect ever having “reserves” as defined by the SEC Industry Guide 7 is not known, our properties may not contain any “reserves,” and any funds spent on exploration may be lost.

We have no “reserves” as defined by SEC Industry Guide 7. Because the probability of an individual prospect ever having “reserves” as defined by SEC Industry Guide 7 is uncertain, our properties may not contain any “reserves,” and any funds spent on exploration, construction, development, extraction, and recovery may be lost. We do not know with certainty that economically recoverable uranium exists on any of our properties as defined by SEC Industry Guide 7. Further, although we are undertaking uranium extraction activities at our White Mesa Mill, our lack of established reserves means that we are uncertain as to our ability to continue to generate revenue from our operations. We may never discover uranium in commercially exploitable quantities and any identified deposit may never qualify as a commercially mineable “reserve.” We will continue to attempt to acquire the surface and mineral rights on lands that we think are geologically favorable or where we have historical information in our possession that indicates uranium mineralization might be present.

The exploration and, if warranted, construction relating to or development of mineral deposits involves significant financial and other risks over an extended period of time, which even a combination of careful evaluation, experience and knowledge may not eliminate. Few properties which are explored are ultimately developed into producing mines. Major expenditures are required to establish reserves by drilling and to construct mining and processing facilities at a site. Our uranium properties are all classified under SEC Industry Guide 7 to be at the “exploration” stage and do not contain any “reserves” at this time. It is impossible to ensure that the current or proposed exploration programs and other activities on properties in which we have an interest will result in the delineation of mineral “reserves” or in profitable commercial operations. Our operations and activities are subject to the hazards and risks normally incident to exploration and production of uranium, precious and base metals, any of which could result in damage to life or property, environmental damage and possible legal liability for such damage. While we may obtain insurance against certain risks, the nature of these risks is such that liabilities could exceed policy limits or could be excluded from coverage. There are also risks against which we cannot insure or against which we may elect not to insure. The potential costs which could be associated with any liabilities not covered by insurance, or in excess of insurance coverage, or compliance with applicable laws and regulations may cause substantial delays and require significant capital outlays, adversely affecting our future earnings and competitive position and, potentially our financial viability.

The White Mesa Mill has historically been run on a campaign basis as sufficient feed materials are available, and there can be no assurance that sufficient mill feed will be available in the future to sustain future campaigns.

The White Mesa Mill has historically operated on a campaign basis, whereby mineral processing occurs as mill feed, cash needs, contract requirements, and/or market conditions may warrant. Each milling campaign is subject to receipt of sufficient mill feed that would allow us to operate the Mill on a profitable basis and/or recover a portion of its standby costs.

At current uranium and vanadium prices, none of the Company’s conventional mines were active in 2020; all such conventional properties are either on standby, in the evaluation and permitting phase, or inactive, and no third-party conventional properties are operating to provide mill feed. In times of depressed commodity prices, when conventional mine production is on standby, the Mill has relied primarily on processing alternate feed materials. The Company continuously seeks to identify and secure additional alternate feed materials and other sources of mill feed, such as materials from the clean-up of abandoned uranium mine sites. The Company is also in the process of ramping up for the planned commercial production of REE carbonate at the Mill in 2021. However, there can be no assurance that sufficient conventional ores, alternate feed materials, suitable tailings pond solutions and/or other sources of mill feed will be available in the future, or that our planned production of REE carbonate will be successful, so as to allow us to operate the White Mesa Mill on a profitable basis and/or recover a portion of the Mill’s standby costs at any time.

Our prior term sales contracts for a portion of our recovered uranium have expired, with no new long-term contracts for the sale of uranium or vanadium made in 2020 or to date in 2021, and there can be no guarantee that we will be able to enter into new term sales contracts in the future on suitable terms and conditions.

39

All the Company’s existing long-term sales contracts for a portion of our recovered uranium expired following the Company’s final April 1, 2018 deliveries. The Company did not enter into any new long-term contracts for the sale of uranium or vanadium in 2019, 2020 or, as of the date of this Form 10-K, in 2021, and there can be no guarantee that the Company will be able to enter into long-term contracts for the delivery of a sufficient amount of uranium, vanadium or REE carbonate at satisfactory prices in the future. The failure to enter into new term sales contracts on suitable terms could adversely impact our operations and mining activity decisions and resulting cash flows and income.

Vanadium mineral resource estimates for the La Sal Complex are based in part on the Company’s White Mesa Mill production records.

For the Company’s La Sal Complex uranium-vanadium property, vanadium assay results are not available for all drill holes such that the vanadium mineral resource estimate is in part based on a ratio of vanadium to uranium supported by actual mill production records from the Company’s White Mesa Mill. There is a risk that the use of a ratio based on mill production records may increase the potential uncertainty in vanadium grades.

We may be unable to timely pay our outstanding debt obligations, which may result in us losing some of our assets covered by mortgage and/or other security arrangements, and which may adversely affect our assets, results of operations, and future prospects.

We may from time to time enter into arrangements to borrow money in order to fund our operations and expansion plans, and such arrangements may include covenants that restrict our business in some way. We may also from time to time acquire properties whereby certain payment obligations owed to the seller are paid by us over time, with the seller’s sole remedy for non-payment by us being re-acquisition of the property. Events may occur in the future, including events out of our control that would cause us to fail to satisfy our debt or financing instruments. In such circumstances, or if we were to default on our obligations under such debt or financing instruments, the amounts drawn in accordance with the underlying agreements may become due and payable before the agreed maturity date, and we may not have the financial resources to repay such amounts when due.

Although most, but not all, of our reclamation obligations are bonded, and cash and other assets have been reserved to secure a portion but not all of this bonded amount, to the extent the bonded amounts are not fully collateralized, we will be required to provide additional cash to perform our reclamation obligations when they occur. In addition, the bonding companies have the right to require increases in collateral at any time, failure of which would constitute a default under the bonds. In such circumstances, we may not have the financial resources to perform such reclamation obligations or to increase such collateral when due.

We may need additional financing in connection with the implementation of our business and strategic plans from time to time.

The exploration, construction and development of mineral properties and the ongoing operation of mines and other facilities requires a substantial amount of capital and may depend on our ability to obtain financing through joint ventures, debt financing, equity financing or other means. We may accordingly need further capital in order to take advantage of further opportunities or acquisitions. Our financial condition, general market conditions, volatile uranium and vanadium markets, volatile interest rates, legal claims against us, a significant disruption to our business or operations, or other factors may make it difficult to secure financing necessary for the expansion of mining activities or to take advantage of opportunities for acquisitions. Further, continuing volatility in the credit markets may increase costs associated with debt instruments due to increased spreads over relevant interest rate benchmarks, or may affect our ability, or the ability of third parties we seek to do business with, to access those markets. Continued volatility in equity markets, specifically including energy and commodity markets, may increase the costs associated with equity financings due to a low share price, and the potential need to offer higher discounts and other value (e.g., warrants). There is no assurance that we will be successful in obtaining required financing as and when needed on acceptable terms, if at all.

We have experienced negative cash flows from operations and may need additional financing in connection with the implementation of our business and strategic plans from time to time.

The Company has had negative cash flow from operations in prior years, and at low commodity prices a number of our mining properties will be on standby, making it less likely that the Company will be able to generate positive cash flows from operations. If the Company cannot generate positive cash flows from operations, its ability to fund its operations and implement its business plans may depend on its ability to obtain financing through joint ventures, debt financing, equity financing or other means. There can be no assurance that we will be able to achieve and maintain positive cash flow from operations to fund our

40

financing needs. Further, if cash flows from operations are negative, there is no assurance that the Company will be able to raise additional funds, if needed, or that if any such additional funds are raised, that the Company will be able to raise such funds on commercially attractive terms. If we do not achieve positive cash flows or are unable to raise additional funds when needed, we may not be able to continue to fund our operations.

We are subject to costs associated with decommissioning and reclamation of our properties.

As owner and operator of the White Mesa Mill, the Nichols Ranch Project, the Alta Mesa Project, and numerous uranium and uranium/vanadium projects and other facilities located in the United States and certain permitting, construction, development and exploration properties, and for so long as we remain an owner thereof, we are obligated to eventually reclaim or participate in the reclamation of such properties. Most, but not all, of our reclamation obligations are bonded, and cash and other assets have been reserved to secure a portion, but not all, of this bonded amount. Although our financial statements will record a liability for the asset retirement obligation, and the bonding requirements are generally periodically reviewed by applicable regulatory authorities, there can be no assurance or guarantee that the ultimate cost of such reclamation obligations will not exceed the estimated liability to be provided on our financial statements. Further, to the extent the bonded amounts are not fully collateralized, we will be required to come up with additional cash to perform our reclamation obligations when they occur.

Decommissioning plans for our properties have been filed with applicable regulatory authorities. These regulatory authorities have accepted the decommissioning plans in concept, not upon a detailed performance forecast, which has not yet been generated. Over time, further regulatory review of the decommissioning plans may result in additional decommissioning requirements, associated costs and the requirement to provide additional financial assurances, including as our properties approach or go into decommissioning. It is not possible to predict what level of decommissioning and reclamation (and financial assurances relating thereto) may be required in the future by regulatory authorities.

Our mineral properties may be subject to defects in title.

We have investigated our rights to explore and exploit all of our material properties and, to the best of our knowledge, those rights are in good standing. However, no assurance can be given that such rights will not be revoked, or significantly altered, to our detriment. There can also be no assurance that our rights will not be challenged or impugned by third parties, including by governments, surface owners, and non-governmental organizations.

The validity of unpatented mining claims on U.S. public lands is sometimes difficult to confirm and may be contested. Due to the extensive requirements and associated expense required to obtain and maintain mining rights on U.S. public lands, our properties are subject to various title uncertainties which are common to the industry with the attendant risk that there may be defects in title. In addition, the Secretary of the Interior has withdrawn certain lands around the Grand Canyon National Park from location and entry under the Mining Laws. All of our material Arizona Strip properties, other than the Wate Property, are located on these withdrawn lands. No new mining claims may be filed on the withdrawn lands and no new plans of operations may be approved, other than plans of operations on mining claims that were valid at the time of withdrawal and that remain valid at the time of plan approval. Whether or not a mining claim is valid must be determined by a mineral examination conducted by BLM or USFS, as applicable. The mineral examination, which involves an economic evaluation of a project, must demonstrate the existence of a locatable mineral resource and that the mineral resource constitutes discovery of a valuable mineral deposit. We believe that all of our material Arizona Strip projects are on valid mining claims that would withstand a mineral examination. Further, our Arizona 1 Project has an approved PO which, absent modification, would not require a mineral examination. Although our Pinyon Plain Project also has an approved PO, which, absent modification, would not require a mineral examination, the USFS performed a mineral examination at that mine in 2012, and concluded that the underlying mining claims are valid existing rights (a decision which is involved in a current court challenge). However, market conditions may postpone or prevent the performance of mineral examinations on certain other properties and, if a mineral examination is performed on a property, there can be no guarantee that the mineral examination would not result in one or more of our mining claims being considered invalid, which could prevent a project from proceeding.

Certain of our properties, or significant portions thereof, are mineral leases that have fixed terms, both with State and private parties. Certain of our properties are subject to other agreements that may affect our ability to explore, permit, develop and operate them, including surface use, access and other agreements. There can be no guarantee that we will be able to renew or extend such leases and agreements on favorable terms or at all. The failure to renew any such leases or agreements could have a material adverse effect on our operations.

41

Because we may be unable to secure access rights to certain of our properties, we may be unable to explore and/or advance such properties.

We are currently in the process of negotiating and clarifying access rights to certain of our properties, such as the Roca Honda Project and the Wate Project, with private landholders. There can be no guarantee that we will be able to negotiate or clarify such access rights on favorable terms, or at all. The failure to negotiate or clarify such access rights on suitable terms could have a material adverse effect on our operations.

We are subject to foreign currency risks.

Our operations are subject to foreign currency fluctuations. Our operating expenses and revenues are primarily incurred in U.S. dollars, while some of our cash balances and expenses are measured in Canadian dollars. The fluctuation of the Canadian dollar in relation to the U.S. dollar will consequently have an impact on our profitability and may also affect the value of our assets and shareholders’ equity. In addition, any strengthening of the U.S. dollar relative to other currencies makes our mineral extraction and recovery less competitive in relation to similar activities in other countries. Any strengthening of the U.S. dollar in relation to the currencies of other countries can have a material impact on our cash flows and profitability and affect the value of our assets and shareholders’ equity.

We may not realize the anticipated benefits of previous acquisitions.

We may not realize the anticipated benefits of acquiring: the Sheep Mountain Project in 2012; Denison Mines Corp.’s U.S. Mining Division in 2012, including the White Mesa Mill, certain of the Arizona Strip Properties, the Henry Mountains Complex, the La Sal Project, and the Daneros Project; Strathmore in 2013, including the Roca Honda Project; Uranerz in 2015, including the Nichols Ranch Project; and EFR Alta Mesa in 2016, including the Alta Mesa Project, due to integration, operational and uranium market challenges. Decreases in commodity prices have required us to place or maintain a number of acquired properties and facilities on standby and to defer permitting and construction and development activities on certain other acquired assets, until market conditions warrant otherwise, and, in some cases, we have elected to sell or abandon certain of these properties at a loss. Our success following those acquisitions will depend in large part on the success of our management in integrating the acquired assets into the Company. Our failure to achieve such integration and to mine or advance such assets could result in our failure to realize the anticipated benefits of those acquisitions and could impair our results of operations, profitability and financial results.

We prepare estimates of future uranium extraction and recovery, and there are no assurances that such estimates will be achieved.

We may from time to time prepare estimates of future uranium extraction and recovery, or increases in uranium extraction and recovery, for particular operations, or relating to our ability to increase uranium extraction and recovery in response to increases in commodity prices, as market conditions warrant or otherwise. No assurance can be given that any such extraction and recovery estimates will be achieved, nor can assurance be given that extraction or recovery increases will be achieved in a cost effective or timely manner. Failure to achieve extraction and recovery estimates or failure to achieve extraction and recovery in a cost effective or timely manner could have an adverse impact on our future cash flows, earnings, results of operations and financial condition. These estimates are based on, among other things, the following factors: the accuracy of mineral resource and reserve estimates; the accuracy of assumptions regarding ground conditions and physical characteristics of mineralized materials, such as hardness and presence or absence of particular metallurgical characteristics; the accuracy of estimated rates and costs of extraction, recovery and processing; assumptions as to future commodity prices; assumptions relating to changes in laws, regulations or policies, or lack thereof, that could impact the cost and time required to obtain regulatory approvals, licenses and permits; assumptions relating to obtaining required licenses and permits in a timely manner, including the time required to satisfy environmental analyses, consultations and public input processes; assumptions relating to challenges to or delays in the licensing and permitting process; and assumptions regarding any appeals or lack thereof, or injunctions or lack thereof, relating to any approvals, licenses or permits.

Our actual uranium extraction and recovery may vary from estimates for a variety of reasons, including, among others: actual mineralized material extracted, mined or recovered varying from estimates of grade, tonnage, dilution and metallurgical and other characteristics; short term operating factors relating to the mineral resources and reserves, such as the need for sequential construction or development of mineralized materials or deposits and the processing of new or different mineral grades; risk and hazards associated with extraction, mining and recovery; natural phenomena, such as inclement weather conditions, underground floods, earthquakes, pit wall failures and cave-ins; unexpected labor shortages or strikes; varying conditions in the commodities markets; and delays in obtaining or denial, challenges or appeals of regulatory approvals, licenses and permits or renewals of existing approvals, licenses or permits.

42

In addition, the Company is evaluating recovering copper at the White Mesa Mill as a byproduct with uranium from its Pinyon Plain Project. There can be no assurance that this evaluation will result in the Mill being able to recover copper at the Mill as a byproduct on an economic basis.

We depend on the issuance of license amendments and renewals which cannot be guaranteed.

We maintain regulatory licenses and permits in order to operate our White Mesa Mill, Nichols Ranch Project and Alta Mesa Project, all of which are subject to renewal from time to time and are required in order to operate in compliance with applicable laws and regulations. In addition, depending on our business requirements, it may be necessary or desirable to seek amendments to one or more of our licenses or permits from time to time. While we have been successful in renewing our licenses and permits on a timely basis in the past and in obtaining such amendments as have been necessary or desirable, there can be no assurance that such license and permit renewals and amendments will be issued by applicable regulatory authorities on a timely basis or at all in the future.

We will need to continuously add to our mineral reserve and resource base and toour alternate feed materials.

Our properties do not contain any mineral reserves under SEC Industry Guide 7. See “Cautionary Note to United States Investors Concerning Disclosure of Mineral Reserve and Mineral Resource Estimates.”

Our material mineral resources are located at the Nichols Ranch Project, the Alta Mesa Project, the Pinyon Plain Project, the Roca Honda Project, the Sheep Mountain Project, the Henry Mountains Complex, the La Sal Project, and the Daneros Project. These projects are our primary sources (and potential sources) of current and future uranium concentrates. Unless other mineral resources or reserves are discovered or extensions to existing resource bodies are found, our sources of extraction, production and recovery for uranium concentrates will decrease over time as our current mineral resources are depleted. There can be no assurance that our future exploration, construction, development and acquisition efforts will be successful in replenishing our mineral resources or finding or developing reserves. In addition, while we believe that many of our properties will eventually engage in extraction or mining activities, there can be no assurance that they will be placed into such activities, or that they will be able to replace current extraction or mining activities.

We also recover uranium from processing alternate feed materials at our White Mesa Mill. There can be no assurance that additional sources of alternate feed materials will be forthcoming in the future on commercially acceptable terms or otherwise, or that we will be successful in receiving all required regulatory approvals, licenses and permits on a timely basis to allow for the receipt and processing of any such alternate feed materials.

Our sales of uranium, vanadium and REE products expose us to the risk of non-payment.

Our sales of uranium, vanadium and REE products expose us to the risk of non-payment. We manage this risk by monitoring the credit worthiness of our customers and requiring prepayment or other forms of payment security from customers with an unacceptable level of credit risk. Most of the Company’s sales are to major nuclear utilities, which pose a relatively low risk of non-payment due to their large size and capitalization.

We are dependent on key personnel and qualified and experienced employees.

Our success will largely depend on the efforts and abilities of certain senior officers and key employees, some of whom are approaching retirement. Certain of these individuals have significant experience in the uranium industry. The number of individuals with significant experience in this industry is small. While we do not foresee any reason why such officers and key employees will not remain with us, other than through retirement, if for any reason they do not, we could be adversely affected. We have not purchased key person life insurance for any of these individuals, other than for our Chief Executive Officer.

Our compensation programs include cash and equity incentive compensation components designed to attract and retain qualified personnel, which, in the case of our equity incentive programs, contain vesting requirements which also help retain qualified personnel. Further, all of the Company’s current executive officers have, and all future executive officers are expected to have, employment agreements with the Company, which also serve to attract and retain qualified personnel. In addition, the Company prioritizes the development of its existing management personnel and the advancement of existing personnel to fill vacancies as they arise, which the Company believes is an important element in developing, attracting and retaining the most qualified management personnel.

43

Nevertheless, our success will depend on the availability of qualified and experienced employees to work in our operations and our ability to develop, attract and retain such employees. The number of individuals with relevant mining and operational experience in this industry, especially the U.S. uranium industry, is small.

We have identified material weaknesses in our internal controls over financial reporting. If we are unable to implement and maintain effective internal controls over financial reporting in the future, investors may lose confidence in the accuracy and completeness of our financial reports and the market price of our common stock may be negatively affected.

As a public company, we are required to maintain internal controls over financial reporting and to report any material weaknesses in such internal controls. A material weakness is a deficiency, or a combination of deficiencies, in financial reporting such that there is a reasonable possibility that a material misstatement of a company’s annual or interim financial statements will not be presented or detected on a timely basis. Section 404 of the Sarbanes-Oxley Act of 2002 (the ‘‘Sarbanes-Oxley Act’’) requires that we evaluate and determine the effectiveness of our internal controls over financial reporting and provide a management report on the internal controls over financial reporting. Such report must also be attested to by our independent registered public accounting firm.

In late 2019, we identified material weaknesses in our internal controls over financial reporting related to the Company’s risk assessment process not adequately identifying (1) risks of misstatement due to error and fraud related to our financial reporting processes; and (2) risks related to the use of information technology (IT) systems as part of our financial reporting processes and designing adequate controls to address those risks. As a consequence of the ineffective risk assessment process, the Company did not design, implement, and maintain effective control activities at the transaction level over significant accounts to mitigate the risk of material misstatement in our financial reporting processes. With the oversight of senior management, the Company has concluded that it has remediated the underlying causes of these material weaknesses, primarily through: the development and implementation of improvements to our risk assessment process designed to ensure that risks of misstatement due to error and fraud related to our financial reporting processes are adequately identified; the development and implementation of adequate controls designed to address risks related to the use of IT systems as part of our financial reporting processes; and the development and implementation of controls responsive to the identified risks.

However, if we are unable to comply with the requirements of Section 404 of the Sarbanes-Oxley Act in a timely manner in the future, or if we are unable to assert in the future that our internal controls over financial reporting are effective, or if our independent registered public accounting firm is unable to express an unqualified opinion as to the effectiveness of our internal controls over financial reporting if required in the future, then future material weaknesses may be identified, and investors may lose confidence in the accuracy and completeness of our financial reports and the market price of our common stock could be negatively affected.

We are dependent on business partners, government and third-party consents.

We have a number of joint ventures and other business relationships from time to time relating to our properties and projects, including key projects, such as the Arkose Mining Venture, which can restrict our ability to act unilaterally with respect to those projects in certain circumstances. There can be no assurances that we will be able to maintain relationships with our joint venture and business partners to allow for satisfactory exploration, permitting, construction, development, extraction, mining, recovery or milling relating to any such projects. Our operations and activities are also dependent from time to time on receiving government and other third-party consents and approvals. There can be no assurances that all such consents and approvals will be forthcoming when required.

Certain of our directors may be in a position of conflict of interest with respect to the Company due to their relationship with other resource companies.

Some of our directors are also directors of other companies that are similarly engaged in the business of acquiring, exploring and developing natural resource properties. Such associations may give rise to conflicts of interest from time to time. In particular, one of the consequences will be that corporate opportunities presented to a director may be offered to another company or companies with which the director is associated and may not be presented or made available to us. Our directors are required by law to act honestly and in good faith with a view to the best interests of the Company, to disclose any interest which they may have in any project or opportunity of the Company, and to abstain from voting on such matter. Conflicts of interest that arise will be subject to and governed by the procedures prescribed in our Code of Ethics and by the Business Corporations Act (Ontario).

44

Our relationship with our employees may be impacted by changes in labor relations.

None of our operations or activities currently directly employ unionized workers who work under collective agreements. However, there can be no assurance that our employees or the employees of our contractors will not become unionized in the future, which may impact our operations and activities. Any lengthy work stoppages may have a material adverse impact on our future cash flows, earnings, results of operations and financial condition.

U.S. investors may have difficulty bringing actions and enforcing judgments under U.S. securities laws against an Ontario corporation.

Although our primary trading market is the NYSE American, we have a majority of U.S. resident shareholders, are a U.S. Domestic Issuer for SEC purposes, and all of our assets, operations and employees are in the U.S., the Company was incorporated in Ontario, and as a result, investors in the United States or in other jurisdictions outside of Canada may have difficulty bringing actions and enforcing judgments against us, our directors, our executive officers and some of the experts named in this Annual Report on Form 10-K based on civil liabilities provisions of the federal securities laws or other laws of the United States or any state thereof or the equivalent laws of other jurisdictions of residence.

An information security incident, including a cybersecurity breach, could have a negative impact to the Company’s business or reputation

To meet business objectives, the Company relies on both internal information technology (IT) systems and networks, and those of third parties and their vendors, to process and store sensitive data, including confidential research, business plans, financial information, process technology, intellectual property, and personal data that may be subject to legal protection. The extensive information security and cybersecurity threats, which affect companies globally, pose a risk to the security and availability of these IT systems and networks, and the confidentiality, integrity, and availability of the Company’s sensitive data. The Company continually assesses these threats and makes investments to increase internal protection, detection, and response capabilities, as well as ensure the Company’s third party providers have required capabilities and controls, to address this risk. In addition, we provide confidential and proprietary information to our third-party business partners in certain cases where doing so is necessary to conduct our business. While we obtain assurances from those parties that they have systems and processes in place to protect such data, and where applicable, that they will take steps to assure the protections of such data by third parties, nonetheless those partners may also be subject to data intrusion or otherwise compromise the protection of such data. Any compromise of the confidential data of our customers, consumers, suppliers, partners, employees or ourselves, or failure to prevent or mitigate the loss of or damage to this data through breach of our information technology systems or other means could substantially disrupt our operations, harm our customers, consumers, employees and other business partners, damage our reputation, violate applicable laws and regulations, subject us to potentially significant costs and liabilities and result in a loss of business that could be material. To date, the Company has not experienced any material impact to the business or operations resulting from information or cybersecurity attacks; however, because of the frequently changing attack techniques, along with the increased volume and sophistication of the attacks, there is the potential for the Company to be adversely impacted. The Company may not maintain cybersecurity insurance in the event of an information security or cyber incident with sufficient coverage to cover all financial losses, or at all.

General Risk Factors

We are subject to global economic risks.

In the event of a general economic downturn or a recession, there can be no assurance that our business, financial condition, and results of operations would not be materially adversely affected. During the global financial crisis of 2007-2008, economic problems in the U.S. and Eurozone caused deterioration in the global economy, as numerous commercial and financial enterprises either went into bankruptcy or creditor protection or had to be rescued by governmental authorities. Access to public financing was negatively impacted by sub-prime mortgage defaults in the U.S., the liquidity crisis affecting the asset-backed commercial paper and collateralized debt obligation markets, and massive investment losses by banks with resultant recapitalization efforts. Moreover, the occurrence of unforeseen or extended catastrophic events, including in particular the COVID-19 pandemic, and the emergence of a future pandemic or other widespread health emergency (or concerns over the possibility of such an emergency), could create economic and financial disruptions. These types of challenges can impact commodity prices, including for uranium, vanadium and REEs, as well as currencies and global debt and stock markets. As a result of the ongoing COVID-19 pandemic, or in the case of a future pandemic or other widespread health emergency, quarantine or other requirements or circumstances may require the Company to change the way it conducts its business and operations, including require the Company to reduce or cease operations at some or all of its facilities for an indeterminate

45

period of time. Furthermore, our critical supply chains may similarly be disrupted for an indeterminate amount of time. All of these factors could have a material impact on the Company’s business, operations, personnel and financial condition.

These types of challenges may impact our ability to obtain equity, debt, or other financing on terms commercially reasonable to us, or at all. Additionally, these types of factors, as well as other related factors, may cause decreases in asset values that are deemed to be other than temporary, which may result in impairment losses. If these types of challenges occur, or if there is a material deterioration in general business and economic conditions, our operations could be adversely impacted, and the trading price of our securities could be adversely affected.

COVID-19

The Company continues to evaluate the effects of the global COVID-19 pandemic on the Company’s business objectives, projections and workforce, To date, although the Company has made operational adjustments since the onset of the pandemic to ensure its workforce remains protected, the Company has not been required to shut down any operations as a result of COVID-19. None of these operational adjustments have been material to the Company. The Company has evaluated any potential shutdown of Company production facilities as a result of COVID-19, and has determined that any such shutdown could be accommodated by the Company in a manner consistent with a typical shutdown of Company production facilities as a result of depressed commodity prices. Nevertheless, circumstances could change in the future, which could create economic and financial disruptions and require the Company to reduce or cease operations at some or all of its facilities for an indeterminate period of time, and which could have a material impact on the Company’s business, operations, personnel and financial condition.

The price of our Common Shares is subject to volatility.

Securities of mining companies have experienced substantial volatility and downward pressure in the recent past, often based on factors unrelated to the financial performance or prospects of the companies involved. These factors include macroeconomic conditions in North America and globally, and market perceptions of the attractiveness of particular industries. The price of our securities is also likely to be significantly affected by short-term changes in uranium and vanadium prices, changes in industry forecasts of uranium and vanadium prices, other mineral prices including oil and natural gas, currency exchange fluctuation, or in our financial condition or results of operations as reflected in our periodic earnings reports. Other factors unrelated to our performance that may have an effect on the price of our securities include the following: the extent of research coverage available to investors concerning our business may be limited if investment banks with research capabilities do not follow our securities; adverse proxy voting recommendations or limited portrayals of the Company’s business, operations or executive compensation practices made to shareholders by shareholder advisory firms resulting from their use of general-purpose formulas that are not suited to the Company’s business, operations or practices, and that may counteract the Company’s substantive disclosures, which often include detailed analyses specific to the Company and which are capable of mitigating apparent market concerns; lessening in trading volume and general market interest in our securities may affect an investor's ability to trade significant numbers of our securities; the size of our public float and the exclusion from market indices may limit the ability of some institutions to invest in our securities; and a substantial decline in the price of our securities that persists for a significant period of time could cause our securities to be delisted from an exchange, further reducing market liquidity. Our exclusion from certain market indices may reduce market liquidity or the price of our securities. If an active market for our securities does not continue, the liquidity of an investor's investment may be limited, and the price of our securities may decline. If an active market does not exist, investors may lose their entire investment. As a result of any of these factors, the market price of our securities at any given point in time may not accurately reflect our long-term value. Securities class-action litigation often has been brought against companies in periods of volatility in the market price of their securities and following major corporate transactions or mergers and acquisitions. We may in the future be the target of similar litigation. Securities litigation could result in substantial costs and damages and divert management's attention and resources.

The issuance of additional Common Shares may impact the trading price of our Common Shares.

In times of depressed commodity prices, such as exist at this time, the Company may be required to raise additional capital to meet its liquidity requirements, through the issuance of additional common shares under our ATM program or otherwise, and/or dispose of assets. If we raise additional funding by issuing additional equity securities or securities convertible, exercisable, or exchangeable for equity securities, such financing may substantially dilute the interests of our shareholders and reduce the value of their investment. Similar dilution could result from the sale of assets to meet liquidity requirements.

46

We are subject to litigation and other legal proceedings arising in the normal course of business and may be involved in disputes with other parties in the future which may result in litigation.

The causes of potential future litigation and legal proceedings cannot be known and may arise from, among other things, business activities, environmental laws, permitting and licensing activities, volatility in stock prices, or alleged failure to comply with disclosure obligations. The results of litigation and proceedings cannot be predicted with certainty and may include injunctions pending the outcome of such litigation and proceedings. Failure to resolve any such disputes favorably may have a material adverse impact on our financial performance, cash flow and results of operations.

If we fail to maintain an effective system of internal controls, we may not be able to accurately report financial results or prevent fraud.

Internal controls over financial reporting are procedures designed to provide reasonable assurance that transactions are properly authorized, assets are safeguarded against unauthorized or improper use, and transactions are properly recorded and reported. Disclosure controls and procedures are designed to ensure that information required to be disclosed by a company in reports filed with securities regulatory agencies is recorded, processed, summarized, and reported on a timely basis and is accumulated and communicated to a company’s management, including its chief executive officer and chief financial officer, as appropriate, to allow timely decisions regarding required disclosure. A control system, no matter how well designed and operated, can provide only reasonable, not absolute, assurance with respect to the reliability of reporting, including financial reporting and financial statement preparation.

ITEM 1B. UNRESOLVED STAFF COMMENTS

None.

47

ITEM 2. DESCRIPTION OF PROPERTIES

Cautionary Note to United States Investors: Information contained in this item differs from the disclosure requirements of the SEC applicable to U.S.-incorporated domestic issuers. This Item 2 and other sections of this Annual Report contain the terms “measured mineral resources,” “indicated mineral resources,” “inferred mineral resources,” “proven mineral reserves,” and “probable mineral reserves” as defined in accordance with NI 43-101. See “Cautionary Note to United States Investors Concerning Disclosure of Mineral Resources,” at the beginning of this Annual Report for definitions and further discussion on the differences between terms under NI 43-101 and SEC Industry Guide 7.

48

Overview

Energy Fuels is engaged in conventional and ISR uranium extraction and recovery, along with the exploration, permitting and evaluation of uranium properties in the United States.

ISR Uranium Activities

The Company conducts its ISR recovery activities through its Nichols Ranch Project in northeast Wyoming, which it acquired in June 2015 through the acquisition of Uranerz, and its Alta Mesa Project in south Texas, which it acquired in June 2016 through the acquisition of EFR Alta Mesa.

The Nichols Ranch Project includes: (i) the Nichols Ranch Plant; (ii) the Nichols Ranch Wellfields; (iii) the Jane Dough Property; and (iv) the Hank Project, which includes the permitted but not constructed Hank Satellite Plant and the Hank Property. See “The Nichols Ranch ISR Project.” The Company also acquired through the acquisition of Uranerz the Reno Creek Property (which it has since sold), the West North Butte Property, the North Rolling Pin Property, and the Arkose Mining Venture, a joint venture of ISR properties held 81% by Energy Fuels. See “Non-Material Mineral Properties - Other ISR Projects.” Nichols Ranch is currently winding down production from its existing wellfields, which are expected to be depleted by the end of the first quarter of 2021. In order for Nichols Ranch to engage in future uranium production, the Company will need to incur capital expenditures to develop additional wellfields. A decision to commence development will be made if the Company decides to take action in response to the proposed establishment of a U.S. Uranium Reserve or uranium prices otherwise improve to a point where economic feasibility of the Nichols Ranch Project is realized.

The Alta Mesa Project has a fully-licensed and constructed ISR uranium recovery plant, with a design capacity of 1.5 million pounds of uranium concentrate per year. In order for Alta Mesa to engage in future uranium production, the Company will need to incur capital expenditures to develop wellfields. A decision to commence development will be made if the Company decides to take action in response to the proposed establishment of a U.S. Uranium Reserve or uranium prices otherwise improve to a point where the economic feasibility of the Alta Mesa Project is realized.

Conventional Uranium Activities

The Company conducts its conventional uranium extraction and recovery activities through its White Mesa Mill, which is the only operating conventional uranium mill in the United States. The White Mesa Mill located near Blanding, Utah is centrally located such that it can be fed by a number of the Company’s uranium and uranium/vanadium projects in Colorado, Utah, Arizona and New Mexico, as well as by ore purchase or toll milling arrangements with third party miners in the region, as market conditions warrant. The Company also owns the Sheep Mountain Project in Wyoming, which is a conventional uranium project. Due to its distance from the White Mesa Mill, the Sheep Mountain Project is not expected to be a source of feed material for the Mill. The Sheep Mountain Project consists of the Sheep Mountain Extraction Operation (both open pit and underground), which is permitted, and the proposed Sheep Mountain Processing Operation (heap leach), which is not permitted at this time.

In November 2020, the Company officially changed the name of its Canyon Project to the Pinyon Plain Project. No material changes have taken place at the Pinyon Plain Project, and the land position and disclosed mineral resources remain the same. The NI 43-101 technical report that the information in this 10-K is based upon still contains Canyon Mine in the title. All references to the Project in this document have been changed from Canyon Mine to Pinyon Plain, except when directly referencing its technical report.

The Company’s principal conventional properties include the following:

•the White Mesa Mill. See “The White Mesa Mill”;

•the Pinyon Plain Project (formerly the Canyon Project). See “The Pinyon Plain Project”;

•the Roca Honda Project. See “The Roca Honda Project”;

•the Sheep Mountain Project. See “The Sheep Mountain Project”;

•the Henry Mountains Complex comprised of the Tony M Property and the Bullfrog Property. See “The Henry Mountains Complex”;

•the La Sal Project. See “The La Sal Project”;

•the Daneros Project. See “The Daneros Project”;

•the Arizona Strip uranium properties located in north-central Arizona, including: the Arizona 1 Project, the Wate Project, and EZ Project. See “Non-Material Mineral Properties – Other Conventional Projects – Arizona Strip”; and

49

•The Colorado Plateau uranium properties located in the Four Corners region of Colorado and Utah, including the Whirlwind Project and the Sage Plain Project. See “Non-Material Mineral Properties – Other Conventional Projects – Colorado Plateau.”

The White Mesa Mill is licensed to process 2,000 tons of mineralized material per day. It is primarily a uranium recovery facility but can also recover vanadium and REEs. In addition, the Mill can recycle other uranium-bearing materials not derived from conventional ore, referred to as “alternate feed materials,” for the recovery of uranium, alone or in combination with other metals. In this regard, the Company is currently evaluating a number of potential alternate feed materials for the recovery of uranium. The White Mesa Mill is also currently receiving low-grade mineralized material from the cleanup of a conventional mine in northwest New Mexico and is pursuing other opportunities to process mineralized materials from the clean-up of abandoned uranium mines on the Navajo Reservation and in the four corners area of the United States.

The material projects are shown on the map above and are described in further detail below. Properties that the Company does not consider material are summarized at the end of this Item 2.

Uranium and Vanadium Recovery History

The following tables show the mineralized material processed and pounds of uranium and vanadium recovered from the Company’s projects and facilities from January 1, 2016 to December 31, 2020:(1)

Recovery History (1)

Alternate Feed Materials(2)

Tailings Solution Recycle & In-Circuit Material(4)

Conventional Feed Materials

Tons (000) --- --- --- --- 45

Contained Grade % U3O8 --- --- --- --- 0.5%

Recovered Pounds U3O8 (000) --- --- --- --- 431

Nichols Ranch(5)

Alta Mesa

Recovered Pounds (000) --- --- --- --- ---

Total Pounds of V2O5 Recovered (000) 67 1,807 --- --- ---

Notes:

(1) Mineralized material is shown as being processed and pounds recovered during the year in which the materials were processed at the White Mesa Mill or at the Nichols Ranch Plant, which is not necessarily the year in which the materials were extracted from the project facilities.

50

(2) All alternate feed materials were processed at the White Mesa Mill. A number of different alternate feed materials were processed during the period 2016 – 2020. The table shows the average uranium grades and the total pounds recovered from all alternate feed materials processed at the Mill during each of the years in that period. Because of the variability in uranium grades, pounds recovered is considered to be the relevant metric and tons fed is not considered to be relevant.

(3) The 144,000 pounds recovered in 2020 include nil pounds recovered for the accounts of third parties. The 561,000 pounds recovered in 2018 from alternate feed materials include 424,000 pounds recovered for the accounts of third parties. The 1,004,000 pounds recovered in 2017 include 952,000 pounds recovered for the accounts of third parties; and the 172,000 pounds recovered in 2016 include nil pounds recovered for the accounts of third parties.

(4) Pounds contained in tailings solutions containing previously unrecovered uranium and vanadium, together with in-circuit mineralized material from previous conventional mine material processing, were recovered at the White Mesa Mill, though tons and grade are not available because they cannot be tied to any specific source.

(5) Uranium recovery commenced at the Nichols Ranch Project on April 17, 2014. Because the Nichols Ranch Project uses ISR instead of conventional extraction methods, grade and tons of mineralized material are inapplicable to the Nichols Ranch Project.

Mineral Extraction

The following table shows the extraction history from 2016 to December 31, 2020 from the mineral properties currently owned by the Company:

Nichols Ranch

Notes:

(1) All properties reported in this table were owned by the Company on December 31, 2020 and continue to be owned by the Company. Nichols Ranch was acquired by the Company in June 2015 as part of the Uranerz acquisition. Properties sold or otherwise disposed of are not included in this table.

Summary of Mineral Reserves and Resources

Daniel Kapostasy, a Professional Geologist licensed in Wyoming (PG-6778) and in Utah (10110615-2250), employed as the Company’s Manager of Technical Services, is responsible for the disclosure of scientific or technical information concerning mineral projects in this Annual Report.

The following tables show the Company’s estimate of Mineral Reserves and Mineral Resources as of December 31, 2020. NI 43-101 requires mineral companies to disclose Mineral Reserves and Mineral Resources using the subcategories of Proven Mineral Reserves, Probable Mineral Reserves, Measured Mineral Resources, Indicated Mineral Resources and Inferred Mineral Resources. The Company reports Mineral Reserves and Mineral Resources separately. Properties sold or otherwise disposed of, or committed to be sold or otherwise disposed of, during 2019 or 2020 are not included in the table. Except as stated below, the Mineral Reserve and Mineral Resource information shown below is as reported in the various technical reports prepared in accordance with NI 43-101 (the “Technical Reports”) by qualified persons employed by Peters Geosciences, BRS Inc., SRK Consulting (U.S.) Inc., and Roscoe Postle Associates Inc. See “Mineral Projects.” The table below also reflects the Company’s adjustments to the resources as of December 31, 2020 at the properties where exploration and well installation drilling and/or extraction were in progress in 2020 – notably, at the Nichols Ranch Project. Note that the name of the Canyon Mine was changed to “Pinyon Plain Mine” in 2020. As no material changes have taken place at the Pinyon Plain as of the date of this Annual Report, the technical report has not been updated and still contains Canyon Mine in its title.

Mineral Reserve Estimates - Uranium(1)(2)(3)(4)(5)(6)

Proven Mineral Reserves Probable Mineral Reserves

51

Notes:

(1) The Mineral Reserve estimate for the Sheep Mountain Project is based on a technical report titled “Sheep Mountain Uranium Project, Fremont County, Wyoming, USA, Updated Preliminary Feasibility Study, National Instrument 43-101 Technical Report, Amended and Restated” dated February 28, 2020, prepared by Douglas L. Beahm, P.E., P.G., Principal Engineer of BRS Inc. in accordance with NI 43-101.

(2) The Mineral Reserve estimate in this table complies with the requirements of NI 43-101, and the classifications comply with CIM definition standards and do not represent reserves under SEC Industry Guide 7.

(3) Mineral Reserves are estimated at a uranium grade x thickness (G.T.) cut-off grade of 0.10 G.T. (2 ft. of 0.05% eU3O8) for the Congo Pit and 0.45 G.T. (6 ft. of 0.075% eU3O8) for Sheep Underground.

(4) Mineral Reserves are estimated using a long-term uranium price of $60 per pound U3O8.

(5) Numbers may not add due to rounding.

(6) The Mineral Reserves are fully included in the total Mineral Resources shown below.

Mineral Resource Estimates – Uranium(1)(2)(3)(4)

ISR Properties

Conventional Properties

Notes:

(1) The Mineral Resource estimates in this table comply with the requirements of NI 43-101 and the classifications comply with CIM definition standards and do not represent reserves under SEC Industry Guide 7. Mineral resources that are not reserves do not have demonstrated economic viability. See “Cautionary Note to United States Investors Concerning Disclosure of Mineral Resources.”

(2) Mineral Resources were estimated at various %eU3O8 or G.T. cut-off grades. Details regarding cut-off grade calculations for each project are given in the project’s respective section below.

(3) Mineral Resources were estimated at various long-term uranium prices. The specific long-term uranium price for each project is given in the project’s respective section below.

(4) Numbers may not add due to rounding.

(5) The numbers shown represent Energy Fuels share of the Nichols Ranch Project, which is less than 100% due to a portion that is held by the Arkose Mining Venture. The total Nichols Ranch Project Mineral Resources (100%) are shown in the Nichols Ranch section of this report, and include 0.86 million, 6.2 million, and 1.2 million pounds of measured mineral

52

resources, indicated mineral resources, and inferred mineral resources, respectively. The Nichols Ranch Project is comprised of three properties: the Nichols Ranch Wellfield, the Hank Property and the Jane Dough Property. A portion of the Jane Dough Property is held through the Arkose Mining Venture, in which the Company has an 81% interest. The Mineral Resources shown in the table differ from those in the 2015 Nichols Ranch Technical Report due to adjustments made by the Company by subtracting recovered material (1,073,156 pounds) and adding additional resources discovered by drilling during well field installation (162,500 pounds). Nichols Ranch ISR began producing on April 15, 2014. Approximately 200,000 pounds were produced that year. The total production from Nichols Ranch is now 1,273,192 pounds eU3O8.

(6) Includes Alta Mesa and Mesteña Grande.

(7) The other Powder River Basin ISR properties include: the North Rolling Pin Property, the West North Butte Property, the East North Butte property, the Willow Creek property, and the East Buck, Little Butte, Sand Rock and South Doughstick properties in the Arkose Joint Venture. The Mineral Resources for the Arkose properties are included in the table as 81% of the total, which is Energy Fuels share.

(8)The name of the Canyon Mine was changed to “Pinyon Plain Mine” in 2020.

(9) The numbers do not include the historical resource estimate for the Adjacent Roca Honda Properties. See “The Roca Honda Project,” below.

(10) The Sheep Mountain Indicated Mineral Resource fully includes the Probable Mineral Reserves calculated in accordance with NI 43-101 of 18,365,000 pounds of eU3O8 in 7,453,000 tons at a grade of 0.123%. Such mineral resources do not constitute reserves under SEC Industry Guide 7.

(11) The Henry Mountains Complex includes the Tony M, Southwest, Indian Bench and Copper Bench properties.

(12) The La Sal Project includes the Energy Queen, Redd Block, Beaver, and Pandora properties.

(13) This includes all conventional Non-Material properties, including: Wate, EZ Project, Whirlwind, and the retained portion of Sage Plain.

Mineral Resource Estimate – Vanadium(1)(2)(3)(4)(5)

Notes:

(1) The Mineral Resource estimates in this table comply with the requirements of NI 43-101 and the classifications comply with CIM definition standards and do not represent reserves under SEC Industry Guide 7. Mineral resources that are not reserves do not have demonstrated economic viability. See “Cautionary Note to United States Investors Concerning Disclosure of Mineral Resources.”

(2) Mineral Resources were estimated at various %U3O8 or G.T. cut-off grades. Details regarding cut-off grade calculations for each project are given in the project’s respective section below.

(3) Mineral Resources were estimated at various long-term uranium prices. The specific long-term uranium price for each project is given in the project’s respective section below.

(4) Various vanadium to uranium ratios were used to calculate the vanadium grades and pounds given in the table. The specific ratio used for each project is given in the project’s respective section below.

(5) Numbers may not add due to rounding.

(6) The La Sal Project includes the Energy Queen, Redd Block, Beaver, and Pandora properties.

(7) Other Properties includes Whirlwind and the retained portion of Sage Plain.

53

Mineral Resource Estimate – Copper(1)(2)(3)(4)(5)(6)(7)

Notes:

(1) The Mineral Resource estimate in this table complies with the requirements of NI 43-101 and the classifications comply with CIM definition standards and do not represent reserves under SEC Industry Guide 7. Mineral resources that are not reserves do not have demonstrated economic viability. See “Cautionary Note to United States Investors Concerning Disclosure of Mineral Resources.”

(2) For the Main and Main-Lower zones of the Pinyon Plain Mine, a 0.36% uranium equivalent cut-off grade (% U3O8 Eq) was applied to account for both the copper and uranium mineralization. In all other zones, only uranium was reported and a 0.29% U3O8 cut-off grade was applied. (The %U3O8 Eq grade term is not the same as the eU3O8 % grade term with indicates probe rather than assay data listed elsewhere in this report. For details see the Canyon Technical Report (as defined below; now the Pinyon Plain Project)).

(3) Mineral Resources are estimated using a long-term uranium price of $60 per pound and a Copper price of $3.50 per lb.

(4) A copper to U3O8 conversion factor of 18.19 was used for converting copper grades to equivalent U3O8 grades (U3O8 Eq) for cut-off grade evaluation and reporting.

(5) Numbers may not add due to rounding.

(6) For Pinyon Plain, Mineral Resource tonnages of uranium and copper cannot be added as they overlap in the Main and Main-Lower Zones.

(7) The name of the Canyon Mine was changed to “Pinyon Plain Mine” in 2020.

54

The Nichols Ranch Project

Unless stated otherwise, the following description of the Nichols Ranch Project is derived from a technical report titled “Nichols Ranch Uranium Project, 43-101 Technical Report, Preliminary Economic Assessment” dated February 28, 2015, prepared by Douglas L. Beahm, P.E., P.G. of BRS Inc. and Paul Goranson, P.E., former Chief Operating Officer of the Company, in accordance with NI 43-101 (the “Nichols Ranch Technical Report”). The Nichols Ranch Technical Report includes an updated NI 43-101 mineral resource estimate and the results of a Preliminary Economic Assessment (“PEA”) for the uranium resources identified to date at the Nichols Ranch Project. Each of the authors is a “qualified person” within the meaning of NI 43-101, and Mr. Beahm is “independent” of the Company within the meaning of NI 43-101. Because the independent author of the Nichols Ranch Technical Report assumed overall responsibility for all items of the technical report, the report is therefore an independent technical report under NI 43-101. The Nichols Ranch Technical Report is available on SEDAR at www.sedar.com. The Nichols Ranch Project does not have known “reserves” and is therefore considered under SEC Industry Guide 7 definitions to be exploratory in nature, despite currently ongoing uranium recovery activities.

Property Description and Location

The Nichols Ranch Project is an ISR uranium recovery project, which the Company acquired in June 2015 through the acquisition of Uranerz. It is located in the Powder River Basin of northeast Wyoming. The Nichols Ranch Project includes: (i) the Nichols Ranch Plant; (ii) the Nichols Ranch Wellfield; (iii) the Jane Dough Property; and (iv) the Hank Project, which includes the planned Hank Satellite Plant and the Hank Property. The Nichols Ranch Project is an ISR project; it is not an underground or open pit project.

A map of the Nichols Ranch Project, including the Nichols Ranch Plant, the Nichols Ranch Wellfield, the Jane Dough Property and the Hank Property is shown below:

55

The Nichols Ranch Project is a fully permitted and licensed ISR facility that recovers uranium through a series of injection and recovery wells. Using groundwater fortified with oxygen and sodium bicarbonate, uranium is dissolved within a deposit. The groundwater is then collected in a series of recovery wells and pumped to the Nichols Ranch Plant. The Nichols Ranch Plant creates a yellowcake slurry that is transported by truck to the White Mesa Mill where it is dried and packaged into drums that are later shipped to a conversion facility.

The original plan for the Nichols Ranch Project included the construction of an ISR processing facility and a second uranium recovery and extraction facility at the Hank Project. The Company’s current extraction plan for the Nichols Ranch Project is now divided into three separate areas, being (i) the Nichols Ranch Wellfield, (ii) the Jane Dough Property, and (iii) the Hank Property. The Nichols Ranch Wellfield is, and the Jane Dough Property is expected to be, directly connected to the Nichols Ranch Plant via pipeline. The Hank Project is expected to consist of a uranium extraction and recovery facility that will create a loaded resin that will be trucked to the Nichols Ranch Plant for elution. The Nichols Ranch Wellfield consists of two production areas: Production Area #1 and Production Area #2. The Nichols Ranch Wellfield also includes the two deep disposal wells that are permitted and constructed for the Nichols Ranch Project. The Jane Dough Property is adjacent to the Nichols Ranch Wellfield to the south and contains certain properties that are 100% owned by Energy Fuels and other properties that are held in the Arkose Mining Venture, in which the Company owns an 81% interest. The Jane Dough Property contains two fully licensed and permitted extraction areas. The Hank Project is 100% owned by Energy Fuels and is located approximately six miles east of the Nichols Ranch Wellfield. The Hank Satellite Plant is fully licensed and permitted to be constructed and operate as a satellite to the Nichols Ranch Plant, and the Hank Property contains two targeted extraction areas.

Construction of the Nichols Ranch Plant was substantially completed in 2013, and extraction commenced in the second quarter of 2014 after final NRC inspections were completed. The Jane Dough Property described above has two fully licensed and permitted

56

extraction areas. The Company completed construction of an elution and precipitation circuit at the Nichols Ranch Plant in early February 2016. Yellowcake slurry is now transported from the Nichols Ranch Plant to the White Mesa Mill for drying and packaging. However, the Nichols Ranch Plant is currently licensed to allow for the construction and operation of a drying and packaging circuit should conditions warrant.

The Nichols Ranch Project does not have known “reserves” under SEC Industry Guide 7 and is therefore considered under SEC Industry Guide 7 definitions to be “exploratory” in nature. During 2020, a total of approximately 6,000 pounds of U3O8 were recovered from the Nichols Ranch Project and nil pounds of mineralized material were added through drilling.

Accessibility, Local Resources, Physiography and Infrastructure

The Nichols Ranch Project site is located approximately 50 road miles southwest of Gillette, Wyoming and 76 road miles northeast of Casper, Wyoming in portions of Campbell and Johnson Counties, Wyoming in the Townships 41 to 45 North and Ranges 73 to 77 West. It is accessed from State Highway 50 from the east or State Highway 387 from the south, and various internal gravel-surface county and private roads. The city of Casper is located along Interstate 25, approximately one hour by air from either Denver, Colorado or Salt Lake City, Utah. The Nichols Ranch Project is accessible via two-wheel drive vehicle on existing county and/or private gravel and dirt roads.

The Nichols Ranch Project is located within the Wyoming Basin physiographic province in the central portion of the Powder River Basin, within the Pumpkin Buttes Mining District. The Pumpkin Buttes are a series of small buttes rising several hundred feet above the surrounding plains. Portions of the Powder River Basin properties are located east, west and south of these buttes. The cap rocks on top of the buttes are erosional remnants of the Tertiary White River Formation that is believed to have overlain the majority of the Powder River Basin. The volcanic tuffs in the White River Formation have been cited as a source of uranium in this basin.

The area in which the Powder River Basin properties is located is a low lying plain, and elevations range from approximately 4,390 feet (1,440 meters) in the northwest to approximately 5,450 feet (1,790 meters) in the southeast. Historically and currently, the land is used for livestock and wildlife grazing. Vegetation is characteristically sagebrush grassland with some pines on elevated terrain and some deciduous trees within drainages.

The climate is semi-arid and receives an annual precipitation of approximately 9.4 inches, the most falling in the form of late autumnal to early spring snows. The summer months are usually hot, dry and clear except for infrequent heavy rains. Cold, wind and snow/blizzards can make winter exploration work in this area difficult but not impossible. The weather may limit the time periods for capital construction but should not have any significant adverse impacts on the operation of an ISR facility.

Infrastructure at the site of the Nichols Ranch Project is predominantly related to local oil, gas, and coal bed methane exploration and development. Mineralized locations could affect future siting of wellfields and processing facilities. Generally, the proximity of the Nichols Ranch Project to paved roads is beneficial with respect to transportation of equipment, supplies, personnel and product to and from the property. Power transmission lines are located on or near parts of the property. The Company has secured power from the local electrical service provider to accommodate all operational needs. Water is available from wells developed at planned facility locations, and water for ISR operations comes from the operation itself, i.e. the extracted groundwater. Therefore, the basic infrastructure (power, water and transportation) that is required to support an ISR mining operation is located within reasonable proximity to the Nichols Ranch Project.

Ownership

The Company’s property interests vary widely, and include unpatented mining claims, private and state leasehold interests and surface use rights. Some agreements renew annually, some renew automatically when mineral extraction has commenced, and some are agreements for fixed terms. For the property agreements that expire in 2021, the Company may negotiate new agreements for only those acres that are within permit boundaries or critical project areas. Leases outside of such desired project areas may be allowed to expire, although the Company may seek to negotiate new agreements for those dropped properties in the future should market conditions warrant. The Company does not expect that the expiry of any property interests in 2021 and beyond, nor the forfeiture of any unpatented mining claims in 2021, will have a material effect on the Company’s ability to continue exploration and extraction activities on these properties.

Unpatented lode mining claims are located on minerals owned by the federal government and open to location, with the surface being owned by either the federal government or private individuals. In addition, the unpatented lode mining claims are recorded in the appropriate county and filed with the state office of the BLM. The unpatented lode claims do not have an expiration date. However, affidavits must be filed annually with the BLM and respective county recorder’s offices in order to maintain the claims’ validity. All of the unpatented lode mining claims have annual filing requirements ($165 per claim) with the BLM, to be paid on or

57

before September 1 of each year. Most of the above-mentioned unpatented lode mining claims are located on Stock Raising Homestead land where the United States government has issued a patent for the surface to an individual and reserved the minerals to the United States government subject to the location rights by claimants as set forth in the federal Mining Act of 1872.

Leasehold interests are subject to the various terms as set forth in the applicable leases. The state leases and leases on fee mineral lands usually have annual payments, royalty obligations, and the terms of the leases vary, but for the most part can be extended by production (as defined in the leases). The fee surface and mineral leases apply only to uranium and other fissionable minerals and typically have a 10-year term with the right to extend the leases with production (as defined in the leases). Commingling of extraction from adjacent lands is allowable under the fee mineral leases.

Surface rights under applicable laws allow for exploration disturbance, road construction and facility siting. The claimant must first notify the surface owner of its intention to locate unpatented lode mining claims on the owner’s surface and then reach an agreement with the surface owner to pay for damages caused by the claimant’s operations. If an agreement cannot be reached, the claimant may post a bond with the BLM to cover the amount of the damages caused by the claimant’s operations. Surface use agreements were negotiated with various surface owners that provide the Company with all required surface access for the Nichols Ranch Project. The surface use agreements typically provide for reimbursement to the surface owner of actual damages resulting from operations.

Nichols Ranch Plant – 100% Energy Fuels

The Nichols Ranch Plant is located on the Nichols Ranch Project property pursuant to the surface use agreements described below.

Nichols Ranch Wellfield – 100% Energy Fuels

The Nichols Ranch Project, which includes the Nichols Ranch Plant and the Nichols Ranch Wellfield mining permit area, consists of 36 unpatented lode mining claims, two fee surface and mineral leases, and one surface use agreement encompassing approximately 920 acres. The Nichols Ranch Wellfield permit boundary encompasses approximately 1,120 acres. There is a portion of the Nichols Ranch Wellfield that includes private (fee) mineral that is subject to a royalty payable to the fee mineral owners under the fee leases. The royalty is a sliding scale of 6 to 8 percent, depending on the price of uranium. The primary term of the leases would have expired in 2017; however, they are held by production (as defined in the leases). The primary term of the surface use agreement would have expired in 2016, however the term has been held by production.

Hank Property – 100% Energy Fuels

The Hank Project, for which the Company has received a license to construct and operate a satellite plant to the Nichols Ranch Plant (known as the Hank Satellite Plant), consists of 66 unpatented lode mining claims and one surface use agreement encompassing approximately 1,393 acres. Two fee leases were allowed to expire in 2016, as they were not deemed to be significant to the project. The Hank Project permit boundary encompasses approximately 2,250 acres.

Jane Dough Property (Jane Dough/Doughstick – 100% Energy Fuels; North Jane and S. Doughstick – 100% Arkose Mining Venture, held 81% by Energy Fuels)

In 2017, the Company received its license amendment from the NRC, which includes the Jane Dough Property in the Nichols Ranch Project permit area, and combines the Jane Dough/Doughstick, North Jane and S. Doughstick properties consisting of 117 unpatented lode mining claims, 16 mineral leases, and three surface use agreements encompassing approximately 3,121 acres. Operating interests in the Jane Dough Property includes Energy Fuels’ 100% owned property and 81% from the two properties held by the Arkose Mining Venture. The Jane Dough Property permit amendment encompasses approximately 3,680 acres. The fee land in the project is covered by mineral leases some of which have annual payments and some of which are five-year paid-up leases. The mineral leases have primary terms of ten years and can be held by ongoing uranium extraction (as defined in the leases). Some of the leases expired in 2019. The fee surface is covered by three separate surface use agreements, which include damage payments paid on an annual basis. The mining leases have a variety of royalty payments based on a fixed rate, a two-tier system, or a sliding scale system.

One of the leases has a fixed royalty rate of 4% of the gross proceeds. Two of the leases have a two-tier royalty based on the price of U3O8 at the time of the sale, and they are 6% for a U3O8 price less than $75 per pound, and 8% for a U3O8 price equal to or greater than $75 per pound. Five of the leases have a sliding scale royalty that runs from a low of 2% at a U3O8 price of $25 per pound up to a high of 10% for a U3O8 price of equal to or greater than $100 per pound. Four leases have a sliding scale royalty that runs from a low of 4% at a U3O8 price of $40 per pound up to a high of 10% for a U3O8 price of equal to or greater than $100 per pound. Four of the leases have a sliding scale royalty that runs from a low of 4.5% at a U3O8 price of $49.99 up to a high of 10% for a U3O8 price of equal to or greater than $100 per pound. There are twenty (20) unpatented mining claims located in Section 32, Township 43 North, Range 76 West that have an overriding royalty interest of 0.25%. This overriding royalty interest is based on production of uranium on said claims. Two of the surface use agreements have a two-tiered royalty based on the sales price of the U3O8 received by

58

Uranerz, and they are 1% for a sales price of less than $50 per pound; and 2% for a sales price of equal to or greater than $50 per pound.

Uranium Severance Tax

The Company is required to pay a standard uranium industry severance tax of approximately 4% of sales and an ad valorem tax (annual property tax based on assessed values) to the State of Wyoming, in addition to various maintenance, land impact and access fees and other consideration to surface owners.

Permitting and Licensing

Energy Fuels has received all regulatory approvals necessary to conduct extraction and uranium processing activities at the Nichols Ranch Plant and Nichols Ranch Wellfield. In December 2010, Uranerz received its Permit to Mine for the Nichols Ranch Project from the WDEQ-LQD. In July 2011, Uranerz received a Source Material License from the NRC for the Nichols Ranch Plant and Nichols Ranch Wellfield, and construction of the Nichols Ranch Plant immediately began. Effective September 30, 2018, the State of Wyoming became an Agreement State under the Atomic Energy Act (as amended) for the regulation of uranium mills and uranium ISR facilities, and regulation of the Source Material License was transferred from the NRC to WDED-LQD.

Both the state and federal agencies analyzed all environmental aspects of the Nichols Ranch Project including reclamation of the land surface following extraction operations and restoration of impacted ground water. Workplace safety and the safety of the public are also closely monitored by regulatory agencies. We have posted a reclamation bond with the regulatory agencies in an amount of $6.8 million to cover the total estimated cost of reclamation by a third party as a requirement of the licenses.

The various state and federal permits and licenses that were required and have been obtained for the Nichols Ranch Project, exclusive of the expansion to the Jane Dough Property, are summarized below:

Primary Permits and Licenses for the Nichols Ranch Project (Nichols Ranch and Hank Units Only)

Permit, License, or Approval Name Agency Status

Source Material License NRC (2011); WDEQ-LQD (2018) Obtained

Permit to Mine (UIC Permit) WDEQ-LQD Obtained

Aquifer Exemption WDEQ-LQD; EPA Obtained

Permit to Appropriate Groundwater WSEO Obtained

Wellfield Authorization WDEQ-LQD Obtained

Class I UIC Deep Disposal Well Permits WDEQ-WQD Obtained

WYPDES WDEQ- WQD Obtained

Plan of Operations (Hank Unit only) BLM Obtained

Air Quality Permit WDEQ-AQD Obtained

Notes: NRC - Nuclear Regulatory Commission

EPA - Environmental Protection Agency

UIC - Underground Injection Control

WDEQ-LQD - Wyoming Department of Environmental Quality Land Quality Division

WDEQ-WQD - Wyoming Department of Environmental Quality Water Quality Division

WDEQ-AQD - Wyoming Department of Environmental Quality Air Quality Division

WSEO - State Engineer’s Office

WYPDES - Wyoming Pollutant Discharge Elimination System

Under the licensed plan, the Nichols Ranch Plant has been built, and a satellite processing facility is licensed for the Hank Project. In 2017, the NRC approved a source material license amendment to add the Jane Dough Property to the existing license for the Nichols Ranch Project, and the Wyoming Department of Environmental Quality approved an amendment to our Permit to Mine to incorporate the Jane Dough Property. The Jane Dough Property is now fully licensed and permitted as part of the Nichols Ranch Project. The Jane Dough Property is adjacent to the Nichols Ranch Wellfield and is expected to share its infrastructure. We are now able to bring the Jane Dough Property into extraction operations before the Hank Project. Due to its close proximity, extracted

59

solutions from the Jane Dough Property may be delivered directly to our Nichols Ranch Plant by pipeline, thus eliminating the need for a larger capital outlay to construct a satellite plant as is planned for the Hank Project. The Jane Dough Property includes the Doughstick, South Doughstick and North Jane properties. Additional wellfields may be added to the extraction operations plan as the Company continues to assess geological data.

Geology

The Nichols Ranch Project is located in the Powder River Basin. The mineralized trends within the Nichols Ranch Project are alteration-reduction trends hosted in the Eocene age channel sands that lie at depths of approximately 300 to 1,100 feet from the surface. Roll front deposits of uranium bearing material are anticipated to occur within these properties. An alteration-reduction trend is a natural chemical boundary trend line in a sandstone aquifer where reduced (non-oxidized) sand is in contact with altered (oxidized) sand. Uranium mineralization may be found along the trend line.

The properties in the Nichols Ranch Project contain alteration-reduction trends hosted in Eocene age channel sands. Alteration-reduction trends in the Pumpkin Buttes Mining District are typically composed of multiple, stacked roll front deposits that often contain associated uranium mineralization. A stacked roll front is a type of uranium occurrence found in thick sandstone where a number of mineralization trends are stacked on top of each other. Uranium mineralization within and adjacent to the Nichols Ranch Project are found in the Eocene Wasatch Formation (“Wasatch”). The Wasatch is a fluvial deposit composed of arkosic sandstones that are typically 25% or more feldspar grains and indicates a source rock where chemical weathering was not extreme, and the sediments have not been transported far. A fluvial deposit is a deposit of uranium mineralization found in sandstones that originated from sediments laid down by streams and rivers. The arkosic sandstone is a type of sandstone that contains a high percentage of feldspar grains. The medium grain size and relatively good sorting of this sediment implies water transportation, probably in a meandering river/stream system. The Wasatch Formation is interlaid with sandstones, claystones, siltstones, carbonaceous shale, and thin coal seams that overlie the Paleocene Fort Union Formation, another fluvial sedimentary unit.

History

The Nichols Ranch Project is located within the Pumpkin Buttes Mining District, which was the first commercial uranium extraction district in Wyoming. Uranium was first discovered in the Pumpkin Buttes in 1951. Intermittent uranium extraction from about 55 small mines occurred through 1967 producing 36,737 tons of material containing 208,143 pounds of uranium. This early mining activity focused on shallow oxidized deposits exploited by small open pit mines. The material was generally transported to the Atomic Energy Commission (“AEC”) buying station in Edgemont, South Dakota. Modern mining in the district has focused on deeper reduced deposits, including facilities operated by Cameco Corporation and Uranium One Inc.

The properties included in the Nichols Ranch Project were originally part of a large exploration area encompassing Townships 33 through 50 North of Ranges 69 through 79 West, on the 6th principal meridian. In 1966, Mountain West Mines Inc. (“MWM,” subsequently known as Excalibur Industries) began a successful drilling exploration program in a portion of this area. In 1967, MWM entered into an agreement with Cleveland-Cliffs Iron Company (“CCI”) for further exploration and an option if suitable resources were found. CCI exercised its option in 1976 with plans to begin underground mining operations in the vicinity of North Butte. Changing economic conditions and the introduction of ISR mining technology reportedly ended much of CCI’s interest in the area. By the late 1980’s, CCI began selling select properties or allowing them to revert to the federal government.

Between 1968 and 1980, CCI drilled 117 holes and installed 3 water wells on the Nichols Ranch Project area. Texas Eastern Nuclear Inc. in 1985 completed limited drilling and exploration on the property (approximately 28 borings) and in early 1990s Kerr McGee Corporation and Rio Algom Mining Corporation also completed limited drilling in the area.

Mineralization

The targeted mineralized zones for the Nichols Ranch Wellfield in the A Sand unit are 300 to 700 feet below the surface and occur in two long narrow trends meeting at the nose. The nose is in the northwest corner of the deposit where the two narrow trends meet to form the tip of the geochemical front. The Hank Project’s two targeted mineralized zones in the F Sand unit range from 200 to 600 feet below the ground surface depending on the topography and changes in the formation’s elevation and stratigraphic horizon. The targeted mineralization zone for the Jane Dough Property is the A Sand unit, the same as Nichols Ranch, at depths of 300 to 750 feet below the surface.

Mineral Resource Estimates

BRS prepared an updated NI 43-101 compliant Mineral Resource estimate for the Nichols Ranch Project in the Nichols Ranch Technical Report. The updated Mineral Resource estimate is effective as of January 1, 2015 and is summarized in the table below. Mineral Resources were estimated using the GT Contour method. The primary data used in evaluation are equivalent uranium

60

values as quantified by downhole geophysical logging reported as %e U3O8. Radiometric equilibrium was evaluated and a disequilibrium factor (“DEF”) of 1 was used. The minimum uranium grade included in the estimate was 0.02% eU3O8. A minimum grade of 0.02% U3O8 and GT (grade x thickness) of 0.20 were used in the resource calculations. Mineral resources are reported at a cutoff of 0.20 GT, which is the cutoff applied at the Nichols Ranch Project. The table below provides a summary of Mineral Resources by classification following CIM guidelines. There are no Mineral Reserves on the property at this time. BRS noted that it is not aware of any known environmental, permitting, legal, title, taxation, socioeconomic, marketing, political, or other relevant factors that could materially affect the current resource estimate.

Nichols Ranch Remaining Mineral Resources – Uranium(1)(2)(3)(4)(5)(6)

Nichols Ranch Measured Resources (M) Nichols Ranch 280 0.140% 784 784

Nichols Ranch Inferred Resources Nichols Ranch --- --- --- ---

Notes:

(1) The Mineral Resource estimate in this table complies with the requirements of NI 43-101 and the classifications comply with CIM definition standards and do not represent “reserves” under SEC Industry Guide 7. Mineral resources that are not “reserves” do not have demonstrated economic viability. See “Cautionary Note to United States Investors Concerning Disclosure of Mineral Resources.”

(2) Remaining Mineral Resource includes reduction for production of 1,073,156 pounds from December 31, 2014 through December 31, 2020.

(3) Nichols Ranch ISR began producing on April 15, 2014. Approximately 200,000 pounds were produced that year. The total production from Nichols Ranch is now 1,273,192 pounds eU3O8.

(4) Mineral Resources are estimated at a uranium grade x thickness (G.T.) cut-off grade of 0.20 G.T. (minimum 0.02% eU3O8).

(5) Mineral Resources are estimated using a long-term uranium price of $65 per pound.

(6) Numbers may not add due to rounding.

(7) “Energy Fuels Pounds” represent 100% of Nichols Ranch and Hank, and 81% of the Company's share of the portion of Jane Dough held by the Arkose Mining Venture.

Information shown in the table above differs from the disclosure requirements of the SEC. See “Cautionary Note to United States Investors Concerning Disclosure of Mineral Resources.”

Activities Subsequent to Nichols Ranch Technical Report

Subsequent to the completion of the Nichols Ranch Technical Report, the Company has continued to operate and advance the Nichols Ranch Project, as described below. The information contained in this subsection entitled “Activities Subsequent to Nichols Ranch Technical Report” was prepared by the Company and has not been reviewed or confirmed by the authors of the Nichols Ranch Technical Report.

Wellfield Development and Exploration Completed by Energy Fuels

Prior to its acquisition by Energy Fuels in June 2015, Uranerz drilled 257 exploration holes, including three core holes and three water wells at the Nichols Ranch Project during 2006 and 2007 and 25 exploration holes and seven wells in 2009. In addition,

61

Uranerz drilled 61 exploratory holes and seven wells within the Hank Property during 2006 and 2007 and eight additional wells in 2009. There has been no new drilling activity at the Hank Project since 2009. Uranerz drilled 691 exploration holes and 29 wells for baseline monitoring at the Jane Dough Property. There has been no new drilling at the Jane Dough Property since 2010.

Uranerz drilled a total of 78 rotary drill holes on the Hank Property, Nichols Ranch Wellfield, and Jane Dough Property during 2006, with 46 holes demonstrating uranium mineralization. During 2006, environmental permitting activities also continued at the Hank Property and Nichols Ranch Wellfields with the completion of a total of five hydrogeologic test wells, and the drilling of six core holes. The core was submitted for laboratory testing to support permitting requirements as well as to define resource disequilibrium attributes.

From February 19 to December 20, 2007, Uranerz drilled a total of 486 uranium trend delineation holes and eight hydrologic sampling wells on the Nichols Ranch Project, utilizing as many as three drill rigs and one electric log probing unit. This represents a total of approximately 300,000 feet of drilling with an average depth of 617 feet per hole. A total of 214 delineation holes were drilled on Nichols Ranch in 2007. In the final months of the 2007 drilling program, exploration efforts focused on the Hank Property and Nichols Ranch Wellfield to facilitate sub-surface geologic mapping with cross sections and to refine previous geologic models delineating known trends of uranium mineralization.

During 2008, no new exploration work was undertaken at the Nichols Ranch Wellfield.

During 2009, 51 delineation holes were drilled at the Nichols Ranch Wellfield, including the Doughstick and North Nichols Ranch properties. The purpose of this drilling was primarily to prepare for the installation of baseline monitor wells for the planned Nichols Ranch Plant. Additional drilling was carried out on the Doughstick properties.

During 2011, 38 delineation holes were drilled in 2011 on the Nichols Ranch Wellfield. The purpose of this drilling was for final delineation drilling prior to beginning the monitor well and extraction well installation in Production Area #1 of the Nichols Ranch Wellfield.

During 2012, Uranerz engaged in drilling exploration efforts and wellfield installation at Production Area #1 at the Nichols Ranch Wellfield. At Production Area #1, 263 extraction wells were cased and cemented. The extraction wells were connected to header houses with buried feeder lines. It was planned that initial extraction should begin with four header houses. Three header houses were set on their foundations in 2012 and connected to individual extraction wells.

The Uranerz 2013 and 2014 drilling programs at the Nichols Ranch Wellfield were restricted to adding extraction and monitor wells. No new exploration drilling was conducted.

During 2015, Uranerz engaged in drilling delineation efforts and wellfield installation at Production Area #1 of the Nichols Ranch Wellfield, where 283 extraction wells were cased and cemented. At Production Area #2 of the Nichols Ranch Wellfield, 51 monitor wells were cased and cemented. The extraction wells were connected to header houses with buried feeder lines. Initial extraction at the Nichols Ranch Wellfield began with four header houses. In 2015, two additional header houses (#5 and #6) were set on their foundations and connected to the individual extraction wells.

In 2016, the Company completed drilling 12 delineation holes and drilling and casing of 86 extraction wells in Header Houses #7 and #8 in Production Area #1. Header House #7 was turned on in March of 2016 and Header House #8 was turned on in June of 2016. In Production Area #2, 133 extraction and injection wells were drilled and cased.

Header House #9 was completed and turned on in March of 2017. No drilling or other development activities were performed since 2017.

Current Status of Wellfields

All the currently planned and permitted wellfields are in Production Areas #1 and #2 of the Nichols Ranch Wellfield. The Nichols Ranch Wellfield is expected to have a total of 13 header-houses, with Production Area #1 comprising header-houses 1 through 8, and Production Area #2 comprising header-houses 9 through 13. Each of the two planned Nichols Ranch Wellfield Production Areas will include a number of injection wells, recovery wells, monitoring wells, header houses and associated piping and power supply. Header houses will be located within the Production Areas and will distribute recovered fluids from recovery wells to trunk lines, and injection fluids from the processing facility through the trunk lines to injection wells. See the map below illustrating Production Areas #1 and #2, and the plant.

62

The first five header houses and their respective wellfields in Production Area #1 at the Nichols Ranch Wellfield were installed and extracting uranium at the time we acquired Uranerz in June 2015. Header house #6 was turned on in November 2015. The Company placed the 7th and 8th header-houses on-line in March and July 2016, respectively, thereby completing development of Production Area #1. In February 2017 we completed construction on our 9th header-house, marking the beginning of development in Production Area #2. Uranium recovery operations from Production Area #2 commenced in March of 2017. Nichols Ranch is

63

currently on standby and is engaged in reduced uranium recovery activities in Production Area #1 and Production Area #2. In order for Nichols Ranch to engage in future uranium production, the Company will need to incur capital expenditures to develop additional wellfields.

Nichols Ranch Plant

Source: SEC EDGAR (public domain) · 10-K for the period ended 2020-12-31, filed 2021-03-22 · accession 0001385849-21-000027

Filing HTML rendered to line-structured narrative text by the shipped reducer (datafeeds.edgar_fulltext.visible_text, keep_table_headers=True): scripts and inline-XBRL headers are dropped, and table content is reduced to its short label cells — numeric table data is not rendered and is therefore not counted. The same rendering is used for every year, so a year-over-year comparison is like for like.

The text is our rendering of the filing, not a facsimile: original pagination, typography and tables are not reproduced, and the numbers live in the financial statements (FA).

The outline locates item HEADINGS in this document. Only Items 1A and 7 have certified boundaries elsewhere in the terminal (the redline and the narrative-overlap number); every span here runs from one heading found to the next heading found.

How the outline was chosen. It is the longest chain of item headings that runs forward through both the document and the standard item order: 21 headings are on that chain and 15 further heading-shaped lines are not — the table-of-contents echo of every item, cross-references and exhibit-list mentions. Each entry's length is measured from its heading to the next heading on the chain.