TMC · 10-K · period ended 2023-12-31

← all TMC documents
filed 2024-03-25 · EDGAR original ↗

Our rendering of the filing — original pagination and typography are not reproduced, and tables are reduced to their short label cells (the figures live on FA). Nothing is summarized: every line below is the filing's own text.

blocks 1532 of 2,487546k characters rendered

Table of Contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 10-K

(Mark One)

☒ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2023

or

☐TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period fromto

Commission file number: 001-39281

TMC THE METALS COMPANY INC.

(Exact name of registrant as specified in its charter)

British Columbia, Canada Not Applicable

​ ​

595 Howe Street, 10th FloorVancouver, British Columbia V6C 2T5

(Address of principal executive offices) (Zip Code)

(Registrant’s telephone number, including area code)

Securities registered pursuant to Section 12(b) of the Exchange Act:

Title of each class Trading Symbol(s) Name of each exchange on which registered

Common Shares, without par value TMC The Nasdaq Stock Market LLC

Securities registered pursuant to Section 12(g) of the Exchange Act: None

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes ☐No☒

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Exchange Act. Yes ☐No☒

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes☒ No ☐

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes☒ No ☐

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Large accelerated filer ☐ Accelerated filer ☐

Non-accelerated filer ☒ Smaller reporting company ☒

​ Emerging growth company ☒

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. ☐

If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements. ☒

Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b). ☐

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ☐ No ☒

The aggregate market value of the registrant’s voting and non-voting common stock held by non-affiliates of the registrant (without admitting that any person whose shares are not included in such calculation is an affiliate) computed by reference to the price at which the common shares were last sold as of the last business day of the registrant’s most recently completed second fiscal quarter was $274,979,313.

As of March 22, 2024, the registrant had 318,249,878 common shares outstanding.

DOCUMENTS INCORPORATED BY REFERENCE

Portions of the registrant’s proxy statement in connection with the registrant’s annual meeting of shareholders, scheduled to be held on May 30, 2024, are incorporated by reference in Part III of this report. Except as expressly incorporated by reference, such proxy statement shall not be deemed to be part of this report.

Table of Contents

TABLE OF CONTENTS

Page

PART I ​ 4

Item 1. Business 4

Item 1A. Risk Factors 45

Item 1B. Unresolved Staff Comments 73

Item 1C. Cybersecurity 73

Item 2. Properties 75

Item 3. Legal Proceedings 102

Item 4. Mine Safety Disclosures 103

​ ​ ​

Item 6. [Reserved] 104

Item 7A. Quantitative and Qualitative Disclosures About Market Risk 121

Item 8. Financial Statements and Supplementary Data 122

Item 9A. Controls and Procedures 162

Item 9B. Other Information 163

Item 9C. Disclosure Regarding Foreign Jurisdictions that Prevent Inspections 164

​ ​ ​

Item 10. Directors, Executive Officers and Corporate Governance 164

Item 11. Executive Compensation 164

Item 14. Principal Accounting Fees and Services 165

​ ​ ​

Item 15. Exhibits and Financial Statement Schedules 166

​ Signatures 171

1

Table of Contents

In this Annual Report on form 10-K (“Annual Report”), the terms “we,” “us,” “our,” “Company” and “TMC” mean TMC the metals company Inc. (formerly Sustainable Opportunities Acquisition Corp.) and our subsidiaries. On September 9, 2021 (the “Closing Date”), Sustainable Opportunities Acquisition Corp. (“SOAC” and after the Business Combination described herein, the “Company”) consummated a business combination (the “Business Combination”) pursuant to the terms of the business combination agreement dated as of March 4, 2021 (the “Business Combination Agreement”) by and among SOAC, 1291924 B.C. Unlimited Liability Company, an unlimited liability company existing under the laws of British Columbia, Canada (“NewCo Sub”), and DeepGreen Metals Inc., a company existing under the laws of British Columbia, Canada (“DeepGreen”) under which SOAC acquired DeepGreen and its business. In connection with the Business Combination, SOAC changed its name to “TMC the metals company Inc.” (“TMC”). The combined company’s common shares and warrants to purchase common shares commenced trading on the Nasdaq Global Select Market (“Nasdaq”) on September 10, 2021, under the symbols “TMC” and “TMCWW,” respectively.

As used in this Annual Report, “Mtpa” refers to millions of tonnes per year, “ktpa” refers to thousands of tonnes per year, “dmtu” refers to dry metric tonne unit, TWh” refers to trillion-watt hours, “CO2e” refers to metric tonnes of carbon dioxide emissions and “w/w” refers to weight for weight.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

This Annual Report includes forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), that relate to future events, our future operations or financial performance, or our plans, strategies and prospects. These statements are based on the beliefs and assumptions of our management team. Although we believe that our plans, intentions and expectations reflected in or suggested by these forward-looking statements are reasonable, we cannot assure that we will achieve or realize these plans, intentions or expectations. Forward-looking statements are inherently subject to risks, uncertainties and assumptions. Generally, statements that are not historical facts, including statements concerning possible or assumed future actions, business strategies, events or performance, are forward-looking statements. These statements may be preceded by, followed by or include the words “believes,” “estimates,” “expects,” “projects,” “forecasts,” “may,” “will,” “should,” “seeks,” “plans,” “scheduled,” “anticipates” or “intends” or the negative of these terms, or other comparable terminology intended to identify statements about the future, although not all forward-looking statements contain these identifying words. The forward-looking statements are based on projections prepared by, and are the responsibility of, the Company’s management. Forward-looking statements contained in this Annual Report include, but are not limited to, statements about:

2

Table of Contents

● cash flow provided by operating activities;

● the expected activities of our partners under our key strategic relationships;

● any litigation to which we are a party;

● claims and limitations on insurance coverage;

● geological, metallurgical and geotechnical studies and opinions;

● the impact of pandemics on our business; and

● our financial performance.

These forward-looking statements are based on information available as of the date of this Annual Report, and current expectations, forecasts and assumptions, and involve a number of judgments, risks and uncertainties. Important factors could cause actual results, performance or achievements to differ materially from those indicated or implied by forward-looking statements such as those described under the caption “Risk Factors” in Item 1A of Part I of this Annual Report and in other filings that we make with the Securities and Exchange Commission (“SEC”). The risks described under the heading “Risk Factors” are not exhaustive. New risk factors emerge from time to time, and it is not possible to predict all such risk factors, nor can we assess the impact of all such risk factors on our business or the extent to which any factor or combination of factors may cause actual results to differ materially from those contained in any forward-looking statements. Forward-looking statements are not guarantees of performance. You should not put undue reliance on these statements, which speak only as of the date hereof. All forward-looking statements attributable to us or persons acting on our behalf are expressly qualified in their entirety by the foregoing cautionary statements. We undertake no obligations to update or revise publicly any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.

3

Table of Contents

PART I

Item 1.BUSINESS

Overview

We are a deep-sea minerals exploration company focused on the collection, processing and refining of polymetallic nodules found on the seafloor in international waters of the Clarion Clipperton Zone (“CCZ”), about 1,300 nautical miles (1,500 miles or 2,400 kilometers) south-west of San Diego, California. The CCZ is a geological submarine fracture zone of abyssal plains and other formations in the Eastern Pacific Ocean, with a length of around 7,240 kilometers (4,500 miles) that spans approximately 4,500,000 square kilometers (1,700,000 square miles). Polymetallic nodules are discrete rocks that sit unattached to the seafloor, occur in significant quantities in the CCZ and have high concentrations of nickel, manganese, cobalt and copper in a single rock.

These four metals contained in the polymetallic nodules are critical for the transition to low carbon energy. Our resource definition work to date shows that nodules in our contract areas represent the world’s largest estimated undeveloped source of critical battery metals. If we are able to collect polymetallic nodules from the seafloor on a commercial scale, we plan to use such nodules to produce three types of metal products: (i) feedstock for battery cathode precursors (nickel and cobalt sulfates, or intermediary nickel-copper-cobalt matte, or nickel-copper-cobalt alloy) for electric vehicles (“EV”) and renewable energy storage markets, (ii) copper cathode for EV wiring, energy transmission and other applications, and (iii) manganese silicate for manganese alloy production required for steel production. Our mission is to build a carefully managed, shared stock of metal (a “metal commons”) that can be used, recovered and reused for generations to come. Significant quantities of newly mined metal are required because existing metal stocks are insufficient to meet rapidly rising demand.

Exploration and exploitation of seabed minerals in international waters is regulated by the International Seabed Authority (“ISA”), an intergovernmental organization established pursuant to the 1994 Agreement Relating to the Implementation of the United Nations Convention on the Law of the Sea (“UNCLOS”). The ISA grants contracts to sovereign states or to private contractors who are sponsored by a sovereign state. The ISA requires that a contractor obtain and maintain sponsorship by a host nation that is a member of the ISA and signatory to UNCLOS, and that such nation maintains effective supervision and regulatory control over such sponsored contractor. The ISA has issued a total of 19 polymetallic nodule exploration contracts covering approximately 1.28 million square kilometers, or 0.4% of the global seafloor, 17 of which are in the CCZ. We hold exclusive exploration and commercial rights to three of the 17 polymetallic nodule contract areas in the CCZ through our subsidiaries Nauru Ocean Resources Inc. (“NORI”) and Tonga Offshore Mining Limited (“TOML”), sponsored by the Republic of Nauru (“Nauru”) and the Kingdom of Tonga (“Tonga”), respectively, and exclusive commercial rights through our wholly-owned subsidiary, DeepGreen Engineering Pte. Ltd.’s (“DGE”), arrangement with Marawa Research and Exploration Limited (“Marawa”), a company owned and sponsored by the Republic of Kiribati (“Kiribati”).

We are still in the exploration phase and have not yet obtained any exploitation contracts from the ISA to commence commercial scale polymetallic nodule collection in the CCZ. Additionally, we do not have the applicable environmental and/or other permits required to build and operate commercial-scale polymetallic nodule processing and refining plants on land.

4

Table of Contents

Polymetallic Nodules

Deep-sea polymetallic nodules form on and just below the sediment-covered seafloor of the abyssal plains. These nodules contain significant amounts of metals, and their unique characteristic compared to terrestrial deposits is the presence of the four critical metals, nickel, copper, cobalt and manganese, in one deposit.

Source: TMC inaugural Impact Report 2021, filed May 2022

5

Table of Contents

Additionally, polymetallic nodules in the CCZ possess the following characteristics:

Characteristic ​ What it means

Far removed from human communities ​ No need for social displacement

Low head-grade variability ​ Potentially easy to process

2-10 cm diameter ​ Potentially easy to handle

Microporous ​ Potentially easy to smelt

The above characteristics of polymetallic nodules may provide an opportunity to compress lifecycle environmental and social impacts of producing critical metals as compared to land ores. In order to extract nickel, copper, cobalt and manganese from land ores, at least three different types of ores would need to be excavated. Mine development often involves social displacement and impacts on Indigenous people as well as deforestation, destruction of carbon sinks and biodiversity loss. In addition, several times more mass would need to be processed, often requiring significant amounts of local water resources; mining and processing tailings which can be toxic and need to be managed indefinitely in tailings dams, using dry-stacking or a practice known as deep-sea tailings placement (DSTP). Furthermore, metal production from land ores can release several toxic streams into the surrounding environment which can negatively impact the health of local communities and ecosystems. We believe using nodules to produce critical metals can help reduce several of these impacts associated with mining land ores. If our nodules are to be processed and refined in the United States (“U.S.”), we can also compress the current supply chain that some materials need to travel before reaching the U.S. of 50,000 miles down to 1,500 miles, while reducing dependency on China which dominates refining for battery metals such as nickel, cobalt and manganese.

Market Opportunity

A 2021 study by the International Energy Agency shows that the production of energy transition minerals could increase by 600% by 2040 to meet the growing demand for low-carbon energy technologies required to keep global warming at 1.5°C. Given the wide range of environmental and social impacts associated with conventional land-based mining, we believe it is important to ensure that these large amounts of critical metals are sourced with the lowest environmental, social, and economic impacts possible. As the global supply of high-grade ore remains limited and metal demand increases, we can expect a larger environmental and social footprint, potential supply shortages and volatility in metal prices should land-based ores remain the only viable source of critical metals.

6

Table of Contents

Industries which represent an end-use segment that may require all four critical metals contained in nodules (e.g. EVs) are of particular interest to us and represent potential market opportunities. Nodules contain metals that can be employed as: (i) feedstock for battery cathode precursors (nickel, cobalt and manganese sulfates) for EV and renewable energy storage markets, (ii) copper cathode for EV wiring, energy transmission and other applications, and (iii) manganese silicate for manganese alloy production required for steel production. See Section – Competitive Strengths. While end-uses driven by the energy transition represent a small fraction of the total use of the four metals contained in polymetallic nodules today, we believe that the relative use of these four metals by EV’s and other energy transition is set to increase significantly over the next decades.

The below charts published by the International Energy Agency show increasing global demand by end-use application for nickel, cobalt, copper and manganese, under the scenario that net zero emissions is achieved by 2050. The International Energy Agency provides global demand projections for 37 critical minerals needed for clean energy transitions across various target and technology scenarios.

7

Table of Contents

8

Table of Contents

Source: IEA Critical Minerals Market Review 2023

9

Table of Contents

Battery Metals and EV Market Opportunity Global

We believe the world is at the very beginning of a multi-decade electrification of road transportation. According to Bloomberg New Energy Finance (BNEF), at the end of 2023, the global fleet of four-wheeled vehicles including cars, vans, trucks, and buses numbered 1.57 billion (up 2.1% from 2022) and only 41 million passenger cars, or less than 3%, were electric. However, the new sales of internal combustion cars have decreased since 2017 as sales of battery electric and plug-in hybrids vehicles have increased and accounted for over 15% of global passenger vehicle sales in 2023. By 2030, automakers have collectively committed to sell 47 million EVs a year, a commitment that represents more than tripling of current sales levels.

The electrification of global road transportation is underpinned by the rapid expansion of the battery manufacturing capacity, which started accelerating since 2020 and is expected to reach 8TWh by 2040.

Battery chemistries that require metals contained in CCZ polymetallic nodules, nickel, cobalt and manganese, deliver high energy densities and are typically deployed in vehicles requiring long range (e.g., luxury and upmarket passenger cars) and power (trucks). In 2023, these battery chemistries accounted for 58% of overall battery manufacturing, which represented only a small portion of the overall use of nickel (~12% of nickel demand) and manganese (<1% of manganese demand). In addition, the use of batteries with different chemistries has changed over time, and we expect demand for the four metals found in polymetallic nodules to increase as the demand for batteries with certain chemistries increases.

10

Table of Contents

We believe there will be continued growth in EV demand, with many countries committing to phasing out cars that burn fossil fuels and many original equipment manufacturers (“OEMs”) devoting significant resources to the electrification of their vehicle offerings. In 2023, the number of signatories to the Zero Emission Vehicle declaration announced at the UN Climate Change Conference (COP28) increased to 228; the declaration is aimed at accelerating the transition to zero emission vehicles with a goal to reach 100% new EV car and van sales by 2040, and by 2035 in leading markets. In the U.S., 23 states, plus the District of Columbia and Puerto Rico, have set 100% decarbonized energy goals by 2050 or sooner, with the Biden administration seeking to make half of all new vehicles sold in the U.S. zero-emissions vehicles by 2030. We believe the transition to low carbon energy and EVs will test the limits of the current supply of certain metals, as EVs require several times more of these metals (such as nickel, cobalt and copper) than cars with internal combustion engines. Following price surges in 2022 in anticipation of a period of increased demand, an oversupply of nickel largely produced in

11

Table of Contents

Indonesia has driven down prices of the metals. These surpluses, however, could be temporary and we believe potential shortages in nickel and cobalt supply could return in the 2027/2028 timeframe, subject to developments in Indonesia and responses by the U.S. and the European Union where regulators could impose measures to differentiate between sources of metal based on the environmental and social impacts of these sources. Since prices of these metals have declined, investments by Western countries have declined and some of these interests have stopped mining/production of these metals altogether. It should be noted that current metal prices as of the date of this report are similar to projections used in the initial assessment from March 2021 for the NORI Area D project.

Battery Metals and EV Market Opportunity in the U.S.

Although the total fleet of four-wheeled vehicles in the U.S. (267 million or 17% of global) is roughly comparable in size to that of China (361 million or 23% of global), the U.S. EV fleet is three times smaller in relative terms than that of China (5.1 million EVs or 2% of national fleet vs. 22 million EVs in China or 6% of national fleet).

Based on 2023 data, the U.S. is the second largest consumer of battery nickel based on EV end-use. We expect this use to grow significantly in the coming years.

In August 2021, the U.S. government announced a target of 50% EV sales by 2030 and in August of 2022, the U.S. Congress enacted the Inflation Reduction Act of 2022 (“IRA”) which included incentivizing EV adoption and domestic production of clean vehicle

12

Table of Contents

critical mineral and battery components. These announcements resulted in industry commitments to build battery cell manufacturing gigafactories, which would represent approximately 1.3TWh of aggregate capacity across North America, according to Benchmark Minerals Intelligence (“Benchmark”). While the IRA has helped attract over US$100 billion in EV value chain investments, less than 1.3% of the total is being invested in the sourcing of raw materials.

In June 2021, the Biden administration’s 100-Day Review of Critical Minerals Supply Chains estimated that fully electrifying U.S. car sales would require 1,273ktpa of Class 1 nickel, 160ktpa of cobalt and 148ktpa of manganese, compared with existing U.S. primary production of 18ktpa of nickel, 0.6ktpa of cobalt, and zero primary production of manganese. Across our NORI and TOML contract areas, we have estimated resources of 15.9Mt of nickel, 2.2Mt of cobalt and 355Mt of manganese plus 13.3Mt of copper, with the potential to take the U.S. from zero or de minimis production of those metals, which comprise the metals used in the most prominent battery cathode (NMC) in 2023 to near self-sufficiency or potentially a net export position in each. In September 2023, nine U.S. House of Representatives members wrote to the Secretary of Defense, Lloyd Austin, noting that the United States has “an opportunity to evaluate domestic processing and refining of seafloor resources from contracts held by allied parties in international waters,” and urging the Department of Defense to “assess polymetallic nodules as a viable resource to secure critical minerals and close national security vulnerabilities.” In December 2023, 31 U.S. House of Representatives members wrote to the Secretary of Defense, Lloyd Austin, emphasizing “the importance of evaluating and planning for seabed mining as a new vector of competition with China for resource superiority and security.” Additional letters from five members of the Texas House delegation as well as Senator Cornyn were written to the Department of Defense in support of our U.S. subsidiary DeepGreen Resources’ application to the Defense Production Act Title III program for support with a site-specific feasibility study for its planned full-scale processing plant.

Also in December of 2023, the U.S. National Defense Authorization Act (NDAA) was signed into law for fiscal year 2024 including a provision on ‘Critical and Strategic Minerals and Materials Sourcing from Seafloor Resources.’ In this provision, the House Armed Services Committee (HASC) directed the Assistant Secretary of Defense for Industrial Base Policy to, by March 2024, submit a report to the HASC assessing the processing of seabed resources of polymetallic nodules domestically. Although not yet submitted, the report shall include, at a minimum, the following: (1) a review of current resources and controlling parties in securing seabed resources of polymetallic nodules; (2) an assessment of current domestic deep-sea mining and material processing capabilities; and (3) a roadmap recommending how the U.S. can have the ability to source and/or process critical minerals in innovative arenas, such as deep-sea mining, to decrease reliance on sources from foreign adversaries and bolster domestic competencies. We believe the continued focus by the U.S. government may increase our opportunities to develop operations in the U.S.

Environmental Market Opportunity

All nickel, cobalt, copper and manganese going into EVs today are produced from land-based ores or recycled metal stock. Existing metal stocks available for recycling are insufficient to meet current demand. Even with high end-of-life product recycling rates, most of the new demand over the coming decades will have to be met by new mining. We believe the land mining sector is fundamentally challenged: ore grades are falling, production is moving to some of the more biodiverse and conflict-laden regions in the world (such as the Democratic Republic of the Congo, Indonesia, Philippines and South Africa), accessing ore bodies often requires a complete removal of ecosystems situated on and above such orebodies, and removing, breaking or tunneling through significant tonnage of waste rock. Toxic levels of heavy elements often found in land orebodies typically need to be removed, stored, and maintained indefinitely; a real challenge on seismically active and wet tropical islands in countries like Indonesia that accounts for most of the growth in nickel supply.

13

Table of Contents

As a result of a vigorous campaign by several non-governmental organizations, some participants in the EV supply chain have called for a general moratorium on all forms of deep seabed mining until there is more knowledge about marine impacts of nodule collection operations. While our Environmental & Social Impact Assessment (ESIA) for offshore nodule collection segment of the NORI Area D Nodule Project is still ongoing, based on already completed research into lifecycle impacts of battery metal production specifically from deep-sea polymetallic nodules, we identified how nodules can potentially provide an opportunity to significantly compress most lifecycle environmental, social and governance (ESG) impacts associated with conventional metal production from land-based ores.

14

Table of Contents

To quantify environmental footprints of metal production from nodules as compared to conventional land ores, we commissioned several lifecycle assessments (“LCAs”) looking at the cradle-to-gate impacts of producing nickel, copper, cobalt and manganese products from polymetallic nodules and how it compares to land-based routes. An LCA white paper examining a comprehensive set of impacts was commissioned by us and co-authored by certain of our executive officers in 2018 and reviewed by subject matter specialists and published on our website in April 2020; an LCA research paper focusing on climate change impacts was peer-reviewed and published in the Elsevier Journal of Cleaner Production in December 2020, an LCA research paper focusing on solid waste streams was peer-reviewed and published in the Yale Journal of Industrial Ecology in January 2022 and an independent LCA compliant with the International Organization for Standardization Standard 14040 on our NORI Area D project was conducted by Benchmark and released in March 2023. Based on these LCA assessments that we commissioned, we believe that we are positioned to become one of the lowest ESG footprint metal companies in the industry. The March 2023 LCA by Benchmark shows that the NORI Area D project model performed better in each impact category analyzed than all the land-based processing routes chosen for comparison, except for the global warming potential (“GWP”) and water consumption of producing cobalt sulfate, in which one land-based route performed better. While most of these reductions are attributable to the unique characteristics of the polymetallic nodule resource as described above, the elimination of solid processing waste streams onshore is due to our investment in a near-zero-waste flowsheet design and part of the low carbon emissions are due to our commitment to locate onshore processing facilities in places with access to low carbon power.

Benchmark modeled the land-based processing routes with background ecoinvent data and foreground data from two expert chemical engineers in the nickel and cobalt industry. The NORI Area D Project data is based on the NORI Technical Report Summary, dated March 2021, which included an initial assessment and an economic analysis of NORI Area D prepared in accordance with the SEC’s Modernization of Property Disclosures for Mining Registrants set forth in subpart 1300 of Regulation S-K (the “SEC Mining Rules”). The NORI Technical Report Summary is filed as Exhibit 96.1 to this Annual Report.

As part of the ESIA conducted by NORI in partnership with world leading deep-sea research institutions and contractors, we are currently assessing the impacts of the NORI Area D Project on marine biodiversity and ecosystem function. The CCZ abyssal plains are one of the most common and least populated habitats on the planet, akin to deserts on land. The CCZ abyssal seafloor is plant-free, food-poor and dominated by bacterial life forms. It has been studied extensively since the 1960s with over 150,000 papers published on polymetallic nodules in general and over 40,000 on CCZ nodules in particular.

15

Table of Contents

The largest driver of uncertainty in assessing the potential future impact of nodule collection operations on marine biodiversity is our ability to measure biodiversity itself. Unlike biodiversity, biomass, measured as carbon contained in live organisms per m2 of habitat, is easier to measure and compare. Based on available data we have reviewed, we believe that the CCZ is one of lowest biomass places on the planet. Metal production from nodules will reduce biomass at risk by over 90% compared to producing the same amount of metals from conventional land ores.

In contrast, land-based mining for nickel and cobalt occurs in diverse countries as identified by Benchmark in a study commissioned by us and published in November 2023. In both Indonesia and the Democratic Republic of the Congo (the “DRC”), which are the world’s largest producers of nickel and cobalt respectively, the extraction of metal ores through open pit mines requires the complete removal of overlying ecosystems and contained carbon sinks, in turn eliminating the carbon sequestration. The study found that 1 kilogram of nickel mined from saprolite and limonite ore in Sulawesi, Indonesia removes forests containing carbon stock equivalent to 7.0 and 9.4 kilograms of CO2e, and 3.6 kilograms of CO2e in the case of cobalt mined in Katanga, DRC. Due to the resulting vegetation change, mining activities cause carbon sequestration services loss of 4.8 grams and 6.5 grams of CO2e respectively for nickel, and 9.3 grams of CO2e for cobalt per year.

16

Table of Contents

As a precautionary environmental management and protection measure, the ISA has already set aside 43% of the CCZ as protected areas or 1.97 million square kilometers, or Areas of Particular Environmental Interest (APEIs) aiming to ensure that all types of habitats that could be impacted by exploitation are represented within APEIs. For comparison, only approximately 8.2% of global oceans are protected today and the global target agreed in the High Seas Treaty in March 2023 is to protect 30% of the oceans by 2030. Additional marine impact mitigation measures such as setting aside more no-take areas inside our contract areas and leaving partial nodule cover inside collection areas to aid natural recovery of bacterial and other communities are also being evaluated. We are collaborating with some of the world’s leading researchers to conduct environmental baseline and collection impact studies to design plans that could mitigate marine impacts of nodule collection through collection system design and adaptive management systems.

If the entire CCZ area currently under exploration (1.28 million square kilometers) were to be exploited over a 30-year period, these nodule collection operations would impact 42,500 square kilometers of the abyssal seafloor per year in one of the least productive areas of the ocean (with respect to the abundance of marine life). This is less than 1% of the estimated 4,900,000 square kilometers of the seafloor currently impacted every year by trawling operations that take place primarily in highly productive coastal waters.

Potential future commercial-scale nodule collection operations in the CCZ are likely to disturb marine wildlife in the operating area. The nature and severity of these impacts on CCZ wildlife are expected to vary by species and are currently subject to uncertainty. We have completed studies baselining wildlife and ecosystem function, piloting the nodule collection system and assessing impacts arising from the use of this system immediately following the collector test and 12 months after the collector test, processing and assessment of collected data are currently in progress. Given the significant volume of deep water and the difficulty of sampling or retrieving biological specimens in the CCZ, a complete biological inventory might never be established. Accordingly, impacts on CCZ biodiversity may never be completely and definitively known. Given that similar challenges remain on land, with an estimated 70-80% of species still undescribed, it may also not be possible to definitively establish whether the impact of nodule collection on global biodiversity will be less significant than those estimated for land-based mining for a similar amount of produced metal.

17

Table of Contents

It is also currently not definitively known how effectively the risk of biodiversity loss in the CCZ could be eliminated or reduced through mitigation strategies or how long it will take for disturbed seabed areas to recover naturally. Prior research indicates that the density, diversity and function of fauna representing most of the resident biomass (including mobile, pelagic and microbial life) are expected to recover naturally over years to decades. However, a high level of uncertainty exists around recovery of fauna that requires the hard substrate of nodules for critical life function. The extent to which planned measures such as leaving behind partial nodule cover and setting aside no-take areas would aid recruitment and recovery of nodule-dependent species in impacted areas will depend on factors like habitat connectivity, which is an area that is still under study.

We are still in the exploration phase of the project and do not have the exploitation contracts necessary to commence commercial-scale nodule collection operations in the CCZ nor have we obtained the applicable environmental and other permits required to build and operate commercial scale polymetallic nodule processing and refining plants on land.

All extractive industries result in impacts to the receiving environment. Nodule collection is no exception and will impact the deep-sea marine environment through nodule removal, disturbance of seafloor sediment (“seafloor plumes”) and return of seawater used for nodule transport that is expected to contain residual sediment and nodule fines back in the water column (“midwater plumes”). Baselining the impacted marine environment by characterizing the ecosystem and then developing measures to avoid and mitigate these impacts is the central focus of our offshore ESIA program currently being undertaken in partnership with some of the world’s leading deep-sea research institutions. Nodule removal will impact species that depend on the hard nodule substrate for attachment. The severity of the impact will depend on (1) the extent to which these species are represented in the APEIs set aside by the ISA and additional no-take areas set aside by us and (2) the extent to which residual nodule cover will aid recruitment and recovery of these species in impacted areas. Disturbance of the seafloor by nodule collector vehicles is expected to disturb (mostly microbial) organisms living in and on the sediments. Impact severity will depend on the depth of sediment disturbance (expected to be approximately 5 centimeters based on modelling, laboratory tests, and recent collector tests completed in the CCZ by our subsidiary NORI and two other nodule contract-holders, Belgium’s Global Sea Mineral Resources NV (GSR) and the German’s BGR) and the impact this disturbance has on benthic ecosystem function. Over 90% of the entrained sediment is expected to be separated from nodules inside the collector vehicle and discharged behind the collector vehicle, most settling back to the seafloor within a few hundred meters. The impact of the residual plume will depend on how quickly the smaller mobile sediment particles re-settle, how far they travel and how the resulting sedimentation impacts the benthic organisms. Less than 10% of entrained sediment that will likely evade separation inside the collector vehicle will be transported with nodules and seawater through the riser pipe to the surface production vessel where nodules get dewatered and residual water, sediment and nodules fines will be returned at some depth in the water column below the highly populated and productive photic zone. Potential impacts from the mid-water sediment plume could include clogging of the delicate respiratory and filter feeding structures of pelagic zooplankton species, such as jellyfish and krill. However, the mid-water discharge is expected to have very low solid particle concentration and dilute to low levels within minutes. The depth of discharge will be selected based on ESIA results to minimize impact on life in the midwater column. According to a research paper on midwater sediment plumes published by researchers from the Massachusetts Institute of Technology (“MIT”) in Communications Earth & Environment in July 2021, entrained sediment from the return of seawater used for nodule transport dilutes to natural background levels within a few hundred meters of the outlet. Another research paper on seafloor sediment plumes published by MIT and the Scripps Institution of Oceanography in September 2022 found that 92-98% of benthic plume generated from the pilot nodule collector vehicle rose only two meters above the seafloor.

Our Strategic Positioning

We believe we are well positioned to meet the growing demand for critical battery metals:

18

Table of Contents

Our Competitive Advantages

With the potential that our resources hold and the project advancements we have made to date, we believe we are better positioned than other suppliers to provide a solution to the growing need for critical battery metals:

19

Table of Contents

Exploration Contracts

We currently hold exclusive exploration rights through our subsidiaries NORI and TOML and exclusive commercial rights through an agreement with Marawa, to certain polymetallic nodule areas in the CCZ.

NORI. NORI our wholly-owned subsidiary, holds exploration rights to four blocks (NORI Area A, B, C, and D, the “NORI Contract Area”) covering 74,830 square kilometers in the CCZ that were granted by the ISA in July 2011. NORI is sponsored by Nauru pursuant to a certificate of sponsorship signed by the Government of Nauru on April 11, 2011. The NORI Area D is the seafloor parcel where we have performed the most resource definition and environmental work to date. NORI commissioned AMC Consulting Ltd, a leading mining consulting firm (AMC), to undertake a preliminary economic assessment (“PEA”) of the mineral resource contained in NORI Area D and to compile a technical report compliant with Canadian National Instrument (NI 43-101), which was completed in March 2021. AMC subsequently compiled the NORI Technical Report Summary, dated March 2021, which included an initial assessment and an economic analysis of NORI Area D prepared in accordance with the SEC Mining Rules. The NORI Technical Report Summary is filed as Exhibit 96.1 to this Annual Report.

TOML. TOML our wholly-owned subsidiary which we acquired in March 2020, holds exploration rights to an area covering 74,713 square kilometers in the CCZ that were granted by the ISA in January 2012 (the “TOML Contract Area”). On March 8, 2008, Tonga and TOML entered into a sponsorship agreement formalizing certain obligations of the parties in relation to TOML’s exploration application to the ISA (subsequently granted) for the TOML Contract Area. The sponsorship agreement was updated on September 23, 2021. TOML commissioned a Technical Report Summary by AMC, dated March 2021, which is filed as Exhibit 96.2 to this Annual Report.

20

Table of Contents

Marawa. DGE, our wholly-owned subsidiary, entered into agreements with Marawa and Kiribati which provide DGE with exclusive exploration rights to an area covering 74,990 square kilometers in the CCZ (the “Marawa Contract Area”). The exploration contract between Marawa and the ISA (the “Marawa Exploration Contract”) was signed on January 19, 2015. To date, limited offshore marine resource definition activities in the Marawa Contract Area have occurred. We are collaborating with Marawa to assess the viability of any potential project in the Marawa Contract Area, although the timing of such assessment is uncertain. Marawa has delayed certain of its efforts in the Marawa Contract Area while it determines how it will move forward with additional assessment work.

Business Strategy

Our contemplated business spans the entire lifecycle from the resource acquisition and definition stage through the collection and transportation phases offshore into the processing and refining of nodules onshore and finally in product marketing and offtake (and eventually recycling of end-of-life products containing nodule-derived metals). NORI and TOML, two of our subsidiaries, intend to operate in the CCZ under the effective supervision, regulation and sponsorship of the Republic of Nauru and the Kingdom of Tonga, respectively. We intend to utilize processing operations in locations that are yet to be finalized. We have chosen a capital-light approach to our operations and have focused on forming deep strategic partnerships with leading offshore and onshore companies.

Our key strategic alliances include:

Allseas: Allseas, a leading global offshore contractor, has developed and successfully tested the pilot nodule collection system in the NORI Area D, completed in the fourth quarter of 2022. The experience from the development and testing program of the pilot system are now informing the design of upgrades and modifications into the initial smaller scale commercial production system which is expected to serve as the basis for the design of a full-scale commercial production system.

Glencore: Glencore International AG (Glencore) holds offtake rights to 50% of the NORI nickel and copper production. Glencore has the right to purchase from DGE 50% of the annual quantity of copper material and 50% of the annual quantity of nickel material produced by DGE from ore derived from the NORI Contract Area at a processing plant directly owned or controlled by DGE.

Hatch and KPM: We have worked with engineering firm Hatch Ltd. (“Hatch”) and consultants Kingston Process Metallurgy Inc. (KPM) to develop a near-zero solid waste flowsheet. The primary processing stages of the flowsheet from nodule to NiCuCo matte intermediate were demonstrated as part of our pilot plant program at FLSmidth and Xpert Process Solutions, a Glencore company (“XPS”), facilities. The matte refining stages are being tested at SGS Lakefield. The near-zero solid waste flowsheet is expected to serve as the basis for our onshore processing facilities.

21

Table of Contents

PAMCO: In November 2022, TMC entered into a non-binding MoU with PAMCO of Japan. In November 2023, we entered into a binding MoU with PAMCO whereby they must complete a feasibility study (anticipated to be completed during the third quarter of 2024) to toll treat 1.3 million tonnes of wet polymetallic nodules per year at its Hachinohe, Japan smelting facility, which is expected to start in the second quarter of 2026, if we obtain an exploration contract from the ISA in a timely manner. PAMCO’s Hachinohe facility is located on the coast in northern Japan and is equipped with port and processing infrastructure required to receive and process polymetallic nodules and to ship products to customers.

The toll treatment is expected to take place on a dedicated RKEF processing line and produce two products: nickel-copper-cobalt alloy, an intermediate product used as feedstock to produce Li-ion battery cathodes, and a manganese silicate product used to make silico-manganese alloy, a critical input into steel manufacturing.

PAMCO successfully completed a pre-feasibility exercise pursuant to the non-binding MoU signed by the parties in November 2022. Under the binding MoU signed in November 2023:

The feasibility study is expected to confirm operating parameters and product specifications for PAMCO’s dedicated production line and define the scope and execution plan for any additional equipment requirements, which are expected to be minor. An extended pilot demonstration program utilizing existing kilns and furnaces at PAMCO’s Hachinohe, Japan facility is expected to treat a 2,000 tonne sample of polymetallic nodules collected during the successful pilot nodule collector test completed by Allseas in November 2022 on NORI Area D, with the goal of optimizing the furnace refractory selection and confirm commercial scale operating parameters such as tapping temperatures and dusting rates when treating nodules through the Hachinohe facility. The cost of processing polymetallic nodules will also be estimated to help finalize the definitive processing agreements.

In parallel, PAMCO is continuing to study the addition of a converting facility to process the intermediate alloy to nickel-copper-cobalt matte, which is an upgraded intermediate battery supply chain feedstock. It is expected that the additional facility would be constructed once commercial processing of polymetallic nodules to alloy has been demonstrated.

There can be no assurance that we will enter into a definitive strategic alliance with PAMCO in a particular time period, or at all, or on terms similar to those set forth in the binding MoU, or that if a definitive strategic alliance are entered into by us or that the existing facility will be able to successfully process nodules in a particular time period, or at all.

Phased Project Development

Currently, we are an exploration stage company with a completed Initial Economic Assessment, working towards a pre-feasibility study that will form an integral part of our ISA application for an exploitation contract for the NORI Contract Areas. We expect to enter into the feasibility study phase in 2024, having completed the pilot collection system test with Allseas in the CCZ in the fourth quarter of 2022. Having significantly advanced resource definition and environmental baseline studies on NORI Area D, we intend to apply for an exploitation contract on that area first. If we obtain an exploitation contract, we then plan to commence production offshore (“Project Zero”) at the end of the first quarter of 2026 using the Hidden Gem vessel which, subject to further modifications, is expected to be upgraded to a maximum capacity of 3.0 Mtpa of wet nodules. Subject to the success of Project Zero and any regulatory requirements, we then expect to move into the next phase of production (“Project One”) in which we intend to scale up production and expect to collect and process up to approximately 12.5Mtpa of wet nodules at steady state (expected 2030-2045), as outlined in the NORI – D Technical Report Summary.

22

Table of Contents

Current Work Program

We are currently focused on preparing to submit our application to the ISA for our first exploitation contract, which will include the entire NORI Contract Area, with the initial collection activities occurring within NORI Area D only following the July 2024 meetings of the ISA’s twenty-ninth session. Assuming a review process of approximately one-year, we expect to be in production offshore at the end of the first quarter of 2026, if the application is approved.

To reach our objective and initiate commercial production, we are: (i) defining our resource and project economics, (ii) developing a commercial offshore nodule collection system, (iii) assessing the environmental and social impacts of offshore nodule collection, and (iv) developing onshore technology to process collected polymetallic nodules into a manganese silicate product, and an intermediate nickel-copper-cobalt matte or nickel-copper-cobalt alloy product and/or end-products like nickel and cobalt sulfates, and copper cathode.

NORI Area 2020 Mineral Resource Estimate, in situ, for the NORI Areas within the CCZ at 4kg/m2 nodule abundance cut-off.

Note: Tonnes are quoted on a wet basis and grades are quoted on a dry basis, which is common practice for bulk commodities. Moisture content was estimated to 24% w/w. These estimates are presented on an undiluted basis without adjustment for resource recovery.

23

Table of Contents

TOML Area 2020 Mineral Resource Estimate, in situ, for the TOML Areas within the CCZ at 4kg/m2 nodule abundance cut-off.

Note: Tonnes are quoted on a wet basis and grades are quoted on a dry basis, which is common practice for bulk commodities. Moisture content was estimated to 28% w/w. These estimates are presented on an undiluted basis without adjustment for resource recovery.

We plan to continue to define our resource in the NORI and TOML areas, develop project economics to pre-feasibility and feasibility level and convert resources into reserves.

As a result of the successful collector test in the fourth quarter of 2022, where more than 3000 tonnes of wet nodules were lifted to the Hidden Gem, Allseas and NORI believe that they can upgrade the pilot nodule collection system, including the Hidden Gem, into the first production system, which we refer to as the Project Zero Offshore Nodule Collection System.

24

Table of Contents

In August 2023, we announced that Allseas and NORI are executing on a plan designed based on Allseas’ estimates to increase the maximum production capacity of the Project Zero Offshore Nodule Collection System from the previous estimate of 1.3 million wet tonnes per annum to up to an estimated 3.0 million wet tonnes per annum in stepped increments, a potential increase of 130%. The upgrades are expected to include the addition of a second collector vehicle, the use of a wider diameter riser pipe from the seafloor to the surface, implementation of a larger compressor spread and improvements to the system designed to further mitigate its environmental impacts.

System capacity is expected to be increased over time as production and experience milestones are met, which we believe will help manage operational risk, minimize up-front capital expenditure requirements and allow for staged increases in capacity as environmental review thresholds are met.

The work program with Allseas during 2023 focused on the review of the pilot nodule collection system performance, review of operational issues and identification of potential improvements to overall system performance. Key aspects include scaling the technology to meeting the anticipated commercial production rates of the Project Zero Offshore Nodule Collection System and integration of the scaled-up technology into the Hidden Gem. Engineering scope has been split into six major work packages: (1) collector, (2) vertical transport system (riser and riser handling equipment), (3) storage & offloading, (4) control & automation, (5) electrical & instrumentation, and (6) flow assurance. Engineering studies have progressed on the offshore nodule offloading and transportation system, including hydrodynamic simulations and dynamic positioning analysis of the vessel-to-vessel interface during the nodule offloading activity. In line with engineering milestones, design reviews have been conducted at the Allseas office in Delft, Netherlands. The design reviews are attended by us, Allseas and third-party consultants. Regular meetings are held between us and Allseas project teams covering engineering, procurement, scheduling and estimating, operational planning (including health and safety aspects) and environmental impact.

Further to our non-binding term sheet entered into in March 2022 with Allseas, we continue discussions with Allseas regarding the specifics of these upgrades and the continued development of the Project Zero Offshore Nodule Collection System and anticipate reaching definitive agreements on commercial terms and key terms around continued development and commercial operations with Allseas before the submission of the NORI exploitation application in 2024. There can be no assurances, however, that we will enter into definitive agreements with Allseas in a particular time period, or at all, or on terms similar to those currently expected, or that if such definitive agreements are entered into that the Project Zero Offshore Nodule Collection System will be successfully developed or operated.

In addition, on August 1, 2023, we entered into an Exclusive Vessel Use Agreement with Allseas pursuant to which Allseas will give exclusive use of the Hidden Gem to us in support of the development of the Project Zero Offshore Nodule Collection System until the system is completed or December 31, 2026, whichever is earlier. In consideration of the exclusivity term, we have issued 4.15 million of our common shares to Allseas (“Common Shares”) on August 14, 2023. We expect that the definitive agreement with Allseas discussed above will extend the exclusive use of the Hidden Gem.

In October 2023 we entered into a services agreement with a third party in order for NORI to conduct an assessment of the benthic impact of the 2022 collector test in NORI Area D approximately 12 months post the collector test activities (“Campaign 8a”), which we believe will strengthen the quality of NORI’s EIS and Environmental Management and Monitoring Plan (“EMMP”) by providing additional information on the environmental regeneration of the collection test area. The key activities completed during campaign 8a were box cores, multicores, benthic and covariance lander works, and megafauna and sedimentation survey around the test field area.

25

Table of Contents

Notwithstanding that Campaign 8a was subject to coordinated disruptive activities by Greenpeace International (“Greenpeace”) designed to prevent and obstruct the campaign, it was successfully completed on December 28, 2023. The team selected 19 sampling stations in the locality of the 2022 nodule collection system test in NORI Area D and conducted 39 multicore deployments, recovering 395 individual core samples. These yielded more than 600 subsamples that will be shared with independent researchers from leading marine research institutions for further biological analysis. Additionally using a remotely operated vehicle, the research team deployed innovative seafloor lander systems that are capable of measuring seafloor oxygen fluxes using eddy covariance methods. This resulted in over 600 hours of data acquisition at a maximum deployment depth of 4,285 meters, which we believe is the first time these bespoke sensor suites have been deployed at abyssal depths. This data is further supplemented by over one thousand core sub-samples for geochemical analysis. Researchers also conducted the fourth annual recovery and redeployment of three oceanographic moorings within NORI Area D. The sensor payload on the moorings provides insights into the soundscape, regional oceanographic currents, and particulate organic carbon flux in the Eastern CCZ regions. This data contributes to the long-term oceanographic time series and importantly will cover the El Niño-Southern Oscillation fluctuations. Greenpeace spent 11 days, actively obstructing the planned work of Campaign 8a, resulting in a significant impact to the work scopes planned for the campaign which we were able to successfully mitigate. In the case of TOML and our planned work as part of Campaign 8a, its work scope included the deployment of long-term monitoring moorings which was completely obstructed and was not able to be completed. The NORI and TOML work scopes were part of ISA approved plans of work and in NORI’s case, the post disturbance sampling was a specific suggestion of the ISA. NORI pursued legal action through the Dutch courts to halt Greenpeace’s activities and requested further assistance from the ISA. The District Court of Amsterdam ruled that Greenpeace’s occupation of NORI’s contracted vessel, the MV Coco, was unlawful, which led to the disembarkation of Greenpeace personnel. Greenpeace continued to actively obstruct NORI’s and TOML’s activities notwithstanding the court ruling.

In addition, as described above and below, in 2022 and 2023, we entered into a non-binding MoU and a binding MoU with PAMCO to study the possibility of using PAMCO’s facility in Hachinohe, Japan to produce up to 1.3 million tonnes of net polymetallic nodules per year.

PAMCO is continuing to study the addition of a converting facility to process the intermediate alloy to nickel-copper-cobalt matte, which is an upgraded intermediate battery supply chain feedstock. It is expected that the additional facility would be constructed once commercial processing of polymetallic nodules to alloy has been demonstrated. There can be no assurance that we will enter into a definitive processing agreement in a particular time period, or at all, or on terms similar to those set forth in the binding MoU, or that the existing facility will be able to successfully process nodules in a particular time period, or at all.

Summary of Mineral Resources

Below is a summary table of estimated mineral resources in NORI and TOML contract areas as of December 31, 2023. The estimated mineral resources in these areas were determined in 2021 as of December 31, 2020, and also reflect the estimated mineral resources as of December 31, 2023, as none of the mineral resources in these areas were depleted by mining or any other activities. See Item 2 entitled “Properties” below for additional information about our estimated mineral resources. Both of these contract areas are in the exploration stage.

26

Table of Contents

Summary Mineral Resources, In-Situ, at end of the fiscal year ended December 31, 2023 at 4kg/m2 abundance cut-off and based on nickel metal $16,472/t; copper metal $6,872/t; cobalt metal $46,333/t; manganese in manganese silicate $4.50/dmtu Mn.

​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​

​ ​ ​ ​ ​ ​ ​ ​ ​ Measured + ​ ​ ​ ​

​ ​ Measured mineral ​ Indicated mineral ​ indicated mineral ​ Inferred mineral

​ resources ​ resources ​ resources ​ resources

​ Million ​ Million ​ Million ​ Million ​

​ ​ tonnes ​ Grades ​ tonnes ​ Grades ​ tonnes ​ Grades ​ tonnes ​ Grades

​ ​ (wet) ​ (%) ​ (wet) ​ (%) ​ (wet) ​ (%) ​ (wet) ​ (%)

Ni ​ ​ ​ ​ ​ ​ ​ ​

NORI ​ ​ ​ ​ ​ ​ ​ ​

NORI Area A ​ — ​ — — — — — 72 1.35

NORI Area B ​ — ​ — — — — — 36 1.43

NORI Area C ​ — ​ — — — — — 402 1.26

​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​

Cu

NORI

NORI Area A ​ — ​ — — — — — 72 1.06

NORI Area B ​ — ​ — — — — — 36 1.13

NORI Area C ​ — ​ — — — — — 402 1.03

​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​

Co

NORI

NORI Area A ​ — ​ — — — — — 72 0.22

NORI Area B ​ — ​ — — — — — 36 0.25

NORI Area C ​ — ​ — — — — — 402 0.21

​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​

Mn

NORI

NORI Area A ​ — ​ — — — — — 72 28.0

NORI Area B ​ — ​ — — — — — 36 28.9

NORI Area C ​ — ​ — — — — — 402 28.3

Note: Tonnes are quoted on a wet basis and grades are quoted on a dry basis, which is common practice for bulk commodities. Moisture content was estimated to be 24% w/w for NORI and 28% w/w for TOML. These estimates are presented on an undiluted basis without adjustment for resource recovery.

27

Table of Contents

As reflected in the Initial Economic Assessment of NORI Area D contained in the NORI Technical Report Summary, a discounted cash flow analysis considering the intended pre-development work up to the end of 2024, discounting at 9% per annum, and assuming metal prices for nickel metal $16,472/t; nickel in nickel sulfate $18,807/t Ni; copper metal $6,872/t; cobalt metal $46,333/t; cobalt in cobalt sulfate $56,920/t Co; manganese in manganese silicate $4.50/dmtu Mn, indicates a NORI Area D project net present value (as of January 1, 2021) of $6.8 billion. The initial assessment included in the NORI Technical Report Summary is a conceptual study of the potential viability of NORI’s mineral resources. This initial assessment indicates that development of the NORI mineral resource is potentially technically and economically viable; however, due to the preliminary nature of project planning and design, and the untested nature of the specific seafloor production systems at a commercial scale, economic viability has not yet been demonstrated.

The NORI Technical Report Summary and TOML Technical Report Summary do not include the conversion of mineral resources to mineral reserves.

You are specifically cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into mineral reserves, as defined by the SEC. You are also cautioned that mineral resources do not have demonstrated economic value. Inferred mineral resources have a high degree of uncertainty as to their existence and to whether they can be economically or legally commercialized. Under the SEC Mining Rules, estimates of inferred mineral resources may not form the basis of an economic analysis. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. A significant amount of exploration must be completed in order to determine whether an inferred mineral resource may be upgraded to a higher category. Therefore, you are cautioned not to assume that all or any part of an inferred mineral resource exists, that it can be economically or legally commercialized, or that it will ever be upgraded to a higher category. Approximately 97% of the NORI Area D resource is categorized as measured or indicated.

Likewise, you are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be upgraded to mineral reserves.

Collection and Processing of Polymetallic Nodules

Collection and Shipping

We are planning a phased development for NORI Area D. Polymetallic nodules would be collected using offshore collection systems, comprising of nodule collector vehicles on the seafloor, a riser and lifting system (RALS) in the water column, and a production support vessel on the surface. The nodules are expected to be transferred to transport vessels and shipped to onshore processing facilities.

Through our strategic partnership with Allseas, a former drillship vessel (the Hidden Gem) acquired by Allseas in February 2020 has been converted and modified to undertake a pre-production collector test in which a collector vehicle, RALS and other systems have been tested. If we obtain an exploitation contract, the first phase of commercial production (“Project Zero”) would then be expected to commence after the Hidden Gem has been upgraded to become a production support vessel that can produce up to 3 Mtpa (wet) of nodules. The nodules collected in Project Zero are expected to be processed through existing third-party RKEF facilities on a tolling basis. In the next phase of development (“Project One”), as outlined in the NORI – D Initial Assessment Technical Report Summary, production is expected to be expanded with an additional converted drillship (Drill Ship 2), a subsequent upgrade to the Hidden Gem, and the construction of a bespoke production support vessel (Collector Ship 1).

28

Table of Contents

Illustration of a polymetallic nodule production system operated at 4 kilometers depth

29

Table of Contents

In order to test the collection system, we entered into a contract with Allseas to undertake a pre-production collector test, which was successfully completed in the second half of 2022. We expect that Project Zero commercial production would then commence after the upgrading of the Hidden Gem into a production vessel. If we obtain an exploitation contract, we expect to commence Project Zero Collection at a rate of 1.3 Mtpa increasing in staged increments to up to 3.0 Mtpa of wet polymetallic nodules. For Project One, we believe that a fleet of three production vessels, each with multiple dedicated nodule collector vehicles, could be estimated to produce approximately 12.5 Mtpa of wet nodules at steady state (expected 2030-2045), which we intend to process, either at a new facility to be constructed by us or by potential processing partners, subject to available capital, or at third-party facilities pursuant to a toll treatment model.

We believe that this phased approach to development allows for proper management of risk and for progressive improvement of engineering and operating systems. The intention is to implement the project in multiple phases that will allow the offshore collection systems to be tested and then polymetallic nodule production to be gradually ramped- up. We believe that this approach will de-risk the project for a relatively low initial capital investment while retaining operational options, particularly in relation to logistics, to decrease unit operating cost as production is scaled up. Additionally, this phased development will allow for an adaptive approach to environmental management providing learning at small-scale which would be applied as production increases in scale.

Mineral Processing and Refining and Metallurgical Testing

Pyrometallurgical processing of polymetallic nodules has been extensively studied since the early 1970s.

From an early stage, we have recognized that processing represents a key to potentially commercializing seafloor polymetallic nodules and to becoming a low-cost producer of nickel, manganese, copper and cobalt products. Moreover, we believe that there is a commercial advantage in positioning ourselves as a leader in the onshore processing of seafloor polymetallic nodules.

To this end, we have been working with leading global process engineering group Hatch, and a professional services firm, to develop pyrometallurgical processing and hydrometallurgical refining technologies for the production of battery metals feedstocks from nodules. Hatch has developed a near-zero solid waste flowsheet and has overseen a pyrometallurgical pilot plant program consisting of several phases: the pyrometallurgical processing phase has been completed at FLSmidth’s and XPS facilities, the hydrometallurgical refining phase is in progress at SGS facilities. Pursuant to an engineering and consulting services agreement, Hatch is assisting and advising us during the development of the pilot test program and is analyzing and interpreting the testing results through reports provided by such test facilities.

30

Table of Contents

We expect that the processing of the polymetallic nodules from the NORI Contract Area would also be ramped up in phases. This plan includes initially toll treating polymetallic nodules at existing RKEF plants, utilizing existing excess industry capacity. We believe that there is significant interest to deploy underutilized RKEF plants which may have become stranded as a result of the Indonesian government nickel laterite ore export ban restricting supply of the nickel laterite feedstock that they have previously utilized. These RKEF plants were originally built to convert nickel laterite to ferro-nickel alloy or nickel pig iron and could potentially be converted to smelt polymetallic nodules.

In November 2023, we signed a binding MoU with PAMCO, where PAMCO must complete a feasibility study (expected to be completed during the third quarter of 2024) to toll treat 1.3 million tonnes of wet polymetallic nodules per year at its Hachinohe, Japan smelting facility expected to start in the second quarter of 2026, consistent with the commencement of NORI’s planned first production offshore from the end of the first quarter of 2026, if our expected application to the ISA for an exploitation contract is approved assuming a review period of approximately one year. The toll treatment is expected to take place on a dedicated RKEF processing line and produce two products: nickel-copper-cobalt alloy, an intermediate product used as feedstock to produce Li-ion battery cathodes, and a manganese silicate product used to make silico-manganese alloy, a critical input into steel manufacturing.

Strategic Alliances and Key Commercial Agreements

Allseas Agreements

On March 29, 2019, we entered into a Strategic Alliance Agreement with Allseas, whereby the parties will conduct project development of an integrated offshore nodule collection system for use by our subsidiaries. As initially constituted, Allseas agreed to subscribe for (i) 6,666,667 DeepGreen Common Shares for a purchase price of $20,000,000 in cash (the “Subscription”), the entire amount of which was funded, and (ii) an additional 10,000,000 DeepGreen Common Shares in exchange for services rendered by Allseas in respect of the contemplated pilot mining test system (the “PMTS”), which would be designed, built and tested by Allseas. The 10,000,000 shares would only be issued upon completion of the pilot mining test in the CCZ using the PMTS (the “Success Fee Shares”), along with an additional $30 million cash success fee that would be payable simultaneously therewith. The Strategic Alliance Agreement also contemplated that the parties would enter into other commercial arrangements following the successful completion of the pilot trials of the PMTS in the CCZ.

On July 8, 2019, we and Allseas entered into the Pilot Mining Test Agreement (the “PMTA”), which governed the terms, design specifications, procedures, and timetable under which Allseas agreed to complete and test the PMTS, to be used by NORI. The PMTA was subsequently amended on September 1, 2019, February 20, 2020, March 4, 2021, June 30, 2021 and February 8, 2023. The Strategic Alliance Agreement was also amended on March 4, 2021 (collectively with the PMTA amendment of the same date, the “Amendment”), which Amendment became effective upon closing of the Business Combination. Pursuant to the Amendment, the cash fee payable pursuant to the PMTA was amended such that we would pay to Allseas (i) $10,000,000 on June 30, 2021 (which we subsequently amended with Allseas to change to within 10 business days of the Closing of the Business Combination in a further amendment; this amount was paid on October 5, 2021), (ii) $10,000,000 on the later of January 1, 2022 and such time that confirmation is received with respect to the successful completion of the North Sea drive test, which was paid on April 25, 2022, and (iii) $10,000,000 upon successful completion of the pilot trials in the CCZ using the PMTS which was settled through the issuance of 10 million Common Shares in February 2023, along with additional costs owed Allseas under the PMTA in 850,000 Common Shares, in each case, priced at $1.00 per share under the fifth amendment to the PMTA. Pursuant to the Amendment, except as provided therein, Allseas may not, without our prior written consent, terminate the Strategic Alliance Agreement or the PMTA before NORI receives an ISA exploitation contract.

The PMTA terminated by its terms upon the successful completion of the PMTS, whereas the overarching Strategic Alliance Agreement remains in place.

On March 16, 2022, NORI and Allseas entered into a non-binding term sheet for the development and operation of a commercial nodule collection system. The PMTS developed and tested by Allseas was expected to be upgraded to a commercial system with a targeted production capacity of at least 1.3 Mtpa of wet nodules (“Project Zero System”). NORI and Allseas intended to equally finance all costs related to developing and getting Project Zero System into production that were estimated at less than EUR100 million. It was anticipated that NORI will not have to make any Project Zero System-related payments to Allseas until later in 2023. Once in production, NORI expected to pay Allseas a nodule collection and transshipment fee estimated at approximately EUR 150 per wet tonne in the first year of operations and expected to be reduced by more than 20% in the following years as Allseas scaled up production to at least 1.3 Mtpa of wet nodules.

31

Table of Contents

Subject to the necessary regulatory approvals, Allseas and NORI also intend to investigate acquiring a second production vessel similar to the Hidden Gem, a further Samsung 10000, with the potential for it to be engineered to support a production rate of 3.0 Mtpa of wet nodules.

Following the successful completion of the NORI Area D pilot collection system trials in November 2022 and subsequent analysis of pilot data, the parties reviewed Project Zero System production target increases, system design changes and associated cost estimates revisions. In August 2023, we announced that Allseas and NORI were executing on a plan designed based on Allseas’ estimates to increase the maximum production capacity of the Project Zero Offshore Nodule Collection System from the previous estimate of 1.3 million wet tonnes per annum to up to an estimated 3.0 million wet tonnes per annum in stepped increments, a potential increase of 130%. The upgrades are expected to include the addition of a second collector vehicle, the use of a wider diameter riser pipe from the seafloor to the surface, implementation of a larger compressor spread and improvements to the system designed to further mitigate its environmental impacts.

System capacity is expected to be increased over time as production and experience milestones are met, which we believe will help manage operational risk, minimize up-front capital expenditure requirements and allow for staged increases in capacity as environmental review thresholds are met.

The work program with Allseas during 2023 focused on the review of the pilot nodule collection system performance, review of operational issues and identification of potential improvements to overall system performance. Key aspects include scaling the technology to meeting the commercial production rates of the Project Zero Offshore Nodule Collection System and integration of the scaled-up technology into the Hidden Gem. Engineering scope has been split into six major work packages: (1) collector, (2) vertical transport system (riser and riser handling equipment), (3) storage & offloading, (4) control & automation, (5) electrical & instrumentation, and (6) flow assurance. Engineering studies have been progressed on the offshore nodule offloading and transportation system, including hydrodynamic simulations and dynamic positioning analysis of the vessel-to-vessel interface during the nodule offloading activity. In line with engineering milestones, design reviews have been conducted at the Allseas office in Delft, Netherlands. The design reviews are attended by TMC, Allseas and third-party consultants. Regular meetings are held between TMC and Allseas project teams covering engineering, procurement, scheduling & estimating, operational planning (including health & safety aspects) and environment.

Further to our non-binding term sheet entered into in March 2022 with Allseas, Allseas is proceeding with system design and TMC continues its discussions with Allseas regarding the specifics of these upgrades, associated cost estimates and operational implications of the continued development of the Project Zero Offshore Nodule Collection System. We anticipate reaching definitive agreements on commercial terms and key terms around continued development and commercial operations with Allseas before the end of 2024.

In addition, in August 2023, we entered into an Exclusive Vessel Use Agreement with Allseas pursuant to which Allseas will give exclusive use of the Hidden Gem to us in support of the development of the Project Zero Offshore Nodule Collection System until the system is completed or December 31, 2026, whichever is earlier. In consideration of the exclusivity term, we have issued 4.15 million Common Shares (valued at $6.5 million) to Allseas on August 14, 2023. We expect that the definitive agreement with Allseas discussed above will extend the exclusive use of the Hidden Gem.

There can be no assurances, however, that we will enter into definitive agreements with Allseas contemplated by the non-binding term sheet in a particular time period, or at all, or on terms similar to those set forth in the non-binding term sheet, or that if such definitive agreements are entered into by us that the proposed commercial systems and second production vessel will be successfully developed or operated in a particular time period, or at all.

32

Table of Contents

Offtake Agreements

On May 25, 2012, our wholly-owned subsidiary, DGE, and Glencore, entered into a copper offtake agreement and a separate nickel offtake agreement (together, the “Glencore Offtake Agreements”), pursuant to which Glencore has the right to purchase from DGE 50% of the annual quantity of copper material and 50% of the annual quantity of nickel material produced by DGE from ore derived from the NORI Contract Area at a processing plant directly owned or controlled by DGE. Pursuant to the Glencore Offtake Agreements, for London Metal Exchange (“LME”) Codelco registered Grade “A” copper cathodes, the delivered price is the official LME Copper Grade “A” Cash Settlement quotation as published in the London Metal Bulletin averaged over the month of shipment or the following month at Glencore’s choice, plus the official long-term contract premium as announced annually by Codelco, basis CIF Main European Ports (Rotterdam, the Netherlands). For LME Registered Primary Nickel, the delivered price is the official LME Primary Nickel Cash Settlement averaged over the month of shipping or the following month at Glencore’s choice. For other copper-bearing material and other nickel-bearing material, the parties shall agree a price annually for the forthcoming calendar year on the basis of prevailing market prices for such copper products and such nickel products. The Glencore Offtake Agreements are for the life of the NORI Contract Area, and either party may terminate the agreement upon a material breach or insolvency of the other party. Glencore may also terminate either agreement by giving 12 months’ prior written notice. The Glencore Offtake Agreements do not extend to any other of our entities in the event other entities are the ultimate processing owners for metal products. The Glencore Offtake Agreements only apply with respect to metals processed and developed from the NORI areas that are processed by a facility owned or controlled by DGE and do not apply to other projects (including for example Marawa or TOML). Concurrent with entering into the Glencore Offtake Agreements, Glencore made an equity investment of $5 million into our Company.

Binding MoU with PAMCO

In November 2022, we signed a non-binding MoU with PAMCO to evaluate the toll treatment of an initial quantity of 1.3 million tonnes of wet polymetallic nodules per year at PAMCO’s Hachinohe, Japan smelting facility. Potential progression to a NiCuCo matte product along with potentially higher throughputs were also included in the evaluation study. PAMCO successfully completed a pre-feasibility exercise pursuant to the non-binding MoU signed by the parties in November 2022.

In November 2023 TMC signed a binding MoU with PAMCO, where PAMCO must complete a feasibility study (expected to be completed during the third quarter of 2024) to toll treat 1.3 million tonnes of wet polymetallic nodules per year at its Hachinohe, Japan smelting facility which is expected to start in the second quarter of 2026, if we obtain an exploration contract from the ISA in a timely manner. The toll treatment is expected to take place on a dedicated RKEF processing line and produce two products: nickel-copper-cobalt alloy, an intermediate product used as feedstock to produce Li-ion battery cathodes, and a manganese silicate product used to make silico-manganese alloy, a critical input into steel manufacturing. PAMCO’s Hachinohe facility is located on the coast in northern Japan and is equipped with port and processing infrastructure required to receive and process polymetallic nodules and to ship products to customers. Under the new binding MoU:

The PAMCO feasibility study is expected to confirm the operating parameters and product specifications for PAMCO’s dedicated production line and define the scope and execution plan for any additional equipment requirements, which are currently expected to be minor. An extended pilot demonstration program utilizing existing kilns and furnaces at PAMCO’s Hachinohe, Japan facility is expected to treat a 2,000 tonne sample of polymetallic nodules collected during the successful pilot nodule collector test completed by Allseas in November 2022 on the NORI Area D, with the goal of optimizing the furnace refractory selection and confirm commercial scale operating parameters such as tapping temperatures and dusting rates when treating nodules through the Hachinohe facility. The costs of processing polymetallic nodules will also be estimated to help finalize the definitive processing agreement.

33

Table of Contents

In parallel, PAMCO is continuing to study the addition of a converting facility to process the intermediate alloy to nickel-copper-cobalt matte, which is an upgraded intermediate battery supply chain feedstock. It is expected that the additional facility would be constructed once commercial processing of polymetallic nodules to alloy has been demonstrated.

We expect this partnership to progress to a definitive agreement before the end of 2024, subject to successful feasibility study outcomes and agreement to mutually acceptable commercial terms. There can be no assurance that we will enter into a definitive tolling agreement in a particular time period, or at all, or on terms similar to those set forth in the binding MoU, or that if a definitive tolling agreement is entered into by us or that the existing facility will be able to successfully process nodules in a particular time period, or at all.

Competition

The metals production industry is capital intensive and competitive. Production of battery materials and manganese alloys is largely dominated by Chinese or Chinese-funded competitors. These competitors may have greater financial resources, as well as other strategic advantages to operate, maintain, improve and possibly expand their facilities. Additionally, Chinese resources firms have historically been able to produce minerals and/or process metals from land-based operations in developing countries across the globe (e.g., cobalt in the DRC, nickel in Indonesia and the Philippines) at relatively low costs due to scale, efficiency and regulatory factors, including less stringent environmental and social regulations and lower labor and benefit costs. We may be unable to compete successfully with these and other competitors, including other land-based mining operations.

In addition to the three contracts held by our subsidiaries and partners, 16 other entities (ISA Member States and private companies sponsored by ISA Member States) currently hold ISA Exploration Contracts for polymetallic nodules in the CCZ, Western Pacific and Indian Ocean Basin. If and when they move into the exploitation phase, each of these contract-holders could become a potential competitor with respect to the collection of polymetallic nodules and the production of nickel, manganese, copper and cobalt products. Furthermore, several nation states are working on developing polymetallic nodule resources inside their Exclusive Economic Zones (“EEZs”), with the Cook Islands granting three exploration contracts for polymetallic nodules in February 2022.

Beyond polymetallic nodules, nations like Norway, Japan, Cook Islands and the Kingdom of Saudi Arabia are exploring other types of deep-sea resources containing some of the metals contained in polymetallic nodules. There is increasing competition from new and existing marine mineral companies for the availability of marine exploration and support vessels, related marine equipment and specialized personnel, desirable exploration areas, suitable offshore collection and onshore processing equipment, and available capital. Some of our competitors may equally find more promising resources, identify or develop more economic technologies, enter into strategic partnerships that constrain our optionality, or may develop novel methods to collect nodules from the seafloor or process nodules into metals that are more economic than we currently contemplate.

Regulations

United Nations Convention on the Law of the Sea

The Area is defined as the seabed and subsoil beyond the limits of national jurisdiction (UNCLOS Article 1).

The principal policy documents governing the Area, including the CCZ, include:

● the UNCLOS, of 10 December 1982; and

● the 1994 Implementation Agreement.

34

Table of Contents

UNCLOS deals with, among other things, navigational rights, territorial sea limits, exclusive economic zone jurisdiction, the continental shelf, freedom of the high seas, legal status of resources on the seabed beyond the limits of national jurisdiction, passage of ships through narrow straits, conservation and management of living marine resources in the high seas, protection of the marine environment, marine scientific research, and settlement of disputes.

Part XI of UNCLOS and the 1994 Implementation Agreement deal with mineral exploration and collection in the international seabed, known as the Area, providing a framework for entities to obtain legal title to areas of the seafloor from the ISA for the purpose of exploration and eventually collection of resources. UNCLOS became effective on November 16, 1994. A subsequent agreement relating to the implementation of Part XI of UNCLOS was adopted on July 28, 1994 and became effective on July 28, 1996. The 1994 Implementation Agreement and Part XI of UNCLOS are to be interpreted and applied together as a single instrument. As of February 6, 2024, UNCLOS had been signed by 168 States (countries) and the European Union.

International Seabed Authority

The ISA is an autonomous international organization established under UNCLOS and the 1994 Implementation Agreement to organize and control activities in the Area, particularly with a view to administering and regulating the development of the resources of the Area, in accordance with the legal regime established under UNCLOS and the 1994 Implementation Agreement. In so doing, the ISA has the mandate to regulate all mineral related activities in the Area for the benefit of humankind and ensure the effective protection of the marine environment from harmful effects that may arise from deep-seabed related activities. The ISA is comprised of UNCLOS signatories, 168 Member States, and the European Union. All parties to UNCLOS are members of the ISA. Two principal entities establish the policies and govern the work of the ISA: the Assembly, where all 169 members are represented (the “Assembly”), and a 36-member council elected by the Assembly (the “Council”). The Council has two advisory bodies: the Legal Technical Commission (LTC) (41 members), which advises the Council on matters relating to the exploration and collection of non-living marine resources, such as polymetallic nodules, polymetallic sulphides and cobalt-rich ferromanganese crusts, and the Finance Committee (15 members), which deals with budgetary and related matters.

35

Table of Contents

All rules, regulations, and procedures issued by the ISA to regulate prospecting, exploration, and collection of marine minerals are issued within a general legal framework established by UNCLOS and the 1994 Implementation Agreement. To date, the ISA has issued the following regulations (https://www.isa.org.jm/mining-code/Regulations):

No commercial polymetallic nodule collection operations have started anywhere in the world. Currently, exploration activities undertaken are aimed at gathering the necessary information on the location, quality and quantity of the minerals of the seabed as well as collecting the necessary environmental baseline information. To date, the ISA has approved 17 contracts in the CCZ for exploration of nodules, one in the Indian Ocean and one in the Western Pacific Ocean covering more than 1.35 million square kilometers of the seabed. This represents 0.3 percent of the world’s oceans seafloor. Twelve of these contracts are sponsored by developing countries (including the sponsors of our subsidiaries NORI — Nauru, and TOML — Tonga, and our partner Marawa which is sponsored by the Republic of Kiribati). Thirteen countries and one intergovernmental consortium currently have contracts for the exploration of polymetallic nodules, seven countries have contracts for the exploration of polymetallic sulphides, and five countries have contracts for the exploration of cobalt-rich ferromanganese crusts. To date, no exploitation contracts for extracting minerals from the seafloor within the CCZ have been granted. The ISA is currently working on the development of a legal framework to regulate the commercialization of mineral development activities, as described below.

In 2014, the ISA completed a study looking at comparative extractive regulatory regimes. This was followed in March 2014 with a stakeholder survey seeking comments on what financial, environmental, and health and safety obligations should be included under the framework (ISA 2014).

In August 2017, the Council released the first Draft Regulations on Exploitation of Mineral Resources in the CCZ, as subsequently amended. In March 2019, the Council released the advance and unedited text (English only) of the Draft Regulations on Exploitation of Mineral Resources in the CCZ (ISBA/25/LTC/WP.1) (ISA, 2018). The revised draft exploitation regulations incorporated the consideration of requests addressed to the LTC by the Council during the first part of the 24th Session in March 2018, as well as certain comments by the Commission, and also reflected the responses to the first draft from stakeholder submissions. The exploitation regulations will create the legal and technical framework for collection and related operations. Finalization of the exploitation regulations remains subject to the decision of the members of the ISA. Final exploitation regulations must be adopted by the Council. The ISA was targeting to finalize these regulations by July 2020, but the COVID-19 pandemic disrupted ISA meetings and discussions.

36

Table of Contents

The current proposed application process in the draft exploitation regulations consists of the following:

We are still in the exploration phase of the project and have not yet obtained an exploitation contract from the ISA (“ISA Exploitation Contract”) to commence commercial-scale polymetallic nodule collection in the CCZ. An ISA exploitation contract application is comprised of several components, including: Certificate of Sponsorship, Mining Plan, Financing Plan, EIS, Emergency Response and Contingency Plan, Health and Safety Plan and maritime Security Plan, Training Plan, EMMP and Closure Plan. In addition, we do not have the applicable environmental and other permits required to build or modify and operate commercial scale polymetallic nodule processing and refining plants on land.

Section 1, paragraph 15 of the 1994 Agreement relating to the Implementation of Part XI of the UNCLOS allows a member state whose national intends to apply for approval of a plan of work for exploitation to notify the ISA of such intention. This notice obliges the ISA to complete the adoption of exploitation regulations within two years of the request made by the member state.

On June 25, 2021, Nauru submitted its notice to the ISA requesting that it complete the adoption, by July 9, 2023, of rules, regulations and procedures necessary to facilitate the approval of plans of work for exploitation in the Area. The ISA did not complete the adoption of the rules, regulations and procedures by July 9, 2023, as required. At its July 2023 28th Session meeting, the ISA adopted a Council decision agreeing on a timeline and modalities of work until July 2024, with a view to adopt final exploitation regulations during the thirtieth ISA session in 2025. Although we believe that the ISA will adopt the exploitation regulations and any necessary rules, regulations and procedures to facilitate the approval of a plan of work for exploitation by the thirtieth session as the ISA has indicated, there can be no assurances that the adoption of these regulations will not be delayed or halted paused as a result of the actions of ISA member States. The Draft Regulations and several supporting standards and guidelines are at an advanced stage, but there remains uncertainty regarding the final form that these will take as well as the impact that such regulations, standards and guidelines will have on our ability to begin commercial operations in a timely manner, or at all. If the ISA Council has not completed the adoption of such regulations within the prescribed time and an application for approval of a plan of work for exploitation is pending, the ISA shall nonetheless consider and provisionally approve such a plan of work for exploitation based on: (i) the provisions of the UNCLOS; (ii) any rules, regulations and procedures that the ISA may have adopted provisionally, (iii) the basis of the norms contained in the UNCLOS and (iv) the terms and principles contained in the Agreement relating to the Implementation of Part XI, including the principle of non-discrimination among contractors. There can be no assurance that the ISA will provisionally approve our plan or that such provisional approval would lead to the issuance of an exploitation contract by the ISA.

On August 1, 2023, we announced that our subsidiary, NORI, intends to submit its application for an exploitation contract to the ISA following the July 2024 meetings of the ISA. NORI is conducting a post-collection test campaign, strengthening its environmental baseline data and its application for an exploitation contract. This timing allows the Council to meet three more times to continue negotiating and progressing the rules, regulations and procedures.

37

Table of Contents

Consistent with NORI’s rights under the UNCLOS, and the 1994 Agreement relating to the Implementation of Part XI of UNCLOS (the Agreement), NORI reserves its right to submit an application for a plan of work for exploitation, which will be included as part of the application for an exploitation contract, prior to the ISA’s provisional adoption and approval of the exploitation regulations, the possibility of which was recognized in the ISA Council decisions ISBA/28/C/24 and ISBA/28/C/25, and to have that application considered and provisionally approved pursuant to Section 1, Paragraph 15 of the Annex to the Agreement.

At the third and final meeting of the 28th ISA Session in November 2023, the Council agreed to consolidate the text of the draft regulations. The main objective of such a consolidated text, is to better harmonize and clean the text based on negotiations of the interested stakeholders to date. The consolidated text will be the basis for the negotiations of the regulators in 2024.

The NORI Exploration Contract

In July 2011, our wholly-owned subsidiary, NORI, was granted a polymetallic nodule exploration contract by the ISA, providing it exclusive rights to explore 74,830 square kilometers in the CCZ pursuant to the NORI Exploration Contract (“NORI Exploration Contract”). The NORI Exploration Contract was approved by the Council on July 19, 2011, and entered into on July 22, 2011 between NORI and the ISA, and terminates on July 22, 2026, subject to extension.

The NORI Exploration Contract, which was granted pursuant to the ISA’s Regulations on Prospecting and Exploration for Polymetallic Nodules in the CCZ (the “Regulations”), formalized a 74,830 square kilometers exploration area, has an initial term of 15 years (subject to renewal for successive five-year periods), and provides for certain obligations with respect to exploration, training, and other programs of activities for an initial five-year period. The NORI Exploration Contract also formalized the rights of NORI around future rights. Pursuant to the Regulations, NORI has the priority right to apply for an exploitation contract to collect polymetallic nodules in the same area (Regulation 24(2)). Such preference or priority may be withdrawn by the Council if the contractor has failed to comply with the requirements of its approved plan of work for exploration within the time period specified in a written notice or notices from the Council to the contractor indicating which requirements have not been complied with by the contractor. After a hearing process, the Council would be required to provide the reasons for its proposed withdrawal of preference or priority and shall consider any contractor’s response. The decision of the Council shall take account of that response and shall be based on substantial evidence.

On August 1, 2023, we announced that our subsidiary, NORI intends to submit its application for an exploitation contract to the ISA following the July 2024 meetings of the ISA. To date, no exploitation contracts for extracting minerals from the international seafloor have been granted. The ISA is currently working on the development of a legal framework to regulate the exploitation of polymetallic nodules in the Area, as described above.

In 2021, NORI submitted a review of the implementation of the plan of work for the period from 2017 to 2021 to the ISA. The review included a proposed plan of work for the next five-year period from 2022 to 2026. On February 3, 2022, the ISA confirmed that the Secretariat and Commission had reviewed NORI’s report and noted that the program of activities for the next five-year period was acceptable.

The ISA Council may suspend or terminate the NORI Exploration Contract, without prejudice to any other rights that the ISA may have, if any of the following events should occur:

38

Table of Contents

Additionally, if the nationality or control of NORI changes or NORI’s sponsoring State, as defined in the Regulations, terminates its sponsorship and NORI does not obtain another sponsor meeting the requirements prescribed in the Regulations, then the NORI Exploration Contract will terminate.

The NORI Sponsorship Agreement

NORI is sponsored by Nauru pursuant to a certificate of sponsorship signed by the Government of Nauru on April 11, 2011. NORI is a Nauruan incorporated entity and is subject to applicable Nauruan legislation and regulations. In 2015, the Nauruan government established the Nauru Seabed Minerals Authority to regulate activities carried out by companies sponsored by Nauru.

Throughout the period of the NORI Exploration Contract, NORI must be sponsored by a State that is party to UNCLOS. If the nationality or control of NORI changes or NORI’s sponsoring State, as defined in the Regulations, terminates its sponsorship, NORI must promptly notify the ISA. In either event, if NORI does not obtain another sponsor meeting the requirements prescribed in the Regulations and fails to submit to the ISA a certificate of sponsorship for NORI in the prescribed form within six months, the NORI Exploration Contract will terminate.

On July 5, 2017, Nauru, the Nauru Seabed Minerals Authority and NORI entered into a sponsorship agreement (the “NORI Sponsorship Agreement”) formalizing certain obligations of the parties in relation to NORI’s exploration and potential collection of nodules within the NORI Contract Area of the CCZ. The NORI Sponsorship Agreement will remain in force for the duration of the 15-year NORI Exploration Contract and will automatically extend for a further 20 years upon NORI reaching the minimum recovery level under an ISA Exploitation Contract, unless earlier terminated by the ISA as a result of NORI’s breach of the NORI Exploration Contract or pursuant to its terms. Upon reaching the minimum recovery level within the tenement area, NORI will pay Nauru a seabed mineral recovery payment based on the polymetallic nodules recovered from the tenement area. In addition, NORI will pay an administration fee each year to Nauru for such administration and sponsorship, which is subject to review and increase in the event that NORI is granted an ISA Exploitation Contract. NORI has begun discussions with the Government of Nauru to renegotiate the existing sponsorship agreement and has committed to paying corporate income tax within Nauru.

During exploration, NORI is required to, among other things:

● submit an annual report to the ISA;

● meet certain performance and expenditure commitments;

● maintain appropriate insurance policies;

● establish and implement a program to monitor and report on such effects.

NORI is sponsored to carry out its mineral exploration activities in the CCZ by Nauru, pursuant to a certificate of sponsorship signed by the Government of Nauru on April 11, 2011. Sponsorship of an entity requires the sponsoring State to certify that it assumes responsibility for the entity’s activities in the CCZ in accordance with UNCLOS. NORI is a Nauruan incorporated entity and is subject to applicable Nauruan legislation and regulations.

39

Table of Contents

The TOML Exploration Contract

In March 2020, we acquired TOML from Deep Sea Mining Finance Limited, providing us with exclusive rights to explore a 74,713 square kilometers area of the CCZ seabed. TOML holds an exploration contract granted by the ISA and sponsored by the Kingdom of Tonga pursuant to the TOML Exploration Contract (“TOML Exploration Contract”). The plan of work was approved by the Council, acting on the recommendation of the LTC, on July 19, 2011. The TOML Exploration Contract was then signed on January 11, 2012 between TOML and the ISA and terminates on January 11, 2027, subject to a potential extension under the terms of the agreement.

The TOML Exploration Contract was granted pursuant to the ISA’s Regulations, as well as Article 153 of UNCLOS, and formalized a 74,713 square kilometers exploration area. The TOML Exploration Contract includes an initial term of 15 years, which may be extended under the contract, and a program of activities to be completed within the first five-year period of the term. The TOML Exploration Contract also formalized the rights of TOML around future rights. Pursuant to the Regulations, TOML has the priority right to apply for an ISA Exploitation Contract to collect polymetallic nodules in the same area (Regulation 24(2)). The Regulations state that a contractor who has an approved plan of work for exploration only shall have a preference and a priority among applicants submitting plans of work for collection of the same area and resources. Such preference or priority may be withdrawn by the Council if the contractor has failed to comply with the requirements of its approved plan of work for exploration within the time period specified in a written notice or notices from the Council to the contractor indicating which requirements have not been complied with by the contractor. After a hearing process, the Council shall provide the reasons for its proposed withdrawal of preference or priority and shall consider any contractor’s response. The decision of the Council shall take account of that response and shall be based on substantial evidence.

Under ISA requirements contractors are required to submit five-year work programs. The first TOML five-year work program was completed in 2016 and reviewed and accepted by the ISA in late 2016. In 2021, TOML submitted a review of the implementation of the plan of work for the period from 2017 to 2021 to the ISA. The review included a proposed plan of work for the next five-year period from 2022 to 2026.

On December 23, 2022, the ISA accepted TOML’s proposed program of activities for the 2022-2026 five-year period.

The ISA Council may suspend or terminate the TOML Exploration Contract, without prejudice to any other rights that the ISA may have, if any of the following events occur:

Additionally, if the nationality or control of TOML changes or TOML’s sponsoring State, as defined in the Regulations, terminates its sponsorship and TOML does not obtain another sponsor meeting the requirements prescribed in the Regulations, then the TOML Exploration Contract will terminate.

40

Table of Contents

The TOML Sponsorship Agreement

On March 8, 2008, Tonga and TOML entered into the TOML Sponsorship Agreement formalizing certain obligations of the parties in relation to TOML’s exploration and potential exploitation of a proposed application to the ISA (subsequently granted) known as the TOML Area. TOML updated the sponsorship agreement with Tonga in September 2021. Unless otherwise terminated by the parties, the term for the TOML Sponsorship Agreement is for the duration of TOML’s ISA Exploration Contract and will automatically extend for a further 25 years upon TOML being granted an ISA Exploitation Contract. Upon reaching the minimum recovery level within the tenement area, TOML has agreed to pay Tonga a seabed mineral recovery payment based on the polymetallic nodules recovered from the tenement area. In addition, TOML will pay an administration fee each year to Tonga for such administration and sponsorship, which is subject to review and increase in the event that TOML is granted an ISA Exploitation Contract. TOML expects to renegotiate the existing sponsorship agreement with Tonga prior to entering into operations in the TOML area and has committed to paying corporate income tax within Tonga.

Marawa Agreements

On March 17, 2012, our wholly-owned subsidiary, DGE, entered into an Option Agreement (the “Option Agreement”) with Marawa and Kiribati. In consideration of the $250,000 option fee, Marawa granted DGE an option to purchase tenements, as may be granted to Marawa by the ISA or any other regulatory body, for $300,000, or in consideration of DGE waiving any loan and other debt obligation pursuant to the Services Agreement (as defined below) if a default event occurs. The exercise period for the option is a maximum of 40 years after the date of the execution of the Option Agreement.

On July 26, 2012, the ISA Council approved a plan of work for exploration submitted by Marawa covering the Marawa Contract Area. Due to uncertainty of the economic potential of the Marawa Contract Area, Marawa is currently considering its options and expects to finalize its decision in 2024. Marawa delayed certain work programs until it determines how it will move forward.

On October 1, 2013, DGE entered into an agreement (the “Services Agreement”) with the Republic of Kiribati and Marawa granting DGE the exclusive right for 40 years to carry out exploration and collection in the Marawa Contract Area as well as purchase polymetallic nodules collected from the Marawa Contract Area. The Marawa Exploration Contract was signed on January 19, 2015. To date, limited offshore marine resource definition activities in the Marawa Contract Area have occurred. We are collaborating with Marawa to assess the viability of any potential project in the Marawa Contract Area, although the timing of such assessment is uncertain. Marawa has delayed certain of its efforts in the Marawa Contract Area while it determines how it will move forward with additional assessment work.

DGE has the right to terminate the Services Agreement for convenience at any time at its election by giving written notice to Marawa and Kiribati and such termination shall take effect two months following the date of the termination notice, provided that DGE shall pay to the ISA on behalf of Marawa the fees or payments legally owed to the ISA by Marawa (including the Annual ISA Exploration Fee and ISA Royalties and Taxes) that are outstanding at the date of termination or that are incurred within 12 months of the date of such termination, provided that Marawa shall have an obligation to minimize such fees and payments to the extent practicable after the date of said termination. DGE and Marawa have considered the potential to amend the current contractual arrangements to provide additional mutual benefits in the conduct of operations, though no assurances may be given that any changes will be agreed.

Royalties and taxes

Royalties and taxes payable on any future production from the CCZ will be stipulated in the ISA’s exploitation regulations. While the rates of payments are yet to be set by the ISA, the 1994 Implementation Agreement (Section 8(1)(b)) prescribes that the rates of payments “shall be within the range of those prevailing in respect of land-based mining of the same or similar minerals in order to avoid giving deep seabed miners an artificial competitive advantage or imposing on them a competitive disadvantage.”

41

Table of Contents

An open-ended working group has been formed and has met numerous times to discuss potential ISA royalty and sponsoring State taxation regimes supported by modelling conducted by the Massachusetts Institute of Technology. A final royalty and payment regime has not been agreed. However, recent discussions centered on a 2.5% ad valorem royalty on the gross metal value (“GMV”) of nodule ore for the first five years of commercial production, thereafter increasing to 4.5% if GMV is equal or lower than $510 per dry tonne of nodules and scaling linearly to 9.5% if GMV is at or above $720 per dry tonne of nodules. An additional ad valorem environmental levy has also been discussed. The economic analysis included in the initial assessment contained in the NORI Technical Report Summary was based on a slightly different set of assumptions about ISA Royalty that were in use back in 2021: namely, 2% of GMV for the first five years, increasing to 6% thereafter plus 1% environmental levy. Additional discussions have considered capping any proposed environmental levy once an agreed total value has been reached and might no longer be collected once sufficient funds are in trust. We can provide no assurances that any such royalties or levies will not be greater than those discussed and could be significantly greater.

Under the NORI Sponsorship Agreement between Nauru and NORI and under the TOML Sponsorship Agreement between Tonga and TOML, upon reaching a minimum recovery level within the tenement areas, NORI and TOML have agreed to pay Nauru and Tonga a seabed mineral recovery payment for polymetallic nodules recovered from the tenement area, annually adjusted (from year 5) on a compounding basis based on the official inflation rate in the U.S. In addition, NORI and TOML will pay an administration fee each year to Nauru and Tonga for such administration and sponsorship, which is subject to review and increase in the event that NORI or TOML are granted an ISA Exploitation Contract. NORI and TOML have both committed to paying corporate income tax within Nauru and Tonga, respectively.

Environmental Regulation

The ISA is mandated through UNCLOS to “preserve and protect the marine environment” while developing the resources within the Area. Given the location of the NORI Contract Area, the ISA is responsible for assessing any ESIA prepared by NORI and for granting the relevant permits.

The ISA has issued Regulations on Prospecting and Exploration for Polymetallic Nodules (adopted on July 13, 2000, updated on July 25, 2013). The regulations are complemented by the LTC’s recommendations for the guidance of contractors on assessing the environmental impacts of exploration. The exploitation regulations on deep-seabed collection will be complemented by various standards and guidelines, and thresholds. The ISA is currently developing these standards and guidelines, and thresholds which are expected to be finalized by the LTC and adopted by the Council. The ISA has divided the required standards and guidelines in three phases.

Ten standards and guidelines have been prepared in Phase 1, provided to stakeholders for comment, reviewed and amended by the LTC and provided to Council for consideration and approval. Additional standards and guidelines will be drafted as part of the development of Phase 2 and 3.

Although the environmental impact review process has not yet been finalized, all contractors have been made aware that the ISA requires the completion of baseline studies and EIA, culminating in an EIS for proposed commercial operations, prior to collection. An EIS and an EMMP, will be required as part of the application for an ISA Exploitation Contract for operations in the CCZ. Environmental and social baseline studies are being conducted and NORI has engaged several leading deep-sea research institutions and scientists to contribute to our environmental and social impact assessment program, consisting of over 100 discrete studies.

42

Table of Contents

NORI’s offshore exploration campaigns have included sampling to support environmental studies, collection of high-resolution imagery, full column physical and chemical oceanographic data and environmental baseline studies. Our last offshore campaign to collect environmental baseline data was completed in 2022. An integrated collector test involving trialing of collector vehicle and riser system took place in 2022. The environmental impacts of this test were monitored from a separate research vessel. An additional environmental campaign was executed in 2023 to return to the site 12 months after the test. Data collected from the test monitoring campaign and 12-month revisit campaigns will be used to forecast the impacts for a full-scale commercial operation in NORI’s EIS. NORI intends to manage the project under the governance of an environmental management system (“EMS”), which is to be developed in accordance with the international EMS standard, ISO 14001:2004. The EMS will provide the overall framework for the environmental management and monitoring plans that are required.

NORI’s EMMP will specify the objectives and purpose of all monitoring requirements, the components to be monitored, frequency of monitoring, methods of monitoring, analysis required in each monitoring component, monitoring data management and reporting. The EMMP will be submitted to the ISA as part of the ISA Exploitation Contract application.

Pursuant to Article 165(2)(b) of the Convention and Paragraph 11(a) of the 1994 Agreement, an application for a Plan of Work is first reviewed by the LTC and a recommendation concerning the approval of the Plan of Work is submitted by the LTC to the Council. Rule 44 of the Commission’s Rules of Procedure requires decision making by consensus. If all efforts to reach consensus have been exhausted, however, then a decision by voting shall be taken by a majority of members present and voting. A proposed timeline for the consideration of a Plan of Work by the Commission was developed in “Draft guideline on the preparation and assessment of an application for the approval of a Plan of Work for exploitation” (ISBA/27/C/3).

If a positive recommendation is submitted by the Commission to the Council concerning the approval of a Plan of Work, the Council is required to approve the Commission’s recommendation unless a two-thirds majority of its members present and voting, including a majority of members present and voting in each of the chambers of the Council, decides to disapprove the Plan of Work. If the Council does not take a decision on the Commission’s recommendation within 60 days, the recommendation shall be deemed to have been approved by the Council.

In addition, the sponsoring State has a responsibility to put in place legislation to ensure the entity it has sponsored complies with UNCLOS and ISA rules and regulations. Nauru implemented the Nauru International Seabed Minerals Act in 2015 which NORI is required to comply with.

NORI’s assessment is that it is in compliance with existing exploration permits and contracts. In addition to working on key engineering aspects of the project such as designing the final nodule collector and the dewatering facility, NORI is also continuing the following tasks:

● delineating nodule mineralization;

● characterizing the nature of the seabed, water column and biology;

● finalizing environmental baseline studies and impact assessments;

● characterizing the nature of any materials returned to the environment;

● developing other plans, including the EMMP and the various subordinate plans.

The potential future onshore environmental impacts have not yet been assessed because the processing plants that we expect to use through a tolling or other arrangement have not been finalized, and the locations and host countries (and hence regulatory regime) have not been confirmed. The planned metallurgical process is expected to generate near-zero solid waste products. The deleterious elements’ (for example, cadmium and arsenic) content of the nodules is understood to be very low, indicating that with careful management, the environmental impacts of the processing operation are expected to be low.

43

Table of Contents

Intellectual Property

Our success depends in part upon our ability to obtain and maintain patent protection of our core technology and intellectual property, as well as that of our strategic partners, and particularly that our freedom to operate is not restricted by patents lodged by competitors or other third parties. Moreover, we rely on a combination of trade secret protection, non-disclosure and licensing agreements and trademarks to establish and protect our proprietary intellectual property. To this end, we maintain a portfolio of issued patents and pending patent applications, which relate to offshore collection systems and to the processing of polymetallic nodules for recovering metals. As we rely on a number of patents to establish and protect our intellectual property, we have obtained and filed patent applications in countries throughout North America, Europe and Asia.

We cannot conclusively state that any pending applications, existing or future intellectual property will be definitively useful in protecting or promoting our business and growth plans. Please see the section entitled “Risk Factors” for additional information on the risks associated with our intellectual property strategy and portfolio.

Human Capital

As of December 31, 2023, we employed forty-six (46) employees and contractors. None of our staff are covered by collective bargaining agreements.

Attracting Talent. Our team is comprised of highly skilled individuals from a variety of fields. Geographically, our staff are located in Tonga, Nauru, U.S., Canada, Australia, United Kingdom and United Arab Emirates. We are committed to attracting, developing and retaining world-class talent that is inclusive of a diverse range of perspectives, age, gender, gender identity, race, sexual orientation, physical capability, neurological difference, ethnicity and belief. Our goal is to develop cultural competency by seeking knowledge, increasing awareness, modeling respect and promoting inclusion.

People Engagement. As a company working to pioneer a new industry and new ways of doing things, our success depends on attracting and retaining strong, independent, entrepreneurial, and multi-talented team members capable of dealing with high levels of uncertainty and adversity. Our team is distributed across several continents and several time zones, with remote working being the norm for most of our staff and multi-week offshore campaigns being the norm for our offshore team. Despite physical and temporal separation, we maintain a strong sense of cohesion by attracting people who are intrinsically motivated by the company’s purpose and core values, cultivating a flat organizational structure and deep care for each other. We rely on regular management and company meetings, ongoing communication flows across different technology platforms, frequent ad hoc video communication and creating opportunities for in-person gatherings. We offer our team members flexible work schedules and autonomy in managing their time while encouraging them to set boundaries between work on our shared mission and their home lives.

Compensation and Benefits. We compensate our staff competitively, striving to be in the 50th-60th percentile of our peers for total compensation and benefits. In addition to salaries, our compensation and benefits program includes annual discretionary bonuses, equity awards, an employee stock purchase plan, a 401(k) contribution/superannuation or RRSP benefit contribution (as applicable jurisdictionally), healthcare and insurance benefits, health savings and flexible spending accounts. Our annual equity compensation is focused on company priorities that we believe create long-term value for our stakeholders.

Environment, Health & Safety (EHS). Our EHS vision is to fully integrate environmental, health and safety into our operations, and to create a workplace free of incidents. In 2023, we relied on the EHS programs of our partners Allseas and a new offshore support service provider to conduct our operations in a safe manner and in compliance with applicable safety laws, rules and regulations. These all involve EHS systems incorporating thorough planning, risk assessment and disciplined implementation of controls as well as culturally-based safety observations systems like safe act observations and obligation of “stop work if it is unsafe to proceed”.

44

Table of Contents

Available Information

Our internet address is https://themetals.co, to which we regularly post copies of our press releases as well as additional information about us. Our annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, and all amendments to those reports, are available to you free of charge through the Investors section of our website as soon as reasonably practicable after such materials have been electronically filed with, or furnished to, the SEC. The SEC maintains an internet site (http://www.sec.gov) that contains reports, proxy and information statements, and other information regarding issuers that file electronically with the SEC. We include our website address in this Annual Report only as an inactive textual reference. Information contained in our website does not constitute a part of this Annual Report or our other filings with the SEC.

Corporate Information

TMC is a corporation existing under the laws of British Columbia, Canada. TMC’s registered office is currently located at 595 Howe Street, 10th Floor, Vancouver, British Columbia, Canada V6C 2T5, and its telephone number is: (604) 631-3115.

Item 1A.RISK FACTORS

Our business is subject to numerous risks and uncertainties that you should be aware of in evaluating our business. If any such risks and uncertainties actually occur, our business, prospects, financial condition and results of operations could be materially and adversely affected. The risks described below are not the only risks that we face. Additional risks and uncertainties not currently known to us, or that we currently deem to be immaterial may also materially adversely affect our business, prospects, financial condition and results of operations. The risk factors described below should be read together with the other information set forth in this Annual Report, including our consolidated financial statements and the related notes, as well as in other documents that we file with the SEC.

Summary of the Material Risks Associated with Our Business

These risks include, but are not limited to, the following:

45

Table of Contents

46

Table of Contents

I. Regulatory and Environmental Risks.

Our business is subject to numerous regulatory uncertainties which, if not resolved in our favor, would have a material adverse impact on our business.

On March 4, 2023 the United Nations finalized the UN High Seas Treaty. The treaty does not replace or amend UNCLOS, or the authority of the ISA, and must be interpreted consistently with the rights granted by the Convention.

To date, no commercial collection (also referred to as “mining,” “exploitation” or “harvesting”) of nodules has occurred on the seafloor in the area of the high seas beyond the limits of national jurisdiction (the “Area”), which includes the CCZ. Moreover, despite the release by the ISA of the Draft Regulations on Exploitation of Mineral Resources (the “Draft Regulations”), finalization of such regulations remains subject to approval and adoption by the ISA. Once adopted, these regulations will add to the legal and technical framework for exploitation of the polymetallic nodules in the NORI, TOML and Marawa contract areas.

Section 1, paragraph 15 of the 1994 Agreement relating to the Implementation of Part XI of UNCLOS allows a member state whose national intends to apply for approval of a plan of work for exploitation to notify the ISA of such intention. This notice obliges the ISA to complete the adoption of exploitation regulations within two years of the request made by the member state.

On June 25, 2021, Nauru submitted such a notice, with an effective date of July 9, 2021, to the ISA requesting that it complete the adoption of rules, regulations and procedures (“RRPs” or the “Mining Code”) necessary to facilitate the approval of plans of work for exploitation in the Area. As a result of that notice the ISA was required to adopt the relevant RRPs for exploitation by July 9, 2023. The ISA, however, did not adopt the RRPs for exploitation by the July 9, 2023 deadline. At its July 2023 session, the ISA released a road map for the finalization of the Mining Code, with a view to its adoption during the 30th session of the ISA in 2025, with the potential for earlier adoption during the 29th session of the ISA in 2024 if the Mining Code is ready for adoption by that time. The road map includes three scheduled ISA Council meetings through July 2024 to elaborate the Mining Code. Although we believe the ISA will adopt the Mining Code, there can be no assurances that the Mining Code will be adopted within these timelines, or at all, as a result of actions of ISA member States or otherwise. For example, 21 ISA member States out of the 169 ISA members have expressed reservations about the commercialization of seafloor mineral resources and have called for a ban, moratorium, or precautionary pause on the commercialization of these resources. In addition, although the Draft Regulations and several supporting standards and guidelines are at an advanced stage, there remains uncertainty regarding the final form that these will take, as well as the impact that such regulations, standards and guidelines will have on our ability to meet our objectives.

As the ISA Council did not complete the adoption and elaboration of the Mining Code by the prescribed deadline of July 9, 2023, pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement relating to the implementation of Part XI of UNCLOS, if an application for a plan of work for exploitation is now submitted to the ISA, the ISA is nonetheless required to consider and provisionally approve such a plan of work based on: (i) the provisions of the UNCLOS; (ii) any rules, regulations and procedures that the ISA may have adopted provisionally, (iii) the basis of the norms contained in the UNCLOS and (iv) the terms and principles contained in the 1994 Agreement relating to the Implementation of Part XI, including the principle of non-discrimination among contractors.

47

Table of Contents

NORI intends to submit an application to the ISA for an exploitation contract, which will include a plan of work for exploitation for NORI Area D following the conclusion of the July 2024 meeting of the ISA’s 29th session. If the ISA has not adopted the final Mining Code by the time NORI submits this application, we believe that the ISA will review and provisionally approve the plan of work for exploitation included therein pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement relating to the implementation of Part XI of UNCLOS discussed above. The ISA released its road map to finalize the Mining Code at its July 2023 session, however, it also stated that the commercial exploitation of mineral resources in the ISA’s jurisdictional area should not be carried out in the absence of RRPs relating to exploitation. In addition, there can be no assurances that the ISA will come to a consensus as to the interpretation of Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement relating to the implementation of Part XI of UNCLOS. Although we believe the ISA will accept and consider an application for a plan of work for exploitation in the absence of the final Mining Code, there is no consensus within the ISA as to the process to be followed for its consideration of such an application, including the involvement of the ISA’s Legal and Technical Commission and whether and how long the ISA could delay its consideration of an application past the proscribed 60-day period. As a result, and in light of some ISA members States calling for a ban, moratorium or precautionary pause on the commercialization of seafloor mineral resources, there can be no assurance that the ISA will provisionally approve our plan of work for exploitation, within one year from submission thereof, or at all, or that such provisional approval would lead to the issuance of an exploitation contract with the ISA.

The collection of polymetallic nodules within the CCZ, where our exploration areas are located, will require approval of an ISA Exploitation Contract (which will authorize commercial collection activities). As part of the application for an ISA Exploitation Contract, all contractors are required to complete baseline studies and an ESIA, culminating in an EIS, prior to collecting nodules at a commercial scale. The EIS would be accompanied by an EMMP which is expected to specify the objectives and purpose of all monitoring requirements, the components to be monitored, frequency of monitoring, methods of monitoring, analysis required in each monitoring component, monitoring data management and reporting.

In order to move our exploration projects into commercial production, our wholly-owned subsidiaries, NORI and TOML will each need to conclude an exploitation contract with the ISA, as will our partner, Marawa, in addition to obtaining related permits that may be required by our commercial partners. There can be no assurance that the ISA will approve our application for a plan of work for exploitation and issue an exploitation contract to our subsidiaries in a timely manner or at all. Even if the ISA timely evaluates such applications(s), our subsidiaries may be required to submit a supplementary EIS or perform additional studies or campaigns before obtaining approval. As such, there is a risk that an exploitation contract may not be granted by the ISA, may not be granted on a timely basis, thereby delaying our potential timeline for commercial exploitation, or may be granted on uneconomic terms.

Similarly, with respect to sponsoring State regulation, no assurance can be given that new rules and regulations will not be enacted or that existing rules and regulations will not be applied in a manner that would limit or curtail production or development by our subsidiaries. Amendments to current laws and regulations governing the operations and activities of deep-sea mineral resources companies, or changes in interpretation thereto, or the unwillingness of countries throughout the world to enforce such laws and regulations, could have a material adverse impact on our business, and could cause increases in exploration expenses, capital expenditures, production costs, or put the security of our equipment at risk to activism or piracy. Such amendments could also cause reductions in our future production, or the delay or abandonment in the development of our polymetallic mineral resource properties. There can be no certainty that actions by governmental and regulatory authorities, including changes in regulation, taxation and other fiscal regimes, will not adversely impact our projects or our business. Further, our operations depend on the continuation of the sponsorship agreements between our subsidiaries NORI and TOML and each of their host Sponsoring States, Tonga and Nauru, respectively. Each subsidiary has been registered and incorporated within such host nation and each host nation has maintained effective control, supervision, regulation, and sponsorship over the conduct of such subsidiary. While we have beneficial ownership over such subsidiaries, each subsidiary operates under the regulation and sponsorship of Nauru and Tonga. If such arrangement is challenged, or sponsorship is terminated, we may have to restructure the ownership or operations of such subsidiary to ensure continued State sponsorship. Failure to maintain sponsorship, or secure new state sponsorship, will have a material impact on such subsidiary and on our overall business and operations.

48

Table of Contents

While the rates of payments are yet to be set by the ISA, the 1994 Agreement relating to the Implementation of Part XI of the UNCLOS prescribes a relevant framework that the rates of payments “shall be within the range of those prevailing in respect of land-based mining of the same or similar minerals in order to avoid giving deep seabed miners an artificial competitive advantage or imposing on them a competitive disadvantage.” The ISA has held workshops with stakeholders to discuss and seek comments on the potential financial regime for the collecting of polymetallic nodules in the CCZ. There can be no assurance that the ISA will put in place a Mining Code in a timely manner or at all. Such regulations may also impose burdensome obligations or restrictions on us, and/or may contain terms that do not enable us to develop our projects.

Our resource development activities are subject to changes in government regulation and political instability.

Parties carrying out exploration and collection operations in the CCZ must be sponsored by a State that is a member of the ISA. The Sponsoring States of our subsidiaries NORI and TOML are Nauru and Tonga, respectively. In addition, our subsidiary, DGE, has an exclusive contract with Marawa, which is sponsored by Kiribati, that permits DGE to conduct activities in connection with the exploration contract held by Marawa with the ISA. If any of these countries cease such sponsorship, our subsidiaries or their partners (as applicable) would need to seek sponsorship elsewhere, which could impact our operations as a group.

There is a risk that a State sponsoring activities in a project area ceases to be a sponsor, or is not permitted to be a sponsor, or that NORI and TOML cease to remain as sponsored contractors by such State; and if an agreement cannot be reached with a substitute sponsoring State, or if we are unable to transfer our sponsorship to another State, such subsidiary could be forced to cease activities in the CCZ.

Additionally, there is little jurisprudence or interpretative guidance regarding the application of the sponsorship regulations that are applicable to our business. For example, with respect to the question over the regulation of which State can impact the activities of any contractor (such as NORI or TOML), we have taken the view that incorporation, registration and the grant of nationality are critical factors, amongst others, notwithstanding the beneficial ownership of a subsidiary by its parent (“beneficial ownership”). While this position has not been challenged by our Sponsoring States or the ISA, certain organizations that oppose the deep-sea polymetallic nodule exploration and collecting industry have advocated for the use of a beneficial ownership test for state sponsorship, and there are no guarantees that our interpretation will be universally accepted in the future.

The mineral exploration activities of our subsidiaries and their future project development prospects could be affected in varying degrees by political instability and changes in government regulation relating to foreign investment and the deep-sea polymetallic collecting business, including expropriation. Operations may also be affected in varying degrees by possible natural disasters in the region, terrorism, military conflict, crime, piracy, fluctuations in currency rates, and high inflation. In addition, from time to time, governments may nationalize private businesses, including companies such as ours. There can be no assurance that the governments of countries where we or our affiliates or third-party contractors operate or the governments with which our subsidiaries work in the CCZ will not nationalize companies such as ours and our assets in the future or impose burdensome obligations or restrictions. There can also be no assurance that the ISA will not impose burdensome obligations or restrictions on our business or our projects (or those of our affiliates and third-party contractors), or that they will not implement policies or regulations that would prevent us from accomplishing our objectives.

Changes to any of the laws, rules, regulations or policies to which we are subject could have a significant impact on our business.

Changes to any of the laws, rules, regulations, taxation or other policies to which we are subject could have a significant impact on our business. There can be no assurance that we will be able to comply with any future laws, rules, regulations and policies. Failure to comply with applicable laws, rules, regulations, and policies may subject us to civil or regulatory proceedings, including fines or injunctions, which may have a material adverse effect on our business, financial condition, liquidity, and results of operations. In addition, compliance with any future laws, rules, regulations, and policies could negatively impact our profitability, and could have a material adverse effect on our business, financial condition, liquidity and results of operations.

Furthermore, we may seek to expand our production capabilities in the future, which would require additional regulatory approvals that may not be provided in a timely manner or at all. Furthermore, such additional approvals could require changes to environmental offset areas and related environmental protections which, if overly burdensome, could impact our operations.

49

Table of Contents

Our exploration, collecting, processing and refining activities are subject to extensive and costly environmental requirements, and current and future laws, regulations, and permits may impose significant costs, liabilities, or obligations, or could limit or prevent our ability to continue our operations as currently contemplated or to undertake new operations.

All phases of exploring for and collecting and processing polymetallic nodules are subject to environmental regulation in various jurisdictions and under national as well as international laws and conventions. No seafloor polymetallic nodule deposit has been developed commercially, and it is not clear what environmental parameters may need to be measured to satisfy regulatory authorities for an ISA Exploitation Contract to be granted. A full ESIA for deep-sea collecting operations has yet to be completed and approved by the ISA, and the full impact of any polymetallic nodule collecting operation on the environment has yet to be determined. Further, the required standards for an ESIA have not been finalized by the ISA, which could require changes to any submissions made by our subsidiaries in connection with an ISA Exploitation Contract application. Environmental legislation is evolving in a manner which is likely to require strict standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors and employees.

Nodule collection operations in the CCZ are certain to disturb wildlife in the operating area and may impact ecosystem function. The nature and severity of these impacts on CCZ wildlife are expected to vary by species and are currently subject to significant uncertainty. Our campaigns to baseline wildlife and ecosystem function, pilot the nodule collection system and monitor impacts arising from the use of this system have been completed. Data processing and analysis is in progress and, similar to studies conducted in respect of land-based mining, may not definitively establish the impacts of activities on the biodiversity in the CCZ. Given the significant volume of deep water and the difficulty of sampling and retrieving biological specimens, a complete biological inventory might never be established. Accordingly, impacts on CCZ biodiversity may never be, completely and definitively known. For the same reasons, it may also not be possible to definitively say whether the impact of nodule collection on global biodiversity will be less significant than those estimated for land-based mining for a similar amount of produced metal.

It is also currently not definitively known whether the risk of biodiversity loss in the CCZ could be eliminated through setting aside large representative areas of CCZ under protection (13 areas currently set aside by ISA covering 43% of the CCZ) or reduced through mitigation strategies inside operating areas or how long it will take for disturbed seabed areas to recover naturally. Prior research indicates that the density, diversity and function of fauna representing most of resident biomass (including mobile, pelagic and microbial life) are expected to recover naturally over years to decades. However, a high level of uncertainty exists around recovery of fauna that requires the hard substrate of nodules for critical life function. The extent to which planned measures, such as leaving behind partial nodule cover and setting aside no-take zones, would aid recruitment and recovery of nodule-dependent species in impacted areas will depend on factors like habitat connectivity, which is an area that is still under study.

While we intend to collect seafloor polymetallic nodules in a way that mitigates and reduces potential damage to the seafloor, marine life and ecosystem function, we do not know whether the ISA or any other regulatory body will seek to impose onerous methods for the restoration of the disturbed area or rehabilitation obligations on our collecting process. Any such obligations, to the extent they are overly burdensome, could result in material changes to our business as currently contemplated.

Although the environmental impact review process has not yet been finalized, all contractors have been made aware of the requirement to complete baseline studies and an ESIA, culminating in an EIS, prior to collecting. The EIS would be accompanied by an EMMP, which will be required as part of the application for an ISA Exploitation Contract within the contract areas of NORI, TOML and Marawa. The EMMP is expected to specify the objectives and purpose of all monitoring requirements, the components to be monitored, frequency of monitoring, methods of monitoring, analysis required in each monitoring component, monitoring data management and reporting.

The EMMP will also be submitted to the ISA for approval as part of the ISA Exploitation Contract application. There are no guarantees that the ISA will evaluate any exploitation contract application by our subsidiaries in a timely manner, and even if the ISA does timely evaluate such applications(s), such subsidiary may be required to submit a supplementary EIS before being approved. This may result in delays that could impact our projected timeframe. Furthermore, in the event that the ISA evaluates and approves an application in a timely manner, any aspect of such application and approval theoretically could be subject to legal challenges which could result in further delays that could detrimentally impact our business. For example, certain conservation groups have called for a ten-year moratorium on all deep-sea mineral exploration and exploitation activities. While this agenda does not appear to have directly impacted the development of proposed Final Regulations and Standards and Guidelines by the ISA, any such moratorium would have a material adverse effect on our business.

50

Table of Contents

The environmental permitting process, which includes considerations of the impacts of our activities on the biodiversity of the CCZ, is expected to involve a series of checks and balances with reviews being conducted by the ISA, including technical evaluations by the ISA Secretariat and the Legal and Technical Commission (the “LTC”). The recommendations of the LTC will then go before the ISA Council (“Council”), a core policy-making body of the ISA, which will then review and, if it deems appropriate, approve the contractor’s application. It would require a two-thirds majority of the Council to reject a development proposal that is recommended to it by the LTC. There are no assurances that the work our subsidiaries have done to date, or their contemplated future operations will satisfy the final environmental rules and regulations adopted by the ISA, and any future changes could delay the timing of such submissions to the ISA or our subsidiaries operations more generally, which could have a material adverse effect on our business. Sponsoring State approvals and permits are currently and may in future be required in connection with our operations. To the extent such approvals are required and not obtained, our subsidiaries may be curtailed or prohibited from proceeding with planned exploration or development of mineral properties. Failure to comply with applicable laws, regulations, and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions. Parties engaged in collection operations may be required to compensate those suffering loss or damage by reason of the collection activities and may have civil or criminal fines or penalties imposed for violations of applicable laws and regulations.

We may become subject to environmental liabilities as a result of noncompliance with existing or future regulations.

All of the exploration and development operations of our subsidiaries will be subject to environmental permitting and regulations, which can make operations expensive or prohibit them altogether. We may also be subject to potential risks and liabilities associated with pollution of the environment that could occur as a result of our subsidiaries’ exploration, development, and production activities.

Source: SEC EDGAR (public domain) · 10-K for the period ended 2023-12-31, filed 2024-03-25 · accession 0001104659-24-038505

Filing HTML rendered to line-structured narrative text by the shipped reducer (datafeeds.edgar_fulltext.visible_text, keep_table_headers=True): scripts and inline-XBRL headers are dropped, and table content is reduced to its short label cells — numeric table data is not rendered and is therefore not counted. The same rendering is used for every year, so a year-over-year comparison is like for like.

The text is our rendering of the filing, not a facsimile: original pagination, typography and tables are not reproduced, and the numbers live in the financial statements (FA).

The outline locates item HEADINGS in this document. Only Items 1A and 7 have certified boundaries elsewhere in the terminal (the redline and the narrative-overlap number); every span here runs from one heading found to the next heading found.

How the outline was chosen. It is the longest chain of item headings that runs forward through both the document and the standard item order: 23 headings are on that chain and 17 further heading-shaped lines are not — the table-of-contents echo of every item, cross-references and exhibit-list mentions. Each entry's length is measured from its heading to the next heading on the chain.