Paramount Gold Nevada Corp. (NYSE: PZG), an SEC filer in Metal Mining, closed at $1.44, -4.0%, on 2026-08-28, with a market cap of $124M, a return on equity of -25.2%, a net margin of -145575.4% and 3-year sales growth of 2.0%. Institutional ownership, earnings history and filed financials are on the tabs below.

PZG · 10-K · period ended 2022-06-30

← all PZG documents
filed 2022-10-13 · EDGAR original ↗

Our rendering of the filing — original pagination and typography are not reproduced, and tables are reduced to their short label cells (the figures live on FA). Nothing is summarized: every line below is the filing's own text.

blocks 178777 of 1,093203k characters rendered

Item 1A. Risk Factors.

Described below are certain risks that we believe apply to our business and the industry in which we operate. You should carefully consider each of the following risk factors in conjunction with others provided in this Annual Report on Form 10-K and in our other public disclosures. The risks described below highlight potential events, trends or other circumstances that could adversely affect our business, financial condition, results of operations, cash flows, liquidity or access to sources of financing, and consequently, the market value of our common stock. These risks could cause our future results to differ materially from historical results. The risks described below are those that we have identified as material and is not an exhaustive list of all the risks we face. There may be others that we have not identified or that we have deemed to be immaterial. All forward-looking statements made by us or on our behalf are qualified by the risks described below.

Risk Related to Our Industry

The estimation of mineral reserves and mineral resources is imprecise and depends upon subjective factors.

Estimated mineral reserves and mineral resources may not be realized in actual production. Our results of operations and financial position may be adversely affected by inaccurate estimates. The mineral reserve and mineral resource figures presented in our public filings are estimates made by independent mining consultants with whom we contract. Mineral reserve and mineral resource estimates are a function of geological and engineering analyses that require us to make assumptions about production costs, recoveries and gold and silver market prices. Mineral reserve and mineral resource estimation is an imprecise and subjective process. The accuracy of such estimates is a function of the quality of available data and of engineering and geological interpretation, judgment and experience. Assumptions about gold and silver market prices are subject to great uncertainty as those prices fluctuate widely. Declines in the market prices of gold, silver, zinc or lead may render mineral reserves and mineral resources containing relatively lower grades of mineralization uneconomic to exploit, and we may be required to reduce mineral reserve and mineral resource estimates, discontinue development at one or more of our properties or write down assets as impaired. New or updated technical or geological information may also impact anticipated metal recovery rates. Any of these adjustments may adversely affect our financial condition, results of operations and cash flows.

The precious metals markets are volatile markets. This will have a direct impact on our revenues (if any) and profits (if any) and could have an adverse effect on our ongoing operations.

The price of both gold and silver has fluctuated significantly over the past few years. Despite the volatility in the price of gold, there continues to be interest in gold and silver mining and companies engaged in that business, including the exploration for both gold and silver. However, in the event that the price of these metals falls, the interest in the gold and silver mining industry may decline and the value of our business could be adversely affected. Even if we are able to generate revenues, there can be no assurance that any of our operations will prove to be profitable. Finally, in recent decades, there have been periods of both overproduction and underproduction of both gold and silver resources. Such conditions have resulted in periods of excess supply of and reduced demand on a worldwide basis and on a domestic basis. These periods have been followed by periods of short supply of and increased demand for both gold and silver. We cannot predict what the market for gold or silver will be in the future.

Mining operations are hazardous, raise environmental concerns and raise insurance risks.

The development and operation of a mine or mineral property involves many risks, which even a combination of experience, knowledge and careful evaluation may not be able to overcome. These risks include, among other things, ground fall, flooding, environmental hazards and the discharge of toxic chemicals, explosions and other accidents. Such occurrences may result in work stoppages, delays in production, increased production costs, damage to or destruction of mines and other producing facilities, injury or loss of life, damage to property, environmental damage and possible legal liability for such damages as well. Although the Company maintains liability coverage in an amount which it considers adequate for its operations, such occurrences, against which the Company

8

may not be able, or may elect not to insure, may result in a material adverse change in the Company’s financial position. The nature of these risks is such that liabilities may exceed policy limits, in which event the Company would incur substantial uninsured losses.

We are subject to numerous environmental and other regulatory requirements.

All phases of mining and exploration operations are subject to governmental regulation including environmental regulation. Environmental legislation is becoming stricter, with increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and heightened responsibility for companies and their officers, directors and employees. There can be no assurance that possible future changes in environmental regulation will not adversely affect our operations. As well, environmental hazards may exist on a property in which we hold an interest that was caused by previous or existing owners or operators of the properties and of which the Company is not aware at present.

Government approvals and permits are required to be maintained in connection with our mining and exploration activities. Although we believe we currently have all required permits for our operations as currently conducted, there is no assurance that delays will not occur in connection with obtaining all necessary renewals of such permits for the existing operations or additional permits for any possible future changes to the Company’s operations, including any proposed capital improvement programs. Failure to comply with applicable laws, regulations and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions. Parties engaged in mining operations may be required to compensate those suffering loss or damage by reason of the mining activities and may be liable for civil or criminal fines or penalties imposed for violations of applicable laws or regulations. Amendments to current laws, regulations and permitting requirements, or more stringent application of existing laws, may have a material adverse impact on the Company resulting in increased capital expenditures or production costs, reduced levels of production at producing properties or abandonment or delays in development of properties.

Risks Related to our Business Operations

There is substantial doubt about our ability to continue as a going concern.

The accompanying consolidated financial statements have been prepared assuming the Company will continue as a going concern. This assumes continuing operations and the realization of assets and liabilities in the normal course of business.

We have incurred significant losses since our inception and expect to continue to incur losses as a result of costs and expenses related to maintaining our properties and general and administrative expenses. As of June 30, 2022, we had cash of approximately $2.5 million and an accumulated deficit of approximately $67.9 million. As a result of our evaluation of the Company’s liquidity for the next twelve months, we have included a discussion about our ability to continue as a going concern in our consolidated financial statements, and our independent auditor’s report for year ended June 30, 2022 includes an explanatory paragraph that expresses substantial doubt about our ability to continue as a “going concern.” Our capital needs have, in recent years, been funded through sales of our debt and equity securities. In the event that we are unable to raise sufficient additional funds, we may be required to delay, reduce or severely curtail our operations or otherwise impede our on-going business efforts, which could have a material adverse effect on our business, operating results, financial condition, long-term prospects and ability to continue as a viable business.

It is possible investors may lose their entire investment in the Company.

Prospective investors should be aware that if we are not successful in our endeavors, your entire investment in the Company could become worthless. Even if we are successful in identifying mineral reserves that can be commercially developed, there can be no assurances that we will generate any revenues and therefore our losses will continue.

No revenue generated from operations.

We have not generated any revenues from operations. Our net loss for the fiscal year ended June 30, 2022 totaled $7,837,316. We have incurred losses in the past, and we will likely continue to incur losses in the future. Even if our drilling programs identify gold, silver or other mineral deposits, there can be no assurance that we will be able to commercially exploit these resources, generate any revenues or generate sufficient revenues to operate profitably.

We will require significant additional capital to continue our exploration activities, and, if warranted, to develop mining operations.

None of our projects currently have proven or probable reserves. Substantial expenditures will be required to determine if proven and probable mineral reserves exist at any of our properties, to develop metallurgical processes to extract metal, to develop the mining and

9

processing facilities and infrastructure at any of our properties or mine sites and, in certain circumstances, to acquire additional property rights. We have spent and will be required to continue to expend significant amounts of capital for drilling, geological and geochemical analysis, assaying, and, when warranted, feasibility studies with regard to the results of our exploration. We may not benefit from these investments if we are unable to identify commercially exploitable mineral reserves. If we decide to put one or more of our properties into production, we will require significant amounts of capital to develop and construct the mining and processing facilities and infrastructure required for mining operations. Our ability to obtain necessary funding for these purposes, in turn, depends upon a number of factors, including the status of the national and worldwide economy and the price of gold, silver and other precious metals. We may not be successful in obtaining the required financing, or if we can obtain such financing, such financing may not be on terms that are favorable to us. Failure to obtain such additional financing could result in delay or indefinite postponement of further exploration or development and the possible, partial or total loss of our potential interest in certain properties. Any such delay could have a material adverse effect on our results of operations or financial condition.

We cannot be assured that any of our projects are economically feasible or that feasibility studies will accurately forecast operating results.

Our future profitability depends on the economic feasibility of our projects. We have completed a feasibility study on our Grassy Mountain Project. There can be no assurance that the results of any feasibility study for the Sleeper Gold Project will be positive. Economic feasibility depends on many factors which include estimates on production rates, revenues, operating and capital costs. Completed feasibility studies for any of our projects and obtain financing to construct and initiate mining operations, there can be no assurance that actual operating results will not vary unfavorably from the estimates and assumptions included in a feasibility study.

We may acquire additional exploration stage properties, and we may face negative reactions if reserves are not located on acquired properties.

We may acquire additional exploration stage properties. There can be no assurance that we will be able to identify and complete the acquisition of such properties at reasonable prices or on favorable terms or that reserves will be identified on any properties that we acquire. We may also experience negative reactions from the financial markets if we are unable to successfully complete acquisitions of additional properties or if reserves are not located on acquired properties. These factors may adversely affect the trading price of our common stock or our financial condition or results of operations.

Our industry is highly competitive, attractive mineral lands are scarce, and we may not be able to obtain quality properties.

We compete with many companies in the mining industry, including large, established mining companies with substantial capabilities, personnel and financial resources. There is a limited supply of desirable mineral lands available for claim staking, lease or acquisition in the United States of America where we may conduct exploration activities. We may be at a competitive disadvantage in acquiring mineral properties because we compete with these individuals and companies, many of which have greater financial resources and larger technical staffs.

Title to mineral properties can be uncertain, and we are at risk of loss of ownership of one or more of our properties. Our ability to explore and operate our properties depends on the validity of our title to that property. A significant amount of our mineral properties consist of leases of unpatented mining claims. Unpatented mining claims provide only possessory title and their validity is often subject to contest by third parties or the federal government, which makes the validity of unpatented mining claims uncertain and generally more risky. These uncertainties relate to such things as the sufficiency of mineral discovery, proper posting and marking of boundaries, assessment work and possible conflicts with other claims not determinable from public record. Since a substantial portion of all mineral exploration, development and mining in the United States now occurs on unpatented mining claims, this uncertainty is inherent in the mining industry. We have not obtained title opinions covering our entire properties, with the attendant risk that title to some claims, particularly title to undeveloped property, may be defective. There may be valid challenges to the title to our property which, if successful, could impair development and/or operations.

We have no mining operations and no history as a mining company.

We are a development stage company and have no ongoing mining operations of any kind. We have interests in mining claims which may or may not lead to production.

We have no history of earnings or cash flow from mining operations. If we are able to proceed to production, commercial viability will be affected by factors that are beyond our control such as the particular attributes of the deposit, the fluctuation in metal prices, the cost of constructing and the operation of a mine, prices and refining facilities, the availability of economic sources for energy, government regulations including regulations relating to prices, royalties, restrictions on production, quotas on exploration of minerals, as well as the costs of protection of the environment.

10

If our exploration and development costs are higher than anticipated, then our profitability will be adversely affected.

We are currently proceeding with plans to explore and develop our mineral properties on the basis of estimated costs. If our exploration and development costs are greater than anticipated, then we will have fewer capital resources for other expenses and losses could increase. Factors that could cause exploration and development costs to increase include adverse weather conditions, difficult terrain, increased government regulation and shortages of qualified personnel.

Assuming no adverse developments outside of the ordinary course of business, our exploration and development budget will be approximately up to $4.0 million for the next twelve months. Exploration will be funded by our available cash reserves and future issuances of common stock, warrants or units. Our exploration program may vary significantly from what we have budgeted depending upon the results we achieve. Even if we identify mineral reserves which have the potential to be commercially developed, we will not generate revenues until such time as we undertake mining operations. Mining operations will involve a significant capital infusion. Mining costs are speculative and dependent on a number of factors including mining depth, terrain and necessary equipment. We do not believe that we will have sufficient funds to implement mining operations without additional capital raises of debt and or equity or without a joint venture partner, of which there can be no assurance.

Our continuing reclamation obligations at our properties could require significant additional expenditures.

We are responsible for the reclamation obligations related to disturbances located on all of our properties. We have posted a bond in the amount of the estimated reclamation obligation at the Sleeper Gold Project and the Grassy Mountain Project. At the Sleeper Gold Project, we are required to submit a mine closure plan to the BLM every three years. Based on a review by the BLM of our mine closure plan that Paramount submitted in July 2020, the BLM determined that our existing bond was sufficient. There is a risk that any cash bond, even if increased based on the analysis and work performed to update the reclamation obligations, could be inadequate to cover the actual costs of reclamation when carried out. The satisfaction of bonding requirements and continuing reclamation obligations will require a significant amount of capital. There is a risk that we will be unable to fund these additional bonding requirements, and further, that the regulatory authorities may increase reclamation and bonding requirements to such a degree that it would not be commercially reasonable to continue exploration activities, which may adversely affect our results of operations, financial performance and cash flows.

There may be insufficient mineral reserves to develop any of our properties, and our estimates may be inaccurate.

There is no certainty that any expenditures made in the exploration of any properties will result in discoveries of commercially recoverable quantities of ore. Most exploration projects do not result in the discovery of commercially mineable deposits of ore and no assurance can be given that any particular level of recovery of precious metals from discovered mineralization will in fact be realized or that any identified mineral deposit will ever qualify as a commercially mineable ore body which can be legally and economically exploited. Estimates of reserves, mineral deposits and production costs can also be affected by such factors as environmental regulations and requirements, weather, environmental factors, unforeseen technical difficulties, unusual or unexpected geological formations and work interruptions. In addition, the grade of ore ultimately mined may differ from that indicated by drilling results. Short term factors relating to reserves, such as the need for orderly development of ore bodies or the processing of new or different grades, may also have an adverse effect on mining operations and on the results of operations. There can be no assurance that precious metals recovered in small scale laboratory tests will be duplicated in large scale tests under on-site production conditions. Material changes in estimated reserves, grades, stripping ratios or recovery rates may affect the economic viability of any project.

We face fluctuating gold and mineral prices.

The value of any mineral reserves we develop, and consequently the value of our common stock, depends significantly on the value of such minerals. The price of gold and silver as well as other precious and base metals have experienced volatile and significant price movements over short periods of time and are affected by numerous factors beyond our control, including international economic and political trends, expectations of inflation, interest rates, global or regional consumption patterns, speculative activities and increases in production due to improved mining and production methods. The supply of and demand for gold and silver, as well as other precious and base metals, are affected by various factors, including political events, economic conditions and production costs in major mineral producing regions.

Our estimates of mineral reserves and mineral resources are subject to uncertainty.

Estimates of mineral reserves and other mineral resources are subject to considerable uncertainty. Such estimates are arrived at using standard acceptable geological techniques and are based on the interpretations of geological data obtained from drill holes and other sampling techniques. Engineers use feasibility studies to derive estimates of cash operating costs based on anticipated tonnage and grades of ore to be mined and processed, the predicted configuration of the ore bodies, expected recovery rates of metal from ore, comparable facility and operating costs and other factors. Actual cash operating costs and economic returns on projects may differ

11

significantly from the original estimates, primarily due to fluctuations in the current prices of metal commodities extracted from the deposits, changes in fuel costs, labor rates, changes in permit requirements, and unforeseen variations in the characteristics of the ore body. Due to the presence of these factors, there is no assurance that any geological reports will accurately reflect actual quantities of gold, silver or other metals that can be economically processed and mined by us.

If we are unable to obtain all of our required governmental permits, our operations could be negatively impacted.

Our future operations, including exploration and development activities, required permits from various governmental authorities. Such operations are and will be governed by laws and regulations governing prospecting, development, mining, production, exports, taxes, labor standards, occupational health, waste disposal, toxic substances, land use, environmental protection, mine safety and other matters. There can be no assurance that we will be able to acquire all required licenses or permits or to maintain continued operations at our properties.

There is no assurance that there will not be title or boundary disputes.

Although we have investigated the right to explore and exploit our properties and obtained records from government offices with respect to all of the mineral claims comprising our properties, this should not be construed as a guarantee of title. Other parties may dispute the title to any of our properties or any property may be subject to prior unregistered agreements and transfers or land claims by aboriginal, native, or indigenous peoples. The title may be affected by undetected encumbrances or defects or governmental actions.

Local infrastructure may impact our exploration activities and results of operations.

Mining, processing, development and exploration activities depend, to one degree or another, on adequate infrastructure. Reliable roads, bridges, power and water supplies are important determinants that affect capital and operating costs. Unusual or infrequent weather phenomena, sabotage or government or other interference in the maintenance or provision of such infrastructure could adversely affect our activities and profitability.

Because of the speculative nature of exploration for gold and silver properties, there is substantial risk that our business will fail.

The search for precious metals as a business is extremely risky. We cannot provide any assurances that the gold or silver mining interests that we acquired will contain commercially exploitable reserves of gold or silver. Exploration for minerals is a speculative venture necessarily involving substantial risk. Any expenditure that we make may not result in the discovery of commercially exploitable reserves of precious metals.

We are in competition with companies that are larger, more established and better capitalized than we are.

Many of our potential competitors have greater financial and technical resources, as well as longer operating histories and greater experience in mining.

Exploration for economic deposits of minerals is speculative.

The business of mineral exploration is very speculative, since there is generally no way to recover any of the funds expended on exploration unless the existence of mineable reserves can be established. We can exploit those reserves by either commencing mining operations, selling or leasing our interest in the property or entering into a joint venture with a larger resource company that can further develop the property to the production stage. Unless we can establish and exploit reserves before our sources of funds are exhausted, we will have to discontinue operations, which could make our stock valueless.

The loss of key members of our senior management team could adversely affect the execution of our business strategy and our financial results.

We believe that the successful execution of our business strategy and our ability to move beyond the exploratory stages depends on the continued employment of key members of our senior management team. If any members of our senior management team become unable or unwilling to continue in their present positions, our financial results and our business could be materially adversely affected.

12

We operate in a regulated industry and changes in regulations or violations of regulations may result in increased costs or sanctions that could reduce our revenues.

Our organization is subject to extensive and complex federal and state laws and regulations. If we fail to comply with the laws and regulations that are directly applicable to our business, we could suffer civil and/or criminal penalties or be subject to injunctions or cease and desist orders. While we believe that we are currently compliant with applicable rules and regulations, if there are changes in the future, there can be no assurance that we will be able to comply in the future, or that future compliance will not significantly adversely impact our operations.

The COVID-19 pandemic may adversely impact our business and may negatively impact our financial results in the future, and the ultimate impact will depend on future developments, which are highly uncertain and cannot be predicted, including the scope and duration of the pandemic and actions taken by governmental authorities in response to the pandemic.

The COVID-19 pandemic has negatively impacted the global economy, disrupted global supply chains, lowered equity market valuations, created significant volatility and disruption in financial markets, and increased unemployment levels. In addition, the pandemic has resulted in temporary closures of many businesses and the institution of social distancing and sheltering in place requirements in many states and communities. As a result, our ability to continue with our planned activities may be significantly impacted, which could adversely affect the timing of completing our development programs which include the federal and state permitting of our Grassy Mountain Project in eastern Oregon. Furthermore, our business operations may also be disrupted if significant portions of our workforce are unable to work effectively, including because of illness, quarantines, government actions, or other restrictions in connection with the pandemic. The extent to which the COVID-19 pandemic impacts our business, results of operations, and financial condition, will depend on future developments, which are highly uncertain and cannot be predicted, including the scope and duration of the pandemic and actions taken by governmental authorities and other third parties in response to the pandemic.

If we fail to maintain an effective system of internal controls, we may not be able to accurately report our financial results or prevent fraud. As a result, current and potential stockholders could lose confidence in our financial reporting, which would harm our business and the trading price of our common stock.

Effective internal controls are necessary for us to provide reliable financial reports, prevent fraud and operate successfully as a public company. If we cannot provide reliable financial reports or prevent fraud, our reputation and operating results would be harmed. We cannot be certain that our efforts to develop and maintain our internal controls will be successful, that we will be able to maintain adequate controls over our financial processes and reporting in the future or that we will be able to comply with our obligations under Section 404 of the Sarbanes-Oxley Act of 2002. Any failure to develop or maintain effective internal controls, or difficulties encountered in implementing or improving our internal controls, could harm our operating results or cause us to fail to meet our reporting obligations. Ineffective internal controls could also cause investors to lose confidence in our reported financial information, which would likely have a negative effect on the trading price of our common stock.

We are dependent upon information technology systems, which are subject to cybersecurity incidents, disruption, damage, failure and other risks associated with implementation and integration.

Our information technology systems used in our operations are subject to disruption, damage or failure from a variety of sources, including, without limitation, computer viruses, security breaches, cyberattacks, natural disasters and defects in design. Cybersecurity incidents, in particular, are evolving and include, but are not limited to, malicious software, attempts to gain unauthorized access to data or machines and equipment, and other electronic security breaches that could lead to disruptions in systems, unauthorized release of confidential or otherwise protected information, the corruption of data or the disabling, misuse or malfunction of machines and equipment. Various measures have been implemented to manage our risks related to information technology systems and network disruptions. However, given the unpredictability of the timing, nature and scope of information or operational technology disruptions, we could potentially be subject to production downtimes, operational delays, operating accidents, the compromising of confidential or otherwise protected information, destruction or corruption of data, security breaches, other manipulation or improper use of our systems and networks or financial losses from remedial actions, any of which could have a material adverse effect on cash flows, financial condition or results of operations.

We could also be adversely affected by system or network disruptions if new or upgraded information technology systems are defective, not installed properly or not properly integrated into operations. Various measures have been implemented to manage the risks related to the system implementation and modification, but system modification failures could have a material adverse effect on our business, financial position and results of operations.

13

Risks Related to Our Common Stock and Indebtedness

Our stock price may be volatile.

The market price of our common stock has been volatile. We believe investors should expect continued volatility in our stock price. Such volatility may make it difficult or impossible for you to obtain a favorable selling price for our shares.

We may not have sufficient cash to meet our debt obligation.

As of June 30, 2022, we have $4.2 million in outstanding indebtedness in the form of convertible notes. Our ability to repay the outstanding debt on at maturity will depend on the Company having sufficient cash on hand. We could face substantial liquidity problems and could be forced to reduce or delay investments and capital expenditures, dispose of material assets or operations, seek additional debt or equity capital or restructure or refinance our indebtedness. We cannot predict whether we would be able to refinance debt, issue equity or debt securities or dispose of assets to raise funds on a timely basis or on satisfactory terms. In a rising interest rate environment, the costs of borrowing additional funds or refinancing outstanding indebtedness would also be expected to increase. We may not be able obtain proceeds in an amount sufficient to meet any debt service obligations when due.

We do not intend to pay dividends for the foreseeable future.

We have never declared or paid any dividends on our common stock. We intend to retain all of our earnings, if any, for the foreseeable future to finance the operation and expansion of our business, and we do not anticipate paying any cash dividends in the future. As a result, you may only receive a return on your investment in our common stock if the market price of our common stock increases. Our board of directors retains discretion to change this policy.

The exercise of our outstanding options may depress our stock price.

The exercise of outstanding options and the subsequent sale of the underlying common stock in the public market, or the perception that future sales of these shares could occur, could have the effect of lowering the market price of our common stock below current levels and make it more difficult for us and our stockholders to sell our equity securities in the future.

Sales or the availability for sale of shares of common stock by stockholders could cause the market price of our common stock to decline and could impair our ability to raise capital through an offering of additional equity securities.

Item 1B. Unresolved Staff Comments.

Not applicable as a smaller reporting company.

Item 2. Properties.

The following description of the Company’s mining properties is qualified in its entirety by reference to the Technical Report Summary for each of the properties included as exhibits to this Annual Report on Form 10-K (“Report”) and incorporated by reference into this Item 2. The information concerning our mining properties in this Report has been prepared in accordance with the requirements of subpart 1300 of Regulation S-K. Subpart 1300 of Regulation S-K requires us to disclose our mineral resources, in addition to our mineral reserves, as of the end of our most recently completed fiscal year in the aggregate and for each of our individually material mining properties.

You are cautioned that mineral resources do not have demonstrated economic value. Mineral resources are subject to further exploration and development, are subject to additional risks, and no assurance can be made that they will eventually convert to future reserves. Investors are cautioned not to assume that any part of all of the Inferred Resource exists or is economically or legally mineable. See Item 1A, Risk Factors.

14

Summary Disclosure

None of the Company’s material properties are in the production stage.

As summary overview of each material property is as follows:

Property: Grassy Mountain

Stage: Development

Location: Oregon

Mine Type: Underground

Commodity: Gold, Silver

Mineralization Styles: Hot Spring Style, Low Sulfidation Epithermal

15

Property: Sleeper Gold

Stage: Exploration

Location: Nevada

Mine Type: Open Pit Heap Leach

Commodity: Gold, Silver

Mineralization Styles: Low Sulfidation, Vein

Summary Gold Mineral Resources as of June 30, 2022(1,2,4,10):

United States

Summary of Silver Mineral Resources as of June 30, 2022(1,2,4,10):

United States

16

1.

The term “resource” means that it is a concentration or occurrence of material of economic interest in or on the Earth’s crust in such form, grade or quantity that there are reasonable prospects for economic extraction. Inferred, Indicated, and Measured resources are in order of increasing confidence based on level of underlying geological evidence. The term ‘inferred resource’ is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. The term “limited geological evidence” means evidence that is only sufficient to establish that geological and grade or quality continuity is more likely than not. The level of geological uncertainty associated an inferred mineral resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability and must have a reasonable expectation that the majority of inferred mineral resources could be upgraded to indicated or measured mineral resources with continued exploration.

2.

Mineral Resources estimates are reported exclusive of mineral reserves, are current as of June 30, 2022, and are reported using the definitions in SK 1300 and were prepared by RESPEC Company LLC for the Grassy Mountain Property and the Sleeper Gold Property.

3.

Mineral Resources comprised all model blocks at a 0.011 oz/ton AuEq cut-off that lie within an optimized pit plus blocks at a 0.085 oz/ton AuEq cut-off that lie outside of the optimized pit.

4.

Mineral Resources summarized in the table immediately above are reported exclusive of the Mineral Resources converted to Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

5.

Mineral Resources potentially amenable to open pit mining methods are reported using a gold price of US$1,750/oz, a silver price of US$22/oz, a throughput rate of 5,000 tons/day, assumed metallurgical recoveries of 80% for Au and 60% for Ag, mining costs of US$2.50/ton mined, processing costs of US$13.00/ton processed, general and administrative costs of $2.22/ton processed, and refining costs of $5.00/oz Au and $0.50/oz Ag produced. Mineral Resources potentially amenable to underground mining methods are reported using a gold price of US$1,750/oz, a silver price of US$22/oz, a throughput rate of 5,000 tons/day, assumed metallurgical recoveries of 90% gold equivalent, mining costs of US$90/ton mined, processing costs of US$30/ton processed, general and administrative costs of $15.00/ton processed, and refining costs of $5.00/oz gold equivalent produced.

6.

Mineral Resources comprised all model blocks at a 0.137 g Au/t cut-off for Oxide and Mixed within an optimized pit; 0.251 g Au/t for Sulfide within an optimized pit; and 0.137 g Au/t for dumps.

7.

The average grades of the Inferred Mineral Resources are comprised of the weighted average of Oxide, Mixed, Sulfide, and dumps mineral resources. Alluvium mineralized materials are not included in the mineral resources.

8.

Mineral Resources within the optimized pit are block-diluted tabulations. Dumps mineral resources are undiluted tabulations.

9.

Mineral Resources potentially amenable to open pit mining methods are reported using a gold price of US$1,750/oz, a silver price of US$22/oz, a throughput rate of 30,000 tonnes/day, assumed metallurgical recoveries of 72.7% for Au and 28.2% for Ag, mining costs of US$2.00/tonne mined, heap leach processing costs of US$3.08/tonne processed, bio-leach processing costs of US$9.84/tonne processed general and administrative costs of $0.46/tonne processed. Gold and silver commodity prices were selected based on analysis of the three-year running average at the end of August 2022.

10.

Rounding may result in apparent discrepancies between tons, grade, and contained metal content.

Summary Gold Mineral Reserves as of June 30, 2022(1,2,3,4):

Proven Mineral Reserves Probable Mineral Reserves Total Mineral Reserves

United States

Summary Silver Mineral Reserves as of June 30, 2022(1,2,3,4):

Proven Mineral Reserves Probable Mineral Reserves Total Mineral Reserves

United States

17

1.

The term “reserve” means that part of a mineral deposit that can be economically and legally extracted or produced at the time of the reserve determination. The term “proven (measured) reserves” means reserves for which (a) quantity is computed from dimensions revealed in outcrops, trenches, workings or drill holes, grade and/or quality are computed from the results of detailed sampling; and (b) the sites for inspection, sampling and measurements are spaced so closely and the geologic character is sufficiently defined that size, shape, depth and mineral content of reserves are well established. The term “probable (indicated) reserves” means reserves for which quantity and grade and/or quality are computed from information similar to that used for proven (measured) reserves, but the sites for inspection, sampling and measurement are farther apart or are otherwise less adequately spaced. The degree of assurance, although lower than that for proven (measured) reserves, is high enough to assume continuity between points of observation. The term “cutoff grade” means the lowest grade of mineralized material considered economic to process. Cutoff grades vary between deposits depending upon prevailing economic conditions, mineability of the deposit, by-products, amenability of the mineralized material to silver or gold extraction and type of milling or leaching facilities available.

2.

Mineral reserves have an effective date of June 30, 2022. The Qualified Person firm responsible for the mineral reserves estimate is Arrowhead Underground LLC.

3.

Mineral Reserves are reported inside stope designs assuming drift-and-fill mining methods, and an economic gold equivalent cut-off grade of 0.10 oz/ton AuEq. The economic cut-off grade estimate uses a gold price of $1,600/oz, mining costs of $100/ton processed, surface re-handle costs of $0.20/ton processed, process costs of $35/ton processed, general and administrative costs of $20/ton processed, and refining costs of $6/oz Au recovered. Metallurgical recovery is 92.8% for gold. Mining recovery is 97% and mining dilution is assumed to be 8%. Mineralization that was either not classified or was assigned to Inferred Mineral Resources was set to waste. A 1.5% NSR royalty is payable. The reserves reference point is the FS mill crusher.

4.

Total fully diluted Mineral Reserves includes Proven and Probable reserves plus dilution les ore lost, see detail table for each project

Individual Properties

GRASSY MOUNTAIN PROPERTY

Overview and Location

The Grassy Mountain Project is located in Malheur County, Oregon, approximately 22 miles south of Vale, Oregon, and roughly 70 miles west of Boise, Idaho (43°40'10.8"N 117°21'34.2"W). The property is accessed by vehicle from the town of Vale by a private and BLM maintained dirt road. The project site is situated in the rolling hills of the high desert region of the far western Snake River Plain and consists of 455 unpatented lode claims and 3 patented lode claims all totaling roughly 8,280 acres. The local terrain is gentle to moderate, with elevations ranging from 3,300 to 4,300 feet above mean sea level. The geological setting, hydrothermal alteration, styles of gold-silver mineralization, and close spatial and timing association with silica sinter deposition, indicate that Grassy Mountain is an example of the hot-springs subtype of low-sulfidation, epithermal precious-metals deposits.

Power and Water

To effect mining operations power and water source infrastructure would need to be developed as it does not currently exist.

Property Agreements and Royalty Obligations

The following map illustrates the mining claims subject to royalty payments at the Grassy Mountain Project:

18

Sherry and Yates Inc.

Prior to 2018, Calico had an annual lease agreement in place with Sherry & Yates Inc. Under the agreement Calico was required to make annual advance royalty payments at a rate of $100,000 per year. In a mining production scenario, the agreement provided for a production royalty payments based on the price of gold. In February 2018, Paramount exercised its option to reduce the existing Net Smelter Royalty from 6% down to 1.5% and acquired all the rights to the unpatented and patented mining claims subject to the agreement at the Grassy Mountain Project for a total payment of $2.4 million.

Seabridge Gold

Seabridge Gold Inc. (“Seabridge”), a TSX and NYSE listed company, holds a net profits interest (“NPI”) in a mining scenario at Grassy Mountain. The NPI is calculated at a rate of 10% on net profits on certain mining claims. Seabridge also holds an NPI put option in which during the 30-day period immediately following the day that Calico had delivered notice to Seabridge that a positive production decision has been made and construction financing has been secured with respect to the Grassy Mountain Project, Seabridge may cause Calico to purchase the NPI for CDN$10,000,000. If Seabridge exercises the right to cause Calico to purchase the NPI, the Company would likely need to seek additional equity or other financing to fund the purchase, which financing may not be available to the Company on favorable terms or at all.

Other agreements

Cryla LLC ("Cryla") leased 28 unpatented lode mining claims located west of Grassy Mountain to Calico in 2018. Calico is required to make an annual lease payment of $60,000. After June 2020, Calico may elect to acquire the property for $560,000 plus $3/oz of gold reserves, as defined by a prefeasibility or higher confidence-level study. Cryla is entitled to a 2% NSR if the gold price is ≤US$1,500/oz and a 4% NSR if the gold price >US$1,500/oz. Calico is entitled to reduce the NSR to 1% by paying Cryla $800,000 under any circumstances. No Mineral Resources or Mineral Reserves are estimated on the Cryla claims.

Previous Operators

Companies and individuals involved in exploration prior to Paramount’s Project interest include prospectors Richard “Dick” Sherry and Eugene “Skip” Yates (1986), Atlas Precious Metals (Atlas) (1986 to 1992), Golden Predator Mines U.S. Inc., Newmont

19

Exploration Ltd (Newmont) (1992-1996), Tombstone Exploration Company Ltd (Tombstone) (1998), Seabridge, and Calico (2000 to 2015). Work completed included reconnaissance, geological mapping, geochemical sampling (soil, float, rock chip), geophysical surveys (airborne magnetic and radiometric, ground-based gravity, gradient array (IP/resistivity) controlled-source audio-frequency magnetotelluric (CSAMT)), core and reverse circulation (RC) drilling, and Mineral Resource estimation. This work defined the Grassy Mountain deposit, on which a feasibility study was completed in 1990 by Atlas assuming a combined heap leach/milling operation and open pit mining methods.

Work Completed by Paramount

Since acquiring its Project interest in 2016, Paramount has conducted an exploration review of the available Project data, helicopter-borne aeromagnetic and radiometric and CSAMT ground geophysical surveys, drilling, Mineral Resource and Mineral Reserve estimation, baseline environmental studies, and mining studies.

In addition to the above exploration programs, Paramount has progressed the Grassy Mountain Project through several stages of the state and federal permitting process. The Project will require county level, state level and federal permits to construct, operate and close a mining operation.

In November 2019, Paramount submitted its Consolidated Permit Application (“CPA”) to DOGAMI to enable the Company to build and operate its proposed, high grade underground gold mine located in Malheur County. The Application was reviewed by the DOGAMI and cooperating agencies for completeness. As part of this process, the permitting agencies provided Paramount with a list of supplemental information and recommendations required to submit a modified CPA. Paramount, the DOGAMI and the permitting agencies continued to work together to discuss the additional information requested, ensuring the submission of a complete modified CPA which will trigger the 225 day maximum permit evaluation process, upon which draft permits are issued.

In February 2020, the Company submitted a revised Plan of Operation (the ”PoO”) to the BLM outlining the Company’s plans to build and operate the proposed Grassy Mountain underground gold mine. The BLM has reviewed the PoO for completeness and has provided the Company with comments to address. The BLM has previously reviewed 19 of the baseline data reports (“BDRs”) and their requests for clarifications have all been addressed. The BLM will register a Notice of Intent (the ”Notice”) in the Federal Register once the application is deemed complete. The Notice initiates the Environmental Impact Statement (“EIS”) process under the National Environmental Policy Act.

In December of 2021, Paramount submitted a modified CPA with the State of Oregon and submitted a modified PoO to the BLM. Both modified applications incorporated additional information required by the regulators and mine design optimizations that were a result of feedback provided in Paramount’s initial application.

As of June 30, 2022, the net book value of the Grassy Mountain Property was approximately $23.2 million.

Technical Report Summary

The following is a brief summary of the proposed mining operation as detailed in the Technical Report Summary (the "Grassy TRS") on the Grassy Mountain Project, Oregon U.S.A. prepared for the Company by QP, Ausenco with an effective date of June 30, 2022. For more information, see Exhibit 96.1.

The Grassy Mountain mine will be an underground operation accessed via one decline and a system of internal ramps. One ventilation raise is included in the design to be used for ventilation and secondary egress. The mechanized cut-and-fill mining method was selected. The mining direction will be underhand. Cemented rock fill (CRF) will be used for backfill. The mechanized cut-and-fill method is highly flexible and can achieve high recovery rates in deposits with complex geometries, as is the case at the Grassy Mountain deposit. The estimated mine life is eight years

The process plant will be designed with conventional processing unit operations frequently used within the gold processing industry. The process plant will treat 750 tons/d and will operate with two shifts per day, 365 days per year, producing gold doré bars. The major equipment within the process plant is specified in accordance with the climate, site conditions, metal grades and metallurgical performance outlined in this report. Any deleterious metals present in the ore such as Mercury will be abated by specialized equipment installed in the process plant and are not expected to impact payability terms. The plant will have average head grades of 0.206 oz/ton Au and 0.293 oz/ton Ag.

The plant feed will be trucked from the underground mine to a modular crushing facility that will include a jaw crusher as the primary stage and a cone crusher for secondary size reduction. The crushed ore will be ground by a ball mill in closed circuit with a hydro-cyclone cluster. The hydro-cyclone overflow with P80 of 150 mesh (106 μm) will flow to a leach–carbon-in-leach (CIL) recovery circuit via a pre-aeration tank. Gold and silver leached in the CIL circuit will be recovered onto activated carbon and eluted in a pressurized Zadra-style elution circuit and then recovered by electrowinning in the gold room. The gold–silver precipitate will be dried in a mercury retort oven and then mixed with fluxes and smelted in a furnace to pour doré bars. Carbon will be re-activated in a carbon regeneration kiln before being returned to the CIL circuit. CIL tails will be treated for cyanide destruction prior to pumping to the tailings storage facility (TSF) for disposal. The installed power for the process plant will be 4,445 hp and the power consumption is estimated to be 72 kWh/ton processed. Raw water will be pumped from borehole wells to a raw-water storage tank. Potable water

20

will be sourced from the raw water tank and treated by a potable water treatment plant. Gland water will be supplied from the raw-water tank. Process water will primarily consist of TSF reclaim water. Reagents will include lime, sodium cyanide, sodium hydroxide, copper sulfate, hydrochloric acid and sodium metabisulfite.

A summary of the forecast project economics are as follows:

Area Item Units LOM Total/Avg.

General Gold price US$/oz 1,750

Silver price US$/oz 22.00

Mine life years 7.75

Production (gold) Mill head grade Au oz/ton 0.19

Mill recovery rate Au % 92.78%

Total mill ounces recovered Au oz x 1,000 361.8

Total average annual production Au oz x 1,000 46.6

Production (silver) Mill head grade Ag oz/ton 0.28

Mill recovery rate Ag % 73.46%

Total mill ounces recovered Ag oz x 1,000 424.8

Total average annual production Ag oz x 1,000 54.5

Operating Costs Mining cost US$/ton milled 67.29

Processing cost US$/ton milled 33.92

G&A cost US$/ton milled 16.57

Total operating costs US$/ton milled 117.78

Refining cost Au US$/oz 5.00

Refining cost Ag US$/oz 0.50

*Cash costs net of by-products US$/oz Au 680.97

**AISC net of by-products US$/oz Au 815.09

Capital Costs Initial capital US$ M 136.2

Sustaining capital US$ M 36.1

Closure costs US$ M 12.4

Financials(pre-tax) Pre-tax NPV, 5% US$ M 134.9

Pre-tax Payback years 3.32

Financials(post-tax) Post-tax NPV, 5% US$ M 114.1

Post-tax IRR % 22.54%

Post-tax Payback years 3.32

Permitting and Current Proposed Development Program

Paramount expects to continue with both state and federal permitting activities for its proposed underground gold mine. With 22 baseline studies approved and accepted by the State of Oregon and the submitted modified CPA, the Company will continue working with the appropriate permitting agencies to ensure a complete permit application. Once the State of Oregon determines that the CPA is complete it will proceed to the drafting permits process which includes issuing an environmental evaluation and socio-economic impact analysis and the drafting of all relevant permits for the project. Under Oregon law the drafting permits process, which includes public notice and public hearing period, must be completed within 225 days. Subsequent to the drafting permit process if draft permits are issued, up to an additional 120 days is provided for further public consultation and the development and distribution of final permits. The costs incurred by the State of Oregon for the drafting permit and final permit processes will be reimbursed by the Company directly through cost recovery invoices received from DOGAMI or by permit fees established by individual permitting agencies. In addition to the state incurred costs, the Company will engage with its permitting and technical advisors and consultants to respond to any further information requests from the State's permitting agencies.

With respect to federal permitting, once the Notice is registered and the EIS had commenced, Paramount will also engage with its permitting and technical advisors to assist in the process. Paramount is required to reimburse the BLM for the cost of the EIS.

Paramount has budgeted $3.0 million for its fiscal year ended June 30, 2023, for the above stated development program.

Grassy Mountain Property Summary of Mineral Resources at the End of June 30, 2022

Gold (Au)(1,2,3,4,5,6,7)

21

Tons (000s) Grade (oz./ton) Ounces (000s) Metallurgical Recovery

Silver (Ag)(1,2,3,4,5,6,7)

Tons (000s) Grade (oz./ton) Ounces (000s) Metallurgical Recovery

1.

The Qualified Person firm responsible for the mineral resources estimate is RESPEC Company LLC.

2.

Mineral Resources comprised all model blocks at a 0.011 oz/ton AuEq cut-off that lie within an optimized pit plus blocks at a 0.085 oz/ton AuEq cut-off that lie outside of the optimized pit.

3.

oz/ton AuEq (gold equivalent grade) = oz/ton Au + (oz/ton Ag ÷ 106).

4.

Mineral Resources summarized in the table immediately above are reported exclusive of the Mineral Resources converted to Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

5.

Mineral Resources potentially amenable to open pit mining methods are reported using a gold price of US$1,750/oz, a silver price of US$22/oz, a throughput rate of 5,000 tons/day, assumed metallurgical recoveries of 80% for Au and 60% for Ag, mining costs of US$2.50/ton mined, processing costs of US$13.00/ton processed, general and administrative costs of $2.22/ton processed, and refining costs of $5.00/oz Au and $0.50/oz Ag produced. Mineral Resources potentially amenable to underground mining methods are reported using a gold price of US$1,750/oz, a silver price of US$22/oz, a throughput rate of 5,000 tons/day, assumed metallurgical recoveries of 90% gold equivalent, mining costs of US$90/ton mined, processing costs of US$30/ton processed, general and administrative costs of $15.00/ton processed, and refining costs of $5.00/oz gold equivalent produced.

6.

The effective date of the estimate is June 30, 2022;

7.

Rounding may result in apparent discrepancies between tons, grade, and contained metal content.

Grassy Mountain Property Summary of Mineral Reserves at the End of June 30, 2022

Gold (Au)(1,2,3)

Tons (000s) Grade (oz./ton) Ounces (000s) Metallurgical Recovery

Silver (Ag)(1,2,3)

Tons (000s) Grade (oz./ton) Ounces (000s) Metallurgical Recovery

1.

Mineral reserves have an effective date of June 30, 2022. The Qualified Person firm responsible for the mineral reserves estimate is Arrowhead Underground LLC.

2.

Mineral Reserves are reported inside stope designs assuming drift-and-fill mining methods, and an economic gold equivalent cut-off grade of 0.10 oz/ton AuEq. The economic cut-off grade estimate uses a gold price of $1,600/oz, mining costs of $100/ton processed, surface re-handle costs of $0.20/ton processed, process costs of $35/ton processed, general and administrative costs of $20/ton processed, and refining costs of $6/oz Au recovered. Metallurgical recovery is 94.5% for gold. Mining recovery is 97% and mining dilution is assumed to be 8%. Mineralization that was either not classified or was assigned to Inferred Mineral Resources was set to waste. A 1.5% NSR royalty is payable. The reserves reference point is the FS mill crusher.

3.

Tonnage and contained metal have been rounded to reflect the accuracy of the estimate. Apparent discrepancies are due to rounding.

Internal Controls – Grassy Mountain Property

22

Paramount’s internal controls at the Grassy Mountain project are designed to provide reasonable assurance that information and processes utilized in assessing its exploration results, as well as mineral resource and reserve estimation, and are reasonable and in line with industry best practices. These internal controls include quality assurance and quality control (“QA/QC”) programs in the collection and analysis of drillhole assay information based on:

Third-party certified labs used for assays reported in public disclosure or resource models;

Drill programs with insertion of blank, duplicate, and certified reference materials; and

Sufficient QA/QC results for the analytical programs.

All core and reverse-circulation samples were cataloged and stored in secure and designated areas on Paramount’s warehouse in vale Oregon. Data has been subject to validation, which includes checks on downhole surveys, collar coordinates, geological data, and assay data.

Prior to use in mineral resource or mineral reserve estimation, the selected data to support estimation were compiled from Paramount’s databases into RESPEC’s GeoSequel database and reviewed for improbable entries. Written procedures and guidelines are used to support estimation methods and approaches. Estimations include evaluation of modifying and technical factors. Internal controls and resource estimation procedures are discussed where required in the relevant chapters of the technical report summary.

SLEEPER GOLD PROJECT

Overview and Location

Sleeper is a material exploration property of the Company. The Company has the rights to explore, develop and mine the property through our 100% ownership of unpatented lode mining claims. Sleeper is located 26 miles northwest of Winnemucca, Nevada (41°20'03.1"N 118°03'09.7"W). Automobile and truck access to the property is by Interstate Highway 80 to Winnemucca, north on Highway 95 for 32 miles, west on Highway 140 for 14 miles, and then south for 6 miles on the maintained gravel Sod House Road to the project site. An office building, heavy equipment enclosure and warehousing facility are present on the Sleeper Gold Property. Necessary supplies, equipment and services to carry out full sequence exploration and mining development projects are available in Winnemucca, Reno, and Elko, Nevada.

Mining Claims

The Sleeper Gold mine and its 1,044 unpatented lode mining claims were acquired by PGSC through its acquisition of X-Cal Resources Ltd. in August 2010. Additional mining claims have been staked or acquired which now comprise the Sleeper Gold Project.

The 100% owned mining claims are summarized in the following table, (acreage is approximate):

The Sleeper Gold Project Properties Claims Approximate Acres

23

The following map illustrates the general location of the Sleeper Gold Project and the associated mining claims:

Property Agreements and Royalty Obligations:

The Snyder Syndicate, a private company, holds a one percent (1%) net smelter return royalty on the 1,044 Sleeper Gold mine claims in a mining scenario.

Franco-Nevada U.S. Corporation (“Franco”) holds a two percent (2%) net smelter return royalty on minerals produced from 2,474 mining claims at the Sleeper Gold Project.

Evolving Gold holds a 2% net smelter return royalty on minerals produced from the SSG, SP and SS mining claims.

Dry Lake Placer Association hold a 3% net smelter return royalty on minerals produced from the Dry Creek Placer mining claims.

ICN holds a 0.5% net smelter return royalty on the SS & SP mining claims as well as a 1.5% net smelter return royalty on the Blue mining claims.

The following map illustrates the claims subject to the royalty:

24

History of Previous Operations

The Sleeper Gold Project includes a historic open pit mine (the “Sleeper Gold mine”) operated by AMAX Gold Inc. (“Amax”) from 1986 until 1996, which produced 1.66 million ounces of gold and 2.3 million ounces of silver. All processing facilities and equipment related to the mining operations conducted by Amax have been removed from the site.

25

Power and Water

As a result of Amax’s mine operation from 1986 to 1996, electrical power is provided to the property by power lines. Water is available from two deep wells located on the property.

Paramount’s Exploration History at Sleeper Gold Project

PGSC conducted its first exploration program at the Sleeper Gold mine in October 2010. It consisted of 19 drill holes totaling 18,065 feet and focused on verifying data on existing models and confirming continuity and strike extension of known mineralized zones. From July 1, 2011 through June 30, 2012, PGSC completed 79 drill holes totaling 21,013 feet and followed that up in the period from July 1, 2012, through June 30, 2013, with 38 drill holes totaling 55,104 feet.

In August 2011, PGSC announced the acquisition of 606 unpatented lode mining claims (the “Dunes Project”) located eleven miles south of the Sleeper Gold mine from ICN Resources Ltd. (“ICN”). In consideration, PGSC issued 400,000 shares of its common stock to ICN.

In July 2012, PGSC announced the staking of 920 new lode mining claims (the “Mimi Project”) adjacent to the west and immediately south, of the Sleeper Gold mine. The Mimi Project totals 18,400 acres.

In 2013, PGSC announced several results of a drilling campaign which was focused in and around the existing resource and pit areas. Assay results extended the mineralization east and south of the existing resource, opened up new depth potential below the existing sleeper pit and intercepted exceptional results in several zones. Additionally, PGSC undertook an extensive database review and as a result, a total of 473 core and RC holes have been re-logged and new cross-sections were generated. Paramount completed a re-interpreted lithological and structural model which will allow us to plan a new drill program and to update our mineralized material estimate model.

In August 2014, PGSC dropped a total of 212 mining claims from the Dunes and Mimi areas of the Sleeper Gold Project. These claims no longer had any geological value to the Company.

In August 2015, we completed an initial geophysical survey which consisted of a helicopter magnetometry study. The survey defined several possible exploration targets which were reviewed by our geological team. Additional surveys on areas covered by overburden will be evaluated for further testing. This testing can include Induced Polarization programs or other indirect methodologies. The Company believes that the resulting data derived from the geophysical program will produce valuable drilling targets. Future drill programs will be designed with the aim identifying new zones of mineralization with an emphasis on areas covered with overburden.

In April 2021, we purchased 152 unpatented lode claims from South Sleeper Resources LLC for a total consideration of $365,441. The claims are located approximately 2 miles south of past producing Sleeper Gold Mine. The purchased claims carry a mineral production royalty based on a Net Smelter Returns (“NSR”) of one percent (1%). The purchased claims are without known mineral reserves.

As of June 30, 2022, the net book value of the Sleeper Gold Property was approximately $28.5 million.

Technical Report Summary

The Company is reporting a mineral resource estimate as prepared by QP, RESPEC Company LLC with an effective date of June 30, 2022. To determine the estimate the following material assumptions and criteria were used:

The Sleeper deposit has the potential to be mined by open pit methods. The Mineral Resources were tabulated to reflect potential open pit mining and heap leach and bio-oxidation extraction as the primary scenario. To meet the requirement of reasonable prospects for eventual economic extraction, a pit optimization was run using the parameters summarized in following Table:

26

Item Value Unit

Mining Cost 2.00 $/tonne

Heap Leach Processing cost 3.08 $/tonne processed

Biooxidation Processing cost 9.84 $/tonne processed

Process rate 30,000 tonnes per day processed

General and Administration cost 0.46 $/tonne processed

Ag price 22 $/oz

Au recovery 72.7 percent

Ag recovery 28.2 percent

Royalty 1.5% NSR

The pit shell created by the optimization was used to constrain the mineral resources, which are reported at a cut-off grade of 0.137 g Au/t for oxide and mixed materials, whereas the sulfide material is reported at a cut-off grade of 0.251 g Au/t. The gold cut-off grade was calculated using the processing, general and administrative costs, gold price, recovery, refining cost, and royalty provided in above Table. The mining cost is not included in the determination of the cut-off grade, as all material in the conceptual pit would potentially be mined as either ore or waste. The reference point at which the mineral resources are defined is therefore at the top rim of the pit, where material equal to or greater than the cut-off grade would be processed.

The metal prices used in the pit optimization and the determination of the gold cut-off grade and gold-equivalency factor are derived roughly from three-year moving-average prices as of August 2022 ($1,750/oz and $22/oz for gold and silver, respectively).

The open pit resource estimates are based on a 30,000 tonnes per day processing rate, with processing assumed to consist of crushing, milling, and first-stage gravity separation followed by carbon-in-leach recovery.

For more information for mineral resource estimate, see Exhibit 96.1 section 11.8, the Technical Report Summary on the Sleeper Gold Project, Nevada, U.S.A. ("Sleeper TRS") prepared for the Company by QP, RESPEC Company LLC with an effective date of June 30, 2022.

Current Proposed Program

In completing the Sleeper TRS, the Company undertook a comprehensive review of the project’s database which included over 4,000 drill holes dating back to the early 1980s from the time of the first discovery of mineralization to when the mine was closed in 1996. Given the lack of digitization of the original drill hole database, the Company has, under the direction of QP RESPEC Company LLC, engaged in digitizing and re-verifying the entire Sleeper database.

Once the data verification is complete and a higher confidence level can be applied to the resources and allowing for additional 3D modeling, Paramount will continue to advance the evaluation of Sleeper to update the Initial Assessment in 2023. The Company has budgeted $0.25 million for this program.

Geology and Mineralization

The Sleeper Gold Project is situated within the western, apparently older, part of the Northern Nevada Rift geologic province of Miocene age, along the western flank of the Slumbering Hills within Desert Valley. The geological structures that underlie Desert Valley appear to have been down-dropped 3,000 to 3,300 feet along the north-to northeast-trending normal faults along the western edge of the Slumbering Hills.

Four main types of gold mineralization are found within the Sleeper Gold Project deposit and may represent a continuum as the system evolved from a high level, high sulfidation system dominated by intrusion related fluids and volatiles to a low sulfidation meteoric water dominant system. In this setting the paragenetic relationships of the differing mineralization styles are as follows:

Early – quartz-pyrite-marcasite stockwork;

Intermediate – medium-grade, silica-pyrite-marcasite cemented breccias localized on zones of structural weakness;

Late – high-grade, banded, quartz-adularia-electrum-(sericite) veins; and

Post – alluvial gold-silver deposits in Pliocene gravels.

Reclamation

27

Paramount is responsible for managing the reclamation activities from the previous mine operations at the Sleeper Gold Mine as directed by the BLM and the Nevada State Department of Environmental Protection. Under the filed BLM Plan of Operations (“PoO”) and reclamation permit a surety bond in the amount of $4,010,403 has been posted as financial security to ensure that required reclamation activities are fulfilled. The surety bond for the Sleeper mine reclamation activities has been posted on behalf of the Company by an insurance company and forms a part of the Company’s comprehensive insurance program. The insurance policy, which is in effect until 2033, covers reclamation costs up to an aggregate of $25 million. The Company periodically submits updates to its Reclamation Cost Estimate (“RCE”) to the BLM to account for completed reclamation work or new reclamation requirements. As of September 2020, the Company’s RCE submitted in October 2019 was accepted by the BLM and the posted surety bond was deemed sufficient. The Company expects to file a revised RCE in the second half of 2021 with the BLM. The revised RCE will incorporate the significant reclamation work that has been completed by the Company over the past several years.

In addition to the BLM reclamation requirements, the Company is required to satisfy the State of Nevada’s reclamation requirements under various permits it holds for the Sleeper Gold Project.

Summary of Sleeper Gold Property Mineral Resources at the End of June 30, 2022

Gold (Au) (1,2,3,4,5,6,7)

Tons (000s) Grade (oz./ton) Ounces (000s) Metallurgical Recovery

Silver (Ag) (1,2,3,4,5,6,7)

Tons (000s) Grade (oz./ton) Ounces (000s) Metallurgical Recovery

1.

The estimate of mineral resources was done by RESPEC Company LLC in metric tonnes.

2.

Mineral Resources comprised all model blocks at a 0.137 g Au/t cut-off for Oxide and Mixed within an optimized pit; 0.251 g Au/t for Sulfide within an optimized pit; and 0.137 g Au/t for dumps.

3.

The average grades of the Inferred Mineral Resources are comprised of the weighted average of Oxide, Mixed, Sulfide, and dumps mineral resources. Alluvium mineralized materials are not included in the mineral resources.

4.

Mineral Resources within the optimized pit are block-diluted tabulations. Dumps mineral resources are undiluted tabulations.

5.

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

6.

Mineral Resources potentially amenable to open pit mining methods are reported using a gold price of US$1,750/oz, a silver price of US$22/oz, a throughput rate of 30,000 tonnes/day, assumed metallurgical recoveries of 72.7% for Au and 28.2% for Ag, mining costs of US$2.00/tonne mined, heap leach processing costs of US$3.08/tonne processed, bio-leach processing costs of US$9.84/tonne processed general and administrative costs of $0.46/tonne processed. Gold and silver commodity prices were selected based on analysis of the three-year running average at the end of August 2022.

7.

Rounding may result in apparent discrepancies between tonnes, grade, and contained metal content.

Internal Controls - Sleeper Gold Property

Paramount’s internal controls at the Sleeper project are designed to provide reasonable assurance that information and processes utilized in assessing its exploration results, as well as mineral resource and reserve estimation, and are reasonable and in line with industry best practices. These internal controls include quality assurance and quality control (“QA/QC”) programs in the collection and analysis of drillhole assay information based on:

Third-party certified labs used for assays reported in public disclosure or resource models;

Drill programs with insertion of blank, duplicate, and certified reference materials; and

Sufficient QA/QC results for the analytical programs.

All core and reverse-circulation samples were cataloged and stored in secure and designated areas on Paramount’s property. Data has been subject to validation, which includes checks on downhole surveys, collar coordinates, geological data, and assay data.

Prior to use in mineral resource or mineral reserve estimation, the selected data to support estimation were compiled from Paramount’s databases into RESPEC’s GeoSequel database and reviewed for improbable entries. Written procedures and guidelines are used to support estimation methods and approaches. Estimations include evaluation of modifying and technical factors. Internal controls and resource estimation procedures are discussed where required in the relevant chapters of the technical report summary.

28

Exploration and Drilling

Paramount’s internal controls protocols for exploration drilling are summarized in Section 8.2 of the technical report summary for the Sleeper property.

Mineral Resource Estimates

The methods and procedures used by RESPEC for the estimation of Paramount’s mineral resources at the Sleeper property are summarized in Section 11 of the Sleeper technical report summary. Mineral resources and mineral reserves are estimates that contain inherent risk and depend upon geologic interpretation and statistical inferences drawn from drilling and sampling analysis, which may prove to be unreliable. In addition, there are risks inherent to the assumptions of gold and silver recoveries and prices used to estimate cut off grades for the pit optimizations that constrain the estimated resources. Sections 11.8 and 11.9 of the Sleeper technical report summary provide information on the assessment of these risks.

Other Non-Material Properties

NEVADA

The Company owns additional mining claims in the State of Nevada that represents its non-material properties. The Mill Creek property which comprises 36 unpatented lode mining claims are located in Lander County. The Company intends to maintain the annual mining claim fees of approximately $7,000 for these claims.

The Mill Creek claims are without known mineral reserves and there is no current exploratory work being performed.

In August 2021, Paramount entered into an agreement with Nevada Select Royalty ("Nevada Select") to purchase 100% interest in the Bald Peak Project located in Mineral County, Nevada. The total consideration of $300,000 is payable to Nevada Select based upon a schedule determined by when Paramount receives a drilling permit from the federal regulators. Nevada Select will retain a 3% NSR and Paramount will have the right to reduce the NSR to 2% for a payment of $1 million.

OREGON

In October 2018, Paramount entered into an agreement with Cryla LLC (“Cryla”) that gives the Company the right to acquire 44 mining claims covering 580 acres located immediately to the west of the proposed Grassy Mountain Project. Paramount will make annual lease payments to Cryla and following year three of the agreement, Paramount has the right to purchase the claims for a cash payment of $560,000. If purchased, Cryla will maintain a production NSR based on the prevailing price of gold. Paramount has the right to reduce the NSR from 2% to 1% for a payment of $800,000.

In November 2018, Paramount entered into an agreement with Nevada Select to purchase 100% interest in the Frost Project, which consists of 40 mining claims located approximately 12 miles west of its Grassy Mountain Project. A total consideration of $250,000 payable to Nevada Select will be based on certain events over time. Nevada Select will retain a 2% NSR on the Frost Claims and Paramount has the right to reduce the NSR to 1% for a payment of $1 million.

Item 3. Legal Proceedings.

None

Item 4. Mine Safety Disclosures.

Not applicable.

29

PART II

Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities.

MARKET INFORMATION

Our common stock began trading on the NYSE American LLC under the symbol “PZG” on April 20, 2015. Prior to that time, there was no public market for our stock. The following table sets forth for the indicated periods the high and low intra-day sales prices per share for our common stock on the NYSE American LLC for the two most recent years.

High Low

HOLDERS

As of October 11, 2022, there were 155 registered shareholders of our common stock.

DIVIDENDS

We currently do not anticipate paying cash dividends for the foreseeable future.

RECENT SALE OF UNREGISTERED SECURITIES AND USE OF PROCEEDS

During the year-ended June 30, 2022, we issued 404,584 shares of common stock for payment of interest accrued and owing on our outstanding 2019 Convertible Notes. In issuing the foregoing securities, we relied on the exemptive provisions of Section 4(a)(2) of the Securities Act and Rule 506 thereunder.

EQUITY COMPENSATION PLAN

Set out below is information as of June 30, 2022 with respect to compensation plans (including individual compensation arrangements) under which our equity securities are authorized for issuance under our Equity Incentive Plan.

Equity Compensation Plan Information

Equity compensation plans not approved by security holders — $ — —

As of June 30, 2022, 701,000 restricted share units ("RSUs") were outstanding and 1,808,995 stock options were outstanding under our Equity Incentive Plans to acquire 2,509,995 Common Shares.

30

Item 6. Selected Financial Data.

Not applicable as a smaller reporting company.

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.

Overview

We are engaged in the business of acquiring, exploring and developing precious metal projects in the United States of America. Paramount owns both exploration and development stage projects in the states of Nevada and Oregon. We enhance the value of our projects by implementing exploration and engineering programs that are likely to expand and upgrade known mineral resources to mineral reserves. To further advance our projects towards the production decision, we manage the completion of the appropriate technical studies including feasibility studies and undertake permitting processes with the relevant local, state and federal regulators. The following discussion updates our outlook and plan of operations for the foreseeable future. It also analyzes our financial condition and summarizes the results of our operations for the years ended June 30, 2022 and 2021 and compares each year’s results to the results of the prior year.

Operating Highlights:

During the fiscal year-ended June, 2022, the Company conducted several exploration programs and continued with its permitting at its Grassy Mountain Project. Highlights include:

Submitted a modified Consolidated Permit Application (the “CPA”) with the State of Oregon seeking approval to construct and operate its proposed gold mine for its Grassy Mountain Project.

Submitted a modified Plan of Operation to the Bureau of Land Management (the ”BLM”) for its proposes mining operations for its Grassy Mountain Project.

Entering into an option agreement with Nevada Select Royalty to purchase 100% interest in the Bald Peak Project (“Bald Peak”) located in Mineral County, Nevada. Total consideration of $300,000 will be paid based on achieving certain milestones over time.

Completed a drill exploration program to test several targets identified to bring the Sleeper Gold Project back into production.

Completed surface sampling and a geophysical survey at its Bald Peak Project in Nevada. Both these programs confirm a large and shallow target that the Company will design and plan a new drill program in 2022.

Received positive assay results from geotechnical drill holes at its Grassy Mountain Project that indicate the potential for additional economic material to be used during mine operations.

Received from Malheur County an extension on the Conditional Use Permit for the proposed Grassy Mountain underground mine.

Completed a 15-hole reverse circulation drill program at the Frost Project which is located 12 miles from the Company’s Grassy Mountain Project in Eastern Oregon. The program was designed to locate and test historical gold intercepts from drilling that was performed by the previous operators.

Completed a metallurgical testing program using Atmospheric Alkaline Oxidation recovery process for the treatment of sulfide mineralization at the Sleeper Gold Project.

Outlook:

We believe that investors will gain a better understanding of our company if they understand how we measure and talk about our results. As an exploration and development company, we recognize the importance of managing our liquidity and capital resources. We pay close attention to non-discretionary cash expenses and look for ways to minimize them when possible. We ensure we have sufficient cash on hand to meet our annual land holding costs as the maintenance of mining claims and leases are essential to preserve the value of our mineral property assets.

Comparison of Operating Results for the year ended June 30, 2022 as compared to June 30, 2021

Results of Operations

We did not earn any revenue from mining operations for the years ended June 30, 2022 and 2021. During the year ended June 30, 2022, we completed various activities and milestones as described above in operating highlights. Other normal course of business

31

activities included filing annual mining claim fees with the BLM, reclamation work at the Sleeper mine site and on-going reviews of its mining claims were completed.

Net Loss

Our net loss for the year ended June 30, 2022 was $7,837,316 compared to a net loss of $5,903,618 in the previous year. The increase of approximately 33% is fully described below. We will continue to incur losses for the foreseeable future as we continue with our planned exploration and development programs.

Expenses

Exploration, Development and Reclamation and Land Holding Costs

For the year ended June 30, 2022, exploration and development expenses were $4,436,266 compared to $2,816,685 in the prior year. This represents an increase of 57% or $1,619,581 which was mainly due to the Company completing several exploration and development activities at both its Oregon and Nevada based properties. At Grassy Mountain, the Company continued with the permitting process with the State of Oregon and the BLM and submitted modified permit applications and at our Frost Property completed a drill program. Total exploration and development expenses at Grassy Mountain and Frost Project during the year were $2,859,348. At Sleeper, the Company completed a small drill program to test zones of mineralization and at its Bald Peak Project conducted rock surface sampling, completed a geophysical survey and planned for a future exploratory drill program. We also incurred expenses related to the reclamation program at the Sleeper Project. These reclamation expenses are reimbursed from an insurance policy the Company holds related to the closure and reclamation of the past producing Sleeper mine. Total exploration and reclamation expenses at our Nevada based properties during the year were $1,576,918.

For the year ended June 30, 2021, the Company mainly focused its development activities on the permitting process with the State of Oregon. Total development expense at Grassy Mountain in the previous year were $1,949,753. For the year ended June 30, 2021, the Company incurred $866,932 at its Sleeper Gold Project for reclamation and general exploration activities which included drill program planning.

For the year ended June 30, 2022, land holding costs increased by $99,948 or by 18% from the prior year of $540,401 to $640,349. The increase is primarily due the additional mining claim maintenance from the acquisition of new exploration properties.

Salaries and Benefits

For the year ended June 30, 2022, salary and benefits decreased by 13% or by $177,149 from the prior year to $1,196,302. Salary and benefits are comprised of cash and stock-based compensation of the Company’s executive and corporate administration teams. The decrease primarily reflects lower cash bonus and stock-based compensation recorded in the current year compared to the previous comparable year. Included in the salary and benefits expense amount for the year ended June 30, 2022 and 2021 was non-cash stock based compensation of $262,398 and $332,786 respectively.

Directors’ Compensation

For the year ended June 30, 2022, directors’ compensation decreased by 28% or by $44,977 from the prior year ended June 30, 2021. The decrease is due to the stock-based compensation recorded in the current year-ended June 30, 2022 compared to the prior year ended June 30, 2021.

Professional Fees and General and Administration

For the year ended June 30, 2022, professional fees were $130,765 compared to $174,039 in the prior year. This represents a decrease of 25% or $43,274. Professional fees included legal, advisory and consultant expenses incurred on corporate and operational activities being performed by the Company on a period-by-period basis.

For the year ended June 30, 2022, general and administration expenses increased by 17% to $565,466 from $483,608 in the prior year. The increase in expenses was mainly due to an increase in travel and marketing costs.

Asset Retirement Obligation

For the year ended June 30, 2022, the Company's asset retirement obligation for the Sleeper Gold Project increased to $4,475,270 from $1,849,644 from the prior year ended June 30, 2021. $2,475,169 of the increase was a result of a change in estimate in the cost to convert ponds from the past mining operations to evaporation cell as required by NDEP. Due to the engineered designs required and approved by NDEP, the Company requested proposals to complete the pond conversions from third party contractors which were materially higher than its previous estimates. The work to complete the ponds are expected to be completed in the second half of

32

calendar year 2024 and the costs are expected to be reimbursed by the insurance policy held by the Company for government mandated reclamation at the Sleeper Gold Project.

Liquidity and Capital Resources

Operating, Investing and Financing Activities

At June 30, 2022, we had cash and cash equivalents of $2,484,156 compared to $3,113,064 as at June 30, 2021. In May 2020, the Company established an “at the market” equity offering program (“ATM”) with Cantor Fitzgerald & Co. and Canaccord Genuity LLC to proactively increase financial flexibility. During the fiscal year ended June 30, 2022 the Company issued 7,766,388 shares (2021- 3,209,133 shares) for net proceeds of $6,119,954 (2021 -$3,722,554) under the program. At June 30, 2022, the Company’s prepaid expenses were $1,280,895 compared to $1,152,396 for the year-ended June 30, 2021. Included in the total for the year-ended June 30, 2022 were annual payments to hold the Company’s mining claims for all its mineral properties of $568,572. The prepaid expenses also included amounts to secure a helicopter for Paramount’s planned drill program at the Bald Peak Project.

The main uses of cash were comprised of the following material amounts:

Cash used to fund our operations, which included general and administration expenses, land holding costs, exploration and development programs at our mineral properties, of $6,701,139.

In addition to cash used in operating activities, the Company used and received cash as follows:

Cash used to purchase mining claims in the State of Nevada and equipment of $47,723;

Cash received from equity financings of $6,119,954.

Going Concern

The Consolidated Financial Statements of the Company have been prepared on a “going concern” basis, which means that the continuation of the Company is presumed even though events and conditions exist that, when considered in aggregate, raise substantial doubt about the Company’s ability to continue as a going concern because it is possible that the Company will be required to adversely change its current business plan or many be unable to meet its obligations as they become due with one year after the date of that these financial statements were issued.

Paramount expects to continue to incur losses as a result of costs and expenses related to maintaining its properties and general and administrative expenses. Since 2015, the Company has relied on equity financings, debt financings and sale of royalties to fund its operations and the Company expects to rely on these forms of financing to fund operations into the near future. The Company will also continue to identify ways to reduce its cash expenditures.

Paramount’s current business plan requires working capital to fund non-discretionary expenditures for its exploration and development activities on its mineral properties, mineral property holding costs and general and administrative expenses. It also requires approximately $4.3 million in capital to repay the 2019 convertible notes which become due in September 2023.

We anticipate our twelve-month cash expenditures for our fiscal year ending June 30, 2023 to be as follows:

$3.3 million on corporate, land claim maintenance and general expenses

For discretionary exploration and development, subject to available cash on hand and additional share issuances, we are budgeting the following amounts:

$3.0 million on the Grassy Mountain Project state and federal permitting activities

$0.25 million on the Sleeper Gold Project

$0.8 million on the Bald Peak exploration programs

For the planned reclamation activities required by state and federal regulators at Sleeper, the Company expects that these expenditures will be reimbursed by insurance proceeds. For any interest that accrues and is owing on the outstanding convertible debt, the Company expects to elect to pay the semi-annual interest payment in shares of its Common Stock.

Subsequent to October 13, 2022, the Company expects to fund operations as follows:

Existing cash on hand and working capital.

The existing ATM with Cantor Fitzgerald & Co. and Canaccord Genuity LLC.

Other debt, equity financings and sale of royalties.

33

Historically, we have been successful in accessing capital through equity and debt financing arrangements or by the sale of royalties on its mineral properties, no assurance can be given that additional financing will be available to it in amounts sufficient to meet its needs, or on terms acceptable to the Company. In the event that we are unable to obtain additional capital or financing, our operations, exploration and development activities will be significantly adversely affected. The continuation of the Company as a going concern is dependent on having sufficient capital to maintain our operations and to repay the convertible notes which become due in September 2023. In considering our financing plans, our current working capital position and our ability to reduce operating expenses the Company believes there is substantial doubt about its ability to continue as a going concern twelve months after the date that our financial statements are issued.

Critical Accounting Policies and Estimates

Management considers the following policies to be most critical in understanding the judgments that are involved in preparing the Company’s consolidated financial statements and the uncertainties that could impact the results of operations, financial condition and cash flows. Our financial statements are affected by the accounting policies used and the estimates and assumptions made by management during their preparation. Management believes the Company’s critical accounting policies are those related to mineral property acquisition costs, exploration and development cost, stock-based compensation, derivative accounting and foreign currency translation.

Estimates

The Company prepares its consolidated financial statements and notes in conformity to United States Generally Accepted Accounting Principles (“U.S. GAAP”) and requires management to make estimates and assumptions that affect the reported amount of assets and liabilities and the reported amounts of revenue and expenses during the reporting period. On an ongoing basis, management evaluates these estimates, including those related the adequacy of the Company’s reclamation and environmental obligation, share based compensation, valuation of deferred tax assets and assessment of impairment of mineral properties. Management bases these estimates on historical experience and on various other assumptions that are believed to be reasonable under the circumstances, the results of which form the basis of making judgments about the carrying value of assets and liabilities that are not readily apparent from other sources. Actual results may differ from these estimates under different assumptions or conditions.

Mineral property acquisition costs

The Company capitalizes the cost of acquiring mineral properties and will amortize these costs over the useful life of a property following the commencement of production or expense these costs if it is determined that the mineral property has no future economic value or the properties are sold or abandoned. Costs include cash consideration and the fair market value of shares issued on the acquisition of mineral properties. Properties acquired under option agreements, whereby payments are made at the sole discretion of the Company, are recorded in the accounts of the specific mineral property at the time the payments are made.

The amounts recorded as mineral properties reflect actual costs incurred to acquire the properties and do not indicate any present or future value of economically recoverable reserves.

Exploration expenses

We record exploration expenses as incurred. When we determine that precious metal resource deposit can be economically and legally extracted or produced based on established proven and probable reserves, further exploration expenses related to such reserves incurred after such a determination will be capitalized. To date, we have not established any proven or probable reserves and will continue to expense exploration costs as incurred.

Asset Retirement Obligation

The fair value of the Company’s asset retirement obligation (“ARO”) is measured by discounting the expected cash flows using a discount factor that reflects the credit-adjusted risk free rate of interest, while taking into account the inflation rate. The Company prepares estimates of the timing and amounts of expected cash flows and ongoing reclamation expenditures are charged against the ARO as incurred to the extent they relate to the ARO. Significant judgments and estimates are made when estimating the fair value of ARO.

Stock Based Compensation

For stock option grants with market conditions that affect vesting, the Company uses a lattice approach incorporating a Monte Carlo simulation to value stock options granted.

Option awards are generally granted with an exercise price equal to the market price of Paramount’s stock at the date of grant and have contractual lives of 5 years. To better align the interests of its key executives, employee and directors with those of its shareholders a significant portion of those share option awards will vest contingent upon meeting certain stock price appreciation performance goals and other performance conditions. Option and share awards provide for accelerated vesting if there is a change in control (as defined in the employee share option plan). For the year ended June 30, 2022, the Company did not grant any stock

34

options. For the year ended June 30, 2021, the Company used the Black-Scholes option valuation model to value stock options granted. The Black-Scholes option valuation model was developed for use in estimating the fair value of traded options that have no vesting restrictions and are fully transferable. The model requires management to make estimates which are subjective and may not be representative of actual results. Changes in assumptions can materially affect estimates of fair values. For purposes of the calculation, the following assumptions were used for the fiscal years ended June 30, 2022 and 2021:

WA Risk free interest rate N/A .22%

WA Expected dividend yield N/A 0%

WA Expected stock price volatility N/A 60%

WA Expected life of options N/A 5 years

Off-Balance Sheet Arrangements

We are not currently a party to, or otherwise involved with, any off-balance sheet arrangements that have or are reasonably likely to have a current or future material effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, or capital resources.

Item 7A. Quantitative and Qualitative Disclosures About Market Risk.

Foreign Currency Exchange Rate Risk

The Company holds cash balances in both U.S. and Canadian dollars. We transact most of our business in U.S. dollars. We do not manage our foreign currency exchange rate risk through the use of financial or derivative instruments, forward contracts or hedging activities.

In general, the strengthening of the U.S. dollar will positively impact our expenses transacted in Canadian dollars. Conversely, any weakening of the U.S dollar will increase our expenses transacted in Canadian dollars. We do not believe that any weakening of the U.S. dollar as compared to the Canadian dollar will have an adverse material effect on our operations.

Interest Rate Risk

The Company’s investment policy for its cash and cash equivalents is focused on the preservation of capital and supporting the liquidity requirements of the Company. The Company’s interest earned on its cash balances is impacted on the fluctuations of U.S. interest rates. We do not use interest rate derivative instruments to manage exposure to interest rate changes. We do not believe that interest rate fluctuations will have any material effect on our operations.

Item 8. Financial Statements and Supplementary Data.

Our financial statements, accompanying notes and Report of Independent Registered Public Accounting Firm are included in this Annual Report on Form 10-K beginning on page F-1, which are incorporated in this Item 8 by reference.

35

Item 9. Changes in and Disagreements with Accountants on Accounting and Financial Disclosure.

Resignation of Previous Independent Registered Public Accounting Firm

On July 25, 2022, MNP LLP (“MNP”) resigned its positions as the independent registered public accounting firm of the Company.

MNP’s reports on the Company’s consolidated financial statements as of and for the fiscal years ended June 30, 2021 and 2020 did not contain any adverse opinion or a disclaimer of opinion, nor were they qualified or modified as to uncertainty, audit scope or accounting principles.

During the Company’s two most recent fiscal years ended June 30, 2021 and 2020 and during the period from July 1, 2021 through July 25, 2022, the Company has not had any disagreement with MNP on any matter of accounting principles or practices, financial statement disclosure or auditing scope or procedures, which disagreements, if not resolved to MNP’s satisfaction, would have caused MNP to make reference to the subject matter of disagreement in their reports on the Company’s consolidated financial statements. In addition, during such periods, there were no “reportable events” as that term is defined in Item 304(a)(1)(v) of Regulation S-K.

Engagement of New Independent Registered Public Accounting Firm

On July 25, 2022, the Company engaged Moss Adams LLP (“Moss Adams”) as the Company’s independent registered public accounting firm for the fiscal year ending June 30, 2022. During the years ended June 30, 2021 and 2020 and the subsequent interim periods through July 25, 2022, neither the Company nor anyone acting on its behalf consulted with Moss Adams regarding either: (i) the application of accounting principles to a specified transaction, either completed or proposed, or the type of audit opinion that might be rendered on the Company’s financial statements, and neither a written report nor oral advice was provided to the Company that Moss Adams concluded was an important factor considered by the Company in reaching a decision as to the accounting, auditing or financial reporting issue or (ii) any matter that was either the subject of a disagreement (as that term is defined in Item 304(a)(1)(iv) of Regulation S-K and the related instructions to Item 304 of Regulation S-K) or a reportable event (as that term is defined in Item 304(a)(1)(v) of Regulation S-K).

Item 9A. Controls and Procedures.

DISCLOSURE CONTROLS AND PROCEDURES

Under the supervision and with the participation of our management, including the Principal Executive Officer and Chief Financial Officer, we conducted an evaluation of the effectiveness of our disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) as of the end of the period covered by this report. Based on this evaluation, our Principal Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures were effective as of such date. Our disclosure controls and procedures are designed to ensure that information required to be disclosed in the reports we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms and that such information is accumulated and communicated to management, including the Principal Executive Officer and Chief Financial Officer, to allow timely decisions regarding required disclosure.

MANAGEMENT'S REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

Our management is responsible for establishing and maintaining adequate internal control over financial reporting. Internal control over financial reporting is defined in Rule 13a-15(f) or 15d-15(f) promulgated under the Securities Exchange Act of 1934 as a process designed by, or under then supervision of, the company’s principal executive and principal financial officers and effected by the company’s board of directors, management and other personnel, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles and includes those policies and procedures that:

• Pertain to the maintenance of records that in reasonable detail accurately and fairly reflect the transactions and dispositions of the assets of the company;

• Provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and

• Provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of the company’s assets that could have a material effect on the financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate. Our management assessed the

36

effectiveness of our internal control over financial reporting as of June 30, 2022. In making this assessment, the Company’s management used the criteria set forth by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) in Internal Control-Integrated 2013 Framework. Based on this assessment, our management concluded that, as of June 30, 2022, our internal control over financial reporting is effective based on those criteria.

Because we are a smaller reporting company, our independent registered public accounting firm will not be required to attest to the effectiveness of our internal control over financial reporting for so long as we are a smaller reporting company.

CHANGES IN INTERNAL CONTROL OVER FINANCIAL REPORTING

There were no changes to our internal control over financial reporting that occurred during the year ended June 30, 2022 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

Item 9B. Other Information.

None.

Item 9C. Disclosure Regarding Foreign Jurisdictions that Prevent Inspections.

Not applicable.

37

PART III

Item 10. Directors, Executive Officers and Corporate Governance.

The information required by Items 401, 405, 406, 407(c)(3), (d)(4) and (d)(5) of Regulation S-K will be contained in the Company’s 2022 Proxy Statement, to be filed with the SEC 120 days following the end of the Company’s fiscal year ended June 30, 2022 (the “2022 Proxy Statement”) and is hereby incorporated by reference thereto.

Item 11. Executive Compensation.

The information required by Item 402 and paragraph (e)(4) and (e)(5) of Item 407 of Regulation S-K will be contained in the Company’s 2021 Proxy Statement, to be filed with the SEC 120 days following the end of the Company’s fiscal year ended June 30, 2022 and is hereby incorporated by reference thereto.

Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters.

The information required by Item 201(d) and Item 403 of Regulation S-K will be contained in the Company’s 2022 Proxy Statement, to be filed with the SEC 120 days following the end of the Company’s fiscal year ended June 30, 2022 and is hereby incorporated by reference thereto.

Item 13. Certain Relationships and Related Transactions, and Director Independence.

The information required by Item 404 and Item 407(a) of Regulation S-K will be contained in the Company’s 2022 Proxy Statement, to be filed with the SEC 120 days following the end of the Company’s fiscal year ended June 30, 2022 and is hereby incorporated by reference thereto.

Item 14. Principal Accounting Fees and Services.

The information required by Item 9(e) of Schedule 14A will be filed in the Company’s 2022 Proxy Statement, to be filed with the SEC within 120 days following the end of the Company’s fiscal year ended June 30, 2022 and is hereby incorporated by reference thereto. The Company's independent registered public accounting firm is Moss Adams LLP, Denver, CO, PCAOB ID: 659.

38

PART IV

Item 15. Exhibits, Financial Statement Schedules.

(a)

The following report and financial statements are filed together with this Annual Report:

(1)

Audited Consolidated Financial Statements of Paramount Gold Nevada Corp.

Included in Part II of this report:

Reports of Independent Registered Public Accounting Firm

Consolidated Balance Sheets as of June 30, 2022 and 2021

Consolidated Statements of Operations for the years ended June 30, 2022 and 2021

Consolidated Statements of Cash Flows for the years ended June 30, 2022 and 2021

Consolidated Statements of Stockholders’ Equity for the years ended June 30, 2022 and 2021

Notes to Consolidated Financial Statements

39

(b)

Index to Exhibits

ExhibitNumber Description

3.1 Certificate of Amended and Restated Articles of Incorporation.2

3.2 Amended and Restated Bylaws.2

10.1 2015 Stock Incentive and Equity Compensation Plan.2

21.1* List of subsidiaries.

23.1* Consent of Moss Adams LLP, Independent Registered Public Accounting Firm

23.2* Consent of MNP LLP

96.2* Technical Report Summary for the Sleeper Gold Project, Nevada, U.S.A.

40

101.INS Inline XBRL Instance Document

101.SCH Inline XBRL Taxonomy Extension Schema Document

101.CAL Inline XBRL Taxonomy Extension Calculation Linkbase Document

101.DEF Inline XBRL Taxonomy Extension Definition Linkbase Document

101.LAB Inline XBRL Taxonomy Extension Label Linkbase Document

101.PRE Inline XBRL Taxonomy Extension Presentation Linkbase Document

* Filed herewith.

1 Incorporated by reference to the exhibit filed in the Registrant’s Amendment No. 1 to Registration Statement on Form S-1 filed on February 23, 2015.

2 Incorporated by reference to the exhibit filed in the Registrant’s Form 10-Q filed on May 22, 2015.

3 Incorporated by reference to the exhibit filed in the Registrant’s Amendment No. 3 to Registration Statement on Form S-1 filed on April 2, 2015.

41

SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, as amended, the Registrant has duly caused this Report to be signed on its behalf by the undersigned, thereunto duly authorized.

Paramount Gold Nevada Corp.

Date: October 13, 2022 By: /s/ Rachel Goldman

Rachel Goldman

(Director and CEO)

Pursuant to the requirements of the Securities Exchange Act of 1934, as amended, this Report has been signed below by the following persons on behalf of the Registrant in the capacities and on the dates indicated.

Name Title Date

Rachel Goldman

Carlo Buffone

Glen Van Treek

/s/ Rudi Fronk Director October 13, 2022

Rudi Fronk

/s/ John Carden Director October 13, 2022

John Carden

/s/ Eliseo Gonzalez-Urien Director October 13, 2022

Eliseo Gonzalez-Urien

/s/ Christopher Reynolds Director October 13, 2022

Christopher Reynolds

/s/ Pierre Pelletier Director October 13, 2022

Source: SEC EDGAR (public domain) · 10-K for the period ended 2022-06-30, filed 2022-10-13 · accession 0000950170-22-019552

Filing HTML rendered to line-structured narrative text by the shipped reducer (datafeeds.edgar_fulltext.visible_text, keep_table_headers=True): scripts and inline-XBRL headers are dropped, and table content is reduced to its short label cells — numeric table data is not rendered and is therefore not counted. The same rendering is used for every year, so a year-over-year comparison is like for like.

The text is our rendering of the filing, not a facsimile: original pagination, typography and tables are not reproduced, and the numbers live in the financial statements (FA).

The outline locates item HEADINGS in this document. Only Items 1A and 7 have certified boundaries elsewhere in the terminal (the redline and the narrative-overlap number); every span here runs from one heading found to the next heading found.

How the outline was chosen. It is the longest chain of item headings that runs forward through both the document and the standard item order: 21 headings are on that chain and 16 further heading-shaped lines are not — the table-of-contents echo of every item, cross-references and exhibit-list mentions. Each entry's length is measured from its heading to the next heading on the chain.