Skip to content
KStart free
AI InfrastructureDefenseQuantumAll studies →

OKLO US Equity

Oklo Inc.Utilities · Electric Services · CIK 1849056 · FY ends Dec 31
$42.09
+0.43 (+1.03%)
USD · as of 2026-08-21 · marketstack

OKLO · 10-K · period ended 2025-12-31

← all OKLO documents
filed 2026-03-17 · EDGAR original ↗

Our rendering of the filing — original pagination and typography are not reproduced, and tables are reduced to their short label cells (the figures live on FA). Nothing is summarized: every line below is the filing's own text.

blocks 1419 of 1,322344k characters rendered

oklo-20251231

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 10-K

For the fiscal year ended December 31, 2025

OR

For the transition period from to

Commission file number 001-40583

Oklo Inc.

(Exact name of registrant as specified in its charter)

(Address of principal executive offices) (Zip Code)

(Registrant's telephone number, including area code)

Securities registered pursuant to Section 12(b) of the Act:

Title of each class Trading Symbol(s) Name of each exchange on which registered

Class A common stock, par value $0.0001 per share OKLO New York Stock Exchange

Securities registered pursuant to Section 12(g) of the Act: None

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes oNox

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes oNox

Indicate by check mark whether the registrant: (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yesx No o

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yesx No o

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Large accelerated filer o Accelerated filer o

Non-accelerated filer x Smaller reporting company x

Emerging growth company x

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. o

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. o

If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements. o

Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b). o

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes o No x

The aggregate market value of the voting and non-voting stock held by non-affiliates of the registrant, as of June 30, 2025, the last business day of the registrant’s most recently completed second fiscal quarter, was approximately $7 billion. Solely for purposes of this disclosure, shares of common stock held by executive officers and directors of the Registrant as of such date have been excluded because such persons may be deemed to be affiliates. This determination of executive officers and directors as affiliates is not necessarily a conclusive determination for any other purposes.

The registrant had 173,568,788 shares of common stock outstanding as of March 13, 2026.

DOCUMENTS INCORPORATED BY REFERENCE

Portions of the registrant’s definitive proxy statement for its 2026 Annual Meeting of Stockholders (the “Proxy Statement”), to be filed within 120 days after the end of the fiscal year covered by this Annual Report on Form 10-K, are incorporated by reference in Part III. Except with respect to information specifically incorporated by reference in this Annual Report, the Proxy Statement shall not be deemed to be filed as part hereof.

TABLE OF CONTENTS

Page

SPECIAL NOTE REGARDING FORWARD-LOOKING STATEMENTS 3

PART I.

Item 1. Business 5

Item 1A. Risk Factors 13

Item 1B. Unresolved Staff Comments 45

Item 1C. Cybersecurity 45

Item 2. Properties 47

Item 3. Legal Proceedings 47

Item 4. Mine Safety Disclosures 47

PART II.

Item 6. Reserved 49

Item 7A. Quantitative and Qualitative Disclosures About Market Risk 54

Item 8. Financial Statements and Supplementary Data 54

Item 9A. Controls and Procedures 54

Item 9B. Other Information 55

Item 9C. Disclosure Regarding Foreign Jurisdictions that Prevent Inspections 56

PART III.

Item 10. Directors, Executive Officers and Corporate Governance 57

Item 11. Executive Compensation 57

Item 14. Principal Accountant Fees and Services 57

SIGNATURES

PART IV.

Item 15. Exhibits and Financial Statement Schedules 58

2

Table of Contents

SPECIAL NOTE REGARDING FORWARD-LOOKING STATEMENTS

This Annual Report on Form 10-K (this “Annual Report”) of Oklo Inc. (“Oklo,” the “Company,” “we,” “our,” and “us”) contains certain forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”). Forward-looking statements relate to future events or future performance and include, without limitation, statements concerning our business strategy, future revenues, market growth, capital requirements, product introductions, expansion plans and the adequacy of our funding. Other statements contained in this Annual Report that are not historical facts are also forward-looking statements. We have tried, wherever possible, to identify forward-looking statements by terminology such as “may,” “will,” “could,” “should,” “expects,” “anticipates,” “intends,” “plans,” “believes,” “seeks,” “estimates,” “continue,” “might,” “possible,” “potential,” “predict,” “project,” “goal,” “would,” “commit” and other stylistic variants denoting forward-looking statements.

We caution investors that any forward-looking statements presented in this Annual Report, or that we may make orally or in writing from time to time, are based on information currently available, as well as our beliefs and assumptions. The actual outcome related to forward-looking statements will be affected by known and unknown risks, trends, uncertainties, and factors that are beyond our control or ability to predict. Although we believe that our assumptions are reasonable, they are not guarantees of future performance, and some will inevitably prove to be incorrect. As a result, our actual future results can be expected to differ from our expectations, and those differences may be material. Accordingly, investors should use caution in relying on forward-looking statements, which are based only on known results and trends at the time they are made, to anticipate future results or trends.

The forward-looking statements contained in this Annual Report are based on current expectations and beliefs concerning future developments and their potential effects on us. There can be no assurance that future developments affecting us will be those that we have anticipated. Forward-looking statements, by their nature, are subject to a variety of assumptions, risks, and uncertainties that could cause actual results or performance to differ materially from the results projected. Many of these risks and uncertainties cannot be controlled by us. Factors that may cause our actual decisions or results to differ materially from those contemplated by these forward-looking statements include, among other things: risks related to the development and deployment of Oklo’s powerhouses, fuel fabrication and fuel recycling facilities, and radioisotope production activities; the risk that Oklo is pursuing an emerging market with no commercial project operating and regulatory uncertainties; risks related to acquisitions, divestitures, or joint ventures we may engage in; the need for financing to construct plants, which remain subject to market, financial, political, and legal conditions; risks related to an inability to raise additional capital to support our business and sustain our growth on favorable terms; the effects of competition; risks related to accessing high-assay low-enriched uranium (“HALEU”), plutonium, and other fuels (including recycled fuels) at acceptable costs and under acceptable timelines; risks related to our supply chain; risks related to power purchase agreements or other commercial agreements; risks related to human capital; risks related to our intellectual property; risks related to cybersecurity and data privacy; changes in applicable laws or regulations, including tariffs; the outcome of any government and regulatory proceedings and investigations and inquiries; those described in Part I, “Item 1A. Risk Factors” and elsewhere in this Annual Report; and those described from time to time in our future reports filed with the U.S. Securities and Exchange Commission (the “SEC”). Should one or more of these risks or uncertainties materialize, or should any of our assumptions prove incorrect, actual results may vary in material respects from those projected in these forward-looking statements.

This Annual Report and all subsequent written and oral forward-looking statements attributable to us or any person acting on our behalf are expressly qualified in their entirety by the cautionary statements contained or referred to in this section. We undertake no obligation to update or revise any forward-looking statements to reflect events or circumstances after the date of this Annual Report, except as may be required by law.

3

Table of Contents

EXPLANATORY NOTE

Based on the value of the non-affiliate float for our common stock as of June 30, 2025, we ceased to be a “smaller reporting company” as of December 31, 2025. However, we are complying with certain scaled disclosure requirements available to smaller reporting companies in this Annual Report (including information incorporated herein by reference to our Proxy Statement for our 2026 Annual Meeting of Stockholders to be filed with the SEC not later than 120 days after December 31, 2025), permitted under SEC rules because we were a smaller reporting company in the fiscal year ended December 31, 2025. Commencing with our Quarterly Report on Form 10-Q for the quarter ending March 31, 2026, we will no longer be permitted to report under the smaller reporting company scaled disclosure regime for our periodic reports.

4

Table of Contents

Part I

Item 1. Business

Overview

We founded Oklo in 2013 with the goal of revolutionizing the energy landscape by developing clean, reliable, affordable energy solutions at scale. According to the International Energy Agency, global electricity production is expected to increase over 75% by 2050 driven by electrification of buildings, transportation, and industry; increased use of air conditioning in the developing world; and increased consumption from data centers and cloud services. Our business addresses this demand by producing electricity and heat from our Aurora powerhouses which can run on fresh, recycled, or down-blended nuclear fuel. We are also commercializing nuclear fuel recycling technology that can convert used nuclear fuel into usable fuel for our powerhouses and those of others.

The fast fission reactor technology we are commercializing was demonstrated by the Experimental Breeder Reactor-II (“EBR-II”), a fast fission plant that was operated by the U.S. government for 30 years. Our powerhouse product line, called the “Aurora,” builds on this legacy of proven and demonstrated technology. Our Aurora powerhouse product line is designed with embedded safety features, to be able to run on fresh, recycled, or down-blended fuel, and to produce 15-75 megawatts electric (“MWe”) and has the potential to expand powerhouse size to produce 100 MWe and higher. Because the Aurora powerhouses are designed to operate by harnessing the power of high-energy, or “fast,” neutrons, they are expected to be able to tap into the vast energy reserves remaining in existing used nuclear fuel from conventional nuclear power generation facilities, which only use approximately 5% of the energy content stored in nuclear fuel before needing to refuel. The U.S. nuclear power industry has produced approximately 20% of U.S. electricity over the last 30 years and generated over 90,000 metric tons of used nuclear fuel. We estimate that the existing energy reserves contained in the used nuclear fuel in the U.S. that are made accessible through our fast fission reactor technology are equivalent to approximately 1.2 trillion barrels of oil equivalent (BOE), nearly five times the oil reserves of Saudi Arabia. Fission is an energy-dense process, producing approximately 50 million times more energy than combustion.

We have achieved several significant deployment and regulatory milestones for our first Aurora powerhouse. Notably, we secured a site use permit from the U.S. Department of Energy (“DOE”) for the Idaho National Laboratory (“INL”) site and received a fuel award of five metric tons of HALEU produced from recovered uranium from previously irradiated EBR-II fuel from INL for a commercial Aurora powerhouse in Idaho. Related to the construction and operating licensing process of the Aurora powerhouse, we have also submitted the Nuclear Safety Design Agreement and the Preliminary Documented Safety Analysis to the DOE for the Aurora powerhouse at INL ("Aurora-INL"), which represent the first two of five steps in the DOE regulatory pathway for nuclear facility operation. Early in 2026, the DOE approved the Nuclear Safety Design Agreement. Related to our first Aurora powerhouse, the DOE and the INL have completed the environmental compliance process addressing the DOE requirements for site characterization. This process, resulting in an Environmental Compliance Permit, marks a milestone as we advance our plans to deliver the first commercial advanced fission power plant in the U.S.

On May 9, 2024, we consummated a business combination pursuant to an Agreement and Plan of Merger and Reorganization dated July 11, 2023 (as amended, modified, supplemented, or waived, the “Merger Agreement”), by and between AltC Acquisition Corp. (“AltC”) and Oklo Technologies, Inc. (the “Recapitalization”). Prior to the Recapitalization, Oklo Technologies, Inc. was formerly known as Oklo Inc. (referred to herein as “Legacy Oklo”). Upon consummation of the Recapitalization, AltC changed its name to Oklo Inc. See Note 3—Business Combinations—Recapitalization in our accompanying consolidated financial statements for additional information.

On September 25, 2024, we announced the finalization of a Memorandum of Agreement (“MOA”) with the DOE Idaho Operations Office. This MOA grants us access to conduct site investigations at the identified preferred site in Idaho, marking a key step toward the next phase of site preparation and construction.

On February 28, 2025, we acquired Atomic Alchemy Inc. ("Atomic Alchemy"), a radioisotope business located in the U.S. We paid some of Atomic Alchemy’s investors cash of approximately $1.0 million and exchanged 820,840 shares of our Class A common stock, par value $0.0001 per share (“common stock”), with a price per share of $33.39 at the acquisition date, representing approximately $27.4 million of stock consideration. In addition, we issued 274,339 shares of our common stock, subject to certain lock-up provisions, vesting conditions, and substantial risk of forfeiture, representing post-combination services, pursuant to an employment agreement and vesting agreement. The purchase consideration was paid in exchange for all of Atomic Alchemy's outstanding common stock. See Note 3—Business Combinations—Atomic Alchemy in our accompanying consolidated financial statements for additional information.

In December 2025, we purchased land in southern Ohio that we have announced we intend to use to support Aurora powerhouses, including support of a planned 1.2 gigawatt power campus in Pike County, Ohio in connection with a

5

Table of Contents

prepayment agreement with Meta Platforms, Inc. (as further described under —Recent Developments—Prepayment Agreement). Furthermore, we have been tentatively selected to provide electricity and heat to Eielson Air Force Base outside of Fairbanks, Alaska. Our robust pipeline of potential customer engagements spans a number of industries. For example, we have signed non-binding letters of intent with Equinix, Inc. ("Equinix"), Diamondback E&P LLC ("Diamondback Energy"), and Prometheus Hyperscale (formerly Wyoming Hyperscale White Box LLC) ("Prometheus Hyperscale"). In December 2024, we signed a 12 gigawatt (GW) Master Power Agreement with Switch, Ltd. ("Switch"), one of the largest corporate power purchase agreements ("PPA") in history. We are exploring opportunities with the Tennessee Valley Authority (“TVA”) to recycle the utility’s used fuel at a new facility and to evaluate potential power sales from future Oklo powerhouses in the region to TVA. The market interest in our solutions exemplifies the potential demand for the size range of the Aurora powerhouse product line and our differentiated business model. We have an ambitious target of deploying our first powerhouse in 2028 amidst a range of supply chain, construction, macroeconomic, and design complexities.

In addition to deployment milestones, we have made significant progress in our nuclear fuel recycling and fuel fabrication efforts and in securing fuel. The DOE has reviewed and approved our Safety Design Strategy, Conceptual Safety Design Report, Nuclear Safety Design Agreement, and Preliminary Documented Safety Analysis for the Aurora Fuel Fabrication Facility at INL—all key milestones as we advance toward our goal of utilizing recovered nuclear material to fuel our first commercial Aurora powerhouse. Our Aurora Fuel Fabrication Facility was also selected under the DOE Fuel Line Pilot Program ("FLPP"). The FLPP allows for acceleration of permitting, construction, and operation of nuclear fuel production lines for research, development, and demonstration purposes, supporting a fast-track approach to commercial licensing. In addition, we successfully completed the first end-to-end demonstration of the key stages of our advanced fuel recycling process, in collaboration with Argonne and INL. This marks a significant step forward in scaling up fuel recycling capabilities and deploying a commercial-scale recycling facility. In September 2025, we announced plans to design, build, and operate a fuel recycling facility in Tennessee as the first phase of an advanced fuel center (the "Advanced Fuel Center") to recycle used nuclear fuel into fuel for fast reactors, including our Aurora powerhouse line. The facility, which includes a roadmap of up to $1.68 billion in investment, will be the first of its kind in the U.S. and we estimate that it has the potential to create more than 800 high-quality jobs. We have completed a licensing project plan for the fuel recycling facility with the NRC and are currently in pre-application engagement with the regulator’s staff.

In December 2025, we completed a fast-spectrum plutonium criticality experiment in collaboration with Los Alamos National Laboratory under the DOE’s reactor pilot program ("RPP"). During the experiment, the system was taken critical and operated through controlled power maneuvers and transients, enabling the collection of operating data related to reactivity feedback and power response. This work places Oklo among a limited number of organizations with modern, experimentally validated operating data for plutonium-fueled fast-spectrum reactor systems, providing empirical validation of key safety and performance characteristics. Plutonium represents a potential near-term fuel option within a DOE-managed framework that complements Oklo’s use of HALEU and longer-term fuel recycling strategy, providing additional flexibility as fuel markets evolve and supporting continued progress toward deployment in alignment with U.S. national priorities.

Fuel is a significant input to enable us to build and operate our powerhouses at scale and generate expected returns. The cost environment for various sources of fuel (including HALEU) has increased significantly in recent years, which is why we are implementing a diversified fuel strategy. Tariffs, supply chain constraints, inflation, and evolving sanctions have impacted the market dynamics around fuel costs and availability. In particular, beyond developing recycling and fuel fabrication facilities, we are evaluating the use of alternative fuel materials, including plutonium currently designated for the DOE’s dilute-and-dispose programs, that may be made available by the U.S. government for use in advanced reactor applications. Any potential use of such materials would be subject to DOE authorization, applicable regulatory approvals, applicable cost recovery requirements, and programmatic determinations regarding material availability. By developing a diverse set of sources of fuel (including plutonium) with a wide range of costs, levels of regulatory oversight, and operational complexities, and having multiple options for fueling our powerhouses, we believe we will better navigate the shifting fuel landscape.

Our Business Model

We are developing next-generation fast fission power plants called “powerhouses.” In our differentiated build, own, and operate business model, we plan to sell power in the forms of electricity and heat directly to customers, which we believe can allow for fast-tracked customer adoption. In addition, we are a leader in the nuclear industry in the development of advanced fuel recycling, which can unlock the energy content of used nuclear fuel; we also believe this aspect of our business can complement our market position by vertically integrating and securing our fuel supply chain. In addition to our powerhouse and fuel recycling development, we are progressing construction of a pilot scale fuel fabrication facility and building plans for a first‐of‐a‐kind new commercial scale fuel fabrication facility. Through our wholly owned subsidiary, Atomic Alchemy, we are combining our growing expertise in building and operating powerhouses and nuclear

6

Table of Contents

fuel recycling with Atomic Alchemy’s expertise in radioisotope production. Together, we aim to meet the increasing demands for radioisotopes in medical, energy, industry, defense, and artificial intelligence applications.

Our primary product will be the energy produced from our Aurora powerhouses once operational. Our primary business model is to sell the energy to customers through PPAs, as opposed to selling our powerhouse designs. This business model allows for recurring revenue, provides the opportunity to capture profitability of an Aurora powerhouse upon improved operational efficiency, and enables project financing structures. This business model sets us apart from the traditional nuclear power industry, which typically sells reactor design and engineering services to large scale utility customers and not power. Selling power through PPAs is a common practice within the renewable energy and utility sectors and indicates that this business model could be feasible for power plants within the size range targeted by our Aurora product line (i.e., 15 MWe-75 MWe, and ranging upward to potential sizes of 100 MWe and higher).

The traditional nuclear power industry comprises developers of large (ranging from approximately 600 MWe to over 1,000 MWe) light water reactors that sell or license their reactor designs to large utilities that then construct and operate the nuclear power plant. The developer’s focus on regulatory approval of the design may lock in certain lifecycle regulatory costs that are realized by the owner-operator during construction and operations. As a result, lifecycle cost implications are generally not addressed cohesively between the developer and the owner-operator, and the regulatory strategy does not holistically implement the lifecycle benefits of the technology’s inherent safety characteristics. The advanced fission industry has largely followed the historical blueprint of developers seeking design certifications or approvals, and utilities bearing the future burden of licensing for construction and operations. While there are a number of advanced reactor designers developing smaller sized reactors than those traditionally used in the nuclear power industry, many of these developers are generally pursuing regulatory approval of groupings of these smaller reactors as part of singular larger plants, sizes of 200 MWe and up to 1,000 MWe.

In contrast, we plan to be the designer, builder, owner, and operator of our powerhouses and plan to focus on small-scale powerhouses (15 MWe-75 MWe, and potentially 100 MWe and higher). As a result, we have an incentive to relentlessly focus on the full lifecycle of a safe, well-maintained, cost-effective powerhouse and holistically implement the benefits of an inherently safe, simple design. We expect this approach to enable us to reduce and manage lifecycle regulatory and operating costs in an integrated fashion over time, as opposed to the historical model used in the nuclear power industry, which divides the incentives and responsibilities between the developer and the utility.

Additionally, this modular and scalable approach enables us to better deal with the inherent uncertainties, costs, and inefficiencies of the many service providers, manufacturers, fuel providers, and other third parties that we will rely on to build our powerhouses. While we expect that individual powerhouses may, and our first few powerhouses likely will, experience challenges that require us to manage unexpected costs and possible construction delays, our business model allows us to take the learnings from constructing those powerhouses and make improvements with future projects.

In particular, we expect the construction of our first powerhouses, such as the powerhouse at INL, to include additional, unique, one-time costs as compared to the costs expected for future powerhouse projects. Such additional costs will result, in part, from design decisions to include enhanced fuel and core testing capabilities, which will be more costly and complex to design and build. These complexities will also increase the possibility of construction delays. We expect future powerhouses to benefit from substantial cost reductions as compared to the deployment of our first few reactors, both because subsequent reactors will not require these enhanced testing capabilities, and because we expect the testing capabilities to help us identify opportunities to reduce our costs and improve our operational efficiency over time.

Selling electricity under PPAs follows an established revenue model in global power markets. While this model is more typically used for renewable energy solutions, we believe it is a compelling model for us because of the relatively small size and the lower expected capital costs of our powerhouses, when compared with other nuclear power plants. In addition, our model is designed to generate recurring revenue in a way that the traditional licensing model does not. Our powerhouses could be operating cash flow positive from the first year of operation due to our anticipated favorable unit economics. We also believe this approach will drive unit growth and allow us to ultimately launch higher output versions of our powerhouses. As our technology matures, we intend to offer customers flexibility in business model and deployment solutions to meet their needs, providing us with the largest target customer base possible. Given our growth stage, we continue to develop and evaluate our overall cost and potential pricing structure as we evaluate our unit economics, which we expect to be subject to market and extrinsic forces such as the impact of construction costs as a result of tariffs, supply chain pressures, and other macroeconomic factors.

7

Table of Contents

In addition to selling power under PPAs, we are taking steps to enhance our mission with our fuel fabrication projects and advanced nuclear fuel recycling technology. We are actively developing nuclear fuel recycling capabilities with the goal of deploying a commercial-scale fuel recycling facility in the U.S. by the early 2030s. Used nuclear fuel still contains approximately 95% of its energy content, and it has been estimated there is enough energy in the form of used nuclear fuel in the U.S. to power the expected electrical needs in the U.S. for 100 years with fast fission power plants. According to the DOE, more than 90,000 metric tons of used nuclear fuel have been generated since 1950, and an additional 2,000 metric tons are generated every year. Currently, other countries recycle used nuclear fuel, but the U.S. does not, and hence there is an enormous opportunity to do so.

Our reactors are specifically designed to run on fresh, recycled, or down-blended nuclear fuel, and nuclear fuel recycling and down-blending federal government materials could provide future margin uplift for our power sales business, as well as the potential for new revenue streams. We continue to evaluate the overall cost and timeline to be able to receive any potential benefit from this embedded opportunity. We are also evaluating the potential use of alternative fuel materials, including plutonium designated for dilute-and-dispose programs, that could be made available by the U.S. government for use in advanced reactors. This initiative complements our recycling work and supports the development of a resilient and diversified domestic fuel supply chain.

Recent Developments

ATM Program

On December 4, 2025, we entered into an equity distribution agreement with sales agents pursuant to which we may offer and sell, at our sole discretion, shares of our common stock up to an aggregate gross sales price of $1,500.0 million in an "at-the-market" ("ATM") offering (the "December ATM Program"). From December 4, 2025 to December 31, 2025, we sold 3,397,872 shares of our common stock through the sales agents at an average price of $88.29 per share, resulting in aggregate gross proceeds of $300.0 million. The December ATM Program was closed on January 28, 2026. See Note 16 —Subsequent Events for additional details.

Prepayment Agreement

On January 5, 2026, we entered into a prepayment agreement (the "Prepayment Agreement") with Meta Platforms, Inc. (“Meta”) that advances plans to develop a 1.2 gigawatt power campus in Pike County, Ohio, to support Meta’s data centers. The Prepayment Agreement provides a mechanism for Meta to prepay for power and provide funding to advance powerhouse deployment. Pursuant to the Prepayment Agreement, the Company will use Meta's funding to secure nuclear fuel, advancing the first phase of the project.

Radioisotope Pilot Facility Other Transaction Agreement

On January 7, 2026, we announced the execution of a DOE Other Transaction Agreement ("OTA") to support the design, construction, and operation of a radioisotope pilot plant (“Radioisotope Pilot Facility”) under the DOE RPP. The execution of the OTA marks the transition from project selection and planning into active execution under DOE authorization. Atomic Alchemy will use the Radioisotope Pilot Facility to aid in planning and execution of future commercial radioisotope production facilities and may be used for testing radioisotope production methods to further our capability to produce medical and research radioisotopes in the U.S., as well as furthering our research efforts and building capabilities for other projects in development.

Key Factors Affecting Our Performance

We believe that our future success and financial performance depend on a number of factors that present significant opportunities for our business, but also pose risks and challenges. As a result, we are subject to continuing risks and uncertainties. For additional information, see the section titled “Risk Factors” in Part I, Item 1A of this Annual Report.

Product Development Plan

We plan to leverage the next-generation fast fission powerhouses that we are developing in order to sell power to a variety of potential customers, including data centers, military and other government facilities, factories, industrial customers, off-grid and remote communities, commercial and institutional campuses, and utilities.

8

Table of Contents

Commercial deployment of any advanced fission power plant requires obtaining regulatory approvals for design, construction, and operation. Our long-term regulatory strategy has been focused on a custom combined license application. We became the first advanced fission company to submit a custom combined license application with the NRC in March 2020, which was denied without prejudice in 2022. We are currently working toward submitting an updated custom combined license application for NRC review.

In July 2025, we completed a Phase I pre-application readiness assessment with the NRC to evaluate the maturity of our siting and environmental approach and our overall readiness to submit those parts of the combined license application. The assessment concluded with no significant gaps identified that would hinder acceptance of the application, marking a key milestone in our licensing strategy. It is uncertain when, if at all, we will obtain NRC approvals for the design, construction, and operation of any of our powerhouses. Our financial condition, commercial plans, and results of operation are likely to be materially and adversely affected if we do not obtain such approvals or if this process takes significantly longer or costs more than we expect.

Alongside ongoing NRC progress, on August 13, 2025, Oklo and Atomic Alchemy were selected by the DOE for three of the eleven projects awarded under the newly established RPP. Oklo was selected for two projects, and Atomic Alchemy for one project. Among these, the Aurora–INL powerhouse was approved to proceed under DOE purview, granting access to the DOE authorization pathway—a regulatory framework that provides full authority to construct and operate the powerhouse while maintaining high safety standards. This designation supports deployment of the Aurora–INL powerhouse by streamlining federal review and providing a platform for demonstration of the Aurora powerhouse design to support future NRC licensing.

In August 2025, the NRC accepted for review our PDC topical report, which establishes a regulatory framework that defines the fundamental safety, reliability, and performance requirements to guide future reactor licensing and design activities. The NRC accepted our PDC topical report under an accelerated timeline and proposed an expedited review schedule of the report.

Additionally, we plan to be the designer, builder, owner, and operator of our powerhouses and plan to focus on small-scale powerhouses (15 MWe, 75 MWe, and potentially 100 MWe and higher designs). As a result, we have an incentive to relentlessly focus on the full lifecycle of a safe, well-maintained, cost-effective powerhouse and holistically implement the benefits of an inherently safe, simple design. We expect this approach to enable us to reduce and manage lifecycle regulatory and operating costs in an integrated fashion, as opposed to the historical model used in the nuclear power industry, which divides the incentives and responsibilities between the developer and the utility. However, this model exposes us directly to the costs of building, owning, and operating our powerhouses. Our cost projections and timelines are heavily dependent upon fuel, raw materials (such as steel), equipment, and technical and construction service providers (such as engineering, procurement, and construction firms). The global supply chain on which we will rely (including for HALEU), has been significantly impacted in recent years by inflation, instability in the banking sector, war and other hostilities, and other economic uncertainties, resulting in potential significant delays and cost fluctuations. Similar developments in the future may impact our performance from both a deployment and cost perspective. Our initial assets in operation will represent the first deployment of our Aurora design and, as such, will be subject to risk around both cost and time to associated with first-of-a-kind capital project delivery. In particular, we expect the construction of our first powerhouse at INL to include additional, unique costs as compared to the costs expected for future powerhouse projects. Such additional costs will result, in part, from design decisions to include enhanced fuel and core testing capabilities, which will be more costly and complex to design and build. We expect future powerhouses to benefit from substantial cost reductions as compared to our first reactor deployment.

Plan of Operations

To further our ambitious target of deploying our first powerhouse in 2028, amidst a range of supply chain, geopolitical, macroeconomic, and design complexities, we will engage or continue to engage in the following key initiatives:

•Progressing regulatory approval for powerhouse deployments with both the DOE and the NRC.

•Progressing regulatory pre-application related activities with the NRC for licensing of commercial fuel fabrication.

9

Table of Contents

•Continuing work and regulatory activities related to fuel recycling, such as pre-application regulatory alignment efforts with the NRC, and research and development, both independently and in conjunction with the DOE, focused on facility and process design for the Oklo fuel recycling facility.

•Working with INL on fuel manufacturing, including preparation of documentation for regulatory review, finalization of the facility design, and expected construction activities.

•Advancing partnerships related to fuel enrichment, fuel fabrication, and other key supply chain elements, as well as other procurement activities to expand our fuel sourcing supply chain.

•Advancing DOE authorization and related design activities for the Aurora Fuel Fabrication Facility at INL, which is intended to fabricate fuel for Oklo’s first commercial-scale Aurora powerhouse, the Aurora-INL.

•Advancing plans for our Advanced Fuel Center in Oak Ridge, Tennessee—beginning with a proposed fuel recycling facility—to support fuel recycling and fabrication capabilities.

•Evaluating the potential use of alternative U.S. government fuel materials, including plutonium for use in advanced reactor applications, in support of Oklo’s multi-pronged fuel strategy and domestic fuel supply chain development.

•Executing on key non-fuel elements of our supply chain, including steam turbine generator sourcing, steel, and other construction inputs.

•Progressing engineering procurement and construction activities in support of the construction of Aurora powerhouses.

•Working with Kiewit Nuclear Solutions Co. ("Kiewit"), who was selected as the lead constructor for our first Aurora powerhouse in Idaho, a major milestone toward project delivery and execution.

•Continuing and initiating site preparation for announced facilities at INL, and Pike County, Ohio, respectively. We will begin site preparation for other announced projects based on prioritization, potentially including prospective customers such as Meta Platforms, Inc., Equinix, Diamondback Energy, Prometheus Hyperscale, Switch, and other future projects.

•Exploring activities related to, or in support of, various Executive Orders that look to accelerate the deployment of domestic, advanced nuclear energy.

•Negotiating and executing additional letters of intent, memoranda of understanding, and master partnership agreements and converting such preliminary agreements into purchase power agreements with multiple potential customers.

•Negotiating term sheets and binding power purchases agreements with customers who have previously signed nonbinding agreements such as letters of intent to purchase power.

•Continuing to hire additional personnel and implement processes and systems necessary to deliver our business strategy.

•Progressing production of radioisotopes by Atomic Alchemy, assessing options to scale production, developing and executing plans to progress the RPP deployment for this business, as well as obtaining the NRC license required to handle, manufacture, and distribute radioisotopes.

•Evaluating potential acquisition opportunities to strategically accelerate our business and enhance our capability to execute on our business plans.

•Continuing to pursue activities, such as our ATM Program, to raise capital at the corporate and asset levels.

10

Table of Contents

For the years ended December 31, 2025 and 2024, our total operating expenses were $139.3 million and $52.8 million, respectively. We expect our total cash used in operating expenses for 2026 to be in the range of $80 million to $100 million and our total cash used in investing activities to be in the range of $350 million to $450 million.

Nuclear Energy Industry

The nuclear energy industry operates in a politically sensitive environment, and the successful execution of our business model is dependent upon public support for nuclear power in the U.S. and other countries. The U.S. government has consistently indicated through bipartisan action that it recognizes the importance of nuclear power in meeting the United States’ growing energy needs. As an example, the ADVANCE Act, which was signed into law on July 9, 2024 with significant bipartisan support, streamlines licensing, reduces costs, and boosts U.S. leadership in advanced nuclear energy by modernizing regulations, supporting fuel innovation, and expanding global competitiveness.

On May 23, 2025, four Executive Orders directed federal agencies to streamline licensing at the NRC, accelerate advanced reactor deployment at DOE and DOD sites for national security and AI/data-center needs, overhaul the domestic nuclear fuel cycle, and strengthen the U.S. nuclear industrial base. These Executive Orders, together with proposed legislation, reflect sustained federal interest in strengthening domestic energy security, supporting AI-driven infrastructure growth, and promoting advanced nuclear deployment. Ongoing DOE initiatives, including the RPP and FLPP, further demonstrate federal focus on developing a resilient nuclear fuel cycle and advancing advanced reactor technologies.

Additionally, opponents of advanced nuclear deployment in the U.S. and intervenors in regulatory proceedings could delay the licensing that our business model requires. As a result, our performance will depend in part on factors generally affecting the views and policies regulating the nuclear energy industry, which we cannot predict over the long term.

Human Capital Resources

We have a highly technical and founder-led team. Co-founders Jacob DeWitte, our Chief Executive Officer, and Caroline DeWitte, our Chief Operating Officer, have approximately 20 years and 15 years of experience in nuclear technology, respectively. Their experience includes graduate degrees in nuclear engineering from the Massachusetts Institute of Technology and prior roles in industry and the DOE. In addition, R. Craig Bealmear, our Chief Financial Officer, has over 30 years of finance, strategy, and commercial experience, including as the Chief Financial Officer of Renewable Energy Group and as the Chief Financial Officer - North America Downstream for bp plc. His experience includes an M.B.A from the Wharton School at the University of Pennsylvania and a B.A. in Business Administration from Bellarmine University. William Goodwin, our Chief Legal and Strategy Officer, has approximately 15 years of experience in the legal industry, including as Deputy General Counsel and Head of Special Projects at Joby Aviation and Head of Policy at Skyryse. Mr. Goodwin holds a J.D. from UCLA School of Law, an M.A. in Political Philosophy from Claremont Graduate University, and a B.A. in Classics from the University of Southern California. Further, Patrick Schweiger, our Chief Technology Officer, has over 40 years of leadership experience in the energy sector, including as the head of Hedron Engineering and Consulting and Chief Engineer at Commonwealth Fusion Systems. Mr. Schweiger holds a Master’s certificate in Project Management, is a licensed Professional Engineer, holds multiple nuclear technology patents in the U.S. and China, and has written numerous publications on reactor development.

As of December 31, 2025, Oklo had 205 full-time employees, across 33 different states in the U.S., as well as two full-time employees in Canada. Our team members have 13 Ph.D.s and 50 master’s degrees in engineering or science. We also have eight employees who were formerly NRC staff members, cumulatively representing decades of NRC experience. We also continue to expand our operational functions including legal, accounting, procurement, tax, and finance with staff possessing public company experience.

Corporate Culture

Our employees are at the heart of our success and are the driving force behind our company. We actively seek out individuals with exceptional technical and specialized expertise to ensure our technical rigor and excellence. Our team is generally made up of people who are personally passionate to work on our mission, often motivated by the desire to work on solutions to climate change or to support human prosperity, which leads to exceptional teamwork and dedication beyond that inspired by a typical workplace.

11

Table of Contents

As much as we invest in attracting top talent, we are dedicated to their well-being and retention. We place a strong emphasis on promoting wellness initiatives within our organization. These efforts include comprehensive company-sponsored health benefits, insurance, and wellness stipends intended to support a range of wellness programs.

Treating our employees with dignity and respect is nonnegotiable. We believe in fostering a workplace culture that values each individual’s contribution, celebrates the variety in individuals’ experiences and backgrounds, and encourages open dialogue. We are proud to offer fair, competitive, and equitable compensation packages including both cash and equity compensation.

Fostering a culture of recognition and appreciation of our employees’ dedication and hard work cultivates a sense of pride and camaraderie among our workforce, leading to a motivated and engaged team. We believe that investing in our employees and their well-being creates a positive and dynamic work environment, ultimately fueling our success.

Competition

Our competitors include other power generation technologies, including traditional baseload power producers, other advanced nuclear technologies, renewables with or without storage, advanced energy storage, fossil fuels with carbon capture, and combinations of these technologies.

•Traditional baseload power — Includes natural gas, coal, oil, and large-scale nuclear.

•Fossil fuels with carbon capture — Sources provide firm, baseload power but require carbon capture technology to provide clean power. Carbon capture has not been demonstrated to be economically scalable.

•Renewables with or without energy storage — Wind and solar provide clean energy but cannot provide firm, baseload energy due to their intermittency. When paired with energy storage, they can provide a more dispatchable energy supply, but battery storage technology has not been demonstrated to be scalable or cost-effective.

•Other advanced nuclear reactors — There are several advanced reactor technologies in various stages of development, including high-temperature gas reactors, molten salt reactors, fusion technologies, and advanced light water reactor designs.

Intellectual Property

We protect our intellectual property through a combination of patents, trademarks, domain names, copyrights, and trade secrets. We currently hold U.S. patents and have patent applications pending in a number of different jurisdictions that cover a range of different technologies relevant to our technology roadmap and anticipated areas of development. We acquire patents and technology licenses when we consider it advantageous for us to do so. Although in the aggregate our patents and technology licenses are important to us, we do not regard any single patent or license or group of related patents or licenses as critical or essential to our business as a whole.Beyond patents, we also take steps to contractually restrict counterparties from disclosing our confidential or proprietary information in our agreements with employees, consultants, contractors, vendors, and business partners.

Additional information regarding certain risks related to our intellectual property is included in Part I, Item 1A, “Risk Factors.”

Government Regulations

We are subject to numerous U.S. federal, state, and local, as well as foreign laws and regulations covering a wide variety of subjects relating to our operations, and the scope of this coverage continues to broaden with continuing new legal and regulatory developments in the U.S. and internationally. In particular, we must comply with a range of laws and regulations including those relating to nuclear energy, nuclear materials (including fuels on which we rely, such as HALEU and plutonium-based fuels), the environment, export controls, national security, and other broad areas of law.

Like other companies involved in the generation of nuclear energy, we deal with intense scrutiny from both U.S. and foreign governments with respect to our compliance with laws and regulations. Many of these laws and regulations are evolving and their applicability and scope, as interpreted by agencies or the courts, remain uncertain. Some of these laws

12

Table of Contents

and regulations require that certain aspects of our operations, facilities, and business model be licensed or approved by specific regulators, including the DOE and the NRC. Particularly with regard to our operations, U.S. regulators (including the NRC) have limited precedent dealing with business models and product roadmaps like ours, which may make regulatory and licensing discussions more complicated than with more traditional providers (e.g., providers designing and building light water reactor plants).

Additionally, we work in close collaboration with the DOE’s National Laboratories and various other governmental bodies (e.g., the U.S. Department of War and various state or local bodies). These collaborations often impose legal and/or contractual restrictions on us that arise out of laws or regulations that may otherwise not apply to private commercial businesses.

Our compliance with these laws, regulations, and contractual commitments may be onerous and may, individually or in the aggregate, increase our cost of doing business, impact the financial viability of our business model, limit our ability to pursue certain business practices or offer certain products and services, cause us to change our business models and operations, affect our competitive position relative to our peers, and/or otherwise harm our business, reputation, financial condition, and operating results.

Additional information regarding certain risks related to government regulations is included in Part I, Item 1A, “Risk Factors.”

Available Information

We file our annual, periodic, and current reports, and other required information, electronically with the SEC. The SEC maintains a website at www.sec.gov that contains reports, proxy and information statements, and other information that we file with the SEC electronically. We also make available on our website at www.oklo.com, free of charge, copies of these reports and other information as soon as reasonably practicable after we electronically file such material with, or furnish it to, the SEC.

We use our website, press releases, public conference calls, and public webcasts as means of disclosing material non-public information and for complying with our disclosure obligations under Regulation FD. The information disclosed by the foregoing channels could be deemed to be material information. As such, we encourage investors, the media, and others to follow the channels listed above and to review the information disclosed through such channels. The contents of the websites referred to above are not incorporated into this filing.

Item 1A. Risk Factors

RISK FACTORS

The below is a summary of principal risks to our business and risks associated with ownership of our common stock. The risks and uncertainties described below should be carefully considered, together with all other information in this Annual Report on Form 10-K, including the section titled “Management’s Discussion and Analysis of Financial Condition and Results of Operations” and our consolidated financial statements and related notes, before making a decision to invest in our common stock. Our business, results of operations, financial condition, or prospects could also be harmed by risks and uncertainties not currently known to us or what we currently do not believe are material. In the event that any of the risks actually occur, our business, results of operations, financial condition, and prospects could be adversely affected and could lead to a decline in the market price of our common stock.

Risk Factors Summary

The following summarizes some, but not all, of the risks provided below. Please carefully consider all of the information discussed in this Item 1A “Risk Factors” in this Annual Report for a more thorough description of these and other risks.

•We have not yet constructed any powerhouses or entered into any binding power purchase agreement with any customer to operate a plant or deliver electricity or heat, and there is no guarantee that we will be able to do so in the future. Our limited commercial operating history makes it difficult to evaluate our prospects, the risks and challenges we may encounter, and our total potential addressable market.

13

Table of Contents

•We are an early‐stage company with a history of financial losses (i.e., negative cash flows), and we expect to incur significant expenses and continuing financial losses at least until our powerhouses become commercially viable, which may never occur.

•Acquisitions, divestitures, or joint ventures involve unknown risks and could result in operating difficulties or other consequences that may have adverse effects on our business and operating results.

•Our powerhouses, like many advanced fission reactors, are expected to rely at least in part on HALEU or plutonium-based fuels, either partially or for a period of time until recycled used nuclear fuel is available. HALEU and plutonium-based fuels are not currently available at scale.

•Building new fuel fabrication facilities (including plutonium-based fuel fabrication facilities) and new fuel recycling facilities is challenging as a result of many factors, including regulatory and construction complexity, and may take longer or cost more than we expect.

•We rely on a limited number of suppliers for certain materials and supplied components, some of which are highly specialized and are being designed for first‐of‐a‐kind or sole use in our powerhouses, fuel fabrication facilities, fuel recycling facilities, and radioisotopes facilities.

•Our business operations rely heavily on securing agreements with suppliers for essential materials and components that will be used to construct our powerhouses, fuel fabrication facilities, fuel recycling facilities, and radioisotope production facilities.

•Our ability to enter into agreements with potential new customers to provide power may be limited by certain terms, including purchase options, rights of first refusal, rights of first offer, and “most favored nation” provisions, of our existing agreements and future agreements into which we may enter.

•Customers and other third parties may rescind or back out of non‐binding agreements for various reasons, which could adversely affect our revenue streams, project timelines, and overall financial performance.

•We depend on key executives, management, directors, and other highly skilled personnel to execute our business plan and conduct and oversee our operations, as applicable. The departure of key personnel or our failure to successfully recruit and retain skilled personnel could have a material adverse effect on our business.

•Power purchase agreements are a key component of our anticipated business model for sales of power, and customers may be able to void all or part of these contracts under certain circumstances, which could significantly impact our financial performance and operational stability.

•There is limited precedent for independent developer construction and operation, use of power purchase agreements, and other behind‐the‐meter or off‐grid business models relating to deployment of fission power plants.

•There is limited commercial operating experience for the facilities of the type, configuration, and scale we plan to employ, particularly when comparing our metal‐fueled fast reactors to that of the existing fleet of large light water reactors, which creates risks in cost and timeline estimates. The lack of recent domestic commercial experience, particularly with respect to labor and supply chain management, and other factors may result in greater than expected development and construction costs, deployment timelines, maintenance requirements, differing power output, and greater operating expenses.

•Competition from existing or new competitors or technologies domestically and internationally could cause us to experience downward pressure on prices, fewer customer orders, reduced margins, the inability to take advantage of new business opportunities, and the loss of market share.

•Our investment in recycling may not provide the return we expect. The market for recycled nuclear fuel in the U.S. may never be established or may be smaller or grow more slowly than expected.

•Our business plan primarily involves the concurrent development of two configurations of our powerhouses (i.e., 15 MWe and 75 MWe), may also include the development of other configurations of our powerhouses (e.g., 100 MWe and higher), and makes certain assumptions with respect to learnings, efficiencies and regulatory approvals as a result of this development approach, which may not be accurate or correct. Any adverse change to these assumptions may have a material adverse effect on our business, results of operations, and financial condition.

14

Table of Contents

•We and our customers operate in a politically sensitive environment, and negative public and political perceptions of us, or more generally, of nuclear energy and radioactive materials could materially and adversely affect us, our customers, and the markets in which we operate.

•Our use of technologies and systems that employ artificial intelligence or large language models, given the dynamic state of such technologies, may cause inadvertent or unexpected impacts that may harm our business.

•Our ability to protect our patents and other intellectual property rights may be challenged and is not guaranteed. If we are unable to protect our intellectual property rights, our business and competitive position may be harmed.

•If we or our third-party providers fail to protect confidential information and experience data security incidents, we may experience adverse effects, including regulatory enforcement consequences, on our business, results of operations, and financial condition.

•Our cost estimates are highly sensitive to broader economic factors, and our ability to control or manage our costs may be limited. Building new powerhouses, fuel fabrication facilities, fuel recycling facilities, and radioisotope production facilities is challenging as a result of many factors, including regulatory and construction complexity, and may take longer or cost more than we expect.

•Our business is, and the markets in which we compete are, rapidly evolving, including with respect to artificial intelligence products, which make it difficult to forecast demand for our power.

•The nature of our business requires us to interact with various governmental entities, making us subject to the policies, priorities, regulations, mandates, and funding levels of such governmental entities and we may be negatively or positively impacted by any change thereto.

•Our powerhouses, fuel fabrication facilities (including plutonium-based fuel fabrication facilities), fuel recycling facilities, and radioisotope production facilities will be highly regulated by the U.S. government, including the NRC and DOE, as well as foreign, state, and local governments. We have not received any approval or licensing to date, nor have we submitted our updated custom combined license application (“COLA”) to the NRC, and approval or licensing of these designs or facilities, and the timing of such approval or licensing, if any, is not guaranteed. Our potential international expansion will subject us to additional U.S. and foreign regulations.

•Changes to trade policies, including higher tariffs, restrictions, and other economic disincentives to trade, may lead to operational delays, higher procurement and operational costs, and increased regulatory and compliance complexities, resulting in supply chain disruptions and higher prices and lower demand for devices and services we sell.

•We will require additional future funding to support our operations and implementation of our growth plans.

•The market price of our common stock is, and could remain, highly volatile. Purchasers of our common stock could incur substantial losses.

•Our failure to effectively implement controls and procedures required by Section 404(a) of the Sarbanes‐Oxley Act could negatively impact our business.

Risks Related to Our Business and Operations

We have not yet constructed any powerhouses or entered into any binding power purchase agreement with any customer to operate a plant or deliver electricity or heat, and there is no guarantee that we will be able to do so in the future. Our limited commercial operating history makes it difficult to evaluate our prospects, the risks and challenges we may encounter, and our total potential addressable market.

Our business plan to construct and operate our powerhouses is subject to reaching binding agreements with potential customers for electricity or heat delivered by our powerhouses. If no potential near‐term customer enters into binding power purchase agreements with us, our planned construction and operation of our powerhouses could be significantly delayed. Such delays would result in delayed revenue and could hinder our ability to gain market traction with other potential customers. This could have a material adverse effect on our business and financial condition. We have entered into contingent, non‐binding agreements related to the purchase of power with potential customers, which may not result in binding agreements for the purchase of electricity or heat from our powerhouses. In addition, we have been tentatively selected to provide electricity and heat to Eielson Air Force Base, outside of Fairbanks, Alaska; however, this has not been

15

Table of Contents

finalized and is subject to our completion of various requirements set forth by the U.S. Air Force. As a result of our limited commercial operating history and ongoing changes in our new and evolving industry, including evolving demand for our products and services and the potential development of technologies that may prove more efficient or effective for our intended use cases, our ability to forecast our future results of operations and plan for and model future growth is limited and subject to a number of uncertainties. Therefore, there can be no assurance that our internal estimates relating to the size of our total addressable market will be correct. In addition, our expectations with respect to our total potential addressable market may differ from those of third parties, including investors or securities analysts.

We have a limited commercial operating history in a rapidly evolving industry. The markets for electricity and heat generated by nuclear power plants, nuclear reactor design, nuclear reactor production, nuclear fuel design, nuclear fuel supply, used nuclear fuel recycling, nuclear fuel fabrication, nuclear waste management, and services related to any or all of the foregoing may not continue to develop in a manner that we expect or that otherwise would be favorable to our business. We have encountered and expect to continue to encounter risks and uncertainties frequently experienced by growing companies in rapidly evolving industries. Accordingly, we may be unable to prepare accurate internal financial forecasts or replace anticipated revenue that we do not receive as a result of a range of supply chain, geopolitical, macroeconomic, and design complexities, delays, changed circumstances, or changed market conditions arising from these factors, and our results of operations in future reporting periods may be below the expectations of investors or analysts. If we do not address these risks successfully, our results of operations could differ materially from our estimates and forecasts or the expectations of investors or analysts, causing our business to suffer and our common stock price to decline.

We have limited experience in operating a company that builds and operates commercial nuclear power plants or that directly provides customers heat or power.

We have limited experience operating a company that builds, operates, or maintains commercial nuclear power plants or that directly provides customers with energy as electricity or heat. Our management may not be fully aware of many of the specific requirements of operating such a company. We believe our primary business approach of providing power directly to customers as opposed to licensing designs or selling powerhouses is unique in the nuclear power industry. As a result of our business model and the lack of experience of our management, our management’s decisions and choices may not take into account standard managerial approaches that commercial nuclear power companies commonly use, some of which may not be directly relevant to our business. Our operations, earnings, and ultimate financial success could suffer due to our management’s lack of experience.

We are an early‐stage company with a history of financial losses (i.e., negative cash flows), and we expect to incur significant expenses and continuing financial losses at least until our powerhouses become commercially viable, which may never occur.

We expect our operating expenses to increase over the next several years and to continue to incur operating losses for the foreseeable future as we continue to expand and develop, and we may need additional capital from external sources.

Our construction and delivery timeline estimates for our powerhouses, facilities, and other equipment may be extended due to a number of factors, including the degree of pre‐fabrication, standardization, on‐site construction, long‐lead procurement, contractor performance, supply chain constraints, plant pre‐operational and startup testing, and other site‐specific considerations.

The success of our business will depend in large part on our ability to successfully construct our powerhouses and deliver heat and electricity to potential customers on‐time and on‐budget at guaranteed performance levels, which may encourage subsequent customers to have greater confidence in our business. The success of our business will also depend in part on our ability to construct fuel fabrication and recycling facilities. There is no guarantee that all necessary components will be commercially available, and substantial development of new supply chains might be necessary. Additionally, we cannot guarantee the level of quality of these third‐party supplies or import and export requirements or limitations that might be stipulated by the NRC or DOE for the procurement of these components. There is no guarantee that the planned construction, delivery, and performance of our powerhouses or the equipment we need to fabricate and recycle fuel will be successfully manufactured, delivered in a timely manner, or be on budget or that our third‐party suppliers and contractors will deliver timely or on budget; plant pre‐operational and startup testing, including tests mandated as license conditions by the NRC, will be successfully completed on‐time; we will not experience delays, operational or process failures, or other problems during our first commercial deployment or any planned deployment thereafter; or the construction of our fuel fabrication and recycling facilities will be completed at the cost and on the timeline we expect. We depend, and will continue to depend, on third‐party contractors to perform many of the essential activities needed to deploy our powerhouses. We do not directly control the performance of these contractors and our contracts with them may not provide adequate remedies if they fail to perform. We are starting to employ risk-sharing structures to mitigate the risks associated with the construction, delivery, and performance of our powerhouses and our fuel fabrication and fuel recycling facilities. Any delays or setbacks we may experience for our first commercial delivery or in establishing our fuel fabrication or

16

Table of Contents

recycling facilities as well as any failure to obtain final investment decisions for future orders could have a material adverse effect on our business, results of operations, and financial condition and could harm our reputation.

Acquisitions, divestitures, or joint ventures involve unknown risks and could result in operating difficulties or other consequences that may have adverse effects on our business and operating results.

Acquisitions, divestitures, or joint ventures, including our acquisition of Atomic Alchemy, may fail to achieve their intended results, and their activities may disrupt or have a negative impact on the Company’s business or to our financial condition and operating results. The pursuit of acquisitions, divestitures, or joint ventures could create unforeseen operating difficulties and expenditures. Some of the areas in which we face risks include:

•diversion of management time and focus from operating our business to challenges related to acquisitions, divestitures, and other strategic arrangements;

•failure to complete acquisitions, divestitures, or joint ventures on a timely basis, if at all, could restrict our ability to realize the expected financial or strategic goals of a transaction;

•failure to successfully integrate the acquired operations, technologies, services, and personnel (including cultural integration and retention of employees) and further develop the acquired business or technology;

•implementation of accounting controls (or remediation of financial control deficiencies), procedures, and policies at the acquired company;

•integration of the acquired company’s accounting, human resources, and other administrative systems, and the coordination of product, engineering, and sales and marketing functions;

•transition of the acquired company’s operations, users, and customers onto our existing platforms;

•failure to accomplish commercial, strategic, or financial objectives with respect to investments, joint ventures, and other strategic arrangements;

•liability for activities of the acquired company before the acquisition, including patent and trademark infringement claims, data privacy and security issues, violations of laws, commercial disputes, employment disputes, tax liabilities, warranty claims, product liabilities, and other known and unknown liabilities; and

•litigation or other claims in connection with the acquired company, including claims from former employees, customers, former stockholders, or other third parties.

Our failure to address these risks or other problems encountered in connection with our past or future acquisitions, divestitures, and other strategic arrangements could cause us to fail to realize their anticipated benefits, incur unanticipated liabilities, and harm our business generally.

Our acquisitions and other strategic arrangements could also result in dilutive issuances of our equity securities, the incurrence of debt, contingent liabilities, or amortization expenses, or impairment of goodwill and/or purchased long-lived assets, and restructuring charges, any of which could harm our financial condition and operating results.

Our powerhouses, like many advanced fission reactors, are expected to rely at least in part on HALEU or plutonium-based fuels, either partially or for a period of time until recycled used nuclear fuel is available. HALEU and plutonium-based fuels are not currently available at scale. Access to a domestic supply of HALEU or plutonium-based fuel requires regulatory approval, and may require additional third‐party development and investment and/or significant government assistance. If we are unable to access HALEU, plutonium-based fuels, or recycled used nuclear fuel, our ability to manufacture fuel and to produce power will be adversely affected, which could have a material adverse effect on our business, results of operations, and financial condition.

Existing commercial nuclear infrastructure, including enrichment facilities and fuel fabrication facilities, in most cases were designed and are currently licensed to produce uranium in pellet and rod form, with enrichment of the isotope Uranium 235 up to 5%, according to the World Nuclear Association and NRC. Our powerhouses are expected to rely, in part, on HALEU or plutonium-based fuels that are not currently available at scale domestically.

Supplying fresh HALEU to our powerhouses could require continued modifications to, and NRC licensing of, existing commercial uranium enrichment and fuel fabrication facilities, none of which are currently owned or operated by us. Currently, HALEU for our commercial powerhouses is available only in limited quantities globally. In the U.S., HALEU

17

Table of Contents

can be sourced in small amounts from the DOE, and a small but growing supply is being produced domestically and made available at high prices by Centrus Energy Corp. (“Centrus”) and others.

Despite U.S. government initiatives, including $700 million in funding for HALEU development (supported by the Energy Act of 2020 and the Inflation Reduction Act of 2022) and the DOE’s request for proposals to purchase low-enriched uranium (LEU) from domestic sources on June 27, 2024, the HALEU program is still in its early stages, and significant progress is required to achieve reliable and scalable production. It is possible that the U.S. government may release feedstock, initially in the form of highly enriched uranium (HEU), that could be down-blended to HALEU for commercial use. However, the ability to process HEU into HALEU is currently limited to a few licensed third parties in the U.S., and these entities do not yet produce commercial-scale HALEU. Additionally, these third parties may require regulatory approvals, infrastructure modifications, and process changes to scale up their operations. Additionally, some industry participants may be slow to implement required infrastructure upgrades or to obtain NRC licenses or other regulatory approvals needed to enable the enrichment and fabrication of HALEU. These challenges could impair our ability to secure adequate HALEU supplies on a predictable schedule and at an acceptable cost.

In addition to HALEU, we are evaluating the use of alternative fuel materials, including plutonium currently designated for the DOE’s dilute-and-dispose programs, that may be made available by the U.S. government for use in advanced reactor applications. Plutonium-based fuel supply originates from U.S. government reserves of plutonium declared excess to defense needs, and the use of plutonium-based fuels may be subject to increased fuel certifications, regulatory uncertainty, cost recovery requirements, secure transportation requirements, and security and proliferation concerns. Delays in obtaining HALEU or plutonium-based fuels could impact key activities such as fuel loading, testing, and operation of our powerhouses, potentially exposing us to cost and scheduling uncertainties. Any such delays may negatively affect the ability of our powerhouses to effectively compete in the market for power and heat production.

Building new fuel fabrication facilities (including plutonium-based fuel fabrication facilities) and new fuel recycling facilities is challenging as a result of many factors, including regulatory and construction complexity, and may take longer or cost more than we expect.

We have received initial third‐party cost estimates related to building our pilot scale fuel fabrication facility and our first‐of‐a‐kind new commercial scale fuel fabrication facility, and we are beginning to plan for construction of our first-of-a-kind new fuel recycling facility. Costs may ultimately be significantly higher than our current estimates, which may affect the marketability, capital and operational costs of our powerhouses, and our expectations with respect to our business plan and future profitability. If these issues arise at such later stages of deployment, deployment could be subject to greater costs or be significantly delayed, which could materially and adversely affect our business, results of operations, and financial condition.

Our estimates for a fuel recycling facility are based upon studies performed at the U.S. national labs and work that is underway through a series of joint Oklo-DOE projects. However, costs may be significantly higher than our current estimates, both in terms of the capital and operational costs of our recycling facilities. There is limited experience with licensing and constructing fuel recycling facilities at commercial scale in the U.S. As a result, the deployment of this facility could be subject to higher costs than expected or be significantly delayed, which could materially and adversely affect our business, results of operations, and financial condition.

We rely on a limited number of suppliers for certain materials and supplied components, some of which are highly specialized and are being designed for first‐of‐a‐kind or sole use in our powerhouses, fuel fabrication facilities, fuel recycling facilities, and radioisotopes facilities. We and our third‐party vendors may not be able to obtain sufficient materials or supplied components to meet our manufacturing and operating needs or obtain such materials on favorable terms including price. Additionally, certain components may only be available from international suppliers.

We do not have manufacturing assets and will rely on third-party manufacturers and construction firms to build powerhouses, fuel fabrication facilities, recycling facilities, radioisotope facilities, and associated equipment. These capabilities and the facilities involve risks including timeline, cost, and financing risk and even if successfully developed, such capabilities will not be available at scale for our earliest powerhouse deployments. Moreover, we are dependent on future supplier capability to meet production demands attendant to our forecasts. If our supply chain cannot meet the schedule demands of the market, our projected sales revenues could be materially impacted. In addition, certain transactions or arrangements that we expect to pursue may not be consummated with third-party suppliers on acceptable terms, or at all, which could delay or prevent the execution of planned business operations.

We rely on a limited number of suppliers for certain materials and supplied components. We may not be able to obtain sufficient materials or supplied components to meet our manufacturing and operating needs, or obtain such materials on favorable terms, which could impair our ability to fulfill our orders in a timely manner or increase our costs of production.

18

Table of Contents

We do not have significant prior experience in the manufacture of any of the components of radioisotopes facilities, fuel fabrication facilities, fuel recycling facilities, or powerhouses. We have done prototypic fabrication work and are working to establish manufacturing capabilities for components as well as the deployment of a manufacturing facility. Our suppliers’ ability to manufacture components for our radioisotopes facilities, fuel fabrication facilities, fuel recycling facilities, and powerhouses is dependent upon sufficient availability of materials and possibly other supplied components, some of which are highly specialized and are being designed for first‐of‐a‐kind or sole use in our radioisotopes facilities fuel fabrication facilities, fuel recycling facilities, and powerhouses. Any supply chain disruption incurred by our third‐party suppliers or degradation in the quality and processes of our manufacturer partners, may result in delays, cost overruns, or impairments to the development of our radioisotopes facilities, fuel fabrication facilities, fuel recycling facilities, and powerhouses.

Additionally, certain components may only be available from international suppliers, and the imposition of sanctions, tariffs, or material changes in import and export requirements on a nation‐by‐nation basis, on materials or supplied components for our facilities could have a material adverse effect on our operations. Prolonged disruptions in the supply of any of our key materials or components, difficulty qualifying new sources of supply, implementing the use of replacement materials or new sources of supply or any volatility in prices could have a material adverse effect on our ability to operate in a cost‐efficient, timely manner. Such prolonged disruptions could also cause us to experience cancellations or delays of scheduled launches, customer cancellations or reductions in our prices and margins, any of which could harm our business, results of operations, and financial condition.

Our business operations rely heavily on securing agreements with suppliers for essential materials and components that will be used to construct our powerhouses, fuel fabrication facilities, fuel recycling facilities, and radioisotope production facilities.

The execution, termination, expiration, or failure to renew agreements with our suppliers, including, but not limited to, Siemens Energy, Inc., Amentum Technology Inc., Kiewit, and Centrus, whether due to unforeseen circumstances such as supplier insolvency and regulatory changes or other circumstances, pose significant risks to our supply chain. In the event that such agreements are not successfully maintained or replaced, we may encounter difficulties sourcing required materials and components, leading to deployment delays, increased costs, or an inability to meet customer demand. Any interruption or inability to maintain relationships with current and future suppliers, or failure to secure materials from alternative suppliers, could adversely impact our business, results of operations, and financial condition.

Our ability to enter into agreements with potential new customers to provide power may be limited by certain terms, including purchase options, rights of first refusal, rights of first offer, and “most favored nation” provisions, of our existing agreements and future agreements into which we may enter.

Some of our agreements with third parties have contained, and may in the future contain, restrictive contractual provisions in favor of third parties, including, but not limited to, purchase options, rights of first refusal, rights of first offer, and “most favored nation” pricing provisions (collectively, “restrictive contractual provisions”). Such restrictive contractual provisions may adversely affect our ability to enter into agreements with third parties for the purchase of power, limit the amount we are able to charge for our power, prevent us from entering into relationships with potential customers, and negatively impact future revenues. If we do not successfully manage compliance with these restrictive contractual provisions, we may be required to forego revenues from some third parties or reduce the amount we charge certain third parties with most favored nation pricing, which would adversely affect our business, results of operations, and financial condition.

In addition, disputes or legal proceedings relating to such restrictive contractual provisions may arise, which may result in the incurrence of legal costs and diversion of management resources to resolve.

Customers and other third parties may rescind or back out of non‐binding agreements for various reasons, which could adversely affect our revenue streams, project timelines, and overall financial performance.

We have entered into, and may enter into additional non‐binding agreements, such as master power agreements, joint development agreements, memoranda of understanding, and letters of intent, with customers for the purchase of power or to collaborate on projects. Many of these agreements are non‐binding and the underlying contracts may not come to fruition as a result of, among other things, changes in business priorities, financial constraints, regulatory changes, force majeure events, failures to obtain necessary approvals, or failures to meet contractual obligations by either party. The termination of such agreements could adversely affect our business, results of operations, and financial condition. Additionally, any loss of planned customers or projects may result in reputational harm and negatively impact our future business prospects.

Some members of our management team have limited experience in operating a public company.

19

Table of Contents

Some of our executive officers have limited experience managing a publicly traded company. Their limited experience in dealing with the increasingly complex laws pertaining to public companies could be a significant disadvantage. It is likely that an increasing amount of our executive officers’ time will be devoted to public company management activities, which may result in less of their time being devoted to our day-to-day operations and growth. We may need to add additional personnel with the appropriate level of knowledge, experience, and training in the accounting policies, practices, or internal controls over financial reporting to maintain compliance with requirements for public companies in the U.S. The development and implementation of the standards and controls necessary for us to maintain the level of accounting standards required of a public company in the U.S. may require costs greater than expected. We may be required to expand our employee base and hire additional employees to support our operations as a public company, which will increase our operating costs in future periods.

We depend on key executives, management, directors, and other highly skilled personnel to execute our business plan and conduct and oversee our operations, as applicable. The departure of key personnel or our failure to successfully recruit and retain skilled personnel could have a material adverse effect on our business.

Our success depends, in significant part, on the continued services of our senior management team and directors and on our ability to attract, motivate, develop, and retain a sufficient number of other highly skilled personnel, including engineering, science, technology, manufacturing, and quality assurance, regulatory affairs, finance, legal, procurement, marketing, and sales personnel. Our senior management team and directors have extensive experience in the energy and manufacturing industries, and we believe that their depth of experience is instrumental to our continued success. The loss of one or more members of our senior management team or directors, for any reason, including resignation or retirement, could impair our ability to execute our business strategy and have a material adverse effect on our business, results of operations, and financial condition if we are unable to successfully attract and retain qualified and highly skilled replacement personnel.

Competition for the limited number of these skilled personnel is intense. If we are unable to adequately anticipate our needs for certain key competencies and implement human resource solutions to recruit or improve these competencies, our business, results of operations, and financial condition would suffer. Additionally, to properly manage our growth and the scale of our business operations, we will need to hire additional personnel at an accelerated rate. If we are unable to recruit and retain highly skilled personnel, especially personnel with sufficient technical expertise to develop our powerhouses, fuel fabrication facilities, recycling facilities, and fuel, we may experience delays, increased costs, and reputational harm.

Increases in our contractor and labor costs as a result of labor unions organizing, changes in regulations related to labor unions, or increases in employee minimum wages, could adversely affect our future results.

Labor unions may attempt to organize our employees in the future. Certain groups of employees may seek union representation in the future, and, if successful, would enhance organized labor’s leverage to obtain higher than expected wage and benefits costs and resist the introduction of new technology and other initiatives, which can result in increased operating expenses. If we are unable to negotiate acceptable collective bargaining agreements, our operating expenses could increase significantly as a result of work stoppages, including strikes. Additionally, increases in minimum wage rates, or the enactment of new wage-related legislation, may significantly increase our labor costs. Any of these matters could adversely affect our business, results of operations, and financial condition.

Power purchase agreements are a key component of our anticipated business model for sales of power, and customers may be able to void all or part of these contracts under certain circumstances, which could significantly impact our financial performance and operational stability. We may need to find substitute customer power and/or heat offtake or may need to cancel licensing work related to particular customers and sites as a result of changes in customer demand or contracts with customers.

In our power purchase agreements with customers, we will seek to protect ourselves from risks, but there is no guarantee that we can prevent all customers from voiding our contracts in full or in part.

Customers may have the right to terminate or renegotiate these contracts based on a number of factors that will be specified on an agreement‐by‐agreement basis. Given the risk that a customer might void, or attempt to renegotiate, a power purchase agreement, we might ultimately expend resources on a deployment that does not realize expected revenue. Depending on the stage of development of the deployment we may be required to cancel licensing and procurement efforts, resulting in a loss of our investment to that point. Additionally, we may be forced to find substitute customers, which may not purchase energy on as favorable of terms, reducing the expected revenue of the deployment. Attracting new customers could be time‐consuming, and there is no guarantee that we will be able to secure new power purchase agreements on terms that are as favorable as original agreements with certain customers.

20

Table of Contents

Fluctuations in energy prices could impact the viability of our power purchase agreements, especially if the contract prices are fixed or based on long-term projections. Rapid changes in the energy markets might render our pricing less competitive or less profitable.

Power purchase agreements may include penalties for not delivering sufficient electric and/or heat energy on schedule, which may result in liabilities and reductions in cash flow.

A term occasionally used in power purchase agreements involves penalties that may accrue if either party fails to meet the stipulations of the relevant agreement, including penalties for the power producer, in this case the Company, if adequate power is not provided on time. Such penalties may adversely impact our profitability and financial stability. Additionally, such penalties might lead to cash flow reductions as our financial resources are diverted to remediate. Reduced cash flow may inhibit our ability to invest in growth opportunities, fund operational expenses, and service any future indebtedness, among other financial impacts. Incurring penalties may also harm our reputation in the market, and may put us at a competitive disadvantage to our competitors.

There is limited precedent for independent developer construction and operation, use of power purchase agreements, and other behind‐the‐meter or off‐grid business models relating to deployment of fission power plants.

The deployment of fission power plants by independent developers, as well as the utilization of power purchase agreements and other behind‐the‐meter or off‐grid business models, is relatively novel in the energy industry. As a result, our business faces certain risks and challenges due to the novelty of the business model. The absence of prior experiences may introduce uncertainties that could impact our business projections and subsequent performance. Additionally, the novelty of this business approach, or the perception thereof, might lead to higher perceived risks and, consequently, less favorable financing terms, commercial terms, or higher uncertainty in risk assessments, which may increase the potential for cost overruns and deployment delays.

The unfamiliarity of independent developer fission power plants and alternative business models might affect market acceptance. Potential customers and stakeholders may hesitate to adopt our approach, which could slow market penetration and revenue growth.

Some of our powerhouses may rely on interconnections to distribution and transmission facilities owned and operated by third parties, meaning that those specific deployments are exposed to interconnection and transmission facility development and curtailment risks. Such curtailment risks could impede delivery of our electricity, have a material adverse effect on our revenue and operational performance, occur without compensation, and reduce our ability to fully capitalize on the potential of certain deployments.

Insurers may perceive higher risks associated with limited precedent projects, potentially leading to increased insurance premiums or difficulties in obtaining adequate coverage.

If we fail to manage our growth effectively, we may be unable to execute our business plan, which may result in a material adverse effect on our business, results of operations, and financial condition.

We intend to expand our operations significantly to address our target market. To properly manage our growth, we will need to hire and retain additional personnel, upgrade our existing operational management and financial and reporting systems, and improve our business processes and controls. Our future expansion will include (among other matters):

•hiring and training new personnel;

•completing the designs, licensing, construction, and commissioning of our powerhouses, fuel fabrication facilities (including plutonium-based fuel fabrication facilities), fuel recycling facilities, and radioisotope facilities;

•optimizing applications of our reactors to serve both electric power customers and a broad base of industrial customers interested in utilizing the heat produced by our powerhouses;

•progressing production of radioisotopes by Atomic Alchemy, assessing options to scale production, developing and executing plans to progress the RPP deployment for this business;

•expanding and maintaining quality assurance standards and procurement procedures across our business;

•developing the supply chain necessary to supply components for our powerhouses and other facilities;

21

Table of Contents

•establishing the supply chain required to source and obtain fuel at acceptable costs;

•developing the processes and technologies to transport radiological materials;

•controlling expenses and investments in anticipation of expanded operations;

•developing the operational capabilities, capacities, and functions necessary to operate our powerhouses, fuel fabrication facilities, fuel recycling facilities, and radioisotope production facilities;

•prioritizing resources and attention across multiple concurrent critical projects;

•upgrading existing operational management and financial reporting systems and hiring additional personnel to comply with requirements as a public company; and

•implementing and enhancing administrative and functional infrastructure, systems, and processes.

If our operations continue to grow, of which there can be no assurance, we will need to continue to expand our sales and marketing, research and development, customer, commercial strategy, permitting and licensing, products and services, manufacturing, supply, operations, and general and administrative functions. These efforts will require us to invest significant financial and other resources, including in industries and sales channels in which we have limited experience to date. We will also need to continue to develop our manufacturing and operational systems and processes, and there is no guarantee that we will be able to scale the business as currently planned or within the planned timeframe. The continued expansion of our business may also require additional manufacturing and operational facilities, as well as space for administrative support, and there is no guarantee that we will be able to find suitable locations for such facilities.

Our continued growth could increase the strain on our resources, and we could experience operating difficulties, including difficulties in hiring and training employees, finding capacity internally and with third parties to construct our powerhouses and related equipment, delays in production, challenges in scaling‐up fuel recycling capacity, and difficulty sourcing adequate raw materials, such as HALEU. These difficulties may divert the attention of management and key employees and impact our business, results of operations, and financial condition. If we are unable to drive commensurate growth, costs, which include, among other things, lease commitments, headcount, and capital assets, could result in decreased margins, which could have a material adverse effect on our business, results of operations, and financial condition.

There is limited commercial operating experience for the facilities of the type, configuration, and scale we plan to employ, particularly when comparing our metal‐fueled fast reactors to that of the existing fleet of large light water reactors, which creates risks in cost and timeline estimates. The lack of recent domestic commercial experience, particularly with respect to labor and supply chain management, and other factors may result in greater than expected development and construction costs, deployment timelines, maintenance requirements, differing power output, and greater operating expenses.

The lack of commercial experience designing, building, and operating metal-fueled fast reactors like ours could cause us to fail to identify latent design, manufacturing, construction, and operations issues of our powerhouses early enough to avoid negative effects on production, fabrication, construction, or ultimate performance of our powerhouses and related technologies. If these issues arise at later stages of development, deployment could be subject to greater costs or be significantly delayed, which could materially and adversely affect our business, results of operations, and financial condition.

Moreover, the cost and time associated with the construction and maintenance of our metal‐fueled fast reactors may be greater than we expect because of a lack of a domestic labor force with relevant commercial experience and an inexperienced supply chain for this type of reactor. Suppliers, contractors, and service providers often lack relevant commercial experience and price components, labor, and services based on assumptions applicable to NRC-licensed large light water reactors. These pricing assumptions take into account regulatory, quality assurance, and compliance requirements that may not be applicable to our metal-fueled fast reactors, including in cases where we pursue alternative regulatory pathways such as through the DOE. Such misalignment between our regulatory framework and supplier pricing models may result in higher procurement costs and extended procurement timelines. Significant portions of our supply chain are being developed specifically to support our metal-fueled fast reactor technology rather than relying on an established commercial supply base tailored toward serving the existing fleet of large light water reactors.

In addition, there is limited recent commercial operating experience in the U.S. with fuel recycling, fuel fabrication, and radioisotope production facilities of the type and scale we intend to deploy. This lack of commercial operating experience could cause us to fail to identify latent design, manufacturing, construction, and operations issues of our facilities early

22

Table of Contents

enough to avoid negative effects on production, fabrication, construction, or ultimate performance of our fuel recycling, fuel fabrication, and radioisotope production facilities and related technologies. We may encounter unforeseen challenges in scaling processes for such facilities to commercial production. The longer lead times and reduced pricing transparency we face increases construction and operating costs and impairs our ability to accurately forecast project budgets and schedules, heightening the risk of cost overruns and project delays. Any such outcomes may have a material adverse effect on our business, results of operations, and financial condition and could harm our reputation.

Successful commercialization of new, or further enhancements to existing, alternative carbon‐free energy generation technologies, such as adding carbon capture and sequestration/storage mechanisms to fossil fuel power plants, wind, solar, geothermal, or fusion, may prove to be more cost effective or appealing to the global energy markets and therefore may adversely affect the market demand for our powerhouses, potentially adversely affecting our ability to successfully commercialize our powerhouses.

The expected market for our powerhouses may be superseded or rendered obsolete by new technology or the novel application of existing technology. Our estimates for the total addressable market and expectations with regard to certain unit economics are based on a number of internal and third‐party estimates, including our potential contracted revenue, the number of potential customers who have expressed interest in heat and electricity from our powerhouses, the conversion rate of those potential customers into paying customers, assumed prices, including fuel prices, and production costs for our powerhouses and resulting power, our ability to leverage our current logistical and operational processes, and assumptions regarding our technology and general market conditions. However, our assumptions and the data underlying our estimates may not be correct and the conditions supporting our assumptions or estimates may change at any time, reducing the predictive accuracy of these underlying factors. Any material change to our assumptions or expectations may have a material adverse effect on our business, results of operations, and financial condition and could harm our reputation.

The market for alternative carbon‐free energy generation technologies has not yet been established and may not achieve the potential we expect or may grow more slowly than expected. If demand for our powerhouses fails to develop sufficiently, our business and operations could suffer, and we may be unable to achieve or maintain profitability.

The viability and continued growth in demand for alternative carbon‐free energy generation technologies, and in turn, our powerhouses, may be impacted by many factors outside of our control, including:

•market acceptance of nuclear power;

•cost competitiveness, reliability, and performance of our powerhouses compared to conventional and renewable energy sources and products;

•availability and amount of financing to support the development and deployment of our powerhouses;

•availability, continuation, and amount of tax incentives to support the development and deployment of our powerhouses;

•the extent to which the nuclear power industry and broader energy industries undergo regulatory changes to permit broader adoption of nuclear electricity generation;

•the cost and availability of key materials and components used in the production of our powerhouses;

•prices of traditional utility‐provided energy sources; and

•the emergence, continuance, or success of, or increased government support for, other alternative energy generation technologies and products.

Reduction in energy demand or changes in climate‐related policies may change market conditions, reduce our product’s competitiveness, and affect our performance. If demand does not grow, our business and operations could suffer, which would have an adverse impact on our ability to grow our business and we may be unable to achieve profitability.

Competition from existing or new competitors or technologies domestically and internationally could cause us to experience downward pressure on prices, fewer customer orders, reduced margins, the inability to take advantage of new business opportunities, and the loss of market share.

We operate in a highly competitive energy market and are subject to competition based upon product design, performance, technology, pricing, quality, and services, from competing nuclear suppliers, as well as from alternative means of

23

Table of Contents

producing electricity and/or heat. There are a number of advanced reactor designs and advanced reactor projects under development in the U.S. Many of these designs are involved in application and pre-application reviews with the NRC. Our products and services will conform to exacting specifications and may carry a higher price than competing non‐nuclear products due to the highly regulated nature of the U.S. nuclear industry. Other companies providing competing technologies could capture customers or market share from us, which could have a material adverse effect on our business, results of operations, or financial condition.

Our business model is novel to the nuclear industry and, if proven successful, may be adopted by competitors. Increased competition could erode profit margins and hinder our market expansion. Moreover, our competitors may develop or adopt technologies that are superior, more efficient, or more effective for prospective customers compared to our technologies (on a price-to-value, operational impact, or other basis), or may adapt more quickly to leverage new or emerging technologies or meet new or evolving regulatory requirements in our target markets. We will need to anticipate and respond to these changes by enhancing our offerings and/or internal processes in order to maintain our competitive position, but we may not be successful in doing so.

For sales and deployments outside of jurisdictions with highly developed nuclear regulatory frameworks, some of our foreign competitors currently benefit from, and others may benefit in the future from, permissive regulatory and licensing regimes and/or from protective measures by their home countries where governments are providing financial support, including significant investments in the development of new technologies. Those competitors may have a competitive advantage if they are able to obtain approvals, or if they can demonstrate to potential customers the value and benefits of their products and services, particularly in jurisdictions that have less stringent nuclear regulatory requirements. These competitors may have access to greater sources of funding to develop and commercialize their power than we do, whether as a result of potential competitive advantages or supportive national governments. This market environment may result in increased pressures on our pricing and other competitive factors.

We believe our ability to compete successfully in designing, engineering, manufacturing, and operating our products and services at significantly reduced costs to customers does, and will continue to, depend on a number of factors, which may change in the future due to increased competition. If we are unable to compete successfully, our business, results of operations, and financial condition could be adversely affected.

The cost of electricity and heat generated from our powerhouses may not be cost competitive with electricity and/or heat generated from other sources, which could materially and adversely affect our business, results of operations, and financial condition.

Many U.S. electricity markets price electric energy, capacity, and ancillary services on a competitive basis, with market prices subject to substantial fluctuations. Other markets remain heavily regulated by state or local utility regulatory authorities, with power purchase decisions by electric utilities subject to various competitiveness or prudence tests. As a result of competitive pressures, some electricity markets experience low marginal energy prices at certain times due to a combination of subsidized generating resources, competitors with low‐cost or no‐cost fuel sources, or market‐design features that create incentives for certain attributes or deliver revenue in unpredictable ways over time, and we may not be able to compete in these markets unless the benefits of our advanced fission power technology and business model are sufficiently valued. Even in markets that price reliable capacity on a long‐term basis, there is no guarantee that advanced fission power will be sufficiently low‐cost so as to clear auction‐style capacity markets or to attract customers to sign power purchase agreements with us on commercially acceptable terms. Signing a power purchase agreement or clearing a capacity auction in any one year is no guarantee of similar outcomes in successive years. Moreover, powerhouses will likely serve a specific number of market segments targeting smaller distributed generation, remote application, or industrial customers, who may have lower cost power/heat alternatives available to them, especially in the near‐term.

Failure of the cost of electricity and heat generated from our powerhouses to be cost competitive with electricity and/or heat generated from other sources, will limit our ability to charge a premium relative to other energy sources, which could materially and adversely affect our business, results of operations, and financial condition.

Changes in the availability and cost of oil, natural gas, and other forms of energy are subject to volatile market conditions that could adversely affect our business, results of operations, and financial condition.

The availability and prices of oil, natural gas, and other forms of energy are subject to volatile market conditions. These market conditions are affected by political, economic, and other factors beyond our control. Decreases in energy prices or increases in nuclear energy costs, including fuel costs and asset deployment costs, relative to other forms of energy may adversely affect our business, results of operations, and financial condition. To the extent that these uncertainties cause suppliers and customers to be more cost sensitive or to adjust their business plans and operations, decreased energy prices may have an adverse effect on our business, results of operations, and financial condition.

24

Table of Contents

Our investment in recycling may not provide the return we expect. The market for recycled nuclear fuel in the U.S. may never be established or may be smaller or grow more slowly than expected.

We are actively developing fuel recycling capabilities with the goal of deploying a commercial‐scale fuel recycling facility in the U.S. by the 2030s. We currently expect to be the primary, but not the sole, users of the recycled fuel we plan to generate. Challenges that could impact the timeline and costs might arise from necessary activities such as siting, obtaining federal, state, and local permits and approvals, transportation, threatened litigation, access to used fuel for the purposes of recycling, and securing disposal solutions for waste. Our estimates for the total addressable market and expectations with regards to this potential line of business are based on several internal and third‐party estimates, including those for facility deployment, licensing, capital and operational costs, and sales prices for the resulting recycled fuel. The timeline to scale‐up and deploy the necessary technological processes is based upon assumptions regarding our technology and general market conditions. However, our assumptions and the data underlying our estimates may not be correct, and the conditions supporting our assumptions or estimates might change at any time, reducing the accuracy of such estimates. As a result, our investment in fuel recycling technology and this potential line of business may not provide any return, or the return we have projected. In addition, the market for recycling nuclear fuel in the U.S. has not yet been established and nuclear fuel recycling technologies such as ours have limited operational history and have not been proven at scale. Any material change to our assumptions or expectations with respect to the market for recycled nuclear fuel and the technology we plan to utilize may have a material adverse effect on our business, results of operations, and financial condition, and could harm our reputation.

Our business plan primarily involves the concurrent development of two configurations of our powerhouses (i.e., 15 MWe and 75 MWe), may also include the development of other configurations of our powerhouses (e.g., 100 MWe and higher), and makes certain assumptions with respect to learnings, efficiencies and regulatory approvals as a result of this development approach, which may not be accurate or correct. Any adverse change to these assumptions may have a material adverse effect on our business, results of operations, and financial condition.

Our business plan to construct and operate our powerhouses is subject to continued development activities and makes assumptions with respect to learnings, efficiencies, and regulatory approvals as a result of the concurrent 15 MWe and 75 MWe development approach. If assumptions regarding such concurrent development of our powerhouses are not accurate, we may be unable to successfully introduce, market, and sell these configurations of our powerhouses in a timely and cost‐effective manner or properly position and/or price our products, and our business, results of operations, and financial position could be materially impacted.

We compete in a market characterized by rapid technological advances, evolving regulatory standards in software technology and frequent new product introductions and enhancements. To succeed, we may also rely on the development of other configurations of our powerhouses (e.g., 100 MWe and higher). The development of other configurations of our powerhouses has inherent risks, including, but not limited to:

•higher-than-expected research and development costs;

•delays or unexpected costs in developing planned and new configurations;

•higher than expected costs and/or timing delays in the construction of powerhouses, fuel fabrication facilities, or fuel recycling facilities;

•delays in obtaining, or failure to obtain, regulatory approvals;

•delays in customer purchase decisions in anticipation of new configurations;

•customer confusion and extended evaluation and negotiation time;

•failure to educate our sales, marketing, and consulting personnel to work with new configurations;

•competition from earlier and more established market entrants;

•market acceptance of earlier configurations; and

•the accuracy of assumptions regarding customer demand.

If we are unable to successfully introduce, market, and sell other configurations of our powerhouses in a timely and cost‐effective manner or properly position and/or price our products, our business, results of operations, and financial position could be materially impacted.

25

Table of Contents

We and our customers operate in a politically sensitive environment, and negative public and political perceptions of us, or more generally, of nuclear energy and radioactive materials could materially and adversely affect us, our customers, and the markets in which we operate.

Nuclear energy is closely tied to government policies and regulations due to its potential risks and benefits, including risks and benefits relating to issues such as waste disposal, radiation exposure, non-proliferation (particularly as it relates to plutonium), and national security. Governments often play a central role in the approval, regulation, and funding of nuclear projects. Changes in political leadership or shifts in public sentiment can lead to shifts in nuclear energy policies, which can affect the viability and profitability of nuclear businesses. The regulatory framework for nuclear energy is stringent and subject to public scrutiny. Regulatory decisions can influence the cost, timeline, and feasibility of nuclear projects. Public concerns and political pressure can lead to tighter regulations or stricter enforcement of existing ones. Government policies and incentives, often influenced by public opinion and political considerations, can directly impact the growth and competitiveness of nuclear energy. Favorable policies such as subsidies, tax credits, or incentives for clean energy can attract more customers to the nuclear energy sector.

Changing political environments in the U.S. and abroad may amplify the media and political scrutiny we face. Negative publicity about us, including about our management, the efficacy and reliability of our technologies, and our product offerings, even if inaccurate, may adversely affect our reputation and brand. Additionally, the nature and complexity of our business could make us susceptible to various claims, including government investigations, due to changes in the political environment in the U.S. and the heightened regulatory scrutiny of our industry.

Additionally, while we have made intentional efforts to work with legislators, policymakers, and politicians from across the political spectrum, there may be an external perception that we are solely or primarily associated with one political party. In a highly partisan era, that perception can lead to undue and unexpected scrutiny, can subject us to litigation or governmental investigations, and can otherwise cause us to expend significant resources and attention that we might otherwise use on our business operations. Further, actions we take in response to the activities of certain political leaders, government agencies, and customers could harm our brand and reputation. The resulting harm to our reputation could cause certain customers to cease doing business with us, impair our ability to attract new customers or to expand our relationships with existing customers, diminish our ability to recruit, hire, or retain employees, or undermine our standing in professional communities to which we contribute and from which we receive expert knowledge. Any of these factors could adversely impact our business, results of operations, and financial condition.

Successful execution of our business model is dependent upon public support for nuclear power in the U.S. and other countries. The risks associated with uses of radioactive materials in our nuclear facilities and the public perception of those risks can affect our business. Opposition by third parties can delay or prevent the licensing and construction of new nuclear facilities and, in some cases, can limit the operation of nuclear facilities. Adverse public reaction to developments in the use of nuclear power could directly affect our business and indirectly affect our customers’ businesses. In addition, journalists, trade press, and other third parties, potentially including one or more of the agencies with regulatory jurisdiction over us, may publish statements that negatively affect the public or political perception of us. We may also face adverse public or political perception due to a variety of environmental and social factors, including as relevant standards continue to evolve. Stakeholder and policymaker expectations on such matters are not uniform, and any failure to successfully navigate such expectations may result in various adverse impacts. Adverse public opinion or political perceptions could result in increased regulatory requirements and costs or increased likelihood that our operations are subject to liabilities or adverse claims. In the past, adverse public reaction, increased regulatory scrutiny, and related litigation contributed to extended licensing and construction periods for new nuclear power plants, sometimes delaying construction schedules by decades or more or even shutting down operations at already‐constructed nuclear power facilities.

Incidents involving nuclear energy facilities, including accidents, terrorist acts, or other high profile events involving radioactive materials, could materially and adversely affect the public perception of the safety of nuclear energy, and such adverse effects could potentially decrease demand for nuclear energy, increase regulatory requirements and costs, or result in liability or claims that could materially and adversely affect our business.

Successful execution of our business model is dependent upon public support for nuclear power in the U.S. and other countries. Any significant incident affecting a nuclear energy facility could materially damage public perception of nuclear power. In the past, adverse public reaction to such incidents (for example, incidents involving the Fukushima nuclear power plant in Japan, and incidents at Three Mile Island and Chernobyl) led to increased public and regulatory scrutiny. Such incidents could also impact customer demand for heat, electricity, or fuel derived from nuclear energy. Any of these effects could materially and adversely affect our business, results of operations, and financial condition.

26

Table of Contents

Our use of technologies and systems that employ artificial intelligence or large language models, given the dynamic state of such technologies, may cause inadvertent or unexpected impacts that may harm our business.

Like many companies, we are using and looking for more opportunities to use artificial intelligence technologies, including those that leverage large language models, in an effort to reduce costs and run our business efficiently. In particular, we are evaluating opportunities to leverage artificial intelligence operations in our research & development efforts, as well as in operational areas like procurement and contract management. Some of these technologies are nascent, and their reliability and effectiveness are unproven. As a result, the resources and time we expend to use such systems may ultimately fail to create efficiencies and may even make us less efficient. Additionally, these systems may hallucinate or generate incorrect outputs that may negatively impact our business or operations in unexpected ways if we fail to identify and screen out such errors, particularly if we are using such technologies in our research and development efforts (for example, if we use such technologies to help us evaluate design parameters).

Additionally, the legal and regulatory framework that applies to the use of artificial intelligence technologies is rapidly evolving. Such evolving laws and regulations may prevent us from being able to effectively use such technologies, may increase operational costs associated with the use such technologies, or may subject us to legal or regulatory liabilities.

Our ability to protect our patents and other intellectual property rights may be challenged and is not guaranteed. If we are unable to protect our intellectual property rights, our business and competitive position may be harmed.

We may not be able to prevent unauthorized use of our intellectual property, which could harm our business and competitive position. We rely upon a combination of the intellectual property protections afforded by patents, trademarks/service marks, copyrights, and trade secret laws in the U.S. and other jurisdictions, as well as commercial agreements, such as confidentiality agreements, assignment agreements, and license agreements to establish, maintain and enforce rights associated with our powerhouses, our fuel fabrication, fuel recycling, radioisotope production, and related proprietary technologies. Given that the underlying technology for our powerhouses is many decades old, we primarily use patents to help ensure that others cannot preclude us from using certain technologies or key design aspects.

Our success depends in part on our ability to obtain and enforce patent protection for our powerhouses and related technologies, but our patent applications may not result in issued patents, given the complexity of questions around patentability and the large number of patents and patent applications in related fields. Failing to obtain patent protection may have a material adverse effect on our ability to prevent others from commercializing products similar to ours.

Even if issued, our patents may be contested, challenged, circumvented, invalidated, or limited in scope in the future. The rights granted under any issued patents may not provide us with meaningful protection or competitive advantages, and some foreign countries provide significantly less effective patent enforcement as compared to the U.S. In addition, the claims of any patents that issue from our patent applications may be narrowed in scope during prosecution, challenged as invalid, or may simply not be broad enough to prevent others from developing technologies that are similar or that achieve results similar to ours. For example, competitors may “design around” our patents.

Additionally, some of our technology has been developed with funding from the DOE. Inventions conceived or first actually reduced to practice under agreements with the DOE (“subject inventions”) grant the United States Government (“USG”) certain rights and impose specific obligations on our ability to practice and license these inventions. Specifically, the USG obtains a worldwide, nonexclusive, nontransferable, irrevocable, paid‐up license to practice or have the subject invention practiced for or on behalf of the USG, and we are generally obligated to ensure that any products embodying or produced through the use of any subject invention will be manufactured substantially in the U.S., unless the USG determines that it is not commercially feasible to do so. Failure to abide by the U.S. competitiveness requirements for domestic manufacture of certain subject inventions may also cause us to forfeit and assign all rights to certain inventions to the DOE. Another right the USG has in subject inventions—although it has never exercised such a right—is march‐in rights whereby the USG may require us to license a patent on reasonable terms under very limited circumstances, such as if we or a licensee are not commercializing the invention or if there is a violation of the domestic manufacturing requirement in 35 U.S.C. § 204.

We also rely on unpatented trade secret protection, unpatented know‐how, and continuing technological innovation to develop and help maintain our business and competitive position. We may not be able to prevent the unauthorized disclosure or use of our trade secrets, know‐how, or information that we consider to be confidential, by the parties to these agreements, despite the existence generally of confidentiality provisions and other contractual restrictions. If any of the suppliers, customers, subcontractors, venture partners, employees, and consultants, and other third parties who are parties to these agreements breach or violate the terms of any of these agreements, we may not have adequate remedies for any such breach or violation, and we could lose our trade secrets as a result. It is also possible that our trade secrets, know‐how, or other proprietary information could be obtained by third parties as a result of breaches of our physical or electronic security systems. Even where remedies are available, enforcing a claim that a party illegally disclosed or misappropriated

27

Table of Contents

our trade secrets is expensive and time consuming, and the outcome of such enforcement is unpredictable. Courts outside the U.S. are sometimes less willing to protect trade secrets. Additionally, our trade secrets could become known or be independently discovered by our competitors. If any of our trade secrets were to be lawfully obtained or independently developed by a competitor or other third party, we would have no right to prevent them, or those with whom they share such technology or information, from using that technology or information to compete with us.

We do not have worldwide patent rights for our powerhouses and related proprietary technologies because there is no such thing as a worldwide patent or “international patent rights.” We also do not have worldwide trademark protection for our brand for similar reasons. Accordingly, we may not be able to protect our intellectual property rights in certain jurisdictions and their legal systems. Our competitors may operate in countries where we do not have patent protection and can freely use our technologies and discoveries in such countries to the extent such technologies and discoveries are publicly known or disclosed in countries where we do have patent protection.

We may need to defend ourselves against intellectual property infringement claims, which may be time‐consuming and could cause us to incur substantial fees and costs.

Companies, organizations or individuals, including our existing and future competitors, may hold or obtain patents, trademarks/service marks or other intellectual property rights that would prevent, limit, or interfere with our ability to develop our intellectual property and make, use, develop, import, offer to sell, or sell the power and heat generated by our powerhouses and related technology, which could make it more difficult for us to operate our company. From time to time, we may receive inquiries from holders of patents or trademarks/service marks inquiring whether we are infringing on their proprietary rights. Companies, organizations, or individuals, including our existing and future competitors, may also seek court declarations that they do not infringe on our intellectual property rights. Companies holding patents or other intellectual property rights similar to our technology may bring proceedings alleging infringement of such rights or otherwise asserting their rights and seeking licenses. In addition, if we are determined to have infringed on a third party’s intellectual property rights, we may be required to do among other things, one or more of the following: (i) cease making, using, offering to sell, selling, or importing our powerhouses or the power and heat generated by our powerhouses that incorporate the challenged intellectual property; (ii) pay substantial damages; (iii) pay for and obtain a license from the holder of the infringed intellectual property right, which may not be available on reasonable terms or at all; or (iv) redesign part or all of our technology. In the event of a successful claim of infringement against us and our failure or inability to obtain a license to the infringed technology, our business, results of operations, and financial condition could be materially adversely affected. In addition, any litigation, or claims, whether or not valid, could result in substantial costs and diversion of resources and management’s focus and attention.

We also anticipate licensing patents and other intellectual property from third parties, and we may face claims that the use of this intellectual property infringes on the rights of other third parties. Our rights to indemnification or damages under our license agreements may be unavailable or insufficient to cover our costs and losses, depending on our use of the technology, whether we choose to retain control over conduct of the litigation, and other factors.

Additionally, our confidentiality and intellectual property assignment agreements with our employees, consultants, and contractors generally provide that inventions conceived by the party in the course of rendering services to us will be our exclusive intellectual property. Those agreements may not be honored and obligations to assign intellectual property may be challenged or breached. Moreover, there may be some circumstances where we are unable to negotiate for such ownership rights or where others misappropriate those rights.

We may be subject to claims that former employees, collaborators, or other third parties have an interest in our patents or other intellectual property as an owner, a joint owner, a licensee, an inventor, or a co‐inventor. In the latter two cases, the failure to name the proper inventors on a patent application can result in the patents issuing thereon being unenforceable. Inventorship disputes may arise from conflicting views regarding the contributions of different individuals named as inventors, from the effects of foreign laws where foreign nationals are involved in the development of the subject matter of the patent, from conflicting obligations of third parties involved in developing our patented technology, or as a result of questions regarding co‐ownership of potential joint inventions. Litigation may be necessary to resolve these and other claims challenging inventorship and ownership. Alternatively, or additionally, we may enter into agreements to clarify the scope of our rights in such intellectual property. If we fail in defending any such claims, in addition to paying monetary damages, we may lose exclusive ownership of, or right to use or license valuable intellectual property. Such loss could have a material adverse effect on our business. Even if we are successful in defending against such claims, litigation could result in substantial costs and be a distraction to management and other employees.

If we or our third-party providers fail to protect confidential information and experience data security incidents, we may experience adverse effects, including regulatory enforcement consequences, on our business, results of operations, and financial condition.

28

Table of Contents

In the ordinary course of business, we collect, store, and transmit confidential information (including, but not limited to, intellectual property, proprietary business information, and personal information). We process this information on our own and third-party computer systems, hardware, software, technology, infrastructure and online sites and networks (collectively, “IT Systems”). It is critical that we do so in a secure manner to maintain the confidentiality, availability, and integrity of such confidential information. While we own some of these IT Systems, we also have outsourced elements of our operations to third parties, and as a result we manage a number of third‐party contractors who may provide IT Systems or otherwise have access to our confidential information. Regarding actual powerhouse deployments, we are subject to the NRC’s and/or DOE's regulations in this area, the violation of which could carry regulatory enforcement action.

Despite the implementation of security measures, our IT Systems and those of our contractors and consultants are potentially vulnerable to breakdown or other damage or interruption from service interruptions, system malfunctions, natural disasters, terrorism, war, and telecommunication and electrical failures. Our IT Systems and those of our contractors and consultants also face numerous and evolving cybersecurity risks from diverse threats. These threats may come from a variety of sources including nation-state sponsored espionage and hacking activities, industrial espionage, organized crime, sophisticated organizations, hacking groups, individuals, and fraudulently hired insider threats. Such threats may arise as security breaches from inadvertent or intentional actions by our employees, contractors, consultants, business partners, and/or other third parties, or as cyber‐attacks by malicious third parties, state-sponsored organizations, opportunistic hackers, and hacktivists. These cybersecurity threats may appear through diverse attack vectors, including the deployment of harmful malware, ransomware, denial‐of‐service attacks, social engineering, natural disasters, terrorism, war, and telecommunication and electrical failures, as well as security breaches from inadvertent or intentional actions by our employees, contractors, consultants, business partners and other means to affect service reliability and threaten the confidentiality, integrity and availability of information. Cyberattacks are expected to accelerate on a global basis in frequency and magnitude as threat actors are becoming increasingly sophisticated in using techniques and tools—including artificial intelligence—that circumvent security controls, evade detection, and remove forensic evidence. As a result, we may be unable to detect, investigate, remediate, or recover from future attacks or incidents, or to avoid a material adverse impact to our IT Systems, confidential information, or business. There can also be no assurance that our cybersecurity risk management program and processes, including our policies, controls or procedures, will be fully implemented, complied with or effective in protecting our IT Systems and confidential information. Furthermore, given the nature of complex systems, software, and services like ours, and the scanning tools that we deploy across our networks and products, we regularly identify and track security vulnerabilities. We are unable to comprehensively apply patches or confirm that measures are in place to mitigate all such vulnerabilities, or that patches will be applied before vulnerabilities are exploited by a threat actor.

To the extent that any disruption or security breach were to result in a loss of, or damage to, our data or IT Systems, or inappropriate disclosure of confidential or proprietary information, we could incur liability and reputational damage and the further development and commercialization of our products could be delayed.

Furthermore, significant disruptions of our internal IT Systems or security breaches could result in the loss, misappropriation, and/or unauthorized access, use, or disclosure of, or the prevention of access to, confidential information (including, but not limited to, intellectual property, proprietary business information, export‐controlled information, and personal information), which could result in financial, legal, business, and reputational harm to us. Any such event that leads to unauthorized access, use, or disclosure of personal information, including personal information related to our employees, could harm our reputation directly, compel us to comply with federal and/or state breach notification laws and foreign law equivalents, result in legal claims or proceedings (including class actions), subject us to mandatory corrective action, and otherwise subject us to liability under laws and regulations that protect the privacy and security of personal information, which could result in significant legal and financial exposure and reputational damage that could potentially have an adverse effect on our business. Additionally, some of our systems may be considered to be critical infrastructure systems and so we may have additional obligations in response to a cybersecurity attack. We cannot guarantee that any costs and liabilities incurred in relation to an attack or incident will be covered by our existing insurance policies or that applicable insurance will be available to us in the future on economically reasonable terms or at all.

Any actual or perceived failure to comply with new or existing laws, regulations and other requirements relating to the privacy, security, and processing of personal information could adversely affect our business, results of operations, or financial condition.

In connection with running our business, we process information that relates to individuals, including from our employees and business contacts. We are therefore subject to certain laws and regulations relating to the privacy, security, and handling of personal information. The application and interpretation of such requirements are constantly evolving and are subject to change, creating a complex compliance environment. In some cases, these requirements may be either unclear in their interpretation and application or they may have inconsistent or conflicting requirements with each other. Further, there has been a substantial increase in legislative activity and regulatory focus on data privacy and security in the U.S., including in relation to cybersecurity incidents.

29

Table of Contents

It is possible that new laws and regulations, or amendments to or changes in interpretations of existing laws and regulations, may require us to incur significant costs, implement new processes, or change our handling of information and business operations, which could ultimately hinder our ability to grow our business. These risks are particularly pronounced for our business given that we are participating in multiple governmental programs that involve new and novel licensing or other regulatory pathways, which may ultimately be limited as the result of litigation, regulatory challenges, political decisions, or any number of other factors. In addition, any failure or perceived failure by us to comply with laws, regulations, and other requirements relating to the privacy, security, and handling of information could result in legal claims or proceedings (including class actions), regulatory investigations, or enforcement actions. We could incur significant costs in investigating and defending such claims and, if found liable, pay significant damages or fines or be required to make changes to our business. These proceedings and any subsequent adverse outcomes may subject us to significant negative publicity and an erosion of trust. If any of these events were to occur, our business, results of operations, and financial condition could be materially adversely affected.

Macroeconomic Risks Relating to Our Business

We may experience a disproportionately larger impact from inflation and rising costs.

Inflation has resulted in, and may continue to result in, higher interest rates and capital costs, higher shipping costs, higher material costs (including fuel costs), supply shortages, increased costs of labor, and other similar effects. Although the impact of material cost, labor, or other inflationary or economically driven factors will impact the entire nuclear and energy transition industry (including renewable sources of electricity, like solar and wind), the relative impact will not be the same across the industry, and the particular effects within the industry will depend on a number of factors, including material use, technology, design, structure of supply agreements, project management, and others. Such inflation could significantly affect the competitiveness of our technology and our ability to construct and operate our fuel fabrication facilities, fuel recycling facilities, and powerhouses, which could have a material adverse effect on our business, results of operations, and financial condition.

Uncertain global macroeconomic and political conditions could materially adversely affect our business prospects, results of operations, financial condition, and cash flows.

Our results of operations could be materially affected by economic and political conditions in the U.S. and internationally, including inflation, deflation, fluctuations in interest rates, fluctuations in exchange rates, availability of capital, energy and commodity prices, trade laws, and the effects of governmental initiatives to manage economic conditions.

Potential customers may delay or decrease spending on our powerhouses and related services as their business and budgets are impacted by economic conditions. The inability of potential customers to pay us for power produced by our powerhouses and related services may adversely affect our earnings and cash flows.

The ongoing military conflict in Ukraine has escalated tensions between the U.S., and its North Atlantic Treaty Organization (“NATO”) allies on one hand, and Russia on the other. The U.S. and other NATO member states, as well as some non‐member states, have imposed sanctions against Russia and certain Russian banks, enterprises, and individuals. Now that there are sanctions on Russian companies supplying HALEU, sourcing HALEU presents a supply chain risk. These circumstances have impacted the commercial availability of HALEU, increased the cost of uranium enrichment services to produce HALEU, and could potentially increase the adverse impact on the price of enrichment services and on our future operations.

Further, the sanctions and related countermeasures by NATO states, including the U.S., and other countries have led to, and are likely to continue to lead to, additional market disruptions, including significant volatility in commodity prices, credit, and capital markets, as well as supply chain interruptions for equipment. These disruptions could have an adverse impact on our operations and financial performance. Global supply chain disruptions have increasingly affected the availability and cost of materials, component manufacturing, and deliveries. Disruptions such as military conflicts, sanctions, and other countermeasures between nations, as well as any escalation in tension between nations, may result in delays in equipment deliveries and cost escalations that could adversely affect our business, results of operations, and financial condition.

Our cost estimates are highly sensitive to broader economic factors, and our ability to control or manage our costs may be limited. Building new powerhouses, fuel fabrication facilities, fuel recycling facilities, and radioisotope production facilities is challenging as a result of many factors, including regulatory and construction complexity, and may take longer or cost more than we expect.

30

Table of Contents

Capital and operating costs for the deployment of any energy infrastructure, and especially for our first-of-a-kind powerhouses, are difficult to project, inherently variable, and are subject to significant change based on a variety of factors including, but not limited to, site-specific factors, project-specific testing capabilities, customer offtake requirements, regulatory oversight, operating agreements, fuel pricing (including of HALEU and uranium conversion), supply chain availability effects on reactor and power plant performance, inflation, and other factors, many of which have already increased cost estimates since our initial disclosures relating to our Company in connection with the Recapitalization consummated on May 9, 2024. Opportunities for cost reductions with subsequent deployments are similarly uncertain.

We have received initial third‐party cost estimates related to building and fueling our Aurora powerhouses, which similarly include increases to the estimates we previously prepared in connection with the Recapitalization. The cost estimates may continue to increase significantly through design maturity, accounting for supply chain availability and fuel costs, as we progress through the regulatory process, or as a result of other factors, including unexpected cost increases that particularly affect our powerhouses given their first-of-a-kind nature. The actual cost and time required to construct and operate our powerhouses, recycling facilities, and fuel fabrication facilities or to bring our nuclear power to market at scale may vary significantly from our current forecasts. To the extent cost reductions are not achieved within the expected timeframe or magnitude, powerhouses, such as the Aurora, may not be cost competitive with alternative technologies, which may have a material adverse effect on our business, results of operations, and financial condition, and could harm our reputation.

Source: SEC EDGAR (public domain) · 10-K for the period ended 2025-12-31, filed 2026-03-17 · accession 0001628280-26-018698

Filing HTML rendered to line-structured narrative text by the shipped reducer (datafeeds.edgar_fulltext.visible_text, keep_table_headers=True): scripts and inline-XBRL headers are dropped, and table content is reduced to its short label cells — numeric table data is not rendered and is therefore not counted. The same rendering is used for every year, so a year-over-year comparison is like for like.

The text is our rendering of the filing, not a facsimile: original pagination, typography and tables are not reproduced, and the numbers live in the financial statements (FA).

The outline locates item HEADINGS in this document. Only Items 1A and 7 have certified boundaries elsewhere in the terminal (the redline and the narrative-overlap number); every span here runs from one heading found to the next heading found.

How the outline was chosen. It is the longest chain of item headings that runs forward through both the document and the standard item order: 23 headings are on that chain and 17 further heading-shaped lines are not — the table-of-contents echo of every item, cross-references and exhibit-list mentions. Each entry's length is measured from its heading to the next heading on the chain.