Skip to content
KStart free
AI InfrastructureDefenseQuantumAll studies →

MNTK US Equity

Montauk Renewables, Inc.Utilities · Gas & Other Services Combined · CIK 1826600 · FY ends Dec 31
$1.88
-0.01 (-0.53%)
USD · as of 2026-08-21 · marketstack

MNTK · 10-K · period ended 2020-12-31

← all MNTK documents
filed 2021-03-31 · EDGAR original ↗

Our rendering of the filing — original pagination and typography are not reproduced, and tables are reduced to their short label cells (the figures live on FA). Nothing is summarized: every line below is the filing's own text.

blocks 9441,543 of 3,211390k characters rendered

ITEM 1A. RISK FACTORS.

This Annual Report on Form 10-K contains forward-looking information based on our current

expectations. Because our business is subject to many risks and our actual results may differ materially from any forward-looking statements made by or on behalf of us, this section includes a discussion of important factors that could affect our

business, operating results, financial condition and the trading price of Montauk common stock. You should carefully consider these risk factors, together with all of the other information included in this Annual Report on Form 10-K as well as our other publicly available filings with the SEC. Although the risks are organized by headings, and each risk is discussed separately, many are interrelated.

COVID-19 Risks

The COVID-19 pandemic has had, and is expected to continue to have, an adverse effect on our business, financial

condition and results of operations.

In December 2019, there was an outbreak of a novel strain of coronavirus (“COVID-19”) in China that has since spread to nearly all regions of the world. The outbreak was subsequently declared a pandemic by the World Health Organization in March 2020. To date, the COVID-19 pandemic and preventative measures taken to contain or mitigate the pandemic have caused, and are continuing to cause, business slowdowns or shutdowns in affected areas and significant disruptions in the

financial markets both globally and in the United States.

In response to the COVID-19 pandemic

and related mitigation measures, we began implementing changes in our business in March 2020 to protect our employees and customers, and to support appropriate health and safety protocols. For example, we arranged shifts at facilities to stagger

employees to assist with following social distancing protocols, utilized overnight and weekend remote facility monitoring during normal operating shifts, implemented extensive cleaning and sanitation processes for both facilities and office spaces,

incorporated temperature checks and facial covering requirements, instituted employee and visitor fitness questionnaires, restricted corporate travel and visitor access to sites and implemented work-from-home initiatives for certain employees.

Further, we established the Infectious Disease and Response Committee (the “IDRC”) to lead the development and implementation of Montauk’s Infectious Disease and Response Plan and to oversee the company’s response to any

infectious disease event. These measures resulted in additional costs, which we expect will continue through 2021 as we continue to work to address employee safety.

Although we are unable to predict the ultimate effects of the COVID-19 pandemic at this time, to date,

the pandemic has adversely affected, and is expected to continue to adversely affect, our business, financial condition and results of operations. While we are considered an essential company under the U.S. Federal Cybersecurity and Infrastructure

Security Agency guidance and the various state or local jurisdictions in which we operate, the spread of COVID-19 has disrupted certain aspects of our operations, including our ability to execute on our

business strategy and goals, and complete the development of our projects. Commissioning of our development sites was delayed four to five months in 2020. Delayed commissioning also delays the registrations and qualifications necessary for EPA

pathways, which in turn delays revenue streams from these facilities. In addition, the COVID-19 pandemic has caused delays and disruptions in our operations, including contract cancellations, and decreased our

operational efficiency in maintenance and operations. State and local mitigation protocols have contributed to reduced needs for transportation fuels, which has lowered and could continue to lower state-based environmental premiums. During 2020, we

also faced a reduction in RINs pricing due to the outbreak of COVID-19.

Additionally, certain

third parties with whom we engage, including our project partners, third-party manufacturers and suppliers, and regulators with whom we conduct business have adjusted their operations and are assessing future operational and project needs in light

of the COVID-19 pandemic. If these third parties experience shutdowns or continued business disruptions, our ability to conduct our business in the manner and on the timelines presently planned could be

materially and adversely affected.

-30-

Table of Contents

The COVID-19 pandemic could continue to adversely

affect our business, financial condition and results of operations in the future. Such future effects may be material, and include, but are not limited to:

The situation surrounding the COVID-19 pandemic remains dynamic, and given

its inherent uncertainty, it could have an adverse effect on our business in the future. The duration and extent of the impact from the COVID-19 pandemic depends on future developments that cannot be

accurately predicted at this time, such as the severity and transmission rate of the virus, the extent and effectiveness of containment actions and the impact of these and other factors on our employees, customers, suppliers, and distributors.

Should these conditions persist for a prolonged period, the COVID-19 pandemic, including any of the above factors and others that are currently unknown, could have a material adverse effect on our business,

financial condition and results of operations. The impact of the COVID-19 pandemic may also exacerbate other risks discussed in these risk factors, any of which could have a material effect on us.

Renewable Energy Risks

Our commercial success

depends on our ability to develop and operate individual renewable energy projects.

Our specific focus on the renewable energy

sector exposes us to risks related to the supply of and demand for energy commodities and Environmental Attributes, the cost of capital expenditures, government regulation, world and regional events and economic conditions, and the acceptance of

alternative power sources. As a renewable energy producer, we may also be negatively affected by lower energy output resulting from variable inputs, mechanical breakdowns, faulty technology, competitive electricity markets or changes to the laws and

regulations that mandate the use of renewable energy sources by refiners and importers of gasoline and diesel fuel and electric utilities.

In addition, a number of other factors related to the development and operation of individual renewable energy projects could adversely affect

our business, including:

-31-

Table of Contents

Any of these factors could prevent us from completing or operating our projects, or otherwise adversely affect our business, financial

condition and results of operations.

If there is not sufficient demand for renewable energy, or if renewable energy projects do not develop or take

longer to develop than we anticipate, we may be unable to achieve our investment objectives.

If demand for renewable energy fails

to grow sufficiently, we may be unable to achieve our business objectives. In addition, demand for renewable energy projects in the markets and geographic regions that we target may not develop or may develop more slowly than we anticipate. Many

factors will influence the widespread adoption of renewable energy and demand for renewable energy projects, including:

• increases or decreases in the prices of oil, coal and natural gas;

• availability or effectiveness of government subsidies and incentives.

-32-

Table of Contents

Regulatory Risks

We may be unable to obtain, modify, or maintain the regulatory permits, approvals and consents required to construct and operate our projects.

In order to construct, modify and operate our projects, we will need to obtain or may need to modify numerous environmental and

other regulatory permits, approvals and consents from federal, state and local governmental entities, including air permits, wastewater discharge permits, permits or consents related to the management of municipal solid waste landfills and permits

or consents related to the management and disposal of waste. A number of these permits, approvals and consents must be obtained prior to the start of development of a project. Other permits, approvals and consents are required to be obtained at, or

prior to, the time of first commercial operation or within prescribed time frames following commencement of commercial operations. Any failure to successfully obtain or modify the necessary environmental and other regulatory permits, approvals and

consents on a timely basis could delay the construction, modification or commencement of commercial operation of our projects. In addition, once a permit, approval or consent has been issued or acquired for a project, we must take steps to comply

with the conditions of each permit, approval or consent conditions, including conditions requiring timely development and commencement of the project. Failure to comply with certain conditions within a permit, approval or consent could result in the

revocation or suspension of such permit, approval or consent; the imposition of penalties; or other enforcement action by governmental entities. We also may need to modify permits, consents or approvals we have already obtained to reflect changes in

project design or requirements, which could trigger a legal or regulatory review under a standard more stringent than the standard under which the permits, approvals or consents were originally issued.

Obtaining and modifying necessary permits, approvals and consents is a time-consuming and expensive process, and we may not be able to obtain

or modify them on a timely or cost effective basis or at all. In the event that we fail to obtain or modify all necessary permits, approvals or consents, we may be forced to delay construction or operation of a project or abandon the project

altogether, which could adversely affect our business, financial condition and results of operations. In addition, we may be required to make capital expenditures on an ongoing basis to comply with increasingly stringent federal, state, provincial

and local EHS laws, regulations and permits.

The reduction or elimination of government economic incentives for renewable energy projects or other

related policies could adversely affect our business, financial condition and results of operations.

We depend, in part, on

Environmental Attributes, which are federal, state and local government incentives in the United States, provided in the form of RINs, RECs, LCFS credits, rebates, tax credits and other incentives to end users, distributors, system integrators and

manufacturers of renewable energy projects, that promote the use of renewable energy. RINs are created through the RFS program administered by the EPA, which requires transportation fuel sold in the United States to contain a minimum volume of

renewable fuel and permits refineries and importers of transportation fuel to satisfy their RVOs by purchasing either (i) D5 RINs and cellulosic waiver credits (“CWCs”) or (ii) D3 RINs. RECs are created through state law

requirements for utilities to purchase a portion of their energy from renewable energy sources. 60% and 56% of our revenues for 2020 and 2019, respectively, were generated from the sale of Environmental Attributes. These government economic

incentives could be reduced or eliminated altogether, or the categories of renewable energy qualifying for such government economic incentives could be changed. These renewable energy program incentives are subject to regulatory oversight and could

be administratively or legislatively changed in a manner that could adversely affect our operations. Further, the generation of LCFS credits on our dairy farm project is expected to increase the percentage of our revenues generated from

Environmental Attributes. Reductions in, changes to, or eliminations or expirations of governmental incentives could result in decreased demand for, and lower revenues from, our projects. Changes in the level or structure of the RPS of a state for

electricity could also result in a decline in our revenues or decreased demand for, and lower revenues from, our electricity projects.

-33-

Table of Contents

Negative attitudes toward renewable energy projects from the U.S. government, other lawmakers and

regulators, and activists could adversely affect our business, financial condition and results of operations.

Parties with an

interest in other energy sources, including lawmakers, regulators, policymakers, environmental and advocacy organizations or other activists may invest significant time and money in efforts to delay, repeal or otherwise negatively influence

regulations and programs that promote renewable energy. Many of these parties have substantially greater resources and influence than we have. Further, changes in U.S. federal, state or local political, social or economic conditions, including a

lack of legislative focus on these programs and regulations, could result in their modification, delayed adoption or repeal. Any failure to adopt, delay in implementing, expiration, repeal or modification of these programs and regulations, or the

adoption of any programs or regulations that encourage the use of other energy sources over renewable energy, could adversely affect our business, financial condition and results of operations.

In addition, in June 2019, the EPA issued the final Affordable Clean Energy (“ACE”) rule and repealed the Clean Power Plan

(the “CPP”), which had previously established standards to limit carbon dioxide emissions from existing power generation facilities. Under the ACE rule, emissions from electric utility generation facilities would be regulated only

through the use of various “inside the fence” or onsite efficiency improvements and emission control technologies. In contrast, the CPP allowed facility owners to reduce emissions with “outside the fence” measures, including

those associated with renewable energy projects. On January 19, 2021, the United States Court of Appeals for the D.C. Circuit vacated the ACE rule and remanded the rule back to EPA for reconsideration of the “best system of emission

reduction.” It is anticipated that EPA will draft a new rule regulating GHG emissions, the impact of which on our operations is unclear.

Revenue from any projects we complete may be adversely affected if there is a decline in public acceptance or support of renewable energy, or regulatory

agencies, local communities, or other third parties delay, prevent, or increase the cost of constructing and operating our projects.

Certain persons, associations and groups could oppose renewable energy projects in general or our projects specifically, citing, for example,

misuse of water resources, landscape degradation, land use, food scarcity or price increase and harm to the environment. Moreover, regulation may restrict the development of renewable energy plants in certain areas. In order to develop a renewable

energy project, we are typically required to obtain, among other things, environmental impact permits or other authorizations and building permits, which in turn require environmental impact studies to be undertaken and public hearings and comment

periods to be held during which any person, association or group may oppose a project. Any such opposition may be taken into account by government officials responsible for granting the relevant permits, which could result in the permits being

delayed or not being granted or being granted solely on the condition that we carry out certain corrective measures to the proposed project. Opposition to our projects’ requests for permits or successful challenges or appeals to permits issued

for our projects could adversely affect our operating plans.

As a result, we cannot guarantee that the renewable energy plants we

currently plan to develop or, to the extent applicable, are developing, will ultimately be authorized or accepted by the local authorities or the local population. For example, the local population could oppose the construction of a renewable energy

plant or infrastructure at the local government level, which could in turn lead to the imposition of more restrictive requirements. This type of negative response may lead to legal, public relations or other challenges that could impede our ability

to meet our construction targets, achieve commercial operations for a project on schedule, address the changing needs of our projects over time or generate revenues.

In certain jurisdictions, if a significant portion of the local population were to mobilize against a renewable energy plant, it may become

difficult, or impossible, for us to obtain or retain the required building permits and authorizations. Moreover, such challenges could result in the cancellation of existing building permits or even, in extreme cases, the dismantling of, or the

retroactive imposition of changes in the design of, existing renewable energy plants.

-34-

Table of Contents

Authorization for the use, construction, and operation of systems and associated

transmission facilities on federal, state, and local lands will also require the assessment and evaluation of mineral rights, private rights-of-way, and other easements;

environmental, agricultural, cultural, recreational, and aesthetic impacts; and the likely mitigation of adverse effects to these and other resources and uses. The inability to obtain the required permits and other federal, state and local

approvals, and any excessive delays in obtaining such permits and approvals due, for example, to litigation or third-party appeals, could potentially prevent us from successfully constructing and operating such projects in a timely manner and could

result in the potential forfeiture of any deposit we have made with respect to a given project. Moreover, project approvals subject to project modifications and conditions, including mitigation requirements and costs, could affect the financial

success of a given project. Changing regulatory requirements and the discovery of unknown site conditions could also adversely affect the financial success of a given project.

A decrease in acceptance of renewable energy plants by local populations, an increase in the number of legal challenges, or an unfavorable

outcome of such legal challenges could adversely affect our business, financial condition and results of operations. We may also be subject to labor unavailability due to multiple simultaneous projects in a geographic region. If we are unable to

grow and manage the capacity that we expect from our projects in our anticipated timeframes, it could adversely affect our business, financial condition and results of operations.

Existing regulations and policies, and future changes to these regulations and policies, may present technical, regulatory and economic barriers to the

generation, purchase and use of renewable energy, and may adversely affect the market for credits associated with the production of renewable energy.

The market for renewable energy is influenced by U.S. federal, state and local government regulations and policies concerning renewable energy.

These regulations and policies are continuously being modified, which could result in a significant future reduction in the potential demand for renewable energy, including RINs, RECs and LCFS credits, renewable energy project development and

investments. Any new government regulations applicable to our renewable energy projects or markets for renewable energy may result in significant additional expenses or related development costs and, as a result, could cause a significant reduction

in demand for our renewable energy.

The EPA annually sets proposed RVOs for D3 RINs in accordance with the mandates established by EISA.

The EPA’s issuance of timely and sufficient annual RVOs to accommodate the RNG industry’s growing production levels is necessary to stabilize the RIN market. Although the 590 million D3 RIN volume for 2020 is a 41% increase over 2019

levels, there can be no assurance that the EPA will timely set annual RVOs or that the RVOs will continue to increase or satisfy the growing receivable natural gas market. The manner in which the EPA will establish RVOs beginning in 2023, when the

statutory RVO mandates are set to expire, is expected to create additional uncertainty as to RIN pricing. In addition, the EPA has exempted a number of small refineries from their RVOs through the issuance of waivers under U.S. federal law and is

expected to continue to do so. Uncertainty as to how the RFS program will continue to be administered and supported by the EPA under the new U.S. presidential administration has created price volatility in the RIN market. We cannot assure you that

we will be able to monetize the RINs we generate at the same price levels as we have in the past, that production shortfalls will not impact our ability to monetize RINs at favorable current pricing, and that the rising price environment will

continue.

In order to benefit from RINs and LCFS credits, our RNG projects are required to be registered and are subject to regulatory audit.

We are required to register an RNG project with the EPA and relevant state regulatory agencies. Further, we qualify our RINs

through a voluntary Quality Assurance Plan, which typically takes from three to five months from first injection of RNG into the commercial pipeline system. Although no similar qualification process currently exists for LCFS credits, we expect such

a process to be implemented and would expect to seek

-35-

Table of Contents

qualification on a state by state basis under such future programs. Delays in obtaining registration, RIN qualification, and any future LCFS credit qualification of a new project could delay

future revenues from the project and could adversely affect our cash flow. Further, we typically make a large investment in the project prior to receiving the regulatory approval and RIN qualification. By registering each RNG project with the

EPA’s voluntary Quality Assurance Plan, we are subject to quarterly third-party audits and semi-annual on-site visits of our projects to validate generated RINs and overall compliance with the RFS

program. We are also subject to a separate third party’s annual attestation review. The Quality Assurance Plan provides a process for RIN owners to follow, for an affirmative defense to civil liability, if used or transferred Quality Assurance

Plan verified RINs were invalidly generated. A project’s failure to comply could result in remedial action by the EPA, including penalties, fines, retirement of RINs, or termination of the project’s registration, any of which could

adversely affect our business, financial condition and results of operations.

Operating Risks

Our renewable energy projects may not generate expected levels of output.

The renewable energy projects that we construct and own are subject to various operating risks that may cause them to generate less than

expected amounts of RNG or electricity. These risks include a failure or wearing out of our or our landfill operators’, customers’ or utilities’ equipment; an inability to find suitable replacement equipment or parts; less than

expected supply or quality of the project’s source of biogas and faster than expected diminishment of such biogas supply; or volume disruption in our fuel supply collection system. Any extended interruption and or volume disruption in the

project’s operation, or failure of the project for any reason to generate the expected amount of output, could adversely affect our business and operating results. In addition, we have in the past, and may in the future, incur material asset

impairment charges if any of our renewable energy projects incurs operational issues that indicate our expected future cash flows from the project are less than the project’s carrying value. Any such impairment charge could adversely affect our

operating results in the period in which the charge is recorded.

The concentration in revenues from five of our projects and geographic

concentration of our projects expose us to greater risks of production interruptions from severe weather or other interruptions of production or transmission.

A substantial portion of our revenues are generated from five project sites. For the years ended December 31, 2020 and 2019, excluding the

effect of derivative instruments, approximately 78.7% and 80.4%, respectively, of operating revenues were derived from these locations. During 2020, RNG production at our McCarty, Rumpke, Atascocita and Apex facilities accounted for approximately

22.6%, 24.8%, 20.6%, and 9.6% of our RNG revenues, respectively, and 18.8%, 28.9%, 19.6%, and 9.9% of the RNG we produced during 2020, respectively. During 2020, Renewable Electricity production at our Bowerman Power LFG, LLC (“Bowerman”)

facility accounted for approximately 86.8% of our Renewable Electricity Generation revenues and 61.2% of the Renewable Electricity we produced during 2020. A lengthy interruption of production or transmission of renewable energy from one or more of

these projects, as a result of a severe weather event, failure or degradation of our or a landfill operator’s equipment or interconnection transmission problems could have a disproportionate effect on our revenues and cash flow as further

described below.

Our Atascocita, McCarty, Galveston and Coastal Plains projects are located within 20 miles of each other near Houston,

Texas and seven of our other RNG projects are located in relatively close proximity to each other in Pennsylvania and Ohio. Regional events, such as gas transmission interruptions, regional availability of replacement parts and service in the event

of equipment failures and severe weather events in either of those geographic regions could adversely affect our RNG production and transmission more than if our projects were more geographically diversified. Recent historical cold weather impacted

our Houston, Texas facilities during the winter of 2021. Production at these facilities was temporarily idled from February 14, 2021 through February 20, 2021 while the facilities were without power. The index based pricing for the cost of

utilities were adversely

-36-

Table of Contents

impacted during the month of February. Force majeure events were declared for the period February 12 through February 22, 2021 related to these weather events. These facilities have

resumed operations and the Company expects that the cost of utilities will return to historical levels. Additionally, recent California wildfires, which occurred in October of 2020, forced our Bowerman facility to temporarily shut down and caused

limited damage to our facility and equipment. Production was reduced by approximately 38% at the Bowerman facility during the fourth quarter of 2020 as compared to the fourth quarter of 2019. Our Bowerman revenues were reduced by approximately 20%

in the fourth quarter of 2020 over the prior year quarter and we expect 2021 first quarter revenues to be approximately 16% less than the 2020 first quarter.

Our use and enjoyment of real property rights for our projects may be adversely affected by the rights of lienholders and leaseholders that are superior

to those of the grantors of those real property rights to our projects.

Our projects generally are, and any of our future projects

are likely to be, located on land occupied pursuant to long-term easements, leases and rights of way. The ownership interests in the land subject to these easements, leases and

rights-of-way may be subject to mortgages securing loans or other liens (such as tax liens) and other easement, lease rights and rights-of-way of third parties (such as leases of oil or mineral rights) that were created prior to our projects’ easements, leases and

rights-of-way. As a result, certain of our projects’ rights under these easements, leases or

rights-of-way may be subject, and subordinate, to the rights of those third parties. We may not be able to protect our operating projects against all risks of loss of

our rights to use the land on which our projects are located, and any such loss or curtailment of our rights to use the land on which our projects are located and any increase in rent due on such lands could adversely affect our business, financial

condition and results of operations.

Our projects are not able to insure against all potential risks and may become subject to higher insurance

premiums.

Our projects are exposed to the risks inherent in the construction and operation of renewable energy projects, such as

breakdowns, manufacturing defects, natural disasters, terrorist attacks and sabotage. We are also exposed to environmental risks. For example, our McCarty facility experienced the loss of one of its two production engines for the period of

November 27, 2019 through March 27, 2020. The related commissioning and ramp up of the replacement engine was completed during the second quarter of 2020. Additionally, as described above, our Bowerman facility, located near major

earthquake faults and fire zones, temporarily shut down due to the California wildfires in October 2020 which caused limited damage to our facility and equipment. Production and revenues were reduced in 2020 (as compared to 2019) as described above,

and we expect 2021 first quarter revenues to be approximately 16% less than the 2020 first quarter.

We have insurance policies covering

certain risks associated with our business. Our insurance policies do not, however, cover all losses, including those as a result of force majeure. We don’t expect any insurance recovery from the shutdowns in Houston in February 2021 or from

the Bowerman shutdown in October 2020. Insurance liabilities are difficult to assess and quantify due to unknown factors, including the severity of an injury, the determination of our liability in proportion to other parties, the number of incidents

not reported and the effectiveness of our safety program. In addition, while our insurance policies for some of our projects cover losses as a result of certain types of natural disasters, terrorist attacks or sabotage, among other things, such

coverage is subject to important limitations and is not always available in the insurance market on commercially reasonable terms (if at all) and is often capped at predetermined limits. In addition, our insurance policies are subject to annual

review by our insurers and may not be renewed on similar or favorable terms or at all. A serious uninsured loss or a loss significantly exceeding the limits of our insurance policies could adversely affect our business, financial condition and

results of operations.

-37-

Table of Contents

New Project and Growth Risks

Acquisition, financing, construction and development of new projects and project expansions and conversions may not commence on anticipated timelines or

at all.

Our strategy is to continue to expand in the future, including through the acquisition of additional projects. From time

to time, we enter into nonbinding letters of intent for projects. However, until the negotiations are finalized and the parties have executed definitive documentation, we cannot assure you that we will be able to enter into any development or

acquisition transactions, or any other similar arrangements, on the terms in the applicable letter of intent or at all.

The acquisition,

financing, construction and development of new projects involves numerous risks, including:

• failure to obtain all necessary rights to land access and use;

• assumptions with respect to the cost and schedule for completing construction;

• the ability to obtain financing for a project on acceptable terms or at all;

• delays in deliveries or increases in the prices of equipment;

• increases in the cost of labor, labor disputes and work stoppages;

• failure to receive quality and timely performance of third-party services;

• unforeseen engineering and environmental problems;

• cost overruns;

• accidents involving personal injury or the loss of life; and

In

addition, new projects have no operating history and may employ recently developed technology and equipment. A new project may be unable to fund principal and interest payments under its debt service obligations or may operate at a loss, which may

adversely affect our business, financial condition or results of operations.

We may also experience delays and cost overruns in

converting existing facilities from Renewable Electricity to RNG production. During the conversation projects, there is a gap in production and relating revenue while the electricity project is offline until it commences operation as an RNG

facility, which adversely affects our financial condition and results of operations.

In order to secure contracts for new projects, we typically

face a long and variable development cycle that requires significant resource commitments and a long lead time before we realize revenues.

The development, design and construction process for our renewable energy projects generally lasts from 12 to 24 months, on average. We

frequently receive requests for proposals from potential site hosts as part of their consideration of alternatives for their proposed projects. Prior to responding to an RFP, we typically conduct a preliminary audit of the site host’s needs and

assess whether the site is commercially viable based on our

-38-

Table of Contents

expected return on investment, investment payback period, and other operating metrics, as well as the necessary permits to develop a project on that site. If we are awarded a project, we then

perform a more detailed review of the site’s facilities, which serves as the basis for the final specifications of the project. Finally, we negotiate and execute a contract with the site host. This extended development process requires the

dedication of significant time and resources from our sales and management personnel, with no certainty of success or recovery of our expenses. A potential site host may go through the entire sales process and not accept our proposal. Further, upon

commencement of operations, it typically takes 12 months or longer for the project to ramp up to our expected production level. All of these factors, and in particular, increased spending that is not offset by increased revenues, can contribute to

fluctuations in our quarterly financial performance and increase the likelihood that our operating results in a particular period will fall below investor expectations.

We plan to expand our business in part through developing RNG recovery projects at landfills and livestock farms, but we may not be able to identify

suitable locations or complete development of new projects.

Historically, development of new RNG projects at landfills and

livestock farms has been a significant part of our growth strategy. We plan to continue to develop new RNG projects at landfills and livestock farms to expand our project skillsets and capabilities, expand and complement our existing geographic

markets, add experienced management and increase our product offerings. However, we may be unable to implement this growth strategy if we cannot identify suitable landfills and livestock farms on which to develop projects, reach agreements with

landfill or livestock farm owners to develop RNG projects on acceptable terms or arrange required financing for new projects on acceptable terms. While the EPA has identified an additional 477 landfills as candidates for biogas projects, based on

our industry experience and technical knowledge and analysis, after evaluating their currently available LFG collection systems and potential production capacities, we believe that approximately 25 of these sites are potentially economically viable

as projects for acquisition and growth. In the future, additional candidate landfills may become economically viable as their growth increases LFG production and requires installation of LFG collection systems. However, the time and effort involved

in attempting to identify suitable sites and development of new projects may divert members of our management from our operations.

Our dairy farm

project has, and any future digester project will have, different economic models and risk profiles than our landfill facilities, and we may not be able to achieve the operating results we expect from these projects.

Our dairy farm project produces significantly less RNG than our landfill facilities. As a result, we will be even more dependent on the LCFS

credits and RINs produced at our dairy farm project than on the RINs produced at our landfill facilities for the project’s commercial viability. Since the number of LCFS credits for RNG generated on dairy farms is significantly greater than the

number of LCFS credits for RNG generated at landfills, we are substantially more dependent upon the revenue from LCFS credits for the commercial viability of the dairy farm project. In the event that CARB reduces the CI score that it applies to

waste conversion projects, such as dairy digesters, the number of LCFS credits for RNG generated at our dairy farm project will decline. Additionally, revenue from LCFS credits also depends on the price per LCFS credit, which is driven by various

market forces, including the supply of and demand for LCFS credits, which in turn depends on the demand for traditional transportation fuel and the supply of renewable fuel from other renewable energy sources, and mandated CI targets, which

determine the number of LCFS credits required to offset LCFS deficits, and which increase over time. Fluctuations in the price of LCFS credits or the number of LCFS credits assigned will have a significantly greater impact on the success of our

dairy farm project than the value that RINs have on our landfill facilities. A significant decline in the value of LCFS credits could require us to incur an impairment charge on our dairy farm project and could adversely affect our business,

financial condition and results of operations.

-39-

Table of Contents

While we currently focus on converting methane into renewable energy, in the future we may decide to

expand our strategy to include other types of projects. Any future energy projects may present unforeseen challenges and result in a competitive disadvantage relative to our more established competitors.

Our business is currently focused on converting methane into renewable energy. In the future, we may expand our strategy to include other types

of projects. We cannot assure you that we will be able to identify attractive opportunities outside of our current area of focus or acquire or develop such projects at a price and on terms that are attractive or that, once acquired or developed,

such projects will operate profitably. In addition, these projects could expose us to increased operating costs, unforeseen liabilities or risks, and regulatory and environmental concerns associated with entering into new sectors of the energy

industry, including requiring a disproportionate amount of our management’s attention and resources, which could adversely affect our business, as well as place us at a competitive disadvantage relative to more established market participants.

A failure to successfully integrate such new projects into our existing project portfolio as a result of unforeseen operational difficulties or otherwise, could adversely affect our business, financial condition and results of operations.

Any future acquisitions, investments or other strategic relationships that we make could disrupt our business, cause dilution to our stockholders or

harm our business, financial condition or operating results.

We expect future acquisitions of companies, purchases of assets and

other strategic relationships to be an important part of our growth strategy. We plan to use acquisitions to expand our capabilities, expand our geographic markets, add experienced management and add to our project portfolio. However, we may not be

able to identify suitable acquisition or investment candidates, reach agreements with acquisition targets on acceptable terms or arrange for any required financing for an acquisition on acceptable terms, any of which would materially impact our

present strategy. Further, if we are successful in consummating acquisitions, those acquisitions could subject us to a number of risks, including:

Any of these factors could adversely affect our business, financial condition and operating results.

-40-

Table of Contents

Third-Party Partner Risks

Failure of third parties to manufacture quality products or provide reliable services in a timely manner could cause delays in developing and operating

our projects, which could damage our reputation, adversely affect our partner relationships or adversely affect our growth.

Our

success depends on our ability to develop and operate projects in a timely manner, which depends in part on the ability of third parties to provide us with timely and reliable products and services. In developing and operating our projects, we rely

on products meeting our design specifications and components manufactured and supplied by third parties, and on services performed by subcontractors. We also rely on subcontractors to perform substantially all of the construction and installation

work related to our projects, and we often need to engage subcontractors with whom we have no experience.

If any of our subcontractors

are unable to provide services that meet or exceed our customers’ expectations or satisfy our contractual commitments, our reputation, business and operating results could be harmed. In addition, if we are unable to avail ourselves of

warranties and other contractual protections with providers of products and services, we may incur liability to our customers or additional costs related to the affected products and services, which could adversely affect our business, financial

condition and results of operations. Moreover, any delays, malfunctions, inefficiencies or interruptions in these products or services could adversely affect the quality and performance of our projects and require considerable expense to maintain

and repair our projects. This could cause us to experience interruption in our production and distribution of renewable energy and generation of related Environmental Attributes, difficulty retaining current relationships and attracting new

relationships, or harm our brand, reputation or growth.

Our projects rely on interconnections to distribution and transmission facilities that are

owned and operated by third parties, and as a result, are exposed to interconnection and transmission facility development and curtailment risks.

Our projects are interconnected with electric distribution and transmission facilities owned and operated by regulated utilities necessary to

deliver the Renewable Electricity that we produce. Our RNG projects are similarly interconnected with gas distribution and interstate pipeline systems that are also required to deliver RNG A failure or delay in the operation or development of these

distribution or transmission facilities could result in a loss of revenues or breach of a contract because such a failure or delay could limit the amount of RNG and Renewable Electricity that our operating projects deliver or delay the completion of

our construction projects. In addition, certain of our operating projects’ generation may be curtailed without compensation due to distribution and transmission limitations, reducing our revenues and impairing our ability to capitalize fully on

a particular project’s potential. Such a failure or curtailment at levels above our expectations could impact our ability to satisfy our supply agreements and adversely affect our business. For example, our Bowerman project lost a partial day

in 2018 (March 31), and five days in 2019 (April 1-5), and then was curtailed for approximately 55 days (ending at 80% of power output) while the utility operator designed and permitted a permanent fix. Our

Bowerman project also lost two days in 2019 (June 30-July 1) while the utility operator made permanent repairs. The Bowerman facility was also idled for 34 days in 2020 (October 27 – November 29) due to

California wildfires. Additionally, we experience work interruptions from time to time due to federally required maintenance shutdowns.

We may acquire projects with their own interconnections to available transmission and distribution networks. In some cases, these projects may

cover significant distances. A failure in our operation of these projects that causes the projects to be temporarily out of service, or subject to reduced service, could result in lost revenues because it could limit the amount of Renewable

Electricity and RNG our operating projects are able to deliver.

-41-

Table of Contents

We are dependent upon our relationships with Waste Management and Republic Services for the operation

and maintenance of landfills on which several of our RNG and Renewable Electricity projects operate.

We currently operate eight

renewable energy projects (seven RNG projects and one Renewable Electricity project) on landfills operated by Waste Management and two RNG projects on landfills operated by Republic Services. Our projects located on Waste Management and Republic

Services operated landfills represented approximately 30.8% and 23.7%, respectively, of our revenues for 2020. We are dependent upon Waste Management and Republic Services to operate and maintain their landfill facilities and provide a continuous

supply of waste for conversion to RNG and Renewable Electricity. Further, we consider our relationship with these landfill operators an important factor in our growth strategy for additional projects. In the event that we fall out of favor with

either of these landfill operators due to a dispute, problems with our operations at one of their facilities or otherwise, the landfill operator may seek to terminate the related project and be less inclined to work with us on future projects.

Additionally, Waste Management and Republic Services could seek to develop their own waste-to-renewable energy conversion projects at other existing landfill locations in lieu of contracting with us for these projects. Failure to maintain these favorable relationships could adversely affect

our business, growth strategy, financial condition and results of operations.

We have significant customer concentration, with a limited number of

customers accounting for a substantial portion of our revenues.

For 2020, sales to ExxonMobil, City of Anaheim, Royal Dutch Shell

plc, and Victory Renewables, LLC represented approximately 15.1%, 14.4%, 14.1% and 11.3%, respectively of our operating revenues. In addition, including two of the previous customers, five customers made up approximately 81%, 67% and 72% of our

accounts receivable as of December 31, 2020, 2019 and 2018, respectively. Revenues from our largest customers may fluctuate from time to time based on our customers’ business needs, market conditions or other factors outside of our

control. If any of our largest customers terminates its relationship with us, such termination could adversely affect our revenues and results of operations.

Our fuel supply agreements with site hosts have defined contractual periods, and we cannot assure you that we will be able to successfully extend these

agreements.

Fuel supply rights are issued by the landfill owner to operators for a contractual period. As operators, we have

already invested resources in the development of existing sites and the ability to extend these contracts on expiration would enable us to achieve operational efficiency in continuing to generate revenues from a site without significant additional

capital investments. We cannot assure you that we will be able to extend existing fuel supply agreements when they expire.

Our PPAs, fuel-supply

agreements, RNG off-take agreements and other agreements contain complex price adjustments, calculations and other terms based on gas price indices and other metrics, the interpretation of which could result

in disputes with counterparties that could affect our results of operations and customer relationships.

Certain of our PPAs, fuel

supply agreements, RNG off-take agreements and other agreements require us to make payments or adjust prices to counterparties based on past or current changes in gas price indices, project productivity or

other metrics and involve complex calculations. Moreover, the underlying indices governing payments under these agreements are subject to change, may be discontinued or replaced. The interpretation of these price adjustments and calculations and the

potential discontinuation or replacement of relevant indices or metrics could result in disputes with the counterparties with respect to these agreements. Any such disputes could adversely affect project revenues, expense margins, customer or

supplier relationships, or lead to costly litigation, the outcome of which we would be unable to predict.

-42-

Table of Contents

Market Pricing Risks

Our renewable fuel projects may be exposed to the volatility of the price of RINs.

The price of RINs is driven by various market forces, including gasoline prices and the availability of renewable fuel from other renewable

energy sources and conventional energy sources. Refiners are permitted to carry-over up to 20% RINs generated for one calendar year after the RINs are generated to satisfy their RVOs. As a result, we are only able to sell RINs on a forward basis for

the year in which the RINs are generated and the following year. We may be unable to manage the risk of volatility in RIN pricing for all or a portion of our revenues from RINs, which would expose us to the volatility of commodity prices with

respect to all or the portion of RINs that we are unable to sell through forward contracts, including risks resulting from changes in regulations, general economic conditions and changes in the level of renewable energy generation. We expect to have

quarterly variations in the revenues from the projects in which we generate revenue from the sale of RINs that we are unable to sell through forward contracts.

Our revenues may be subject to the risk of fluctuations in commodity prices.

The operations and financial performance of projects in the renewable energy sectors may be affected by the prices of energy commodities, such

as natural gas, wholesale electricity and other energy-related products. For example, the price of renewable energy resources changes in relation to the market prices of natural gas and electricity. The market price for natural gas is sensitive to

cyclical demand and capacity supply, changes in weather patterns, natural gas storage levels, natural gas production levels, general economic conditions and the volume of natural gas imports and exports. The market price of electricity is sensitive

to cyclical changes in demand and capacity supply, and in the economy, as well as to regulatory trends and developments impacting electricity market rules and pricing, transmission development and investment to power markets within the United States

and in other jurisdictions through interconnects and other external factors outside of the control of renewable energy power-producing projects. Volatility of commodity prices also creates volatility in the prices of Environmental Attributes, since

the value of D3 RINs is linked to the price of CWCs, which are inversely affected by the wholesale price of unleaded gasoline. In addition, volatility of commodity prices, such as the market price of gas and electricity, may also make it more

difficult for us to raise any additional capital for our renewable energy projects that may be necessary to operate, to the extent that market participants perceive that a project’s performance may be tied directly or indirectly to commodity

prices. Accordingly, the potential revenues and cash flows of these projects may be volatile and adversely affect the value of our investments.

Our off-take agreements for the sale of RNG are typically shorter in duration than our fuel supply

agreements. Accordingly, if we are unable to renew or replace an off-take agreement for a project for which we continue to produce RNG, we would be subject to the risks associated with selling the RNG produced

at that project at then-current market prices. We may be required to make such sales at a time when the market price for natural gas as a whole or in the region where that project is located, is depressed. If this were to occur, we would be subject

to the volatility of gas prices and be unable to predict our revenues from such project, and the sales prices for such RNG may be lower than what we could sell the RNG for under an off-take agreement.

We are subject to volatility in prices of RINs and other Environmental Attributes.

Volatility of commodity prices creates volatility in the price of Environmental Attributes. The value of RINs is inversely proportionate to the

wholesale price of unleaded gasoline. Further, the production of RINs significantly in excess of the RVOs set by the EPA for a calendar year could adversely affect the market price of RINs, particularly towards the end of the year, if refiners and

other Obligated Parties have satisfied their RVOs for the year. A significant decline in the price of RINs and price of LCFS credits for a prolonged period could adversely affect our business, financial condition and results of operations, and could

require us to take an impairment charge relating to one or more of our projects.

-43-

Table of Contents

We are exposed to the risk of failing to meet our contractual commitments to sell RINs from our

production.

We have in the past, and may from time to time in the future, sell forward a portion of our RINs under contracts to

fix the revenues from those attributes for financing purposes or to manage our risk against future declines in prices of such Environmental Attributes. If our RNG projects do not generate the amount of RINs sold under such forward contracts, or if

for any reason the RNG we generate does not produce RINs, we may be required to make up the shortfall of RINs under such forward contracts through purchases on the open market or by making payments of liquidated damages. Forward selling of a portion

of our RINs could result in realized prices monetized in a year which do not correspond directly to index prices.

The failure of our hedge

counterparties or significant customers to meet their obligations to us may adversely affect our financial results.

To the extent

we are able to hedge our RNG revenues, our hedging transactions expose us to the risk that a counterparty fails to perform under a derivative contract. Disruptions in the financial markets could lead to sudden decreases in a counterparty’s

liquidity, which could make them unable to perform under the terms of the derivative contract and we may not be able to realize the benefit of the derivative contract. Any default by the counterparty to these derivative contracts when they become

due would adversely affect our business, financial condition and results of operations.

We also face credit risk through the sale of our

RNG production. We are also subject to credit risk due to concentration of our RNG receivables with a limited number of significant customers. We do not require our customers to post collateral. The inability or failure of our significant customers

to meet their obligations to us or their insolvency or liquidation may adversely affect our financial results.

Environmental Risks

Our operations are subject to numerous stringent environmental, health and safety laws and regulations that may expose us to significant costs and

liabilities.

Our operations are subject to stringent and complex federal, state and local EHS laws and regulations, including

those relating to the release, emission or discharge of materials into the air, water and ground, the generation, storage, handling, use, transportation and disposal of hazardous materials and wastes, the health and safety of our employees and other

persons, and the generation of RINs and LCFS credits.

These laws and regulations impose numerous obligations applicable to our

operations, including the acquisition of permits before construction and operation of our projects; the restriction of types, quantities and concentration of materials that can be released into the environment; the limitation or prohibition of our

activities on certain lands lying within wilderness, wetlands and other protected areas; the application of specific health and safety criteria addressing worker protection; and the imposition of substantial liabilities for pollution resulting from

the ownership or operation of our properties. These laws, regulations and permits can require expensive pollution control equipment or operational changes to limit actual or potential impacts to the environment.

Numerous governmental entities have the power to enforce difficult and costly compliance measures or corrective actions pursuant to these laws

and regulations and the permits issued under them. We may be required to make significant capital and operating expenditures on an ongoing basis, or to perform remedial or other corrective actions at our properties, to comply with the requirements

of these environmental laws and regulations or the terms or conditions of our permits. Failure to comply with these laws and regulations may result in the assessment of sanctions, including administrative, civil or criminal penalties, the imposition

of investigatory or remedial obligations, and the issuance of orders limiting or prohibiting some or all of our operations. In addition, we may experience delays in obtaining or be unable to obtain required environmental regulatory permits or

approvals, which may delay or interrupt our operations and limit our growth and revenue.

-44-

Table of Contents

Our operations inherently risk incurring significant environmental costs and liabilities due

to the need to manage waste from our processing facilities. Spills or other releases of regulated substances, including spills and releases that occur in the future, could expose us to material losses, expenditures and liabilities under applicable

environmental laws, rules and regulations. Under certain of such laws and regulations, we could be held strictly liable for the removal or remediation of previously released materials or property contamination, regardless of whether we were

responsible for the release or contamination and even if our operations met previous standards in the industry at the time they were conducted. In connection with certain acquisitions, we could acquire, or be required to provide indemnification

against, environmental liabilities that could expose us to material losses. In addition, claims for damages to persons or property, including natural resources, may result from the EHS impacts of our operations. Our insurance may not cover all

environmental risks and costs or may not provide sufficient coverage if an environmental claim is made against us.

New laws, changes to

existing laws, new interpretations of existing laws, increased governmental enforcement of environmental laws or other developments could require us to make significant additional expenditures. Continued government and public emphasis on

environmental issues can be expected to result in increased future investments for environmental controls at our plants. Present and future environmental laws and regulations, and interpretations of those laws and regulations, applicable to our

operations, more vigorous enforcement policies and discovery of currently unknown conditions may require substantial expenditures that could have a material adverse effect on our results of operations and financial condition. In January 2021, the

current U.S. presidential administration signed multiple executive orders related to the climate and environment. These executive orders direct federal agencies to review and reverse more than one-hundred

actions taken by the previous U.S. presidential administration on the environment, instruct the Director of National Intelligence to prepare a national intelligence estimate on the security implications of the climate crisis and direct all agencies

to develop strategies for integrating climate considerations into their international work, establish the National Climate Task Force which assembles leaders from across twenty-one federal agencies and

departments, commit to environmental justice and new, clean infrastructure projects, commence development of emissions reduction targets and establish the special presidential envoy for climate on the National Security Council. At this time, we

cannot predict the outcome of any of these executive actions on our operations.

Our ability to generate revenue from sales of RINs and

LCFS credits depends on our strict compliance with these federal and state programs, which are complex and can involve a significant degree of judgment. If the agencies that administer and enforce these programs disagree with our judgments,

otherwise determine that we are not in compliance, conduct reviews of our activities or make changes to the programs, then our ability to generate or sell these credits could be temporarily restricted pending completion of reviews or as a penalty,

permanently limited or lost entirely, and we could also be subject to fines or other sanctions. Moreover, the inability to sell RINs and LCFS credits could adversely affect our business.

Liability relating to contamination and other environmental conditions may require us to conduct investigations or remediation at the properties

underlying our projects and may impact the value of properties that we may acquire.

We may incur liabilities for the investigation

and cleanup of any environmental contamination at the properties underlying or adjacent to our projects, or at off-site locations where we arrange for the disposal of hazardous substances or wastes. Under the

Comprehensive Environmental Response, Compensation and Liability Act of 1980 and other federal, state and local laws, an owner or operator of a property may become liable for costs of investigation and remediation, and for damages to natural

resources. These laws often impose liability without regard to whether the owner or operator knew of, or was responsible for, the release of such hazardous substances or whether the conduct giving rise to the release was legal at the time when it

occurred. In addition, liability under certain of these laws is joint and several. We also may be subject to related claims by private parties alleging property damage and personal injury due to exposure to hazardous or other materials at or from

those properties.

-45-

Table of Contents

The presence of environmental contamination at a project may adversely affect an

owner’s ability to sell such project or borrow funds using the project as collateral. To the extent that an owner of the real property underlying one of our projects becomes liable with respect to contamination at the real property, the ability

of the owner to make payments to us may be adversely affected.

The presence of any environmental contamination with respect to one of our

projects could adversely affect our ability to sell the affected project, and we may incur substantial investigation costs, remediation costs or other damages, thus harming our business, financial condition and results of operations.

Our business is subject to the risk of climate change and extreme or changing weather patterns.

Extreme weather patterns related to climate change could cause changes in rainfall and storm patterns and intensities, water shortages and

changing temperatures, which could result in significant volatility in the supply and prices of energy. In addition, legislation and increased regulation regarding climate change could impose significant costs on us and our suppliers, including

costs related to capital equipment, environmental monitoring and reporting and other costs to comply with such regulations.

Furthermore,

extreme weather events, such as lightning strikes, ice storms, tornados, extreme wind, hurricanes and other severe storms, wildfires and other unfavorable weather conditions or natural disasters, such as floods, fires, earthquakes, and rising sea-levels, could adversely affect the input and output commodities associated with the renewable energy sector. Such weather events or natural disasters could also require us to temporarily or permanently shut down

the equipment associated with our renewable energy projects, such as our access to power and our power to biogas collection, separation and transmission systems, which would impede the ability of our projects to operate, and decrease production

levels and our revenue. Operational problems, such as degradation of our project’s equipment due to wear or weather or capacity limitations or outages on the electrical transmission network, could also affect the amount of energy that our

projects are able to deliver. Any of these events, to the extent not fully covered by insurance, could adversely affect our business, financial condition and results of operations.

These events could result in significant volatility in the supply and prices of energy. This volatility may create fluctuations in commodity

or energy prices and earnings of companies in the renewable energy sectors.

Capital and Credit Risks

Our senior credit facility contains financial and operating restrictions that may limit our business activities and our access to credit.

Provisions in our Amended Credit Agreement, as described in “Liquidity and Capital Resources” impose customary restrictions on our

and certain of our subsidiaries’ business activities and uses of cash and other collateral. These agreements also contain other customary covenants, including covenants that require us to meet specified financial ratios and financial tests.

The Amended Credit Agreement consists of a $95.0 million principal amount term loan and an $80.0 million revolving credit line

that matures in December 2023. The Amended Credit Agreement may not be sufficient to meet our needs as our business grows, and we may be unable to extend or replace it on acceptable terms, or at all. Under the Amended Credit Agreement, we are

required to maintain a maximum ratio of total liabilities to tangible net worth of no greater than 2.0 to 1.0 as of the end of any fiscal quarter. We are also required to maintain:

-46-

Table of Contents

Consolidated EBITDA, as used in the Amended Credit Agreement, may be calculated differently than EBITDA or Adjusted EBITDA, as used in this

report. Consolidated EBITDA is defined under the Amended Credit Agreement as net income plus (a) income tax expense, (b) interest expense, (c) depreciation, depletion, and amortization expense,

(d) non-cash unrealized derivative expense and (e) any other extraordinary, unusual, or non-recurring adjustments to certain components of net income, as

agreed upon by Comerica in certain circumstances. Additional information on Consolidated EBITDA as used in the Amended Credit Agreement can be found in Item 7, Management’s Discussion and Analysis of Financial Condition and Results of

Operations under “Liquidity and Capital Resources.”

The Amended Credit Agreement also contemplates that we would be in default

if for any fiscal quarter, (a) the average monthly D3 RIN price (as determined in accordance with the Amended Credit Agreement) is less than $0.80 per RIN and (b) the consolidated EBITDA for such quarter is less than $6,000,000.

Our failure to comply with these covenants could result in the declaration of an event of default and cause us to be unable to borrow under

the Amended Credit Agreement. In addition to preventing additional borrowings under the Amended Credit Agreement, an event of default, if not cured or waived, could result in the acceleration of the maturity of indebtedness outstanding under it

which would require us to pay all amounts outstanding. If an event of default occurs, we may not be able to cure it within any applicable cure period, or at all. As of December 31, 2020, we were in compliance with all covenants. Certain of our

debt agreements also contain subjective acceleration clauses based on a lender deeming that a “material adverse change” in our business has occurred. If these clauses are implicated, and the lender declares that an event of default has

occurred, the outstanding indebtedness would likely be immediately due. If the maturity of our indebtedness is accelerated, we may not have sufficient funds available for repayment or we may not have the ability to borrow or obtain sufficient funds

to replace the accelerated indebtedness on terms acceptable to us or at all.

Changes to and replacement of the LIBOR Benchmark Interest Rate may

adversely affect our business, financial condition and results of operations.

Our Amended Credit Agreement is indexed to the

London Interbank Offered Rate (“LIBOR”) to calculate the loan interest rate. In 2017, the United Kingdom’s Financial Conduct Authority (“FCA”), which regulates LIBOR, announced that it intends to stop compelling banks to

submit rates for the calculation of LIBOR after 2021. However, on March 5, 2021 announcements by the ICE Benchmark Administration (“IBA”) and the FCA on future cessation and loss of representativeness of LIBOR indicated that IBA would

cease publication of all settings of non-U.S. dollar LIBOR and only the one-week and two-month U.S. dollar LIBOR settings on

December 31, 2021, with the publication of the remaining U.S. dollar LIBOR settings being discontinued after June 30, 2023 as the same will no longer be representative of the underlying market and economic reality that such setting is

intended to measure. Although our Amended Credit Agreement provides for alternative reference rates, such alternative reference rates and the consequences of the phase out of LIBOR cannot be entirely predicted at this time. An alternative reference

rate could be higher or more volatile than LIBOR prior to its discontinuance, which could result in an increase in the cost of our indebtedness, impact our ability to refinance some or all of our existing indebtedness or otherwise have a material

adverse impact on our business, financial condition and results of operations. Furthermore, there can be no assurance that all tenor settings of LIBOR will actually cease to be available after June 30, 2023, whether certain U.S. dollar LIBOR

settings will actually be available until June 30, 2023 or whether U.S. dollar

-47-

Table of Contents

LIBOR or such other LIBOR currency will be replaced by an alternative market benchmark in place of U.S. dollar LIBOR or such other LIBOR currency, as the case may be. The March 5, 2021

announcement by the FCA did note that U.S. dollar LIBOR could, subject to proposed new powers of the FCA, be published on a changed methodology (or “synthetic”) basis and not a representative basis. Similarly, it is not possible to predict

whether LIBOR will continue to be viewed as an acceptable market benchmark prior to June 30, 2023, what rate or rates may become accepted alternatives to LIBOR, or what the effect of any such changes in views or alternatives may be on the

markets for LIBOR-indexed financial instruments. In June 2017, the Alternative Reference Rates Committee (the “ARRC”) convened by the Federal Reserve Board and Federal Reserve Bank of New York announced the Secured Overnight Financing Rate

(“SOFR”) as its recommended alternative to LIBOR for USD obligations. However, because the SOFR is a broad U.S. Treasury repo financing rate that represents overnight secured funding transactions, it differs fundamentally from LIBOR.

The LIBOR cessation fallback language under our Amended Credit Agreement provides for a transition to specified alternative SOFR-based rates,

or, if those alternatives cannot be determined, to another rate selected by the administrative agent and the borrower under the Amended Credit Agreement as well as provisions that allow one or more parties to transition in advance of the dates set

forth above where specified conditions are met. The implementation of a substitute index or indices for the calculation of interest rates under certain of our project loans may result in our incurring significant expenses in effecting the transition

and could adversely affect our financial condition or results of operations.

We may be required to

write-off or impair capitalized costs or intangible assets in the future or we may incur restructuring costs or other charges, each of which would harm our earnings.

In accordance with GAAP, we capitalize certain expenditures and advances relating to our acquisitions, pending acquisitions, project

development costs, interest costs related to project financing and certain energy assets. In addition, we have considerable unamortized assets. In 2020, we recorded impairment charges of $0.3 million related to our digester joint venture. In

2019, we recorded impairment charges of $0.9 million, $0.8 million and $0.8 million related to one digester joint venture, one RNG facility, and one Renewable Electricity facility, respectively. In addition, from time to time in

future periods, we may be required to incur a charge against earnings in an amount equal to any unamortized capitalized expenditures and advances, net of any portion thereof that we estimate will be recoverable, through sale or otherwise, relating

to: (i) any operation or other asset that is being sold, permanently shut down, impaired or has not generated or is not expected to generate sufficient cash flow; (ii) any pending acquisition that is not consummated; (iii) any project

that is not expected to be successfully completed; and (iv) any goodwill or other intangible assets that are determined to be impaired. A material write-off or impairment change could adversely affect our

ability to comply with the financial covenants under the Amended Credit Agreement, and otherwise adversely affect our business, financial condition and results of operations.

Our ability to use our U.S. net operating loss carryforwards to offset future taxable income may be subject to certain limitations.

As of December 31, 2020, we had U.S. federal net operating loss (“NOL”) carryforwards of approximately

$95.5 million, of which $53.5 million were incurred prior to the enactment of the U.S. Tax Cuts and Jobs Act of 2017 (the “Tax Act”) and, therefore, can be carried forward for 20 years to fully offset taxable income in a

future year, and of which $42.0 million were incurred in 2018 or later taxable years and, therefore, can generally be carried forward indefinitely to offset 80% of taxable income in a future year. The CARES Act temporarily lifts the 80%

limitation, allowing us to use our NOLs to offset 100% of our taxable income for our 2018, 2019, and 2020 taxable years. Our NOL carryforwards incurred in 2017 or earlier taxable years expire between 2027 and 2037, while our NOL carryforwards

incurred in 2018 or later taxable years survive indefinitely. Our ability to utilize our U.S. NOL carryforwards is dependent upon our ability to generate taxable income in future periods.

On January 1, 2020, the minority investor of MEC, Johnstown LFG Holdings, Inc. (via assignment of shares from MEC on December 9, 2019), was

bought out by MEH, converting MEC from a partnership to a disregarded entity for U.S. federal income tax purposes, which is currently wholly owned by MEH. This transaction allowed

-48-

Table of Contents

Monmouth Energy Inc., a subsidiary of MEC, to file as part of our consolidated federal tax group. Monmouth Energy, Inc. has NOLs of approximately $13.0 million that are limited for use under

the separate return limitation year rules due to the fact that they were generated prior to Monmouth Energy Inc. joining our consolidated group.

In addition, our U.S. NOL carryforwards and certain other tax attributes may be limited if we have experienced or experience an

“ownership change” under Section 382 of the Internal Revenue Code of 1986, as amended (the “Code”), which generally occurs if one or more stockholders or groups of stockholders who own at least 5% of our shares

increase their ownership by more than 50 percentage points over their lowest ownership percentage within a rolling period that begins on the later of three years prior to the testing date and the date of the last ownership change. Similar rules may

apply under state tax laws. Previous issuances and sales of MNK’s ordinary shares or of our common stock, and future issuances and sales of our common stock (including certain transactions involving our common stock that are outside of our

control) could have caused or could cause an “ownership change.” If an “ownership change” either had occurred or were to occur, Section 382 of the Code would impose an annual limit on the amount of pre-ownership change NOL carryforwards and other tax attributes we could use to reduce our taxable income, potentially increasing and accelerating our liability for income taxes, and also potentially causing certain

tax attributes to expire unused. It is possible that such an ownership change could materially reduce our ability to use our U.S. NOL carryforwards or other tax attributes to offset taxable income, which could adversely affect our profitability.

Competition Risks

We may face intense

competition and may not be able to successfully compete.

There are a number of other companies operating in the renewable energy

and waste-to-energy markets. These include service or equipment providers, consultants, managers or investors.

We may not have the resources to compete with our existing competitors or with any new competitors, including in a competitive bidding

process. Some of our competitors have significantly larger personnel, financial and managerial resources than we have, and we may fail to maintain or expand our business. Our competitors may also offer energy solutions at prices below cost, devote

significant sales forces to competing with us or attempt to recruit our key personnel by increasing compensation, any of which could improve their competitive positions. Moreover, if the demand for renewable energy increases, new companies may enter

the market, and the influx of added competition will pose an increased risk to us.

Further, certain of our strategic partners and other

landfill operators could decide to manage, recover and convert biogas from waste to renewable energy on their own which would further increase our competition, limit the number of commercially viable landfill sites available for our projects or

require us to reduce our profit margins to maintain or acquire projects.

Technological innovation may render us uncompetitive or our processes

obsolete.

Our success will depend on our ability to create and maintain a competitive position in the renewable energy industry.

We do not have any exclusive rights to any of the technologies that we utilize, and our competitors may currently use and may be planning to use identical, similar or superior technologies. In addition, the technologies that we use may be rendered

obsolete or uneconomical by technological advances, more efficient and cost-effective processes or entirely different approaches developed by one or more of our competitors or others.

We may also face competition based on technological developments that reduce demand for electricity, increase power supplies through existing

infrastructure or that otherwise compete with our projects. We also encounter competition in the form of potential customers electing to develop solutions or perform services internally rather than engaging an outside provider such as us.

-49-

Table of Contents

We may not be able to obtain long-term contracts for the sale of power produced by our projects on

favorable terms and we may not meet certain milestones and other performance criteria under existing PPAs.

Obtaining long-term

contracts for the sale of power produced by our projects at prices and on other terms favorable to us is essential for the long term success of our business. We must compete for PPAs against other developers of renewable energy projects. This

intense competition for PPAs has resulted in downward pressure on PPA pricing for newly contracted projects. The inability to compete successfully against other power producers or otherwise enter into PPAs favorable to us would negatively affect our

ability to develop and finance our projects and negatively affect our revenues. In addition, the availability of PPAs depends on utility and corporate energy procurement practices that could evolve and shift allocation of market risks over time. In

addition, PPA availability and terms are a function of a number of economic, regulatory, tax, and public policy factors, which are also subject to change.

Our PPAs typically require us to meet certain milestones and other performance criteria. Our failure to meet these milestones and other

criteria, including minimum quantities, may result in price concessions, in which case we would lose any future cash flow from the relevant project and may be required to pay fees and penalties to our counterparty. We cannot assure you that we will

be able to perform our obligations under such agreements or that we will have sufficient funds to pay any fees or penalties thereunder.

Cybersecurity

and Information Technology Risks

A failure of our information technology (“IT”) and data security infrastructure could adversely

affect our business and operations.

We rely upon the capacity, reliability and security of our IT and data security infrastructure

and our ability to expand and continually update this infrastructure in response to the changing needs of our business. Our existing IT systems and any new IT systems may not perform as expected. We also face the challenge of supporting our older

systems and implementing necessary upgrades. If we experience a problem with the functioning of an important IT system or a security breach of our IT systems, including during system upgrades or new system implementations, the resulting disruptions

could adversely affect our business.

We and some of our third-party vendors receive and store personal information in connection with our

human resources operations and other aspects of our business. Despite our implementation of reasonable security measures, our IT systems, like those of other companies, are vulnerable to damages from computer viruses, natural disasters, fire, power

loss, telecommunications failures, personnel misconduct, human error, unauthorized access, physical or electronic security breaches, cyber-attacks (including malicious and destructive code, phishing attacks, ransomware, and denial of service

attacks), and other similar disruptions. Such attacks or security breaches may be perpetrated by bad actors internally or externally (including computer hackers, persons involved with organized crime, or foreign state or foreign state-supported

actors). Cybersecurity threat actors employ a wide variety of methods and techniques that are constantly evolving, increasingly sophisticated, and difficult to detect and successfully defend against. We have experienced such incidents in the past,

and any future incidents could expose us to claims, litigation, regulatory or other governmental investigations, administrative fines and potential liability. Any system failure, accident or security breach could result in disruptions to our

operations. A material network breach in the security of our IT systems could include the theft of our trade secrets, customer information, human resources information or other confidential data, including but not limited to personally identifiable

information. Although past incidents have not had a material effect on our business operations or financial performance, to the extent that any disruptions or security breach results in a loss or damage to our data, or an inappropriate disclosure of

confidential, proprietary or customer information, it could cause significant damage to our reputation, affect our relationships with our customers and strategic partners, lead to claims against us from governments and private plaintiffs, and

ultimately harm our business. We cannot guarantee that future cyberattacks, if successful, will not have a material effect on our business or financial results.

Many governments have enacted laws requiring companies to provide notice of cyber incidents involving certain types of data, including

personal data. If an actual or perceived cybersecurity breach or unauthorized

-50-

Table of Contents

access to our system or the systems of our third-party vendors, we may incur liability, costs, or damages, contract termination, our reputation may be compromised, our ability to attract new

customers could be negatively affected, and our business, financial condition, and results of operations could be materially and adversely affected. Any compromise of our security could also result in a violation of applicable domestic and foreign

security, privacy or data protection, consumer and other laws, regulatory or other governmental investigations, enforcement actions, and legal and financial exposure, including potential contractual liability. In addition, we may be required to

incur significant costs to protect against and remediate damage caused by these disruptions or security breaches in the future.

We rely

on the technology, infrastructure, and software applications of certain third parties in order to host or operate some of our business. Additionally, we rely on computer hardware purchased in order to operate our business. We do not have control

over the operations of the facilities of the third parties that we use. If any of these third-party services experience errors, disruptions, security issues, or other performance deficiencies, if these services, software, or hardware fail or become

unavailable due to extended outages, interruptions, defects, or otherwise, or if they are no longer available on commercially reasonable terms or prices (or at all), these issues could result in errors or defects in our platforms, cause our

platforms to fail, our revenue and margins could decline, or our reputation and brand to be damaged, we could be exposed to legal or contractual liability, our expenses could increase, our ability to manage our operations could be interrupted, and

our processes for servicing our customers could be impaired until equivalent services or technology, if available, are identified, procured, and implemented, all of which may take significant time and resources, increase our costs, and could

adversely affect our business. Many of these third-party providers attempt to impose limitations on their liability for such errors, disruptions, defects, performance deficiencies, or failures, and if enforceable, we may have additional liability to

our customers or third-party providers. A failure to maintain our relationships with our third-party providers (or obtain adequate replacements), and to receive services from such providers that do not contain any material errors or defects, could

adversely affect our ability to deliver effective products and solutions to our customers and adversely affect our business and results of operations.

Our business could be negatively affected by security threats, including cybersecurity threats and other disruptions.

As a renewable energy producer, we face various security threats, including among others, computer viruses, malware, telecommunication and

electrical failures, cyber-attacks or cyber-intrusions over the internet, attachments to emails, persons with access to systems inside our organization, cybersecurity threats to gain unauthorized access to sensitive information or to expose,

exfiltrate, alter, delete or render our data or systems unusable, threats to the security of our projects and infrastructure or third-party facilities and infrastructure, such as processing projects and pipelines, natural disasters, threats from

terrorist acts and war.

We take various steps to identify and mitigate potential cybersecurity threats. As cyber incidents become more

frequent and the sophistication of threat actors increases, our associated cybersecurity costs are expected to increase. Specifically, we expect to implement several incremental cybersecurity improvements over the next 12 to 24 months to enhance our

defensive capabilities and resilience. Despite our ongoing and anticipated cybersecurity efforts, a successful cybersecurity incident could lead to additional costs, including those related to the loss of sensitive information, repairs to

infrastructure or capabilities essential to our operations, responding to litigation or regulatory investigations, and those related to the adverse impact on our reputation, financial position, results of operations, or cash flows.

Our implementation of various procedures and controls to monitor and mitigate these security threats, and to increase security for our

information projects and infrastructure, may result in increased capital and operating costs. Moreover, there can be no assurance that such procedures and controls will be sufficient to prevent security breaches from occurring. If any of these

security breaches were to occur, they could lead to the loss of sensitive information, critical infrastructure or capabilities essential to our operations, and could adversely affect our reputation, financial position, results of operations or cash

flows. Cybersecurity attacks, in particular, are becoming more sophisticated and include, but are not limited to, malicious software, attempts to gain

-51-

Table of Contents

unauthorized access to data and systems and other electronic security breaches that could lead to disruptions in critical systems, unauthorized release of confidential or otherwise protected

information, and corruption of data. These events could lead to financial losses from remedial actions, loss of business or potential liability.

Emerging Growth Company Risks

For as long as we

are an emerging growth company, we will not be required to comply with certain requirements that apply to other public companies.

We are an emerging growth company, as defined in the JOBS Act. For as long as we are an emerging growth company, which may be up to five full

fiscal years, we, unlike other public companies, will not be required to, among other things: (i) provide an auditor’s attestation report on management’s assessment of the effectiveness of our system of internal control over financial

reporting pursuant to Section 404(b) of the Sarbanes-Oxley Act; (ii) comply with any new requirements adopted by the PCAOB requiring mandatory audit firm rotation or a supplement to the auditor’s report in which the auditor would be

required to provide additional information about the audit and the financial statements of the issuer; (iii) provide certain disclosures regarding executive compensation required of larger public companies; or (iv) hold nonbinding advisory

votes on executive compensation and any golden-parachute payments not previously approved. In addition, the JOBS Act provides that an emerging growth company can take advantage of the extended transition period provided in Section 7(a)(2)(B) of

the Securities Act of 1933, as amended (the “Securities Act”), for adopting new or revised financial accounting standards. We intend to take advantage of the longer phase-in periods for the

adoption of new or revised financial accounting standards permitted under the JOBS Act until we are no longer an emerging growth company. If we were to subsequently elect instead to comply with these public company effective dates, such election

would be irrevocable pursuant to the JOBS Act.

We will remain an emerging growth company for up to five years, although we will lose that

status sooner if we have more than $1.07 billion of revenues in a fiscal year, have more than $700.0 million in market value of our common stock held by non-affiliates, or issue more than

Source: SEC EDGAR (public domain) · 10-K for the period ended 2020-12-31, filed 2021-03-31 · accession 0001193125-21-102560

Filing HTML rendered to line-structured narrative text by the shipped reducer (datafeeds.edgar_fulltext.visible_text, keep_table_headers=True): scripts and inline-XBRL headers are dropped, and table content is reduced to its short label cells — numeric table data is not rendered and is therefore not counted. The same rendering is used for every year, so a year-over-year comparison is like for like.

The text is our rendering of the filing, not a facsimile: original pagination, typography and tables are not reproduced, and the numbers live in the financial statements (FA).

The outline locates item HEADINGS in this document. Only Items 1A and 7 have certified boundaries elsewhere in the terminal (the redline and the narrative-overlap number); every span here runs from one heading found to the next heading found.

How the outline was chosen. It is the longest chain of item headings that runs forward through both the document and the standard item order: 16 headings are on that chain and 16 further heading-shaped lines are not — the table-of-contents echo of every item, cross-references and exhibit-list mentions. Each entry's length is measured from its heading to the next heading on the chain.