ITEM 1A. RISK FACTORS
The following risks and uncertainties, together with the other information set forth in this report, should be carefully considered by those who invest in our securities. Any of the following material risk factors could adversely affect our business, financial condition or operating results and could decrease the value of our common stock. These are not all of the risks we face, and other factors not presently known to us or that we currently believe are immaterial may also affect our business if they occur.
Financial Risks
Diversity in application of accounting literature in the mining industry may impact our reported financial results.
The mining industry has limited industry-specific accounting literature and, as a result, we understand diversity in practice exists in the interpretation and application of accounting literature to mining-specific issues. As diversity in mining industry accounting is addressed, we may need to restate our reported results if the resulting interpretations differ from our current accounting practices.
Our accounting and other estimates may be imprecise.
Preparing consolidated financial statements requires management to make estimates and assumptions that affect the reported amounts and related disclosure of assets, liabilities, revenue and expenses at the date of the consolidated financial statements and reporting periods. The more significant areas requiring the use of management assumptions and estimates relate to:
· future ore grades, throughput and recoveries;
· future metals prices;
· future capital and operating costs;
· environmental, reclamation and closure obligations;
· permitting and other regulatory considerations;
· asset impairments;
· valuation of business combinations;
· future foreign exchange rates, inflation rates and applicable tax rates;
· reserves for contingencies and litigation; and
· deferred tax asset valuation allowance.
Table of contents
Future estimates and actual results may differ materially from these estimates as a result of using different assumptions or conditions.
You may lose all or part of your investment.
If we are unable to effectively develop, mine, recover and sell adequate quantities of gold or generate cash flows from our other diversified precious and strategic metals production and processing activities (including, but not limited to, metals exploration, engineering, resource development, economic feasibility assessments, mineral production, metal processing and related ventures), it is unlikely that the cash generated from our internal operations will suffice as a source of the liquidity necessary for anticipated working capital requirements. There is no assurance that the Company’s initiatives to improve its liquidity and financial position will be successful. Accordingly, there is substantial risk that the Company will be unable to continue as a going concern. In the event of insolvency, liquidation, reorganization, dissolution or other winding up of the Company, the Company’s creditors would be entitled to payment in full out of the Company’s assets before holders of common stock would be entitled to any payment, and the claims on such assets may exceed the value of such assets.
Because we may never earn significant revenues from our mine operations or our other diversified precious metal-based and strategic metals production and processing activities, our business may fail.
We recognize that if we are unable to generate significant revenues from the exploration and exploitation of our mineral reserves or our other diversified precious and strategic metals production and processing activities in the future, we will not be able to earn profits or continue operations. We have yet to generate positive operating income and there can be no assurance that we will ever operate profitably. There is no history upon which to base any assumption as to the likelihood that we will prove successful, and we can provide no assurance that we will generate significant revenues or ever achieve profitability. If we are unsuccessful, our business will fail, and investors may lose all of their investment in our Company.
We will not be successful unless we recover precious or strategic metals and sell them for a profit.
Our success depends on our ability to recover precious or strategic metals, process them, and successfully sell them for more than the cost of production. The success of this process depends on the market prices of metals in relation to our costs of production. We may not be able to generate a profit on the sale of gold or other minerals because we have limited control over our costs and have no ability to control the market prices. The total cash costs of production at any location are frequently subject to great variation from year to year as a result of a number of factors, such as the changing composition of the grade of the mineralized material mined for production, and metallurgy and exploration activities in response to the physical shape and location of the mineral deposit. In addition, costs are affected by the price of commodities, such as fuel and electricity. Such commodities are at times subject to volatile price movements, including increases that could make production unprofitable. A material increase in production costs or a decrease in the price of gold or other minerals could adversely affect our ability to earn a profit on the sale of gold or other minerals.
Cost estimates and timing of new projects are uncertain, which may adversely affect our expected production and profitability.
The capital expenditures and time required to acquire, develop, and explore our projects are considerable and changes in costs, construction schedules or both, can adversely affect project economics and expected production and profitability. There are a number of factors that can affect costs and construction schedules, including, among others:
· availability of labor, energy, transportation, equipment, and infrastructure;
· changes in input commodity prices and labor costs;
· fluctuations in currency exchange rates;
· availability and terms of financing;
· recovery rates of gold and other metals from mineralized materials;
· difficulty of estimating construction costs over a period of a year;
· weather and severe climate impacts; and
· potential delays related to health, social, political and community issues.
Table of contents
Our ability to execute our strategic plan depends on many factors, some of which are beyond our control.
Our strategic plan is focused on high-value, cash-generating, precious metal-based activities, including, but not limited to, precious-metal exploration, resource development, economic feasibility assessments and cash-generating mineral production. Many of the factors that impact our ability to execute our strategic plan, such as the advancement of certain technologies, legal and regulatory obstacles and general economic conditions, are beyond our control. Changes in value or a lack of demand for the sale of non-core assets would negatively affect the Company’s financial condition and performance. Our inability to identify successful joint venture candidates and to complete joint ventures or strategic alliances as planned or to realize expected synergies and strategic benefits could impact our financial condition and performance. Our inability to deploy capital to maximize shareholder value could impact our financial performance. We cannot give assurance that we will be able to execute any or all of our strategic plan. Failure to execute any or all of our strategic plan could have a material adverse effect on our financial condition, results of operations, and cash flows.
Risks Associated with Mining Operations, Development, Exploration and Acquisition Portion of Our Business
Exploration activities involve a high degree of risk, and exploratory drilling activities may not be successful.
The Company’s future success will largely depend on the success of the exploration drilling programs at the Golden Chest Mine, adjacent properties, and other exploration properties. Participation in exploration drilling activities involves numerous risks, including the significant risk that no commercially marketable minerals will be discovered. The mining of minerals and the manufacture of mineral products involves numerous hazards, including:
· Ground or slope failures;
· Equipment failures or accidents;
· Adverse weather conditions;
· Compliance with governmental requirements and laws, present and future;
· Shortages or delays in the availability and delivery of equipment; and
Poor results from the Company’s drilling activities would materially and adversely affect the Company’s future cash flows and results of operations.
Transportation and weather interruptions may affect and delay proposed mining operations and impact our business plans.
Our mining properties are accessible by road. The climate in the area is hot and dry in the summer but cold and subject to snow and other precipitation in the winter, which could at times hamper accessibility depending on the winter season precipitation levels. As a result, our exploration and mining plans could be delayed for several months each year. Such delays could affect our anticipated business operations and increase our expenses.
Moreover, extreme weather events (such as increased frequency or intensity of storms or prolonged drought, flooded or frozen terrain) have the potential to disrupt operations at our projects. Extended disruptions to supply lines due to extreme weather could result in interruption of activities at the project sites, delay or increase the cost of construction of the projects, or otherwise adversely affect our business.
Supplies and equipment needed for exploration may not always be available. If we are unable to secure raw materials and exploration supplies, we may have to delay our anticipated business operations.
Competition and unforeseen limited sources of supplies needed for our proposed exploration work could result in occasional shortages of supplies of certain products, equipment or materials. There is no guarantee we will be able to obtain certain products, equipment and/or materials as and when needed, without interruption, or on favorable terms, if at all. Such delays could affect our anticipated business operations and increase our expenses.
The mining industry is highly competitive and there is no assurance that we will continue to be successful in acquiring mineral properties, claims or leases. If we cannot continue to acquire properties to explore for mineral resources, we may be required to reduce or cease exploration activity and/or operations.
The mineral exploration, development, and production industry is largely un-integrated. We compete with other exploration companies looking for mineral properties and the minerals that can be produced from them. While we compete with other exploration companies in the effort to locate and license mineral properties, we do not compete with them for the removal or sales of mineral products from our claims if we should eventually discover the presence of them in quantities sufficient to make production economically feasible. Readily available markets exist worldwide for the sale of gold and other mineral products, subject to market conditions and prices. Therefore, we will likely be able to sell any gold or mineral products that we identify and produce; however, such sales are subject to market fluctuations that may materially and adversely affect the Company’s future cash flows and results of operations.
Table of contents
Many of our competitors have greater financial resources and technical facilities. Accordingly, we will attempt to compete primarily through the knowledge and experience of our management. This competition could adversely affect our ability to acquire suitable prospects for exploration in the future. Accordingly, there can be no assurance that we will acquire any interest in additional mineral properties that might yield reserves or result in commercial mining operations.
The estimation of the ultimate recovery of gold and other metals is subjective. Actual recoveries may vary from our estimates.
We utilize a conventional flotation process to produce a bulk sulfide flotation concentrate that is sold to smelters in Asia. Ore is crushed, ground and valuable minerals are separated using the flotation process which is longstanding and well understood metallurgical process. However, our estimates of gold recovery can vary from actual gold recovery because of several factors such as oxidation, hardness of the ore, deleterious mineralogy, and gold grade estimation errors due to the nugget effect. Also, final payment is determined by sampling of the concentrate at the smelter which could lead to variations from provisional sampling at the mill facility. Sampling procedures at the mill have been modified to try to increase correlation with smelter samples such as by increasing the sample mass collected for the provisional sample at the mill. Due to the complexity of the estimation process and the number of steps involved, among other things, actual recoveries can vary from estimates, and the amount of the variation could be significant and could have a material adverse impact on our financial condition and results of operations.
Resource and other mineralized material statements are estimates only, and are subject to uncertainty due to factors including metal prices, inherent variability of the mineralized material and recoverability of metal in the mining and beneficiation processes.
Our reports of mineral resources and other mineralized material depend upon geological interpretation and statistical inferences or assumptions drawn from drilling and sampling analysis, which may prove to be unpredictable. There is a degree of uncertainty attributable to the calculation of mineral resources and corresponding grades. Until mineral resources and other mineralized materials are actually mined and processed, the quantity of mineralized material and grades must be considered as an estimate only. In addition, the quantity of mineral resources and mineral reserves may vary depending on metal prices. Any material change in the quantity of mineral resources, mineral reserves, mineralization, grade or stripping ratio may affect the economic viability of our properties. In addition, we can provide no assurance that gold recoveries or other metal recoveries experienced in small-scale laboratory tests will be duplicated in larger scale tests under on-site conditions or during production.
Our mining and metal production depends on the availability of sufficient water supplies.
Our mining and milling operations require significant quantities of water for mining, processing and related support facilities. Continuous production at our mines and mill is dependent on our ability to maintain our water rights and claims, and the continuing physical availability of the water.
We may experience increased costs or losses resulting from the hazards and uncertainties associated with mining.
The exploration for natural resources and the development and production of mining operations are activities that involve a high level of uncertainty. These can be difficult to predict and are often affected by risks and hazards outside of our control. These factors include, but are not limited to:
· surface or underground fires or floods;
· ground and water conditions;
· fall-of-ground accidents in underground operations;
· failure of mining pit slopes and tailings dam walls;
· seismic activity; and
Table of contents
Climate Change could negatively impact our operations and financial performance.
Climate change is expected to create more extreme weather patterns that can increase frequency of droughts and increase the amount of rainfall, circumstances that require careful water management. Potential key material physical risks to the Company from climate change include, but are not limited to: increased volumes of mine contact water requiring storage and treatment, increased design requirements for stormwater diversion and associated water management systems, and reduced freshwater availability due to potential drought conditions. We have identified opportunities and risks with the advent of technologies that support decarbonization and renewable energy sources, such as: electric vehicles and energy storage that may require the metals we produce seek to produce in the future. These technologies may not have the same reliability as conventional technologies and costs may increase to produce such technologies, which could negatively impact our financial performance.
Risks Related to Our Company
The cost of our exploration, development and acquisition activities is substantial, and there is no assurance that the quantities of minerals and metals we discover, acquire or recover will justify commercial operations or replace reserves.
Mineral exploration, development and beneficiation, particularly for gold and other strategic metals, is highly speculative in nature and frequently is nonproductive. There can be no assurance that our exploration, development and/or acquisition activities will be commercially successful. Substantial expenditures are required to acquire existing gold properties, to establish mineral reserves through drilling and analysis, to develop metallurgical processes to extract metal from the mineralized material and, in the case of new properties, to develop the processing facilities and infrastructure at any site chosen for mineral exploration. There can be no assurance that any gold reserves or mineralized material that may be discovered or acquired in the future, if any, will be in sufficient quantities or of adequate grade to justify continued commercial operations, or that the funds required for mineral production operation can be obtained on a timely or reasonable basis, if at all. Mining companies must continually replace mineral reserves depleted by production. There can be no assurance that we will be successful in replacing any reserves or mineralized material acquired or established in the future.
The prices of gold and other strategic metals fluctuate on a regular basis and a downturn in price could negatively impact our operations and cash flow.
Our operations will be significantly affected by changes in the market price of gold. Gold prices can fluctuate widely and may be affected by numerous factors, such as expectations for inflation, levels of interest rates, currency exchange rates, purchases and sales by governments and central banks, monetary policies employed by the world’s major central banks, fiscal policies employed by the world’s major industrialized economies, forward selling or other hedging activities, demand for diversified precious and strategic metals, global or regional political and economic crises, and production costs in major gold-producing regions, such as but not limited to South Africa and the Russian Federation. The aggregate effect of these factors, all of which are beyond our control, is impossible for us to predict. If gold prices decline substantially, it could adversely affect the realizable value of our assets and, potentially, future results of operations and cash flow.
As opportunities rise, we expect to continue to acquire properties with gold and strategic metals reserves or mineralized material with exploration potential. The price that we pay to acquire these properties will be influenced, in large part, by the price of gold and other strategic metals at the time of the acquisition. We expect our potential future revenues to be derived from the production and sale of gold and strategic metals from these properties or from the sale of some of these properties. The value of any mineralized material, and the value of any potential mineral production therefrom, will vary in direct proportion to variations in those mineral prices. The price of gold and strategic metals has fluctuated widely as a result of numerous factors beyond our control. The effect of these factors on the price of gold and strategic metals, and therefore the economic viability of our projects, cannot accurately be predicted. Any drop in the price of gold or strategic metals would negatively affect our asset values, cash flows, potential revenues and profits.
The use of hedging instruments may not prevent losses being realized on subsequent price decreases or may prevent gains being realized from subsequent price increases.
We may from time to time sell some future production of gold pursuant to hedge positions. If the gold price rises above the price at which future production has been committed under these hedge instruments, we will have an opportunity loss. If the gold price falls below that committed price, we may experience losses if a hedge counterparty defaults under a contract when the contract price exceeds the gold price.
Table of contents
Competition from other mineral exploration and mining companies with greater resources may impact us.
We compete with other mineral exploration and mining companies or individuals, including large, established metals and mining companies with substantial capabilities and far greater financial resources, to acquire rights to mineral properties, metal processing technology and other methods for extracting and processing precious, and other metals and minerals. There is a limited supply of desirable lands available for claim staking, lease or other acquisition. There can be no assurance that we will be able to acquire such properties when competing against competitors with substantially greater financial resources than we have. Increases in the amount of gold and associated minerals sold by competitors of the Company may also result in price reductions and/or reduced margins, and the Company may not be able to compete effectively against current and future competitors.
The construction of our mines are subject to all of the risks inherent in start-up operations.
These risks include potential delays, cost overruns, shortages of material or labor, construction defects, and injuries to persons and property. We expect to engage or hire on employees in order to continue the development of our claims. While we anticipate taking all measures which we deem reasonable and prudent in connection with the production phase, there is no assurance that the risks described above will not cause delays or cost overruns in connection with such development, production, or operation. Any delays would postpone our anticipated receipt of revenue and adversely affect our operations, which in turn may adversely affect the price of our stock.
Our business requires substantial capital investment and we may be unable to raise additional funding on favorable terms.
The construction and operation of potential future projects and various exploration projects will require significant funding. Our operating cash flow and other sources of funding may become insufficient to meet all of these requirements, depending on the timing and costs of development of these and other projects. As a result, new sources of capital may be needed to meet the funding requirements of these investments and fund our ongoing business activities. Our ability to raise and service significant new sources of capital will be a function of macroeconomic conditions, future gold and strategic metal prices, our operational performance and our current cash flow and debt position, among other factors. In the event of lower gold and strategic metal prices, unanticipated operating or financial challenges, or a further dislocation in the financial markets as experienced in recent years, our ability to pursue new business opportunities, invest in existing and new projects, fund our ongoing operations and retire or service all of our outstanding debt could be significantly constrained.
Owning real estate and water rights carries inherent risks.
We are susceptible to the following real estate industry risks beyond our control:
· Changes in national, regional and local economic conditions and outlook;
· Economic downturns in the areas where the properties are located;
· Changes in zoning, regulatory restrictions or tax laws;
· Changes in interest rates or availability of financing.
These conditions could adversely affect our financial position, results of operations and cash flows, or the market price of our stock.
Illiquidity of real estate investments could significantly impede our ability to respond to changes in economic and other conditions.
Our ability to sell one or more of our properties in response to changing economic, financial and investment conditions may be limited. We cannot predict whether we will be able to sell any of our properties for the price or terms set by us, or whether any price or other terms offered by a prospective buyer would be acceptable to us. We also cannot predict the length of time needed to find a willing buyer and to the close the sale of an asset. The real estate market is affected by many factors that are beyond our control.
Table of contents
We may undertake joint ventures, investments, joint projects and other strategic alliances and such undertakings may be unsuccessful and may have an adverse effect on our business.
We continually evaluate and explore strategic opportunities as they arise, including product, technology, business or asset transactions. Such undertakings may not be successful or may take a substantially longer period than initially expected to become successful, and we may never recover our investments or achieve desired synergies or economies from these undertakings. Nevertheless, we may in the future to seek to grow our operations in part by entering into joint ventures, or undertaking investments, joint projects or other strategic alliances with third parties in diversified precious and strategic metals production and processing industries. These activities involve challenges and risks in negotiation, execution, valuation and integration, and closing of the transactions could be delayed or prevented by regulatory approval requirements, including permitting issues, or other conditions.
Any future agreements that we may enter into also could expose us to new operational, regulatory, market, litigation and geographical risks as well as risks associated with significant capital requirements, the diversion of management and financial resources, unforeseen operating difficulties and expenditures, sharing of proprietary information, loss of control over day-to-day operations, non-performance by a counterparty, potential competition and conflicts of interest. In addition, we may not be successful in finding suitable targets on terms that are favorable to us, or at all. Even if successfully negotiated and closed, expected synergies from a joint venture, investment or other strategic alliance may not materialize, may not advance our business strategy, may fall short of expected return-on-investment targets or may not prove successful or effective for our business. We may also encounter difficulty integrating the operations, personnel and financial and operating systems of an acquired business into our current business.
We may need to raise additional debt funding or sell additional equity securities to enter into such joint ventures or make such acquisitions. However, we may not be able to obtain such debt funding or sell equity securities on terms that are favorable to us, or at all. The raising of additional debt funding by us, if required and available, would result in increased debt service obligations and could result in additional operating and financing covenants, or liens on our assets, that would restrict our operations. The sale of additional equity securities, if required and available, could result in dilution to our shareholders.
Our business depends on a limited number of key personnel, the loss of whom could negatively affect us.
Our officers and employees are important to our success. If any of them becomes unable or unwilling to continue in their respective positions, and we are unable to find suitable replacements, our business and financial results could be materially negatively affected.
Legal, Regulatory and Compliance Risks
Our ability to execute our strategic plans depends upon our success in obtaining a variety of required governmental approvals that may be opposed by third parties.
Our operations may be delayed, hindered, or prevented to the extent that we are unable to obtain the governmental permits or approvals necessary to conduct the full extent of the operations contemplated by our strategic plan in a timely fashion or at all. This inability may occur due to a variety of factors, including opposition by third parties, such as members of the public or environmental groups. We expect that future permit and approval applications and issuances will meet with similar opposition. We may encounter delays and added costs if permits and approvals are challenged.
The Company is subject to complex laws and regulations, including environmental regulations that can adversely affect the cost, manner or feasibility of doing business.
The Company’s production, development and exploratory mining operations are subject to numerous federal, state and local laws and regulations governing the operations, discharge, emission, or release of materials into the environment and the protection of the environment and human health and safety, including the Federal Clean Water Act (“CWA”), Clean Air Act (“CAA”), Endangered Species Act, Safe Drinking Water Act, Migratory Bird Treaty Act, National Environmental Policy Act, Resource Conservation and Recovery Act (“RCRA”), and Comprehensive Environmental Response, Compensation and Liability Act (“CERCLA”). Federal initiatives are often also administered and enforced through state agencies operating under parallel state statutes and regulations. Failure to comply with such rules and regulations could result in substantial penalties or construction or operational delays or requirements to cease production and have an adverse effect on the Company. These laws and regulations may, among other things:
Table of contents
· Limit or prohibit mining work on protected areas.
Under these laws and regulations, the Company could be liable for personal injury and clean-up costs and other environmental and property damages, as well as administrative, civil and criminal penalties. The Company maintains limited insurance coverage for sudden and accidental environmental damages. Accordingly, the Company may be subject to liability, or it may be required to cease production from properties in the event of environmental damages. Compliance with environmental laws and regulations and future changes in these laws and regulations may require significant capital outlays, cause material changes or delays in the Company’s current and planned operations and future activities and reduce the profitability of operations.
At the state level, surface mining operations in Idaho are regulated by the Idaho Department of Lands (“IDL”). The surface mining regulations require water monitoring to protect surface and ground water and results are submitted to the Idaho Department of Environmental Quality (IDEQ). If any degradation of existing water quality is found, regulations require the Company to work with the state regulators to mitigate any impacts on water quality. In addition, we are required to hold Idaho reclamation permits required under Idaho law. These permits mandate concurrent and post-mining reclamation of mines and require the posting of reclamation bonds sufficient to guarantee the cost of mine reclamation. Other Idaho regulations govern operating and design standards for the construction and operation of any source of air contamination and landfill operations. Any changes to these laws and regulations could have a negative impact on our financial performance and results of operations by, for example, requiring changes to operating constraints, technical criteria, fees or surety requirements.
It is possible that future changes in these laws or regulations could increase operating costs or require capital expenditures in order to remain in compliance. Any such changes could have an adverse effect on the Company’s business, financial condition and results of operations.
The Company is subject to the Federal Mine Safety and Health Act of 1977 and regulations promulgated thereto, which impose stringent health and safety standards on numerous aspects of their operations.
The Company’s exploration, development and mining is subject to the Federal Mine Safety and Health Act of 1977, which imposes stringent health and safety standards on numerous aspects of mineral extraction and processing operations, including the training of personnel, operating procedures, operating equipment and other matters, and the costs associated with compliance with such laws and regulations can be substantial. The Company’s failure to comply with these standards could have a material adverse effect on their business, financial condition or otherwise impose significant restrictions on their ability to conduct mining work.
Regulations and pending legislation governing issues involving climate change could result in increased operating costs which could have a material adverse effect on our business.
A number of governments or governmental bodies have introduced or are contemplating regulatory changes in response to various climate change interest groups and the potential impact of climate change. Legislation and increased regulation regarding climate change could impose significant costs on us, our partners and our suppliers, including costs related to increased energy requirements, capital equipment, environmental monitoring and reporting and other costs to comply with such regulations. Any adopted future climate change regulations could also negatively impact our ability to compete with companies situated in areas not subject to such limitations. Given the emotion, political significance and uncertainty around the impact of climate change and how it should be dealt with, we cannot predict how legislation and regulation will affect our financial condition, operating performance and ability to compete. Furthermore, even without such regulation, increased awareness and any adverse publicity in the global marketplace about potential impacts on climate change by us or other companies in our industry could harm our reputation. The potential physical impacts of climate change on our operations are highly uncertain and would be particular to the geographic circumstances in areas in which we operate. These may include changes in rainfall and storm patterns and intensities, water shortages, changing sea levels and changing temperatures. These impacts may adversely impact the cost, production, and financial performance of our operations.
Our activities are inherently hazardous and any exposure may exceed our insurance limits or may not be insurable.
The Company’s business is subject to a number of risks and hazards generally, including adverse environmental conditions, environmental or industrial accidents, labor disputes, unusual or unexpected geological conditions, ground or slope failures, cave-ins, changes in the regulatory environment and natural phenomena, such as inclement weather conditions, floods, hurricanes and earthquakes. Such occurrences could result in damage to mineral properties or production facilities, personal injury or death, environmental damage to our properties or the property of others, delays in construction or mining, monetary losses, and possible legal liability.
Table of contents
The nature of these risks is such that liabilities might exceed any applicable liability insurance policy limits. It is also possible that the liabilities and hazards might not be insurable, or we could elect not to insure ourselves against such liabilities because of the high premium costs, in which event, we could incur significant costs that could have a material adverse effect on our financial condition.
Our insurance and surety bonds for environmental-related issues are limited.
Our insurance and surety bonds against environmental risks are limited as to the maximum protection against potential liability for pollution or other hazards as a result of the disposal of waste products occurring from exploration and production. Further, there is no assurance that insurance carriers or surety bond providers will be able to meet their obligations under our arrangements with them. In the event that our environmental liabilities and costs exceed the coverage provided by our insurance carriers and surety bond providers, or such parties are unable to meet their obligations, we would have limited funds available to us to remedy such liabilities or costs, or for future operations. If we are unable to fund the cost of remedying an environmental problem, we also might be required to enter into an interim compliance measure pending completion of the required remedy.
We are subject to federal and state laws that require environmental assessments and the posting of bonds, which add significant costs to our operations and delays in our projects.
Mining companies must post a bond or other surety to guarantee the cost of post-mining reclamation. These requirements could add significant additional cost and delays to any mining project undertaken by us. Our mineral exploration operations are required to be covered by reclamation bonds deemed adequate by regulators to cover these risks.
We may be subject to litigation.
We may be subject to legal proceedings. Due to the nature of our business, we may be subject to a variety of regulatory investigations, claims, lawsuits and other proceedings in the ordinary course of our business. The results of these legal proceedings cannot be predicted with certainty due to the uncertainty inherent in litigation, including the effects of discovery of new evidence or advancement of new legal theories, the difficulty of predicting decisions of judges, and juries and the possibility that decisions may be reversed on appeal. There can be no assurances that these matters will not have a material adverse effect on our business.
Title claims against our properties could require us to compensate parties making such claims, if successful, and divert management’s time from operations.
There may be challenges to our title in the properties in which we hold material interests. If there are title defects with respect to any of our properties, we might be required to compensate other persons or perhaps reduce our interest in the affected property. The validity of unpatented mineral claims, which constitute most of our strategic mineral holdings in the United States, is often uncertain and may be contested by the federal government and other parties. The validity of an unpatented mineral claim, in terms of both its location and its maintenance, depends on strict compliance with a complex body of federal and state, statutory and decisional law. Although we have attempted to acquire satisfactory title to our properties, we have not obtained title opinions or title insurance with respect to the acquisition of the unpatented mineral claims. The investigation and resolution of title issues would divert management’s time from ongoing exploration programs.
We are exposed to global health, economic and market risks that are beyond our control, which could adversely affect our financial results and capital requirements.
If any of our facilities or the facilities of our suppliers, third-party service providers, or customers is affected by natural disasters, such as earthquakes, floods, fires, power shortages or outages, public health crises (such as pandemics and epidemics), political crises (such as terrorism, war, political instability or other conflict), or other events outside of our control, our operations or financial results could suffer. Any of these events could materially and adversely impact us in a number of ways, including through decreased production, increased costs, decreased demand for our products due to reduced economic activity or other factors, or the failure by counterparties to perform under contracts or similar arrangements.
For example, the outbreak of the novel strain of coronavirus, specifically identified as “COVID-19”, resulted in governments worldwide enacting emergency measures to combat the spread of the virus. These measures, including the implementation of travel bans, quarantine periods and social distancing, have caused material disruptions to global business and an economic downturn. Global equity markets have experienced significant volatility and weakness. Governments and their central banks have reacted with significant fiscal and monetary interventions designed to mitigate the impacts and stabilize economic conditions.
Table of contents
Attempts to mitigate global health, economic and market risks of natural disasters may result in decreased economic activity which would adversely affect the broader global economy. Pandemics or other significant public health events will most likely have a material adverse effect on our business and results of operations. It is not currently possible to reliably estimate the length and severity of the impact on the Company’s financial condition, and that of its subsidiaries and partners in future periods.
Uncertainties regarding the global economic and financial environment could lead to an extended national or global economic recession. A slowdown in economic activity caused by a recession would likely reduce demand for assets that we hold for sale and result in lower commodity prices for long periods of time. Costs of exploration, development and production have not yet adjusted to current economic conditions, or in proportion to the significant reduction in product prices.
Mineral operations are subject to applicable law and government regulation. Even if we discover a mineral reserve in a commercially exploitable quantity, these laws and regulations could restrict or prohibit the exploitation of that mineral reserve. If we cannot exploit any mineral reserve that we might discover on our properties, our business may fail and you may lose your investment.
Both mineral development and extraction may require permits from various foreign, federal, state, and local governmental authorities and are governed by laws and regulations, including those with respect to prospecting, mine development, mineral production, transport, export, taxation, labor standards, occupational health, waste disposal, toxic substances, land use, environmental protection, mine safety, and other matters. There can be no assurance that we will be able to obtain or maintain any of the permits required for the continued exploration of our mineral properties or for the construction and operation of a mine on our properties at economically viable costs. If we cannot accomplish these objectives, our business could face difficulty and/or fail.
We believe that we are in compliance with all material laws and regulations that currently apply to our activities but there can be no assurance that we can continue to do so. Current laws and regulations could be amended, and we might not be able to comply with them, as amended. Further, there can be no assurance that we will be able to obtain or maintain all permits necessary for our future operations, or that we will be able to obtain them on reasonable terms. To the extent such approvals are required and are not obtained, we may be delayed or prohibited from proceeding with planned development or production of our mining activity.
Environmental hazards unknown to us, which have been caused by previous or existing owners or operators of the properties, may exist on the properties in which we hold an interest. Many of our properties in which we have ownership rights are located within the Coeur d’Alene Mining District, which is currently the site of a Federal Superfund cleanup project. It is possible that environmental cleanup or other environmental restoration procedures could remain to be completed or mandated by law, causing unpredictable and unexpected liabilities to arise. At the date of this Annual Report, the Company is not aware of any environmental issues or litigation relating to the properties.
The laws of the State of Idaho and our Articles of Incorporation may protect the Company’s directors from certain types of lawsuits.
The laws of the State of Idaho provide that the Company’s directors will not be liable to us or our shareholders for monetary damages for all but certain types of conduct as directors of the Company. The Company’s Articles of Incorporation permit the Company to indemnify its directors and officers against all damages incurred in connection with its business to the fullest extent provided or allowed by law. The exculpation provisions may have the effect of preventing shareholders from recovering damages against the Company’s directors caused by director negligence, poor judgment, or other circumstances. The indemnification provisions may require the Company to use its limited assets to defend its directors and officers against claims, including claims arising out of the Company’s negligence, poor judgment, or other circumstances.
Risks Related to Investments in Our Common Stock
The price of the Company’s common stock has and may continue to fluctuate significantly, which could negatively affect the Company and holders of its common stock.
The market price of our common shares is subject to volatility, has fluctuated, and may continue to fluctuate significantly due to, among other things, changes in market sentiment regarding our operations, financial results or business prospects, the mining, metals, or environmental remediation industries generally, coordinated trading activities, large derivative positions or the macroeconomic outlook. The price of our common stock has been, and may continue to be, highly volatile. Certain events or changes in the market or our industries generally are beyond our control.
Table of contents
In addition to the other risk factors contained or incorporated by reference herein, factors that could impact our trading price include:
· developments in our business or operations or our industry sectors generally;
· any future offerings by us of our common stock;
· proposed or final regulatory changes or developments;
If securities or industry analysts do not publish research, or publish inaccurate or unfavorable research about our business, our stock price and trading volume could decline.
The trading market for our common stock will depend in part on the research and reports that securities or industry analysts publish about us or our business. We have relatively little research coverage by securities and industry analysts. If no additional industry analysts commence coverage of the Company, the trading price for our common stock could be negatively impacted. If one or more of the analysts who cover us downgrades our common stock, or publishes inaccurate or unfavorable research about our business, our stock price would likely decline. If one or more of these analysts cease coverage of us or fail to publish reports on us regularly, demand for our common stock could decrease, which could cause our stock price and trading volume to decline.
We do not expect to pay any cash dividends for the foreseeable future.
We expect to retain all available funds and future earnings, if any, for use in the operation and growth of our business and do not anticipate paying any cash dividends in the foreseeable future. Any future determination to pay cash dividends will be at the discretion of our board, subject to compliance with applicable law, our organizational documents and any contractual provisions, including under agreements for indebtedness we may incur, that restrict or limit our ability to pay dividends, and will depend upon, among other factors, our results of operations, financial condition, earnings, capital requirements and other factors that our board deems relevant. Investors seeking cash dividends in the foreseeable future should not purchase our common stock.
Table of contents
The Company may issue additional common stock or other equity securities in the future that could dilute the ownership interest of existing shareholders.
The Company is currently authorized to issue 200,000,000 shares of common stock, of which 12,098,070 shares were issued and outstanding as of December 31, 2022, and 1,000,000 shares of preferred stock, of which no Preferred Shares are outstanding as of December 31, 2022. To maintain its capital at desired levels or to fund future growth, the board may decide from time to time to issue additional shares of common stock, or securities convertible into, exchangeable for or representing rights to acquire shares of common stock. New investors in other equity securities issued by the Company in the future may also have rights, preferences and privileges senior to, that may adversely impact, the Company’s current shareholders.
If a large number of shares of our common stock are sold in the public market, the sales could reduce the trading price of our common stock and impede our ability to raise future capital.
We cannot predict what effect, if any, future issuances by us of our common stock or other equity will have on the market price of our common stock. Any shares that we may issue may not have any resale restrictions, and therefore could be immediately sold by the holders. The market price of our common stock could decline if certain large holders of our common stock, or recipients of our common stock, sell all or a significant portion of their shares of common stock or are perceived by the market as intending to sell these shares other than in an orderly manner. In addition, these sales could also impair our ability to raise capital through the sale of additional common stock in the capital markets.
Table of contents
ITEM 2. DESCRIPTION OF PROPERTIES
Note on New SEC Mining Disclosure Rules
Information concerning our mining properties in this Annual Report on Form 10-K/A has been prepared in accordance with the requirements of subpart 1300 of Regulation S-K, which first became applicable to us for the fiscal year ended December 31, 2021. These requirements differ significantly from the previously applicable disclosure requirements of SEC Industry Guide 7. Among other differences, subpart 1300 of Regulation S-K requires us to disclose our mineral resources, in addition to our mineral reserves, as of the end of our most recently completed fiscal year both in the aggregate and for each of our individually material mining properties. Readers are cautioned that mineral resources do not have demonstrated economic value. Mineral resources are subject to further exploration and development, are subject to additional risks, and no assurance can be given that they will eventually convert to mineral reserves. Inferred resources have more uncertainty than Measured or Indicated as the estimation parameters assume mineralized continuity over greater distances which may not accurately reflect the actual mineralization.
Summary
The map below shows the locations of our operations and our exploration Properties.
Figure 1 - Property Location Map
Table of contents
The following table summarizes our aggregate metal quantities produced and sold, which only includes the quantities produced and sold from the Golden Chest Mine (the Company’s only producing mine) for the last three years:
Year Ended December 31,
The following table summarizes the Company’s total in-situ proven and probable mineral reserves (the Golden Chest Mine is the Company’s only property with calculated reserves) as of December 31, for the last three years:
The following table summarizes the Company’s total in-situ mineral resources (the Golden Chest Mine is the Company’s only property with calculated mineral resources) as of December 31, 2022.
The year ending December 31, 2022 was the first year the Company calculated a mineral resource for the Golden Chest Mine. An historic resource report was completed by a third party in 2012, but it was not an SK-1300 compliant resource. More information on the Company’s mineral reserves and resources is provided in Exhibit 96.1, the Technical Report Summary on the Golden Chest Mine, prepared by the Qualified Persons (QP) under Section 1300 of SEC Regulation S-K, Grant A. Brackebusch, P.E., and Robert J. Morgan, PG, PLS.
Table of contents
The table below summarizes the Company’s production and exploration-stage properties.
Table of contents
GOLDEN CHEST MINE
Figure 2 – Aerial Photo of Golden Chest Mine in February 2020
The Golden Chest Mine is the Company’s only Production Stage mine and is comprised of an underground mine, an open pit mine, and an exploration property located about 1.5 miles east of Murray, Idaho. The Golden Chest Mine includes 86 patented mining claims (1,322 acres) and 217 unpatented claims (4,300 acres). The open pit mine is permitted with the Idaho Department of Lands and the Company has posted a reclamation bond for an approved reclamation plan. IDR is the operator and owns 100% of the Golden Chest LLC (owner of the Golden Chest Mine). Production from the Golden Chest and an adjacent Area of Interest is subject a 2% NSR payable to Marathon Gold Corporation (Marathon). The mineralization occurs as gold-quartz veins associated with an orogenic deposit type. Ore from the Golden Chest Mine is processed off-site at the New Jersey Mill in Kellogg, Idaho. For more information concerning the Golden Chest Mine, please refer to the information set forth under the caption “Individual Properties-MATERIAL OPERATING PROPERTIES” and under the caption “Golden Chest Mine” in this Item 2.
NEW JERSEY MILL
Property Location
The New Jersey Mill is a fully permitted, 360-tonne per day, flotation mill and concentrate leach plant (“CLP”) located two miles east of Kellogg, Idaho, in the Coeur d’Alene Mining District. The CLP is permitted with Idaho Department of Environmental Quality (IDEQ). The mill is located on the same property as the New Jersey Mine, adjacent to U.S. Interstate Highway 90 and easily accessed year-round by local roads. Three-phase electrical power is supplied to the New Jersey Mill by Avista Utilities.
Property Ownership and Operation
The New Jersey Mill is operated by IDR. In 2011, IDR signed a joint venture (“JV”) agreement with Crescent Silver LLC (Crescent) to increase the capacity of the New Jersey Mill. Crescent funded the mill expansion in return for a 35% interest in JV assets plus the right to process 7,000 tonnes of its ore per month. IDR is the JV manager and retains a 65% interest in JV assets as well as the right to process its own ore at the rate of 3,000 tonnes per month and to allocate unused and excess capacity in its role as manager. The property covered by the JV agreement includes the crushing circuit, grinding circuit, gravity circuit, flotation circuit, CLP, buildings, and surface rights over the patented mill site claim. Unpatented mill site claims are also part of the JV.
Table of contents
Present Condition of Plant & Equipment
Mill Expansion and Crescent Ore Processing
The mill expansion was completed in 2012, rendering the mill capable of processing 360 tonnes of sulfide ore per day to produce a single flotation concentrate. The expansion cost approximately $3.2 million, all of which was funded by Crescent under terms of the JV (Ex. 10.1). The expansion project included the installation of a new cone crusher, a new fine ore bin, new conveyors, a new 2.4-meter by 4.0-meter ball mill, additional flotation cells, a new paste thickener, associated pumps, and a new building.
Current Ore Processing Operations
In October 2016, the Company resumed operations at the New Jersey Mill, processing ore extracted from open pit and underground at the Golden Chest. In 2022, the New Jersey Mill processed 42,260 tonnes at an average head grade of 4.33 gpt gold with 89.8% gold recovery. Since restarting operations at the Golden Chest in October 2016, the Company has milled a total of 249,240 tonnes at the New Jersey Mill.
The mill recycles process water and utilizes a paste tailings disposal process patented by IDR founder Fred Brackebusch to minimize impacts to the environment. By implementing paste tailings processing methods, IDR can recycle process water and prevent the discharge of process water to surface waters. At full capacity, this method saves more than 50 million gallons of water per year. IDR was recognized as a “Pollution Prevention Champion” by the Idaho Department of Environmental Quality (IDEQ) in 2014 for its efforts to reduce pollution at the mill. The Company submitted a permit for an expansion of its existing tailings storage facility (TSF) which was approved. The expansion has enough tailings storage capacity for at least four years, and possibly more if a paste backfill system is constructed. The Company has also submitted a Closure Plan for its cyanide leach circuit which is under review by the Idaho DEQ.
As of December 31, 2022, the Company had a net capital cost of $3,704,977 associated with the New Jersey Mill.
Permit Requirements
The New Jersey Mill has all the required environmental permits to operate currently and into the foreseeable. Some permits may require modification if operating conditions change, but typically these changes can be completed without impeding the milling operation. A summary of the permits held by the Company are found in following table:
Permit Descriptions
Permit Description Reference
RARE EARTH OVERVIEW
Idaho Strategic Resources controls and operates three rare earth elements properties known as Diamond Creek, Roberts, and Lemhi Pass. The three properties together make up approximately 18,030 acres of unpatented lode mining claims, and one State of Idaho mineral lease, within Idaho’s 70-mile long Rare Earth Elements–Thorium (REE-Th) Belt. All three of Idaho Strategic’s properties have seen substantive historic exploration conducted by the United States Geological Survey in the 1950s, and more recently by the Idaho Geological Survey. IDR has completed numerous geologic mapping programs, surface sampling programs, and has completed one drill program to date on its rare earth elements land holdings. While each of the three properties IDR controls are early-stage, the Company considers the properties material to its business due to qualitative factors such as the potential for the company’s properties to be advanced toward future production on an unknown timeline, and the potential importance of rare earth elements in low-carbon technology and national defense technologies, which could see increased demand in the future. To date, Idaho Strategic has not established any known resources or reserves on its rare earth elements properties and plans to continue to advance the projects as funding and permitting allows. For more information concerning the Diamond Creek, Roberts, and Lemhi Pass REE properties, please refer to the information set forth under the caption “Individual Properties-MATERIAL EXPLORATION PROPERTIES” and under their respective caption in this Item 2.
Table of contents
Individual Properties – MATERIAL OPERATING PROPERTIES
GOLDEN CHEST MINE
Figure 3 - Golden Chest Mine Location Map
Property and Location
The Golden Chest Mine is a gold Production Stage property comprised of an underground mine, an open pit mine, and an exploration property located about 1.5 miles east of Murray, Idaho, and 115 km east of the city of Coeur d’Alene, Idaho at Latitude 47o37’14” North and Longitude 115o49’43” West. The Golden Chest Mine includes 86 patented mining claims (1,322 acres) and 217 unpatented claims (4,300 acres). The surface mine is permitted with the Idaho Department of Lands and has posted a reclamation bond for an approved reclamation plan. Surface water monitoring is completed as a condition of the permit. The mine is along Forest Highway 9 and is accessible by several improved dirt roads from the paved highway. A three-phase power line was installed at the property in 2014 with power supplied by Avista Utilities.
Property Ownership
IDR owns 100% of the Golden Chest LLC (owner of the Golden Chest Mine). The core of the Golden Chest Mine is a contiguous group of 26 patented claims where all modern mining has taken place to date. The Company owns the rights to both the surface and subsurface mineral on all patented claims directly and through its 100% held subsidiary Golden Chest LLC (GCLLC), excluding the Joe Dandy Claim where IDR owns only the subsurface mineral rights. West of the mine proper, the Company owns an additional 80 patented claims. The total patented claim position covers 1,322 acres. As these patented claims are considered private lots, legal access is allowed. Property taxes on patented claims are assessed by Shoshone County each year and IDR has paid the taxes in full.
IDR currently maintains 217 unpatented mining claims covering 4,300 acres. The claims have been filed with the United States Bureau of Land Management (BLM) agency and at the Shoshone County Courthouse. Annual maintenance fees are paid to the BLM by September 1, and the Golden Chest unpatented claim fees have been paid and are in good standing.
Production from the Golden Chest and an adjacent Area of Interest is subject a 2% NSR payable to Marathon Gold Corporation (Marathon).
Property History
The Golden Chest Mine was developed in the late 1800’s through the early 1900’s as part of the first gold production from the Coeur d’Alene Mining District. Historical accounts vary, but the district is believed to have produced approximately 300,000 ounces of gold from placer sources. It is estimated that the historic hard rock mining at the Golden Chest (prior to IDR’s ownership) produced approximately 65,000 ounces of gold, primarily from shallow, underground, high-grade veins. The Golden Chest Mine is considered to be the largest historic lode producer of gold in northern Idaho.
Table of contents
Modern exploration of the Golden Chest area began in the late 1970’s with several companies, including Cominco-American and Golden Chest Inc. (“GCI”), targeting gold and massive sulfides. Drill tests by GCI included a 200-foot hole from surface that intersected a 60-foot zone containing multiple low-grade gold-bearing quartz veins.
Newmont Exploration Ltd. followed GCI’s discovery by evaluating the veins for bulk mineable potential in the late-1980’s. Newmont drilled 35 shallow reverse-circulation and five core holes. In 2010 and 2011, a joint venture between IDR and Marathon Gold drilled 18,300 meters of core and published a resource report in accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101).
In September 2013, the Skookum Shoot portion of the Golden Chest property was leased to Juniper Mining Company. Juniper began construction in Q3 2014, spending an estimated $7 to $9 million on mine development and infrastructure, building a modern gold mine that reached production in May 2015. Mining activities continued until September 2015 when Gold Hill ceased operations and terminated its lease, forfeiting the mine and infrastructure back to Golden Chest LLC.
Present Condition, Work Completed, and Exploration Plans
Current Underground Operations
The Golden Chest underground mine is accessed by primary decline ramp (MAR) with a complimentary escape-way incline ramp, and a series of ventilation raises. The primary mining method is underhand drift-and-fill utilizing cemented rock-fill (CRF). During 2022, IDR mined a total of 25,000 tonnes of ore at an average grade of 5.35 gpt gold. The ore came from stopes on the Skookum Shoot and from exploration drifting in the Klondike area. The decline (MAR) was extended at depth during 2022 to the 794 sublevel which required about 175 meters of ramp development and one exhaust ventilation raise was completed by IDR miners.
Current Open-Pit Operations
In 2022, IDR continued its open pit mining operation which commenced in August of 2016. Mining in the Klondike pit was completed in June. A small pit on the Jumbo vein was mined intermittently during 2022 also. A total of 8,400 tonnes of ore at average grade of 4.55 gpt gold and 80,200 tonnes of waste were mined during the year. Ore tonnes and grade in the Klondike Pit were lower than modeled because of unmapped, historic stopes in the Klondike where high-grade material had been mined out by the old-timers.
Exploration Plans and Results
Modern exploration, including over 30,000 meters of drilling, reveals six NW-trending ore shoots at Golden Chest that demonstrate strong periodicity, consistent width and spacing, along the Idaho Fault. Most historic production came from the northernmost of these shoots, the Katie-Dora and the Klondike. Current underground mining occurs within the Skookum Shoot. Excellent exploration potential remains in unmined portions of the northern shoots as well as in the unmined Paymaster and Joe Dandy shoots to the south. During 2022, a total of 6,353 meters of core drilling was completed with drilling at the Klondike, Paymaster, Skookum, Argus, Evans, Ida, and Badger areas. Highlights of the 2022 drilling included drillhole GC 22-212 which intersected 8.77 gpt gold over 9.2 meters in the Klondike area, and GC 22-223 which intersected 16.6 gpt gold over 1.23 meters in the Paymaster area. A majority of the drilling was intended to upgrade and further define mineral resources, however some grassroots exploration drilling also took place in the western portion of the property. A highlight of the grassroots exploration was the discovery of a shallow, broad, low-grade zone at the Argus prospect where AG 22-2 assayed 0.56 gpt gold over 24 meters. The Argus is located about 2.8 kilometers northwest of the active mining area at Golden Chest.
Present Condition of Plant & Equipment
The Golden Chest underground mine is accessed by primary decline ramp (MAR) with a complimentary escape-way incline ramp and ventilation raises. The MAR was originally developed in 2013 at nominal 4-meter by 4.5-meter cross-section. Additional development by IDR in the MAR has been completed recently. There are several metal buildings on the mine surface constructed from 2012 through 2021 including a core shed with offices, a mine shop, and associated mine dry and warehouse. The mine electrical service is a three-phase, 500 kVA installation supplied by Avista Utilities.
As of December 31, 2022, the Company had a capitalized development and investment cost of $5,810,490 associated with the Golden Chest.
Geology & Mineralization
Gold mineralization occurs in veins associated with multiple faulting and folding events in the Coeur d’Alene Mining District. The mineralization occurs as gold- quartz veins associated with an orogenic deposit type. The orogenic system at the Golden Chest appears to have an association with igneous rock activity. Hence, the vein deposits may be described as intrusion-related orogenic gold. The principal vein being exploited at the Golden Chest Mine is associated with the Idaho Fault, which juxtaposes the quartzites of the upper Prichard Formation against finer-grained argillites, also of the upper Prichard Formation.
Table of contents
Veins occur adjacent to the Idaho Fault both in its footwall, and in its hanging wall. The mineralization occurs in two types of quartz veins, banded and massive. These veins are generally conformable to bedding in the Proterozoic age Prichard Formation. The banded veins, which occur primarily in argillite, contain, pyrite, arsenopyrite, galena, sphalerite, and visible gold. Thicker, massive veins occur in quartzite and contain pyrite, galena, chalcopyrite, sphalerite, scheelite and visible gold.
The table below summarizes the Company’s Mineral Reserves for the past three years. Note that proven and probable reserves were not reported separately for 2021 and 2020.
Notes:
3. Mineral Reserves are 100% attributable to Idaho Strategic Resources
4. Mineral Reserves are estimated at a cutoff of 2 Au PPM (grams/tonne)
6. An average mining width of 3 m was used for the Reserves reporting.
8. Numbers may not add due to rounding.
The 2022 mineral reserve increased over the previous year due to increased core drilling below the previous year’s reserves and a spatial expansion of stopes in the reserve area which provided more muck sampling data which allowed more of the vein to be classified as mineral reserves.
Two cut-off grades are used for stope planning, the go/no-go cut-off and the in-stope cut-off. The go/no-go cut-off represents any material that has the potential to be mined but does not have to be mined as part of the operational plan. The go/no-go cut-off is used for initial stope planning as any given stope or sublevel does not have to be mined and should only be mined if it is economic. The go/no-go cut-off is equation is presented in Equation 1.
Equation 1 go/no-go cut-off
Equation 1 yields a value of 3.61 gpt for the cut-off and was rounded down to 3.6 gpt for a more natural break.
Table of contents
The in-stope cut-off is used when material in a defined stope must be mined to reach higher grades. In this scenario the mining cost is considered sunk and is omitted from Equation 1 as the cost was incurred regardless of the ore/waste determination at the face. Evaluating equation 1 omitting mining cost yields a value of 2.03 gpt which was rounded to 2.0 gpt.
The table below summarizes the Company’s mineral resources for the year ending December 31, 2022. Resources were not calculated by the Company for the prior two years. An historic resource report was completed by a third party in 2012, but it was not an SK-1300 compliant resource.
Notes:
5. Revenues produced at the Golden Chest are subject to a 2% NSR Royalty.
9. Numbers may not add due to rounding.
For more information, see Section 12-2 of Exhibit 96.1, the Technical Report Summary on the Golden Chest Mine, Idaho, prepared for the Company by the Qualified Persons under Section 1300 of SEC Regulation S-K (QP), Grant Brackebusch, P.E. and Robert J. Morgan, PG, PLS.
Permit Requirements
The Golden Chest Mine has all the required environmental permits to operate currently and into the foreseeable future. Some permits may require modification if operating conditions change, but typically these changes can be completed without impeding the mining operation. A summary of the permits held by the Company are found in the following table:
Table of contents
Permit Descriptions
Permit Description Reference
In 2022, MSHA did not issue any citations for Section 104 S&S violations associated with the Golden Chest Mine or New Jersey Mill. Reference is made to Exhibit 95 to this report.
Table of contents
Individual Properties–MATERIAL EXPLORATION PROPERTIES
DIAMOND CREEK
Overview & History
The Diamond Creek Project is a rare earth element (REE) Exploration Stage property located approximately 13 kilometers (8 miles) north-northwest of the town of Salmon, Idaho. Diamond Creek is operated by IDR and consists of 244 unpatented lode mining claims situated in the Eureka Mining District Lemhi County, Idaho in Township 23N, Range 21E, Sections 2, 3, 10, 11, 14, 15, 23,25, 26, 27,34,35; Township 22N, Range 21E, Sections 1 and 2 (Boise Meridian) and makes up approximately 4,554 acres.
The Diamond Creek Project is located in the central portion of the Idaho Rare Earth Element – Thorium (REE-Th) Belt. The Diamond Creek mineral claims are located on public lands managed by the United States Forest Service (“USFS”). The claims require an annual maintenance fee of $165 per claim per year which must be paid to the Bureau of Land Management (“BLM”) by September 1 of each year. The claims fees necessary to obtain and hold the mineral rights at Diamond Creek as well as the investments to explore the project are expensed each year that they are paid. Therefore, Diamond Creek does not show on the Company’s books and does not qualify as a Material Property for financial purposes, rather the Company considers Diamond Creek material to its business due to qualitative factors such as the potential for the company’s projects to be advanced toward future production on an unknown timeline, and the potential importance of rare earth elements in low-carbon technology, which could see increased demand in the future. To date, Idaho Strategic has not established any known mineral reserves or resources on the Diamond Creek property.
Idaho Strategic initially staked the mining claims comprising the Diamond Creek Project in April 2020 and added claims to the group in January 2023. The unpatented lode claims are wholly owned by IDR and there are no underlying royalties on the unpatented lode claims. The Lemhi Pass mineral claims are located on Bureau of Land Management (“BLM”) land and require an annual maintenance fee of $165 per claim per year which must be paid to the BLM by September 1 of each year.
The Diamond Creek Project was historically prospected for gold, until the 1950’s when U.S. government sponsored country-wide exploration for raw materials related to nuclear power resulted in the discovery the unique thorium and REE mineralization at Diamond Creek by the United States Geologic Survey (USGS) and the Idaho Geological Survey. Several other companies have undertaken minor rare earths exploration programs on the property including one stage of limited core drilling with some notable REE mineralization encountered. Diamond Creek is mentioned in numerous reports including a USGS report written in 1979 by M.H. Staatz.
Geology and Mineralization
The REE mineralization at Diamond Creek is found in two types: fracture filling and replacement veins/bodies. The replacement bodies are composed of bright and varied oxides. There are at least eight known veins, and they range in width from 0.15 m to 7.6 m in thickness. Vein widths appear best developed in the metasediments and can be traced on the surface for distances ranging from 33.5 m to 780 m. The known rare earth elements mineralization occurs along a 2-mile stretch of the Diamond Creek Fault. The Project consists of four distinct areas identified from north to south as: Contact, Lucky Gem, Simer, and Frank Burch.
Table of contents
Samples taken by the USGS show total REE oxide contents ranging from 0.59% to 5.5%. Work by the USGS in 1979 reported that three samples cut across one of the larger veins were assayed for gold and contained 0.5, 2.4 and 11.9 grams per tonne Au. Down-dip extensions of these mineralized veins have never been sufficiently tested.
Infrastructure and Facilities
The Diamond Creek Project currently does not contain any facilities on-site. The Project is easily accessible by road for approximately 8 months out of the year by nearly any vehicle and is accessible year-round by properly equipped vehicles. There are numerous well maintained forest service roads which provide access to all four distinct areas of the Project. There is power nearby to the Project including a powerline which runs along U.S. Highway 93 approximately 3 miles from Diamond Creek. Idaho Strategic utilizes a combined shop and office building located in the town of Salmon, Idaho to stage equipment, log and process drill core, house company employees, and conduct all other rare earth exploration activities relating to Diamond Creek.
Present Condition & Recent Activities
To date, Idaho Strategic has conducted surface sampling programs and geologic mapping throughout its ownership of the mineral claims from 2020 to present. On November 3, 2022, IDR completed its inaugural 12-hole Diamond Creek drill program which targeted REE mineralization on the northern portion of the Project known as the Contact and Lucky Gem areas. The positive results of the drill program were reported, and highlights from hole DC 22-8 drilled from the Lucky Gem area in the north-central portion of the Project, were reported to include 11.3 meters (m) of 1.3% total rare earth oxide (“TREO”) from 2.9 m to 14.2 m. The drill results included intervals of 1.1 m from 13.1 m to 14.2 m which returned grades of 2.2% TREO. Also discovered in hole DC 22-8 were significant concentrations of niobium. The Company reported 0.7% niobium over 10.1 m from 2.9 m to 13.0 m including the following higher-grade interval of 1.0% niobium over 0.5 m from 9.6 m to 10.1 m. Hole DC 22-8 drilled down dip through the shallow dipping replacement body where mineralization continued for 50.3 meters before the hole was lost.
In addition to the Company’s drill program, Idaho Strategic conducted surface sampling along a 32-meter trench that exposed REE mineralization at the surface during drill pad reclamation at the Lucky Gem drill pad located in the north-central portion of the Project. Vertical channel samples were taken every 1 meter for the first 20 meters of exposure, then every 2 meters for the last 12 meters. The exposed geology displayed evidence of dynamic fluid movement along shears and fracture zones forming both replacement and fracture-filling type deposits.
The results include 32 continuous meters averaging 1.28% TREO, including high values of 2.0% TREO at 8 m and 12 m. In addition to REEs, 12 m niobium mineralization that assayed greater than 0.5% Nb was located between 5 and 16 m.
As part of the Company’s ongoing participation in the Idaho Global Entrepreneurial Mission (“IGEM”) Program, Idaho Strategic was able to provide approximately sixty 5-gallon buckets of surface material from its Diamond Creek drill pad reclamation efforts to the University of Idaho for their continued studies regarding alternative, environmentally friendly REE extraction and separation methods.
The Company previously obtained all necessary permits to drill the Diamond Creek Project in 2022. After drilling, all reclamation was completed and the approved by the USFS. An additional drilling Plan of Operations (POO) has been submitted to the USFS for the 2023-2024 field year. The new POO will expand on the 2022 results at Lucky Gem and Contact areas as well as additional drilling targeting REE mineralization on the southern end of the Diamond Creek Project in the area known as Simer. There is no timeline for drill permit approval or projected timing of work. To date, there has not been a technical report, feasibility study, or resource estimate conducted by Idaho Strategic. The Company has provided a summary of exploration activities in order to provide an overview of Diamond Creek and why the Company views this project favorably. Idaho Strategic has excluded exploration results from this report which either did not return the targeted mineralization, did not aid in providing a brief overview of the Project, or for which the Company has not received the results back from lab testing.
Quality Control Procedures
The procedures taken to ensure quality and reliability of the Company’s samples and assays are as follows:
Representative surface outcrop samples collected over time, in the normal course of business and reported by the company, come from favorable geologic outcrops identified during surface reconnaissance and are mapped/recorded by on-site professional geologist. The samples are identified by a “one-of-a-kind” label and bagged for secure “chain-of-command” transport to a certified assay laboratory. Idaho Strategic geologists use the assay results to interpret geologic mapping, geophysics and geochemistry in order to make an informed decision for targeting purposes. The samples that Company geologists determined warranted further analysis were sent for assay to ALS Minerals. ALS Minerals utilized Ore Grade Rare Earth Element analysis (ME-MS81h).
Table of contents
Drill core samples at Diamond Creek were taken from the drill rig to a secure, Company-owned facility prior to logging by Company geologists. The core is then logged and samples for assay are obtained by sawing the core in half longitudinally while trying to ensure a representative sample is submitted to the laboratory for analysis. All the samples that have been publicly released were analyzed by ALS Minerals using Ore Grade Rare Earth Elements analysis (ME-MS81h) and reported niobium results were analyzed using Fusion XRF- NB Ore Grade (Nb-XRF10).
ROBERTS
Overview & History
The Roberts Project is a rare earth element (REE) Exploration Stage property located approximately 48 kilometers (30 miles) northwest of the town of Salmon, Idaho. Roberts is operated by IDR and consists of 109 unpatented lode mining claims situated in the Mineral Hill district in Sections 3,4,9,10,11,13,14,15,16,22,23,24, Township 24 North, Range 19 East and makes up approximately 2,051 acres. The Project is located in the northern portion of the Idaho Rare Earth Element – Thorium (REE-Th) Belt. The Roberts mineral claims are located on US Public Domain Land, which is managed by the United States Forest Service (“USFS”). The claims require an annual maintenance fee of $165 per claim per year which must be paid to the Bureau of Land Management (“BLM”) by September 1 of each year. The claims fees necessary to obtain and hold the mineral rights at Roberts as well as the investments to explore the project are expensed each year that they are paid. Therefore, Roberts does not show on the Company’s books and does not qualify as a material Property for financial purposes, rather the Company considers Roberts material to its business due to qualitative factors such as the potential for the company’s projects to be advanced toward future production on an unknown timeline, and the potential importance of rare earth elements in low-carbon technology, which could see increased demand in the future. To date, Idaho Strategic has not established any known reserves on the Roberts property.
Idaho Strategic initially staked the mining claims comprising the Roberts Project in early 2020. Throughout Idaho Strategic’s ownership of the Project, the Company has staked additional claims at its discretion based upon exploration conducted to date. The unpatented lode claims are wholly owned by IDR and there are no underlying royalties.
The Roberts Project and the Mineral Hill district was historically prospected for gold and copper in the early 1900’s. In the early 1950’s rare earth mineralization was discovered and documented by Abbott (1954) and Anderson (1958) from the Idaho Geological Survey and Kaiser (1956) with the US Geological Survey. Abbott (1954) reported cutting a 2.5-foot sample across the lode at the Robert Lode which returned 21.5% combined rare earth oxides and thoria.
Geology and Mineralization
The REE mineralization at the Roberts property is associated with a unique group of igneous rocks known as carbonatites. Carbonatites are carbonate rocks sourced from magmatic origins, with primary carbonate compositions exceeding 50%. The Roberts property contains two of the eight known carbonatite occurrences within the Mineral Hill District. The first carbonatite can be found in a northwest-trending seam which measures approximately 400 meters (1,300 feet) long and 90 meters (300 feet) wide; the second occurrence appears to be a smaller carbonatite plug, measuring about 200 meters in diameter.
Table of contents
Infrastructure and Facilities
The Roberts Project currently does not contain any facilities on-site. The Project is accessible by road for approximately 8 months out of the year via National Forest Road 036 (Indian Creek Road). Idaho Strategic utilizes a combined shop and office building located in the town of Salmon, Idaho, to stage equipment, log and process samples, house company employees, and conduct all other rare earth exploration activities relating to Roberts.
Present Condition & Recent Activities
From 2020 to present, Idaho Strategic has conducted surface sampling, geophysical surveys and geologic mapping is select areas of its mineral claims. The Roberts Project has two carbonatite prospects with REE mineralization, the “Upper Roberts” and the “Lower Roberts”, which are located about 500 meters apart. The Upper Roberts occurrence outcrops along a northwest strike for greater than 400 meters and demonstrates high-grade REE mineralization in a number of surface samples. One sample taken by Company geologists returned assays of combined rare earth elements in excess of 12%, including 1.67% neodymium. The company’s samples show critical REEs like neodymium, praseodymium, and samarium in abundance. Similarly, as with IDR’s Diamond Creek property, REE’s are not the only valuable commodities. Gold and niobium may also be in profitable concentration as by-products. Recent samples collected from the Roberts’ property, show assays with gold values up to 8.8 grams per ton and niobium as high as 0.50%. Exploration plans include further geologic mapping, sampling, and geophysical surveys in order to prepare the project for its inaugural drill program. The permitting process for a drill program at Roberts is underway and any future drilling activities will be subject to permit approval and funding.
Moving forward, Idaho Strategic plans to advance the Roberts Project by developing drill targets aimed at verifying the extent and grade of the two carbonatites that the Company’s geologists have identified and mapped from the surface. There is no timeline for drill permit approval or projected timing of work. To date, there has not been a technical report, feasibility study, or resource estimate conducted by Idaho Strategic. The Company has provided a summary of exploration activities in order to provide an overview of Roberts and why the Company views this project favorably. Idaho Strategic has excluded exploration results from this report which either did not return the targeted mineralization, did not aid in providing a brief overview of the Project, or for which the Company has not received the results back from lab testing.
Quality Control Procedures
The procedures taken to ensure quality and reliability of the Company’s samples and assays are as follows:
Representative surface outcrop samples collected over time, in the normal course of business and reported by the company, come from favorable geologic outcrops identified during surface reconnaissance and are mapped/recorded by on-site professional geologist. The samples are identified by a “one-of-a-kind” label and bagged for secure “chain-of-command” transport to a certified assay laboratory. Idaho Strategic geologists use the assay results to interpret geologic mapping, geophysics and geochemistry in order to make an informed decision for targeting purposes. The samples that Company geologists determined warranted further analysis were sent for assay to ALS Minerals. ALS Minerals utilized Ore Grade Rare Earth Element analysis (ME-MS81h).
Table of contents
LEMHI PASS
Overview & History
The Lemhi Pass Project is a rare earth element (REE) and thorium Exploration Stage property located approximately 41 kilometers (25 miles) southeast of the town of Salmon, Idaho and stretches into Montana. Lemhi Pass is operated by IDR and consists of 568 total unpatented lode mining claims situated in the McDevitt Mining District, Lemhi County, Idaho in Township 19N, Range 24E, Sections 1, 2, 11, 12, 13, 14, 24; Township 19N, Range 25E, Sections 4, 5, 6, 7, 8, 9, 10, 15, 21, 22 (Boise Meridian) and in the Bloody Dick Mining District, Beaverhead County, Montana in Township 10S, Range 15W, Sections 20, 21, 22, 27, 28, 29, 34, 35 and Township 11S, Range 15W, Sections 10, 11, 14, 15, PB 38. Additionally, IDR has a mineral lease for a 565-acre mineral lease with the State of Idaho for T19N, Range 25E, Section 16. The Project is located in the southern portion of the Idaho Rare Earth Element – Thorium (REE-Th) Belt and straddles the ID-MT border. The property package is mainly contiguous and makes up approximately 11,425 acres. Approximately 407 (7,820 acres) unpatented lode claims are situated in Idaho, while the remaining 161 (3,040 acres) unpatented lode claims are situated in Montana.
The claims fees and lease fees necessary to obtain and hold the mineral rights at Lemhi Pass as well as the investments to explore the project are expensed each year that they are paid. Therefore, Lemhi Pass does not show on the Company’s books and does not qualify as a material Property for financial purposes, rather the Company considers Lemhi Pass material to its business due to qualitative factors such as the potential for the company’s projects to be advanced toward future production on an unknown timeline, and the potential importance of rare earth elements and thorium in low-carbon technology, which could see increased demand in the future. To date, Idaho Strategic has not established any known reserves on the Lemhi Pass Project.
Idaho Strategic initially staked the mining claims comprising the Lemhi Pass Project in October 2021 and have added claims, based upon exploration, to the group in February 2022 and again in January 2023. The unpatented lode claims are wholly owned by IDR and there are no underlying royalties on the unpatented lode claims. The Lemhi Pass mineral claims are located on Bureau of Land Management (“BLM”) land and require an annual maintenance fee of $165 per claim per year which must be paid to the BLM by September 1 of each year. The State of Idaho mineral lease has a term of 20 years with an annual rent of $1,695, increased annually by 3%. The State of Idaho mineral lease has a minimum annual royalty of $1,000 years 1 through 5; $2,500 years 6 through 20.
The Lemhi Pass Project was historically prospected for gold and copper until 1949 when its unique geologic setting was recognized by the United States Geologic Survey (USGS) and the Idaho Geological Survey during the U.S. government sponsored country-wide exploration for raw materials related to nuclear power. These campaigns resulted in the discovery of thorium in several areas of Lemhi County, including the REE occurrences in the Lemhi Pass area. Several other companies have undertaken minor thorium-related exploration programs on the property, including historic reports of past thorium production. Lemhi Pass is mentioned in numerous reports including the 2009 USGS Circular 1336 titled “Thorium Deposits of the United States – Energy Resources for the Future?” which features parts of the Company’s Lemhi Pass Project on its cover page.
Table of contents
Geology and Mineralization
The Company initially staked the Lemhi Pass Project to target an area with the greatest concentration of known veins where the Lemhi Pass, Dan Patch, and Bull Moose faults intersect or approach one another. REE and thorium mineralization at Lemhi Pass is found in the REE mineral monazite. Monazite is a phosphate mineral and most of the Company’s strongest REE values are associated with phosphorus. The monazite at Lemhi Pass occurs as opaque, subhedral, yellow-green to reddish-brown crystals which are mostly microscopic in size, making it hard to detect with the naked eye. Samples taken by the USGS of 31 vein samples, showed total REE-oxide contents ranging from 0.073% to 2.20% Staatz (1972a). IDR sampling in 2022 showed total rare earths assays up to 4.26% validating company belief that the Lemhi Pass District is largely underexplored for REE’s; since their discovery in the district was ancillary, to the government’s search for nuclear related fuels in the 1950’s.
Infrastructure and Facilities
The Lemhi Pass Project currently does not contain any facilities on-site. Portions of the Lemhi Pass Project are accessible year-round by properly equipped vehicles. There are numerous well maintained forest service roads which provide further access to the Project; however, those roads are not well maintained during the winter months. There is power nearby to the Project including a regional powerline which runs across the Project. Idaho Strategic utilizes a combined shop and office building located in the town of Salmon, Idaho to stage equipment, log and process samples, house company employees, and conduct all other rare earth and thorium exploration activities relating to Lemhi Pass.
Present Condition & Recent Activities
To date, Idaho Strategic has conducted surface sampling programs and geologic mapping throughout its ownership of the mineral claims from 2021 to present. Select Idaho Strategic sample results have revealed rare earth grades ranging from 0.67% TREO to 4.26% TREO from areas of the project that had not been well tested for rare earth elements in the past.
Moving forward, Idaho Strategic will continue its surface exploration efforts in order to gather enough information to warrant a drill program. The land stewardship in the Lemhi Pass District has areas under both BLM, USFS and State jurisdiction. The Company in is the process of permitting trenching and drilling work on BLM lands in 2023 and on the USFS lands in 2024. To date, there has not been a technical report, feasibility study, or resource estimate conducted by Idaho Strategic. The Company has provided a summary of exploration activities in order to provide an overview of Lemhi Pass and why the Company views this project favorably. Idaho Strategic has excluded exploration results from this report which either did not return the targeted mineralization, did not aid in providing a brief overview of the Project, or for which the Company has not received the results back from lab testing.
Quality Control Procedures
The procedures taken to ensure quality and reliability of the Company’s samples and assays are as follows:
Representative surface outcrop samples collected over time, in the normal course of business and reported by the company, come from favorable geologic outcrops identified during surface reconnaissance and are mapped/recorded by on-site professional geologist. The samples are identified by a “one-of-a-kind” label and bagged for secure “chain-of-command” transport to a certified assay laboratory. Idaho Strategic geologists use the assay results to interpret geologic mapping, geophysics and geochemistry in order to make an informed decision for targeting purposes. The samples that Company geologists determined warranted further analysis were sent for assay to ALS Minerals. ALS Minerals utilized Ore Grade Rare Earth Element analysis (ME-MS81h).
Internal Controls
Exploration and development drilling programs are performed using industry standard quality control methods for drilling, logging, sampling, and analytical procedures. The laboratory used by IDR for sample preparation and analyses is: American Analytical Services, Inc. (AAS), 59148 Silver Valley Rd, Osburn, ID 83849. American Analytical is ISO 17025 Certified for Mineral and Ore Chemical Testing. Fire assaying is the only method used to quantify gold in core samples and muck samples. Occasionally Atomic Absorptions (AA) is use for multi-element analysis.
IDR’s QA/QC program has been in place since the GCLCC joint venture in 2011. The QA/QC program consists of inserting blanks and commercially certified standards into the sample stream. A blank or a standard is inserted into the sample sequence at least every 10 samples. All standards are commercially certified and have been prepared in advance by accredited labs. The QP’s reviewed the results of blank assay and only 2 of 241 samples returned an assay greater than the detection limit for fire assay, < 0.060 gpt gold.
For all the samples processed by AAS on behalf of GCLLC/IDR, the following methods were used to obtain a fire assay for gold. Samples received at the American Analytical are sorted and coded. They are then placed in the sample drying room and dried at 60°C. All drill samples are collected from the rig daily by Mine staff and transported to the locked and secure Mine Office/Core Shed building. Sample security has relied upon the fact that the samples were always attended or locked in appropriate sample storage areas. Samples remain within the custody of staff up to the moment the samples are delivered to the laboratory at which time AAS assumes custody. Chain of custody procedures include filling out sample submittal forms that are sent to the laboratory with sample shipments to make certain that all samples are received by the laboratory.
Table of contents
The sampling methods meet industry standard practices and are adequate for mineral resource and mineral reserve estimation and mine planning purposes. Sampling was conducted by appropriately qualified personnel under direct supervision of appropriately qualified geologists.Sample collection procedures used meet industry best practices. Sample preparation procedures meet industry best practices. QA/QC results produce acceptable results. Security procedures are consistent with industry standards. The databases are managed in a secure area using modern, commonly used software by trained staff. The staff are experienced in the nuances of narrow vein mining and treat the model with their experience in mind.
Drillhole logs are completed using Microsoft Excel and are only accessible by mine technical staff and timestamped at the last time of change. Geologic interpretation and solid modeling are accomplished using Leapfrog. Survey volumes, block modeling, and estimation of Mineral Reserves is accomplished using Maptek’s Vulcan. Data is stored at the mine site and backed up to a separate server stored at the corporate office quarterly.
ITEM 3. LEGAL PROCEEDINGS
None
ITEM 4. MINE SAFETY DISCLOSURES
The information concerning mine safety violations or other regulatory matters required by Section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act and Item 104 of Regulation S-K is included in exhibit 95 to this report.
Table of contents
PART II
ITEM 5. MARKET FOR COMMON EQUITY AND RELATED STOCKHOLDER MATTERS
Market Information
The Company's Common Stock currently trades on the American tier of the NYSE Market under the symbol "IDR".
As of March 1, 2023, there were approximately 1,200 shareholders of record of the Company's Common Stock.
Dividend Policy
The Company has not declared or paid cash dividends or made distributions in the past and the Company does not anticipate that it will pay cash dividends or make distributions in the foreseeable future. The Company currently intends to retain and reinvest future earnings, if any, to finance its operations.
Transfer Agent
The transfer agent for the Company's Common Stock is Nevada Agency Trust 50 West Liberty, Suite 880 Reno, Nevada 89501.
Securities Authorized for Issuance Under Equity Compensation Plans
In April 2014 the Board of Directors of the Company established a stock option plan to authorize the granting of stock options to officers and employees. Upon exercise of the options shares are issued from the available authorized shares of the Company.
No additional fees are paid for attendance at Board of Directors’ meetings, committee membership or committee chairmanship.
Equity Compensation Plan Information
(a) (b) (c)
Equity compensation plans approved by the board 535,953 $5.47 0
Equity compensation plans not approved by the board 0 0 0
Recent Sales of Unregistered Securities
Occasionally, the Company pays for goods and services with restricted common stock. Our policy is to determine the fair value of the goods or services, and then issue the number of corresponding shares using an agreed upon price for our common stock that considers the bid/offer price as quoted by the NYSE-American.
In the first quarter of 2022, 23,057 shares were issued in exchange for outstanding warrants for net proceeds of $68,006. In the second quarter of 2022, 70,919 shares were issued in exchange for outstanding warrants for net proceeds of $397,147. In the third quarter of 2022, 100,893 shares were issued in exchange for outstanding warrants for net proceeds of $565,005.
In the first quarter of 2022 the Company issued 3,572 shares of common stock at $9.05 per share for services provided for a total value of $32,326.
In 2022 the Company issued 392,866 shares of the Company’s Stock in exchange for $1,950,000 of convertible debt at $4.96 per share.
In 2022, the Company issued 67,355 shares of its common stock in exchange for 116,078 outstanding options in a cashless option exercise to non-management employees with a fair value at the time of exercise of $677,928.
The Company closed a private placement in October 2021. Under the private placement, the Company sold 471,436 units at $4.20 per unit for net proceeds of $1,980,000. Each unit consisted of one share of the Company’s stock and one half of one stock purchase warrant with each whole warrant exercisable for one share of the Company’s stock at $5.60 for 24 months. The Company closed a private placement in November 2021. Under the private placement, the Company sold 107,143 units at $5.60 per unit for net proceeds of $600,000. Each unit consisted of one share of the Company’s stock and one half of one stock purchase warrant with each whole warrant exercisable for one share of the Company’s stock at $7.00 for 24 months. The transactions were strictly limited to persons who met certain minimum financial (accredited investors) or sophistication requirements. In management’s opinion, the securities were issued pursuant to exemption from registration under Section 4(2) of the Securities Act of 1933, as amended.
Table of contents
In June of 2021, 291,667 shares of the Company’s stock were issued to holders of convertible debt at a rate of $2.52 per share in exchange for $735,000 in debt. In July of 2021, 39,682 shares of the Company’s stock were issued to holders of convertible debt at a rate of $2.52 per share in exchange for $100,000 in debt.
In the second quarter of 2021, 19,841 shares were issued in exchange for outstanding warrants for net proceeds of $50,000. In the third quarter of 2021, 26,786 shares were issued in exchange for outstanding warrants for net proceeds of $67,500.
In the first quarter of 2021, the Company issued 28,195 shares of its common stock in exchange for 44,643 outstanding options in a cashless option exercise to non-management employees. In the second quarter of 2021, the Company issued 3,572 shares of its common stock in exchange for 7,143 outstanding options in a cashless option exercise to non-management employees. In the fourth quarter of 2021, the Company issued 38,958 shares of its commons stock in exchange for 50,000 outstanding options in a cashless option exercise, of these 29,048 shares with a fair value at the time of exercise of $217,862 were issued to management and the remaining 9,910 shares with a fair value at the time of exercise of $63,428 were issued to other employees.
In the first quarter of 2021 the Company issued 715 shares of the Company’s common stock valued at $3.22 per share for services received of $2,300. In the second quarter of 2021 the Company issued 1,072 shares of the Company’s common stock valued at $3.92 per share for services received of $4,200. In the fourth quarter of 2021 the Company issued 2,749 shares of the Company’s common stock valued at $6.09 per share for services received of $16,748. In the fourth quarter of 2021 the Company issued 6,190 shares of the Company’s common stock valued at $7.50 per share for services received of $46,425.
In the third quarter of 2021 the Company issued 45,940 shares of the Company’s common stock for 22% of Buckskin Gold and Silver with a fair market value at the time of purchase of $192,946. In the fourth quarter of 2021 the Company issued 30,358 shares of the Company’s common stock for an additional 15% of Buckskin Gold and Silver with a fair market value at the time of purchase of $136,000.
ITEM 6. SELECTED FINANCIAL DATA
Not required for smaller reporting companies.
Table of contents
ITEM 7. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
Plan of Operation
Idaho Strategic Resources, Inc. is a gold producer focused on diversifying and building its asset base and cash flows through a portfolio of mineral properties located in historic producing gold districts in Idaho and Montana.
The Company’s plan of operation is to generate positive cash flow, increase its gold production and asset base over time while being mindful of corporate overhead. The Company’s management is focused on utilizing its in-house technical and operating skills to build a portfolio of producing mines and milling operations with a focus on gold and exploration for Rare Earth elements (REE).
The Company’s properties include: the Golden Chest Mine (currently in production), and the New Jersey Mill (majority ownership interest). Recently, the Company added three rare earth element properties in Idaho to its portfolio of exploration properties in an effort to diversify its holdings towards the anticipated demand for these elements in the electrification of motorized vehicles.
Critical Accounting Estimates
The SEC has requested that all registrants address their most critical accounting policies. The SEC has indicated that a “critical accounting policy” is one which is both important to the representation of the registrant’s financial condition and results and requires management’s most difficult, subjective, or complex judgments, often as a result of the need to make estimates about the effect of matters that are inherently uncertain. We base our estimates on past experience and on various other assumptions our management believes to be reasonable under the circumstances, the results of which form the basis for making judgments about carrying values of assets and liabilities that are not readily apparent from other sources. Actual results will differ and may differ materially from these estimates under different assumptions or conditions. Additionally, changes in accounting estimates could occur in the future from period to period. Our management has discussed the development and selection of our most critical financial estimates with the Audit and Finance Committee of our Board of Directors. The following paragraphs identify our most critical accounting policies:
Our concentrate sales sometimes involve variable consideration, as they can be subject to changes in metals prices between the time of shipment and their final settlement. However, we are able to reasonably estimate the transaction price for the concentrate sales at the time of shipment using forward prices for the estimated month of settlement, and previously recorded sales and accounts receivable are adjusted to estimated settlement metals prices until final settlement for financial reporting purposes. The embedded derivative contained in our concentrate sales is adjusted to fair value through earnings each period prior to final settlement. It is unlikely a significant reversal of revenue for any one concentrate lot will occur. As such, we use the expected value method to price the concentrate until the final settlement date occurs, at which time the final transaction price is known. At December 31, 2022, metals that had been sold but not final settled included 5,361 ounces of gold of which 2,500 ounces were sold at a predetermined price with the remaining 2,861 ounces exposed to future price changes. The Company has received provisional payments on the sale of these ounces with the remaining amount due reflected in gold sales receivable.
The asset retirement obligation and asset on our balance sheet is based on an estimate of the future cost to recover and remediate our properties as required by our permits upon cessation of our operations and may differ when we cease operations. At December 31, 2022, we made an estimate that the cost of the machine and man hours probable to be needed to put our properties in the condition required by our permits once we cease operations would be $103,906 for the Golden Chest property and $203,600 for the New Jersey Mine and Mill. For purposes of the estimate, we evaluated the expected life in years and costs that, initially, are comparable to rates that we would incur at the present. We are adding to the liability each year, and amortizing the asset over the estimated life, which decreases our net income in total each year. We make periodic reviews of the remaining life of the mine and other operations, and the estimated remediation costs upon closure, and adjust our account balances accordingly. At this time, we think that an adjustment in our asset recovery obligation is not required, and an adjustment in future periods would not have a material impact in the year of adjustment but would change the amount of the annual accretion and amortization costs charged to our expenses by an undetermined amount.
Highlights for 2022 include:
Table of contents
Results of Operations
Our financial performance for the years ended December 31, 2022, and 2021 is summarized below:
Table of contents
Cash Costs and All In Sustaining Costs Reconciliation to GAAP
Reconciliation of cost of sales and other direct production costs and depreciation, depletion, and amortization (GAAP) to cash cost per ounce and all-in sustaining costs (AISC) per ounce (non-GAAP).
The table below presents reconciliations between the most comparable GAAP measure of cost of sales and other direct production costs and depreciation, depletion, and amortization to the non-GAAP measures of cash cost per ounce produced and all in sustaining costs per ounce produced for the Company’s gold production for the years ended December 31, 2022, and 2021. The cost per ounce calculations are based on ounces produced. Upon sale, the Company typically receives payment at an average rate of 87% of ounces produced after smelting and refining charges are deducted.
Cash cost per ounce is an important operating measure that we utilize to measure operating performance. AISC per ounce is an important measure that we utilize to assess net cash flow after costs for pre-development, exploration, reclamation, and sustaining capital. Current GAAP measures used in the mining industry, such as cost of goods sold do not capture all the expenditures incurred to discover, develop, and sustain gold production.
December 31,
Depreciation, depletion, and amortization (984,083 ) (814,422 )
Less stock-based compensation and other non-cash items (649,409 ) (1,153,466 )
All in sustaining cost (AISC) per ounce $ 1,777.14 $ 1,818.22
Financial Condition and Liquidity
For the Years Ended December 31,
Net change in cash and cash equivalents (338,487 ) (563,427 )
The Company has accumulated deficit of approximately $18.4 million at December 31, 2022 and incurred a consolidated net loss in 2022 of $2,631,092. The Company’s working capital at December 31, 2022 is $1,729,983. The Company is currently producing from the open-pit and underground at the Golden Chest. During 2022, production generated negative cash flow from operations of $1,817,090 compared to a negative cash flow used in operations of $1,351,027 in 2021. Planned production for the next 18 months indicates a positive cash flow from operations will be renewed as underground mining overtakes the open pit as the primary source of mineralized material. In prior years, the Company has been successful in raising required funds for ongoing operations from sale of its common stock or borrowing. Management believes it has the ability to meet its contractual obligations with continuing cash flows from operations, existing cash, and potential financings for the next 18 months.
ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
Not required for smaller reporting companies.
Table of contents
ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
To the shareholders and the board of directors of Idaho Strategic Resources, Inc.
Opinion on the Financial Statements
We have audited the accompanying consolidated balance sheets of Idaho Strategic Resources, Inc. (the "Company") as of December 31, 2022 and 2021, the related consolidated statements of operations, changes in stockholders’ equity and cash flows for each of the years then ended, and the related notes (collectively referred to as the "financial statements"). In our opinion, the financial statements present fairly, in all material respects, the financial position of the Company as ofDecember 31, 2022 and 2021, and the results of its operations and its cash flows for each of the years then ended, in conformity with accounting principles generally accepted in the United States of America.
Basis for Opinion
These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on the Company's financial statements based on our audits. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) ("PCAOB") and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement, whether due to error or fraud. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. As part of our audits we are required to obtain an understanding of internal control over financial reporting but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control over financial reporting. Accordingly, we express no such opinion.
Our audits included performing procedures to assess the risks of material misstatement of the financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the financial statements. We believe that our audits provide a reasonable basis for our opinion.
Critical Audit Matter
The critical audit matter communicated below is a matter arising from the current-period audit of the financial statements that was communicated or required to be communicated to the audit committee and that (1) relates to accounts or disclosures that are material to the financial statements and (2) involved our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the financial statements, taken as a whole, and we are not, by communicating the critical audit matter below, providing a separate opinion on the critical audit matter or on the accounts or disclosures to which it relates.
The Impact of Ore Reserves on Mineral Properties
As discussed in Note 2 to the consolidated financial statements, the Company’s ore reserves are estimated by management’s specialists based on the amount of metals that could be economically and legally extracted or produced at the time of the reserve determination. Management’s calculations of ore reserves are based on financial, engineering and geological estimates, including future metals prices and operating costs.
We identified the assessment of the impact of ore reserves as a critical audit matter. Costs of developing ore reserves are capitalized and amortized using the units-of-production method over estimated recoverable reserves. Reserves also serve as the basis for assessing the recoverability of the carrying value of Company’s mineral properties.
The reserve estimates are based on several significant assumptions that are developed internally by management’s specialists, including the amount of metals to be extracted, future operating costs, and estimated future capital expenditures. Auditing these elements involved especially challenging and subjective auditor judgment due to the nature and extent of audit effort required to address these matters.
Table of contents
The primary procedures we performed to address this critical audit matter included:
Assure CPA, LLC
We have served as the Company's independent auditor since 2003.
Spokane, Washington
March 31, 2023
Firm ID 444
Table of contents
Idaho Strategic Resources, Inc.
Table of Contents
Page
Notes to Financial Statements 50-62
Table of Contents
ASSETS
Current assets:
Mineral properties, net of accumulated amortization 6,527,561 5,843,186
LIABILITIES AND STOCKHOLDERS’ EQUITY
Current liabilities:
Notes payable related parties, current portion 12,226 10,543
Commitments and Contingencies - -
Stockholders’ equity:
The accompanying notes are an integral part of these consolidated financial statements.
Table of Contents
Cost of sales:
Other operating expenses:
Loss on write-off of equipment 68,641 -
Other (income) expense:
Gain on forgiveness of SBA loan (10,000 ) -
Equity income on investment in Buckskin (1,524 ) (3,782 )
Timber revenue - (4,338 )
Net loss attributable to non-controlling interest (95,663 ) (100,192 )
Net loss per common share-basic and diluted $ (0.22 ) $ (0.31 )
The accompanying notes are an integral part of these consolidated financial statements.
Table of Contents
Issuance of common stock for cashless option exercise 70,725 - - - -
Issuance of common stock for cashless option exercise 66,995 - - - -
The accompanying notes are an integral part of these consolidated financial statements.
Table of Contents
Cash flows from operating activities:
Adjustments to reconcile net loss to net cash used by operating activities:
Accretion of asset retirement obligation 12,691 9,953
Loss on write-off of equipment 68,641 -
Equity income on investment in Buckskin (1,524 ) (3,782 )
Gain on forgiveness of SBA loan (10,000 ) -
Change in operating assets and liabilities:
Joint venture receivable 2,516 (265 )
Accounts payable and accrued expenses (63,062 ) (33,894 )
Accrued payroll and related payroll expenses 5,039 30,625
Cash flows from investing activities:
Purchases of property, plant, and equipment (1,441,874 ) (664,645 )
Purchase of reclamation bonds (223,700 ) -
Cash flows from financing activities:
Sales of common stock and warrants, net of issuance costs 3,681,107 2,580,000
Principal payments on notes, related parties (41,428 ) (37,701 )
Issuance of convertible debt - 1,750,000
Contributions from non-controlling interest 39,494 41,305
Net change in cash and cash equivalents (338,487 ) (563,427 )
Supplemental disclosure of cash flow information:
Interest paid in cash, net of amount capitalized $ 98,218 $ 202,122
Non-cash investing and financing activities:
Deposit applied to purchase of equipment and mineral property $ 11,694 $ 12,863
Common stock issued for investment in Buckskin - 328,946
The accompanying notes are an integral part of these consolidated financial statements.
Table of Contents
Idaho Strategic Resources, Inc.
Notes to Consolidated Financial Statements
1. Description of Business
Idaho Strategic Resources, Inc. (“the Company”) was incorporated as an Idaho corporation on July 18, 1996, as New Jersey Mining Company. On December 6, 2021, New Jersey Mining Company changed its name to Idaho Strategic Resources Inc. and also finalized a 1 for 14 reverse stock split of its common stock as previously approved by shareholders at a Special Meeting of the Shareholders held on October 6, 2021. On the date of the reverse stock split, every fourteen (14) shares of New Jersey Mining Company were automatically converted into one issued and outstanding share of Idaho Strategic Resources, Inc. common stock without any change in the par value per share. The Company's primary business is exploring for, developing, and extracting gold, and to a lesser extent, silver, and base metal mineral resources in the Greater Coeur d’Alene Mining District of North Idaho. From an operational perspective, the Company produces gold at the Golden Chest Mine located in the Murray Gold Belt (MGB) area of the world-class Coeur d’Alene Mining District, north of the prolific Silver Valley. With over 7,000 acres of patented and unpatented land, the Company has the largest private land position in the area following its consolidation of the Murray Gold Belt for the first time in over 100-years.
The Company also has an expanded focus on identifying and exploring Critical Minerals (Rare Earth Minerals). Its business strategy is to grow its asset base and mineral production over time while advancing its Rare Earth Element projects. In addition to gold and gold production, the Company maintains an important strategic presence in the U.S. Critical Minerals sector, specifically focused on the more “at-risk” Rare Earth Elements (REE’s). The Company’s Diamond Creek and Roberts REE properties are included the U.S. national REE inventory as listed in USGS, IGS and DOE publications. Both projects are in central Idaho and participating in the USGS Earth MRI program, with the Diamond Creek Project also participating in the Idaho Department of Commerce’s IGEM program.
2. Summary of Significant Accounting Policies
Principles of Consolidation
The consolidated financial statements include the accounts of the Company and its majority-owned subsidiary, the New Jersey Mill Joint Venture (“NJMJV”). Intercompany accounts and transactions are eliminated. The portion of NJMJV partially owned by another investor is presented as non-controlling interest on the consolidated balance sheets, statements of operations, and statement of changes in stockholders’ equity.
Accounting for Investments in Joint Ventures and Equity Method Investments
Investment in Joint Ventures
For joint ventures where the Company holds more than 50% of the voting interest and has significant influence, the joint venture is consolidated with the presentation of non-controlling interest. In determining whether significant influence exists, the Company considers its participation in policy-making decisions and its representation on the venture’s management committee.
For joint ventures in which the Company does not have joint control or significant influence, the cost method is used. For those joint ventures in which there is joint control between the parties, the equity method is utilized whereby the Company’s share of the ventures’ earnings and losses is included in the statement of operations as earnings in joint ventures and its investments therein are adjusted by a similar amount. The Company periodically assesses its investments in joint ventures for impairment. If management determines that a decline in fair value is other than temporary it will write-down the investment and charge the impairment against operations.
Equity Method Investments
Investments in companies and joint ventures in which we have the ability to exercise significant influence, but do not control, are accounted for under the equity method of accounting. In determining whether significant influence exists, the Company considers its participation in policy-making decisions and representation on governing bodies. Under the equity method of accounting, our share of the net earnings or losses of the investee are included in net income (loss) in the consolidated statements of operations. Upon investment, the Company assesses whether a step up in basis of the investee’s net assets has occurred and, if so, adjust our share of net earnings or losses by related depreciation and amortization expense. We evaluate equity method investments whenever events or changes in circumstance indicate the carrying amounts of such investments may be impaired. If a decline in the value of an equity method investment is determined to be other than temporary, a loss is recorded in earnings in the current period. As changes in ownership percentage of our investments occur, the Company assesses whether we can exercise significant influence and account for under the equity method. If our ownership percentage of the company or venture in which we have an investment changes, we recognize a gain or loss on the investment in the period of change. At December 31, 2022, the Company's 37% common stock holding of Buckskin Gold and Silver, Inc. is accounted for using the equity method (Note 9).
Table of Contents
Idaho Strategic Resources, Inc.
Notes to Consolidated Financial Statements
2. Summary of Significant Accounting Policies (continued)
At December 31, 2022 and 2021, the Company’s percentage ownership and method of accounting for each joint venture and equity method investment is as follows:
NJMJV 65% Yes Consolidated 65% Yes Consolidated
Butte Highlands Joint Venture (“BHJV”) 50% No Cost 50% No Cost
Buckskin Gold and Silver 37% Yes Equity 37% Yes Equity
Non-controlling Interest
Non-controlling interests in the net assets of consolidated subsidiaries are identified separately from the Company’s stockholders’ equity and its net income (loss). Non-controlling interests represent non-controlling investor’s initial contribution at the date of the original acquisition, ongoing contributions, and percentage share of earnings since inception.
Use of Estimates
The preparation of financial statements in conformity with accounting principles generally accepted in the United States requires management to make estimates and assumptions that affect the amounts reported in the financial statements and accompanying notes for items such as mineral reserves, depreciation lives and methods, potential impairment of long-lived assets, deferred income taxes, settlement pricing of gold sales, fair value of stock based compensation, estimation of asset retirement obligations and reclamation liabilities. Estimates are based on historical experience and various other assumptions that the Company believes to be reasonable. Actual results could differ from those estimates.
Revenue Recognition
Gold Revenue Recognition and Receivables-Sales of gold sold directly to customers are recorded as revenues and receivables upon completion of the performance obligations and transfer of control of the product to the customer. For concentrate sales, the performance obligation is met, the transaction price can be reasonably estimated, and revenue is recognized generally at the time of shipment at estimated forward prices for the anticipated month of settlement. The embedded derivative contained in our concentrate sales is adjusted to fair value through earnings each period prior to final settlement. Due to the time elapsed from shipment to the customer and the final settlement with the customer, prices at which sales of our concentrates will be settled are estimated. Previously recorded sales and accounts receivable are adjusted to estimated settlement metals prices until final settlement by the customer. For sales of dore’ and metals from doré, the performance obligation is met, the transaction price is known, and revenue is recognized at the time of transfer of control of the agreed-upon metal quantities to the customer by the refiner.
Sales and accounts receivable for concentrate shipments are recorded net of charges by the customer for treatment, refining, smelting losses, and other charges negotiated with the customers. Charges are estimated upon shipment of concentrates based on contractual terms, and actual charges typically do not vary materially from estimates. Costs charged by customers include fixed costs per ton of concentrate and price escalators. Refining, selling, and shipping costs related to sales of doré and metals from doré are recorded to cost of sales as incurred. See Note 13 for more information on our sales of products.
Other Revenue Recognition-Revenue from harvest of raw timber is recognized when the performance obligation under a contract and transfer of control have both been completed. Sales of timber found on the Company’s mineral properties are not a part of normal operations.
Inventories
Inventories include concentrate inventory and supplies inventory. Concentrate inventory is valued at the lower of full cost of production or estimated net realizable value based on current metal prices. Costs consist of mining, transportation, royalties, and milling costs including applicable overhead, depreciation, depletion, and amortization relating to the operations. Costs are allocated based on the stage at which the ore is in the production process. Supplies inventory is stated at the lower of first-in, first-out weighted average cost or estimated net realizable value.
Table of Contents
Idaho Strategic Resources, Inc.
Notes to Consolidated Financial Statements
2. Summary of Significant Accounting Policies (continued)
Income Taxes
Income taxes are recognized in accordance with Accounting Standards Codification (“ASC”) 740 Income Taxes, whereby deferred income tax liabilities or assets at the end of each period are determined using the tax rate expected to be in effect when the taxes are actually paid or recovered. A valuation allowance is recognized on deferred tax assets when it is more likely than not that some or all of these deferred tax assets will not be realized.
Uncertain tax positions are evaluated in a two-step process, whereby (i) it is determined whether it is more likely than not that the tax positions will be sustained based on the technical merits of the position and (ii) for those tax positions that meet the more-likely-than-not recognition threshold, the largest amount of tax benefit that is greater than 50% likely of being realized upon ultimate settlement with the related tax authority would be recognized.
Fair Value Measurements
When required to measure assets or liabilities at fair value, the Company uses a fair value hierarchy based on the level of independent, objective evidence surrounding the inputs used. The Company determines the level within the fair value hierarchy in which the fair value measurements in their entirety fall. The categorization within the fair value hierarchy is based upon the lowest level of input that is significant to the fair value measurement. Level 1 uses quoted prices in active markets for identical assets or liabilities, Level 2 uses significant other observable inputs, and Level 3 uses significant unobservable inputs. The amount of the total gains or losses for the period are included in earnings that are attributable to the change in unrealized gains or losses relating to those assets and liabilities still held at the reporting date. At December 31, 2022 and 2021, the Company did not have any assets or liabilities that were valued at a fair value measurement other than its gold sales receivable. Due to the time elapsed from shipment to the customer and the final settlement with the customer, management must estimate the prices at which sales of gold concentrates will be settled. Previously recorded sales and accounts receivable are adjusted to estimated settlement metals prices until final settlement by the customer. See Note 13 for further information.
Financial Instruments
The carrying amounts of financial instruments including cash and cash equivalents, reclamation bond, notes payable to related parties, and notes payable approximate their fair values. The fair value of the convertible notes payable at December 31, 2021 was $2,922,923 based on the convertible rate and the trading price of the Company’s stock at December 31, 2021. No convertible debt was outstanding on December 31, 2022.
Net Income (Loss) Per Share
Net income (loss) per share is computed by dividing net income (loss) attributable to the Company excluding net income (loss) attributable to a non-controlling interest by the weighted average number of common shares outstanding during the year. Diluted net income (loss) per share reflects the potential dilution that could occur from common shares issuable through stock options, warrants, and other convertible securities. For the years ended December 31, 2022, and 2021, potentially dilutive common stock equivalents excluded from the calculation of diluted earnings per share as their effect would have been anti-dilutive are as follows:
Reclassifications
Certain prior period amounts have been reclassified to conform to the 2022 financial statement presentation. Reclassifications had no effect on net income (loss), stockholders' equity, or cash flows as previously reported.
Cash and Cash Equivalents
The Company considers cash in banks and other deposits with an original maturity of three months or less when purchased to be cash and cash equivalents. These deposit balances may at times exceed federally insured limits. No losses have been recognized because of these balances.
Table of Contents
Idaho Strategic Resources, Inc.
Notes to Consolidated Financial Statements
2. Summary of Significant Accounting Policies (continued)
Property, Plant and Equipment
Property, plant, and equipment are stated at cost. Depreciation and amortization are based on the estimated useful lives of the assets and are computed using straight-line or units-of-production methods. The expected useful lives of most of the Company’s buildings are up to 50 years and equipment life expectancy ranges between 2 and 10 years. When assets are retired or sold, the costs and related allowances for depreciation and amortization are eliminated from the accounts and any resulting gain or loss is reflected in operations.
Mineral Properties
Significant payments related to the acquisition of mineral properties, mineral rights, and mineral leases are capitalized. If a commercially mineable ore body is discovered, such costs are amortized when production begins using the units-of-production method based on estimated reserves. If no commercially mineable ore body is discovered, or such rights are otherwise determined to have no value, such costs are expensed in the period in which it is determined the property has no future economic value.
Consideration received by the Company pursuant to joint ventures or mineral interest agreements is applied against the carrying value of the related mineral interest. When and if payments received exceed the carrying value, the excess amount is recognized as a gain in the consolidated statement of operations in the period the consideration is received.
Interest Capitalization
When capital projects are funded within the reporting period for which cash is paid which could have been used for debt reduction an amount equal to a weighted average interest rate of qualifying outstanding debt of the capital project expenditure in interest expense is capitalized.
Mine Exploration and Development Costs
The Company expenses exploration costs as such in the period they occur. The mine development stage begins once the Company identifies ore reserves which is based on a determination whether an ore body can be economically developed. Expenditures incurred during the development stage are capitalized as deferred development costs and include such costs for drifts, ramps, and infrastructure. Costs to improve, alter, or rehabilitate primary development assets which appreciably extend the life, increase capacity, or improve the efficiency or safety of such assets are also capitalized. The development stage ends when the production stage of ore reserves begins. Amortization of deferred development costs is calculated using the units-of-production method over the expected life of the operation based on the estimated recoverable mineral ounces.
Claim Fees
Unpatented claim fees paid at time of staking are expensed when incurred. Recurring renewal fees which are paid annually are recorded as other current assets and expensed over the course of the year.
Impairment of Long-Lived Assets
The Company evaluates the carrying amounts of its long-lived assets for impairment whenever events and circumstances indicate the carrying value may not be recoverable from the estimated future cash flows expected to result from its use and eventual disposition. Estimated undiscounted future net cash flows from each mineral property are calculated using estimated future production, three-year average metals prices, operating capital and costs, and reclamations costs. An impairment loss is recognized when the estimated discounted future cash flows expected to result from the use of an asset are less than the carrying amount of the specific asset group. The Company’s estimates of future cash flows are subject to risks and uncertainties. It is reasonably possible that changes in estimates could occur which may affect the expected recoverability of the Company’s investments in mineral properties.
Table of Contents
Idaho Strategic Resources, Inc.
Notes to Consolidated Financial Statements
2. Summary of Significant Accounting Policies (continued)
Asset Retirement Obligations and Remediation Costs
Mineral properties are subject to standards for mine reclamation that have been established by various governmental agencies. Asset retirement obligations are related to the retirement of the mine when a contractual obligation has been established and a reasonable estimate of fair value can be determined. These obligations are initially measured at fair value with the resulting cost recognized at the present value of estimated reclamation costs The liability is accreted, and the asset amortized over the life of the related asset. Adjustments are made for changes resulting from either the timing or amount of the original estimate underlying the obligation. Separate from asset retirement obligations, the Company records liability for remediation costs when a reasonable estimate of fair value can be determined. Accrued remediation costs are not discounted.
Reclamation Bond
Various laws and permits require that financial assurances be in place for certain environmental and reclamation obligations and other potential liabilities. At December 31, 2021 the Company had a $103,320 reclamation bond for the Golden Chest Mine. In 2022 the Company added additional bonds of $132,000 associated with milling operations, and an additional $91,700 in bonds for various exploration and drilling projects for a total reclamation bond balance at December 31, 2022 of $327,020.
Stock Based Compensation
All transactions in which goods or services are received for the issuance of shares of the Company’s common stock or options to purchase shares of common stock are measured at fair value of the equity interest issued. The fair value of common stock awards is determined based upon the closing price of the Company’s stock on the date of the award. The Company estimates the fair value of stock-based compensation of options using the Black-Scholes model, which requires the input of some subjective assumptions. These assumptions include estimating the length of time employees will retain their vested stock options before exercising them (“expected life”), the estimated volatility of the Company’s common stock price over the expected term (“volatility”), the risk-free interest rate and the dividend yield. Changes in the subjective assumptions can materially affect the estimate of the fair value of stock-based compensation. Any forfeitures of stock options are recognized as they occur.
Going Concern
The Company is currently producing from both the open-pit and underground at the Golden Chest Mine. In the past, the Company has been successful in raising required capital from sale of common stock, forward gold contracts, and debt. As a result of its planned production, equity sales and potential debt borrowings or restructurings, management believes cash flows from operations and existing cash are sufficient to conduct planned operations and meet contractual obligations for the next 12 months.
Recent Accounting Pronouncements
Accounting Standards Updates Adopted
In August 2020, the FASB issued ASU No.2020-06Debt with Conversion and Other Options (Subtopic 470-20) and Derivatives and Hedging—Contracts in Entity’s Own Equity (Subtopic 815-40): Accounting for Convertible Instruments and Contracts in an Entity’s Own Equity. The update is to address issues identified as a result of the complexity associated with applying generally accepted accounting principles for certain financial instruments with characteristics of liabilities and equity. The update is effective for fiscal years beginning after December 15, 2023 for smaller reporting companies, including interim periods within those fiscal years and with early adoption permitted. The early adoption of this update on January 1, 2022, did not have a material impact on our consolidated financial statements.
Management does not believe that any other recently issued, but not yet effective, accounting standards if currently adopted would have a material effect on the accompanying financial statements.
Table of Contents
Idaho Strategic Resources, Inc.
Notes to Consolidated Financial Statements
3. Inventories
At December 31, 2022 and 2021, inventories consisted of the following:
Concentrate inventory
Supplies inventory
Core drilling supplies and materials 77,570 -
4. Property, Plant and Equipment
Property, plant and equipment at December 31, 2022 and 2021 consisted of the following:
Mill
Buildings and equipment
Land
5. Mineral Properties
Mineral properties at December 31, 2022 and 2021 are as follows:
Golden Chest
For the years ended December 31, 2022 and 2021, $48,281 and $49,273, respectively, of interest expense was capitalized in association with the ramp access project at the Golden Chest.
Golden Chest
The Golden Chest is an open pit and underground mine project currently producing for the Company located near Murray, Idaho consisting of 86 patented and 217 unpatented mining claims. A 2% Net Smelter Royalty is payable on production at certain portions of the Golden Chest to a former joint venture partner. Royalty expense of $181,300 and $151,763 was recognized as costs of sales and other direct production costs in the years ended December 31, 2022, and 2021, respectively.
New Jersey
The Coleman property is located at the New Jersey Mine area of interest and consists of 62 acres of patented mining claims, mineral rights to 108 acres of fee land, 80 acres of land for which the Company owns the surface but not the mineral rights, and approximately 130 acres of unpatented mining claims.
McKinley-Monarch
The McKinley-Monarch project is located near the town of Lucille, Idaho. The project consists of 28 unpatented claims totaling 560 acres. The Company started exploring the property in 2013.
Butte Gulch
In 2018, the Company purchased the Butte Gulch property near its Golden Chest mine. This property consists of 177 acres of patented mining claims some of which include both the surface and mineral rights and some of which include only the mineral rights. There is an underlying 2% net smelter return on all ores mined and shipped from any lode production from the patented claims on the Butte property.
Potosi
In 2018, the Company purchased the Potosi property near its Golden Chest mine. This property consists of 71 acres of patented mining claims.
Park Copper
In August 2021, the Company paid $78,000 in cash for 100 acres of patented mineral property in Shoshone County referred to as Park Copper.
Table of Contents
Idaho Strategic Resources, Inc.
Notes to Consolidated Financial Statements
6. Notes Payable
At December 31, 2022 and 2021, notes payable are as follows:
Table of Contents
Idaho Strategic Resources, Inc.
Notes to Consolidated Financial Statements
6. Notes Payable, continued
All notes are collateralized by the property or equipment purchased in connection with each note. Future principal payments of debt at December 31, 2022 are as follows:
In the second quarter of 2020 the Company received a loan of $149,900 pursuant to the Small Business Act Section 7(b). The loan which was in the form of a Note dated May 16, 2020, matures May 16, 2050, and bears interest at a rate of 3.75% per annum. Payments of $731 are due monthly began in November 2022. At December 31, 2022 and 2021 accrued interest on the loan was $13,925 and $9,311, respectively and is included in the Small Business Administration Loan balance on the previous page. In the second quarter of 2022, it was determined that an additional $10,000 also received in the second quarter of 2020 was a grant that was forgiven as part of the Covid-19 relief program. This $10,000 was recorded as a gain on forgiveness of the SBA loan in the statement of operations during the second quarter of 2022.
7. Asset Retirement Obligations
The Company has established asset retirement obligations associated with the ultimate closing of its mineral properties where there has been or currently is operations. Obligations were established for the New Jersey mill in 2014 and the Golden Chest mine in 2016. Activity for the years ended December 31, 2022 and 2021 is as follows:
Change in asset retirement obligation estimate 77,178 (10,606 )
The change in the asset retirement obligation estimate during the year ended December 31, 2022 related to the addition of and asset retirement obligation with our New Jersey Mill Tailings expansion and a revision to the estimated start of the reclamation process to a later date at our Golden Chest properties. The change in the asset retirement obligation estimate during the year ended December 31, 2021 related to a revision to the estimated start of the reclamation process to a later date at our Golden Chest properties.
8. Joint Venture Arrangements
New Jersey Mill Venture Agreement (“NJMJV”)
In January 2011, the Company and United Mine Services, Inc. (“UMS”) now Crescent Silver, LLC (Crescent) entered into a joint venture agreement relating to the New Jersey mineral processing plant. To earn a 35 percent interest in the venture, UMS provided $3.2 million funding to expand the processing plant to 15 tonnes/hr. The Company is the operator of the venture and charges operating costs to Crescent for milling its ore up to 7,000 tonnes/month, retain a milling capacity of 3,000 tonnes/month, and as the operator of the venture receive a fee of $2.50/tonne milled. No ore has been milled for Crescent in the last two years. As of December 31, 2022 and 2021, an account receivable existed with the Mill Joint Venture from Crescent for $1,926 and $4,442, respectively.
Butte Highlands Joint Venture
On January 29, 2016, the Company purchased a 50% interest in Butte Highlands JV, LLC (“BHJV”) for a total consideration of $435,000. Highland Mining, LLC (“Highland”) is the other 50% owner and manager of the joint venture. Under the operating agreement, Highland will fund all future project exploration and mine development costs. The Agreement stipulates that Highland is manager of BHJV and will manage BHJV until such time as all mine development costs, less $2 million are distributed to Highland out of the proceeds from future mine production. The Company has determined that because it does not currently have significant influence over the joint venture’s activities, it will account for its investment on a cost basis.
Table of Contents
Idaho Strategic Resources, Inc.
Notes to Consolidated Financial Statements
9. Investment in Buckskin
In August 2021 the Company exchanged 45,940 shares of the Company’s common stock for 22% of Buckskin Gold and Silver Inc. (“Buckskin”). The Company’s closing share price on the date of the agreement (August 18, 2021) was recorded as the cost basis for the investment. In October 2021 the Company exchanged an additional 30,358 shares of the Company’s common stock for an additional 15% of Buckskin. The Company’s closing share price on the date of the exchange (October 15, 2021) was recorded as the cost basis for the investment addition. This investment in Buckskin is being accounted for using the equity method and resulted in recognition of equity income on the investment of $1,524 and $3,782 during the years ended December 31, 2022 and 2021, respectively. The Company makes an annual payment of $12,000 to Buckskin per a lease covering 218 acres of patented mining claims. As of December 31, 2022, the Company holds 37% of Buckskins outstanding shares.
10. Income Taxes
The Company did not recognize a provision (benefit) for income taxes for the years ended December 31, 2022 and 2021.
The significant components of net deferred tax assets at December 31, 2022 and 2021 were as follows:
Deferred tax assets