Skip to content
KStart free
AI InfrastructureDefenseQuantumAll studies →

IDR US Equity

Idaho Strategic Resources, Inc.Materials · Gold and Silver Ores · CIK 1030192 · FY ends Dec 31
$32.67
+1.55 (+4.98%)
USD · as of 2026-08-21 · marketstack

IDR · 10-K · period ended 2022-12-31

← all IDR documents
filed 2023-03-31 · EDGAR original ↗

Our rendering of the filing — original pagination and typography are not reproduced, and tables are reduced to their short label cells (the figures live on FA). Nothing is summarized: every line below is the filing's own text.

blocks 1600 of 945209k characters rendered

njmc_10k.htm

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 10-K

(Mark One)

☒ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2022

☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from ______ to ______

Commission file number: 000-28837

IDAHO STRATEGIC RESOURCES, INC.

(Name of small business issuer in its charter)

201 N. Third Street, Coeur d’Alene, ID83814

(Address of principal executive offices) (zip code)

(208) 625-9001

Registrant’s telephone number, including area code

SECURITIES REGISTERED PURSUANT TO SECTION 12(b) OF THE ACT:

Title of Each Class Trading Symbol(s) Name of Each Exchange on Which Registered

None N/A N/A

SECURITIES REGISTERED PURSUANT TO SECTION 12(g) OF THE ACT:

Title of Each Class Trading Symbol(s) Name of Each Exchange on Which Registered

Common Stock, $0.00 par value IDR NYSE American

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes ☐No☒

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes ☐No☒

Indicate by check mark whether the issuer (1) filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the past 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes☒ No ☐

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate website, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). Yes☒ No ☐

Indicate by check mark if disclosure of delinquent filers in response to Item 405 of Regulation S-K is not contained herein, and no disclosure will be contained, to the best of registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K. ☒

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See definitions of “large accelerated filer,” “accelerated filer” and “small reporting company” in Rule 12b-2 of the Exchange Act.

Large accelerated filer ☐ Accelerated filer ☐

Non-accelerated filer ☒ Smaller reporting company ☒

Emerging Growth Company ☐

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act Yes ☐ No ☒

The aggregate market value of all common stock held by non-affiliates of the registrant, based on the average of the bid and ask prices on June 30, 2022 was $82,171,827.

On March 1, 2023 there were 12,256,523 shares of the registrant’s Common Stock outstanding.

TABLE OF CONTENTS

FORWARD-LOOKING STATEMENTS 3

GLOSSARY OF SIGNIFICANT MINING TERM 4

PART I

ITEM 1. DESCRIPTION OF THE BUSINESS 6

ITEM 1A. RISK FACTORS 9

ITEM 2. DESCRIPTION OF PROPERTIES 21

ITEM 3. LEGAL PROCEEDINGS 37

ITEM 4. MINE SAFETY DISCLOSURES 37

PART II

ITEM 5. MARKET FOR COMMON EQUITY AND RELATED STOCKHOLDER MATTERS 38

ITEM 6. SELECTED FINANCIAL DATA 39

ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKE RISK 42

ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA 43

ITEM 9A. CONTROLS AND PROCEDURES 63

ITEM 9B. OTHER INFORMATION 63

ITEM 9C. DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INPECTIONS 63

PART III

ITEM 10. DIRECTORS, EXECUTIVE OFFICERS, AND CORPORATE GOVERNANCE 64

ITEM 11. EXECUTIVE COMPENSATION 65

ITEM 14. PRINCIPAL ACCOUNTANT FEES AND SERVICES 68

PART IV

SIGNATURES 70

Table of contents

FORWARD-LOOKING STATEMENTS

This Annual Report on Form 10-K and the exhibits attached hereto contain “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995, as amended. All statements other than statements of historical fact are forward-looking statements for purposes of federal and state securities laws, including statements about anticipated future operating and financial performance, financial position and liquidity, growth opportunities and growth rates, pricing plans, acquisition and divestiture opportunities, business prospects, strategic alternatives, business strategies, regulatory and competitive outlook, investment and expenditure plans, financing needs and availability and other similar forecasts and statements of expectation and statements of assumptions underlying any of the foregoing. The words “aims,” “anticipates,” “believes,” “could,” “estimates,” “expects,” “intends,” “may,” “plans,” “projects,” “seeks,” “should” and variations of these words and similar expressions are generally intended to identify these forward-looking statements. These forward-looking statements are inherently subject to significant business, economic and competitive uncertainties and contingencies, many of which are beyond IDR’s control. In addition, these forward-looking statements are subject to assumptions with respect to future business strategies and decisions that are subject to change.

Forward-looking statements by us are based on estimates, projections, beliefs and assumptions of management and are not guarantees of future performance. Such forward-looking statements may be contained in this Annual Report on Form 10-K under Item 1 Description of the Business, Item 1A Risk Factors, and Item 7 Management’s Discussion and Analysis of Financial Conditions and Results of Operations, or in our Current Reports on Form 8-K, among other places. Some of other risk factors include, but are not limited to, the following:

· adverse effects of climate changes or natural disasters;

· adverse effects of global or regional pandemic disease spread or other crises;

· global economic and capital market uncertainties;

· contests over our title to properties;

· potential inability to comply with applicable government regulations or law;

· permitting constraints or delays;

· interruptions in our production capabilities due to capital constraints;

· equipment failures;

· changes in generally accepted accounting principles;

· adverse effects of war, mass shooting, terrorism and geopolitical events;

· potential inability to implement our business strategies;

· potential inability to grow revenues;

· potential inability to attract and retain key personnel;

· assertion of claims, lawsuits and proceedings against us;

· potential inability to satisfy debt and lease obligations;

· work stoppages or other labor difficulties.

Occurrence of such events or circumstances could have a material adverse effect on our business, financial condition, results of operations or cash flows, or the market price of our securities. All subsequent written and oral forward-looking statements by or attributable to us or persons acting on our behalf are expressly qualified in their entirety by these factors. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those anticipated, believed, estimated, or expected. We caution readers not to place undue reliance on any such forward-looking statements, which speak only as of the date made. Except as may be required by securities or other law, we undertake no obligation to publicly update or revise any forward-looking statements, whether as a result of new information, future events, or otherwise.

We qualify all the forward-looking statements contained in this Annual Report by the foregoing cautionary statements.

Table of contents

GLOSSARY OF SIGNIFICANT MINING TERMS

Ag-Silver.

Au-Gold.

Alluvial-Adjectivally used to identify rocks or minerals deposited over time by moving water.

Argillites-Metamorphic rock containing clay minerals.

Arsenopyrite-An iron-arsenic sulfide. Common constituent of gold mineralization.

Ball Mill-A large rotating cylinder usually filled to about 45% of its total volume with steel grinding balls. The mill rotates and crushed rock is fed into one end and discharged through the other. The rock is pulverized into small particles by the cascading and grinding action of the balls.

Bedrock-Solid rock underlying overburden.

Cu-Copper.

CIL-A standard gold recovery process involving the leaching with cyanide in agitated tanks with activated carbon. CIL means "carbon-in-leach."

Crosscut-A nominally horizontal mine passageway, generally driven at right angles to the strike of a vein.

Dip-Angle made by an inclined surface with the horizontal, measured perpendicular to strike.

Deposit-A mineral deposit is a mineralized body that has been intersected by sufficient closely spaced drill holes or underground sampling to support sufficient tonnage and average grade(s) of metal(s) to warrant further exploration or development activities.

Drift-A horizontal mine opening driven on the vein. Driving is a term used to describe the excavation of a mine passageway.

Exploration Stage-As defined by the SEC-includes all issuers engaged in the search for mineral deposits (reserves), which are not in the production stage.

Fault-A fracture in the earth's crust accompanied by a displacement of one side of the fracture with respect to the other and in a direction parallel to the fracture.

Flotation-A physiochemical process for the separation of finely divided solids from one another. Separation of these (dissimilar) discrete solids from each other is affected by the selective attachment of the particle surface to gas bubbles.

GPT-grams per metric tonne.

Galena-A lead sulfide mineral. The most important lead mineral in the Coeur d'Alene Mining District.

Grade-A term used to assign the concentration of metals per unit weight of ore. An example-ounces of gold per ton of ore (opt). One troy ounce per short ton is 34.28 parts per million or 34.28 grams per metric tonne.

Mill-A general term used to denote a mineral processing plant.

Mineralization-The presence of minerals, usually of potential economic significance, in a specific area or geologic formation.

Mineral Reserve-An estimate of tonnage and grade or quality of indicated and measured mineral resources that, in the opinion of the qualified person, can be the basis of an economically viable project. More specifically, it is the economically mineable part of a measured or indicated mineral resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted.

Mineral Resource-A concentration or occurrence of material of economic interest in or on the Earth's crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A mineral resource is a reasonable estimate of mineralization, taking into account relevant factors such as cut-off grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. It is not merely an inventory of all mineralization drilled or sampled.

Table of contents

Net Smelter Return (“NSR”)-The Net Smelter Return from a processed ore is the value recouped from the mineral products less the costs associated with smelting, refining, and transport to the smelter. The NSR specifically does not permit the deduction of mining and milling costs.

Ore-A mineral or aggregate of minerals that can be mined and treated at a profit. A large quantity of ore that is surrounded by waste or sub-ore material is called an orebody.

Patented Claim-A mineral claim where the title has been obtained from the U.S. federal government through the patent process of the 1872 Mining Law. The owner of the patented claim is granted title to the surface and mineral rights.

Production Stage-As defined by the SEC-includes all issuers engaged in the exploitation of a mineral deposit (reserve).

Proven Reserve-The economically mineable part of a measured mineral resource and can only result from conversion of a measured mineral resource.

Pyrite-An iron sulfide mineral that usually has no commercial value but is commonly associated with mineral deposits of gold, copper, and other metals.

Quartz-Crystalline silica (SiO2). An important rock-forming and gangue material in veins or other types of mineral deposits.

Quartzites-Metamorphic rock containing significant amounts of quartz.

Raise-An underground opening driven upward, generally on the vein.

Ramp-An underground opening usually driven downward, but not always, to provide access to an orebody for rubber-tired equipment such as loaders and trucks. Typically ramps are inclined at a slope grade of approximately 15%.

Rare Earth Elements (REE)- The rare earth elements (REE) comprise of 15 elements that range in atomic number from 57 (lanthanum) to 71 (lutetium) on the periodic table. Most of the REE’s are not as rare as the group’s name suggests. Although REE’s are relatively abundant in the Earth’s crust, they are rarely concentrated into mineable ore deposits. These elements are in demand because they are essential for a diverse and expanding array of high-technology applications and emerging alternative energy uses.

Royalty or NSR Royalty-A mineral royalty is a percentage of the value extracted from an ore that is paid to an interest holding party, usually a claim owner. The NSR Royalty is calculated based on the value of the processed ore after deducting the costs of smelting, refining, and transport to a smelter. However, the cost of mining and milling is not deducted. Typical NSR Royalty rates in the United States are on the order of 1–5%.

Shoot – A body of ore, usually of elongated form, extending downward or upward in a vein.

Stope-An underground void created by the mining of ore.

Strike-The bearing or azimuth of the line created by the intersection of a horizontal plane with an inclined rock strata, vein or body.

Tellurium-Relatively rare chemical element found with gold and silver that can form minerals known as tellurides.

Tetrahedrite-Sulfosalt mineral containing copper, antimony, and silver.

Vein-A zone or body of mineralized rock lying within boundaries separating it from neighboring wallrock. A mineralized zone having a more or less regular development in length, width and depth to give it a tabular form and commonly inclined at a considerable angle to the horizontal.

Unpatented Claim-A mineral claim staked on United States Public Domain (USPD) that is open for mineral entry. Unpatented lode claims can be no more than 1,500 feet long by 600 feet wide. The claimant owns the mineral rights, but does not own the surface, which is USPD. Any exploration or mining on the claim must first be submitted in a plan of operations (POO) for approval to the appropriate federal land management entity.

Wallrock-Usually barren rock surrounding a vein.

Table of contents

PART I

ITEM 1. DESCRIPTION OF THE BUSINESS

Business

Idaho Strategic Resources, Inc. (“the Company” or “IDR”) is a gold producer with an established base in three historic mining districts in the Western United States. The Company’s primary source of revenue comes from its operating gold mine, the Golden Chest Mine located in the Murray Gold Belt of northern Idaho. The Company is also pursuing a Rare Earth Element (REE) exploration strategy and has acquired REE properties in Idaho.

Idaho Strategic Resources, Inc. (“the Company” or “IDR”) was incorporated under the laws of the State of Idaho on July 18, 1996. The Company’s head office and registered records office is located at 201 N. 3rd St. Coeur d’Alene, ID 83814.

Any Bankruptcy, Receivership or Similar Proceedings

There have been no bankruptcy, receivership, or similar proceedings.

Any Material Reclassification, Merger, Consolidation, or Purchase or Sale of a Significant Amount of Assets Not in the Ordinary Course of Business.

There have been no material reclassifications, mergers, consolidations, purchases, or sales not in the ordinary course of business for the past three years.

BUSINESS OF THE COMPANY

General Description of the Business

Domiciled in Idaho and headquartered in the Panhandle of northern Idaho, Idaho Strategic Resources, Inc. (formerly New Jersey Mining Company (NJMC)) was incorporated in the State of Idaho on July 18, 1996. On December 6, 2021, The Company changed its name to Idaho Strategic Resources, Inc. (IDR) to better reflect its corporate focus, Idaho-based operations and being domiciled in Idaho. Idaho Strategic Resources (IDR) is one of the few resource-based companies (public or private) possessing the combination of officially recognized U.S. domestic rare earth element properties (in Idaho) and Idaho-based gold production located in an established mining community.

Idaho Strategic Resources produces gold at the Golden Chest Mine located in the Murray Gold Belt (MGB) area of the world-class Coeur d’Alene Mining District, north of the prolific Silver Valley. With over 7,000 acres of patented and unpatented land, the Company has the largest private land position in the area following its consolidation of the Murray Gold Belt for the first time in over 100-years.

The Company is an established gold producer, with surface and underground mining operations at its 100-percent owned Golden Chest Mine and conducts milling operations at its majority-owned New Jersey Mill. The Company also has an expanded focus on identifying and exploring Critical Minerals (Rare Earth Minerals). Its business strategy is to grow its asset base and mineral production over time while advancing its Rare Earth Element projects. In addition to gold and gold production, the Company maintains an important strategic presence in the U.S. Critical Minerals sector, specifically focused on the more “at-risk” Rare Earth Elements (REE’s). The Company’s Diamond Creek and Roberts REE properties are included the U.S. national REE inventory as listed in USGS, IGS and DOE publications. Both projects are in central Idaho and participating in the USGS Earth MRI program, with the Diamond Creek Project also participating in the Idaho Department of Commerce’s IGEM program.

The Company focuses its exploration and production efforts in historical mining districts located within the state of Idaho. Its portfolio of mineral properties includes:

o Diamond Creek - One of the top rare earth prospects in the US

Table of contents

In addition to its portfolio of exploration, pre-development, and producing properties, the Company is also the manager and majority-owner of the New Jersey Mill, which currently processes ore from the Golden Chest Mine. The New Jersey Mill can process gold and silver ore through a 360-tonne per day flotation plant.

The Company has focused its efforts on expanding underground development and production at the Golden Chest Mine and assembled its extensive land holdings within the Murray Gold Belt. With all debt associated with the start-up of operations behind it, the Company significantly increased its exploration and expansion activities in the Murray Gold Belt. This progress, combined with the existing infrastructure and development, has created a solid foundation of real estate holdings, and a tangible base of value regardless of market cycles.

Competitive Business Conditions

While there has been a market for gold and precious metals historically, the Company competes on several different fronts within the minerals exploration industry. The Company competes with other junior mining companies for the capital necessary to sustain its exploration and development programs. IDR has focused its gold operations at and near the Golden Chest Mine, however if it chose to expand to other geographic areas it may compete with other mining companies for exploration properties and/or mining assets. The Company has been successful in resuming operations at the New Jersey Mill, consolidating 100% ownership of the Golden Chest Mine, and assembling one of the largest rare earth element landholdings in the US. In October 2016 production at the Golden Chest resumed with the Company as the sole owner and operator.

Generally, the Company is subject to economic conditions and risks inherent to the mineral industry. A primary risk of mineral exploration is the low probability of finding a major ore deposit. The Company attempts to mitigate this risk by focusing its efforts in areas known to host significant mineral deposits, and by relying on its experienced management team to drive analysis, evaluation, and acquisition of properties that it feels have a higher-than-average probability of success. In addition to deal essentials, such as cost, terms, timing, and market considerations, the Company’s process of property acquisition involves screening target properties based on geological, economic, engineering, environmental, and metallurgical factors. In all its operations the Company competes for skilled labor within the mining industry.

The risks associated with the Company’s mining and milling operations include other risks typical of the mining industry, such as: operational effectiveness in the processing plant that could result in lower recovery of the economic metals, mechanical failure of equipment that could increase costs or decrease efficacy, ability to hire and retain qualified operators, and risks that the mining operations are unable to economically extract material due to lower grade material, ground or slope failures or other development challenges that can increase costs. The Company manages these risks with engineering and geologic analysis, detailed mine planning, a preventive maintenance program, and installing experienced and technically proficient management.

Another significant risk in the mining industry is the price of metals such as gold and silver. If the prices of these metals were to fall substantially, it could lead to a loss of investor interest in the mining sector, which could make it more difficult to raise the capital necessary for the Company to move exploration and development plans forward, if needed.

Customer Dependence and Product Distribution

The Company sold all its flotation gold concentrate to H&H Metals Corporation of New York, NY which accounted for 97% of gold sales in 2022. The remaining gold sales were gold dore’ which was sold to a western U.S. refinery. H&H Metals is also an IDR shareholder. Although not expected, if H&H Metals could not purchase the gold concentrate, it is anticipated another customer could be found readily as the floatation gold concentrate is a high value concentrate with minor deleterious element content.

The Company ships its gold concentrate overseas to a smelter in Japan and the global shipping challenges due to Covid-19 were largely remedied in 2022 and the Company was able to ship a substantial portion of its concentrate inventory reducing the amount of inventory stored at the New Jersey Mill, returning inventory to near pre-pandemic levels.

Effect of Existing or Probable Governmental Regulations on the Business

The mining business is subject to extensive federal, state, and local laws and regulations governing development, production, labor standards, occupational health, waste disposal, the use of toxic substances, environmental regulations, mine safety and other matters. The Company is subject to potential risks and liabilities occurring as a result of mineral exploration and production. Insurance against environmental risk (including potential liability for pollution or other hazards as a result of the disposal of waste products occurring from exploration and production) is not generally available to the Company (or to other companies in the minerals industry) at a reasonable price. To the extent that the Company becomes subject to environmental liabilities, the satisfaction of any such liabilities would reduce funds otherwise available to the Company and could have a material adverse effect on the Company. Laws and regulations intended to ensure the protection of the environment are constantly changing and are generally becoming more restrictive.

Table of contents

All operating and exploration plans have been made in consideration of existing governmental regulations. Regulations that most affect operations are related to surface water quality and access to public lands. An approved plan of operations (POO) and a financial bond are usually required before exploration or mining activities can be conducted on public land that is administered by the United States Bureau of Land Management (BLM) or United States Forest Service (USFS).

The New Jersey Mine, Golden Chest Mine, and other nearby properties are part of the expanded Bunker Hill Superfund Site. Current plans for expanded cleanup do not include any IDR projects. There is no known evidence that previous operations at the New Jersey Mine (prior to 1910) caused any groundwater or surface water pollution or discharged any tailings into the South Fork of the Coeur d'Alene River; however, it is possible that such evidence could surface. Should such a liability emerge for the Company, its exposure would likely be to clean up or cover old mine tailings that may have washed downstream from upstream mining operations. There are no mineral processing tailings deposits at the Golden Chest Mine. However, at least two old adits have small water discharges. The Company could conceivably be required to conduct cleanup operations at its own expense; however, the Environmental Protection Agency’s (EPA) Record of Decision for the Bunker Hill Mining and Metallurgical Complex Operating Unit 3 does not include any cleanup activities at the Company’s projects. Recently, the EPA has proposed a new cleanup plan that greatly increases the number of historic mine sites to be reclaimed, however, the plan has not been approved. IDR has not received any notifications that it could be liable for any environmental cleanup.

Costs and Effects of Compliance with Environmental Laws (Federal, State and Local)

No major Federal permits are required for the Golden Chest and New Jersey Mines because the operations are on private land and there are no process discharges to surface waters. However, any exploration program conducted by the Company on unpatented mining claims, usually administered by the BLM or USFS, requires a POO to be submitted. The Company’s exploration programs on public land can be delayed for significant periods of time (one to two years) because of the slow permitting process applied by the USFS. The Company believes that such permitting delays are caused by insufficient manpower, complicated regulations, competing priorities, and sympathy for environmental groups who oppose all mining projects.

The Company is also subject to the rules of the U.S. Department of Labor, Mine Safety and Health Administration (MSHA) for the New Jersey and Golden Chest operations. When an underground mine or mill is operating, MSHA performs a series of regular quarterly inspections to verify compliance with mine safety laws and can assess financial penalties for violations of MSHA regulations. A typical mine citation order for a violation that is not significant or substantial is about $200.

The New Jersey Mill has two State of Idaho permits. The first is a permit for its tailings storage facility (TSF) with the Idaho Department of Water Resources (IDWR). The Company submitted an engineered design for the TSF and constructed a buttress and Phase 5 lift in 2022. IDWR inspected and approved the TSF for tailings disposal in Phase 5. The Company posted a reclamation bond of $107,000 for the TSF. An Idaho Cyanidation Permit was granted for the New Jersey Mill on October 10, 1995 [No. CN-000027]. Construction of the Concentrate Leach Plant (CLP) at the New Jersey Mill was completed in November of 2007. The Idaho Cyanidation permit requires quarterly surface water and groundwater monitoring. In 2022 the Company submitted a Closure Plan for the cyanidation permit since it no longer uses the cyanidation process. The plan is under review the by the Idaho DEQ. The plan calls for continued surface and groundwater monitoring for as long as tailings are deposited in the TSF and for a post-closure period of five years. IDR estimates the cost of water-monitoring associated with the CLP to be approximately $10,000 per year. The New Jersey Mill also has an EPA general stormwater permit.

The Idaho Department of Lands (IDL) approved a surface mining reclamation plan for the New Jersey Mine in 1993. The plan calls for grading of steep fill slopes and planting of vegetation on the area disturbed by the open pit mine. IDR pays an annual reclamation fee of $133 to the Idaho Department of Lands for surface disturbance associated with the New Jersey Mine open pit. The Company has estimated its costs to reclaim the New Jersey Mine and Mill site to be $96,600.

The Company submitted a reclamation plan to the IDL for its current open pit mining operation at the Golden Chest Mine. The plan was approved, and the Company was required to post a reclamation bond of $103,320. This plan also calls for the grading of steep fill slopes and re-vegetation of disturbed land as well as erosion control measures utilizing best practices. Surface water monitoring is also performed at the Golden Chest and results are reported to the Idaho DEQ on a quarterly basis. The Company estimates the cost of this water monitoring at $6,000 annually. The Golden Chest Mine also has an EPA general stormwater permit.

Table of contents

When the Company plans an exploration drilling program on public lands, it must submit a POO to either the BLM or USFS. Compilation of the plan can take several weeks of professional time and a reclamation bond is usually required to start drilling once the plan is approved. Bond costs vary directly with surface disturbance area. As an example, IDR’s core drilling at Diamond Creek on USFS administered land required a bond of $85,800 for minimal disturbance with drill pads adjacent to an existing road. If a plan requires road building, the bond amount can increase significantly. Upon completion of site reclamation and approval by the managing agency, the bond is returned to the Company.

The Company complies with local building codes and ordinances as required by law.

Number of Total Employees and Number of Full Time Employees

The Company's total number of full-time employees is 40.

REPORTS TO SECURITY HOLDERS

The Company is not required to deliver an annual report to shareholders; however, it plans to deliver an annual report to shareholders in 2023. The annual report will contain audited financial statements. The Company may also rely on the Internet to deliver annual reports to shareholders.

The SEC maintains an Internet site (http://www.sec.gov) that contains reports, proxy and information statements, and other information regarding issuers that file electronically with the Commission and SEC.

The Company maintains a website where recent press releases and other information can be found. A link to the Company’s filings with the SEC is provided on the Company’s website www.idahostrategic.com.

ITEM 1A. RISK FACTORS

The following risks and uncertainties, together with the other information set forth in this report, should be carefully considered by those who invest in our securities. Any of the following material risk factors could adversely affect our business, financial condition or operating results and could decrease the value of our common stock. These are not all of the risks we face, and other factors not presently known to us or that we currently believe are immaterial may also affect our business if they occur.

Financial Risks

Diversity in application of accounting literature in the mining industry may impact our reported financial results.

The mining industry has limited industry-specific accounting literature and, as a result, we understand diversity in practice exists in the interpretation and application of accounting literature to mining-specific issues. As diversity in mining industry accounting is addressed, we may need to restate our reported results if the resulting interpretations differ from our current accounting practices.

Our accounting and other estimates may be imprecise.

Preparing consolidated financial statements requires management to make estimates and assumptions that affect the reported amounts and related disclosure of assets, liabilities, revenue and expenses at the date of the consolidated financial statements and reporting periods. The more significant areas requiring the use of management assumptions and estimates relate to:

· future ore grades, throughput and recoveries;

· future metals prices;

· future capital and operating costs;

· environmental, reclamation and closure obligations;

· permitting and other regulatory considerations;

· asset impairments;

· valuation of business combinations;

· future foreign exchange rates, inflation rates and applicable tax rates;

· reserves for contingencies and litigation; and

· deferred tax asset valuation allowance.

Table of contents

Future estimates and actual results may differ materially from these estimates as a result of using different assumptions or conditions.

You may lose all or part of your investment.

If we are unable to effectively develop, mine, recover and sell adequate quantities of gold or generate cash flows from our other diversified precious and strategic metals production and processing activities (including, but not limited to, metals exploration, engineering, resource development, economic feasibility assessments, mineral production, metal processing and related ventures), it is unlikely that the cash generated from our internal operations will suffice as a source of the liquidity necessary for anticipated working capital requirements. There is no assurance that the Company’s initiatives to improve its liquidity and financial position will be successful. Accordingly, there is substantial risk that the Company will be unable to continue as a going concern. In the event of insolvency, liquidation, reorganization, dissolution or other winding up of the Company, the Company’s creditors would be entitled to payment in full out of the Company’s assets before holders of common stock would be entitled to any payment, and the claims on such assets may exceed the value of such assets.

Because we may never earn significant revenues from our mine operations or our other diversified precious metal-based and strategic metals production and processing activities, our business may fail.

We recognize that if we are unable to generate significant revenues from the exploration and exploitation of our mineral reserves or our other diversified precious and strategic metals production and processing activities in the future, we will not be able to earn profits or continue operations. We have yet to generate positive operating income and there can be no assurance that we will ever operate profitably. There is no history upon which to base any assumption as to the likelihood that we will prove successful, and we can provide no assurance that we will generate significant revenues or ever achieve profitability. If we are unsuccessful, our business will fail, and investors may lose all of their investment in our Company.

We will not be successful unless we recover precious or strategic metals and sell them for a profit.

Our success depends on our ability to recover precious or strategic metals, process them, and successfully sell them for more than the cost of production. The success of this process depends on the market prices of metals in relation to our costs of production. We may not be able to generate a profit on the sale of gold or other minerals because we have limited control over our costs and have no ability to control the market prices. The total cash costs of production at any location are frequently subject to great variation from year to year as a result of a number of factors, such as the changing composition of the grade of the mineralized material mined for production, and metallurgy and exploration activities in response to the physical shape and location of the mineral deposit. In addition, costs are affected by the price of commodities, such as fuel and electricity. Such commodities are at times subject to volatile price movements, including increases that could make production unprofitable. A material increase in production costs or a decrease in the price of gold or other minerals could adversely affect our ability to earn a profit on the sale of gold or other minerals.

Cost estimates and timing of new projects are uncertain, which may adversely affect our expected production and profitability.

The capital expenditures and time required to acquire, develop, and explore our projects are considerable and changes in costs, construction schedules or both, can adversely affect project economics and expected production and profitability. There are a number of factors that can affect costs and construction schedules, including, among others:

· availability of labor, energy, transportation, equipment, and infrastructure;

· changes in input commodity prices and labor costs;

· fluctuations in currency exchange rates;

· availability and terms of financing;

· recovery rates of gold and other metals from mineralized materials;

· difficulty of estimating construction costs over a period of a year;

· weather and severe climate impacts; and

· potential delays related to health, social, political and community issues.

Table of contents

Our ability to execute our strategic plan depends on many factors, some of which are beyond our control.

Our strategic plan is focused on high-value, cash-generating, precious metal-based activities, including, but not limited to, precious-metal exploration, resource development, economic feasibility assessments and cash-generating mineral production. Many of the factors that impact our ability to execute our strategic plan, such as the advancement of certain technologies, legal and regulatory obstacles and general economic conditions, are beyond our control. Changes in value or a lack of demand for the sale of non-core assets would negatively affect the Company’s financial condition and performance. Our inability to identify successful joint venture candidates and to complete joint ventures or strategic alliances as planned or to realize expected synergies and strategic benefits could impact our financial condition and performance. Our inability to deploy capital to maximize shareholder value could impact our financial performance. We cannot give assurance that we will be able to execute any or all of our strategic plan. Failure to execute any or all of our strategic plan could have a material adverse effect on our financial condition, results of operations, and cash flows.

Risks Associated with Mining Operations, Development, Exploration and Acquisition Portion of Our Business

Exploration activities involve a high degree of risk, and exploratory drilling activities may not be successful.

The Company’s future success will largely depend on the success of the exploration drilling programs at the Golden Chest Mine, adjacent properties, and other exploration properties. Participation in exploration drilling activities involves numerous risks, including the significant risk that no commercially marketable minerals will be discovered. The mining of minerals and the manufacture of mineral products involves numerous hazards, including:

· Ground or slope failures;

· Equipment failures or accidents;

· Adverse weather conditions;

· Compliance with governmental requirements and laws, present and future;

· Shortages or delays in the availability and delivery of equipment; and

Poor results from the Company’s drilling activities would materially and adversely affect the Company’s future cash flows and results of operations.

Transportation and weather interruptions may affect and delay proposed mining operations and impact our business plans.

Our mining properties are accessible by road. The climate in the area is hot and dry in the summer but cold and subject to snow and other precipitation in the winter, which could at times hamper accessibility depending on the winter season precipitation levels. As a result, our exploration and mining plans could be delayed for several months each year. Such delays could affect our anticipated business operations and increase our expenses.

Moreover, extreme weather events (such as increased frequency or intensity of storms or prolonged drought, flooded or frozen terrain) have the potential to disrupt operations at our projects. Extended disruptions to supply lines due to extreme weather could result in interruption of activities at the project sites, delay or increase the cost of construction of the projects, or otherwise adversely affect our business.

Supplies and equipment needed for exploration may not always be available. If we are unable to secure raw materials and exploration supplies, we may have to delay our anticipated business operations.

Competition and unforeseen limited sources of supplies needed for our proposed exploration work could result in occasional shortages of supplies of certain products, equipment or materials. There is no guarantee we will be able to obtain certain products, equipment and/or materials as and when needed, without interruption, or on favorable terms, if at all. Such delays could affect our anticipated business operations and increase our expenses.

The mining industry is highly competitive and there is no assurance that we will continue to be successful in acquiring mineral properties, claims or leases. If we cannot continue to acquire properties to explore for mineral resources, we may be required to reduce or cease exploration activity and/or operations.

The mineral exploration, development, and production industry is largely un-integrated. We compete with other exploration companies looking for mineral properties and the minerals that can be produced from them. While we compete with other exploration companies in the effort to locate and license mineral properties, we do not compete with them for the removal or sales of mineral products from our claims if we should eventually discover the presence of them in quantities sufficient to make production economically feasible. Readily available markets exist worldwide for the sale of gold and other mineral products, subject to market conditions and prices. Therefore, we will likely be able to sell any gold or mineral products that we identify and produce; however, such sales are subject to market fluctuations that may materially and adversely affect the Company’s future cash flows and results of operations.

Table of contents

Many of our competitors have greater financial resources and technical facilities. Accordingly, we will attempt to compete primarily through the knowledge and experience of our management. This competition could adversely affect our ability to acquire suitable prospects for exploration in the future. Accordingly, there can be no assurance that we will acquire any interest in additional mineral properties that might yield reserves or result in commercial mining operations.

The estimation of the ultimate recovery of gold and other metals is subjective. Actual recoveries may vary from our estimates.

We utilize a conventional flotation process to produce a bulk sulfide flotation concentrate that is sold to smelters in Asia. Ore is crushed, ground and valuable minerals are separated using the flotation process which is longstanding and well understood metallurgical process. However, our estimates of gold recovery can vary from actual gold recovery because of several factors such as oxidation, hardness of the ore, deleterious mineralogy, and gold grade estimation errors due to the nugget effect. Also, final payment is determined by sampling of the concentrate at the smelter which could lead to variations from provisional sampling at the mill facility. Sampling procedures at the mill have been modified to try to increase correlation with smelter samples such as by increasing the sample mass collected for the provisional sample at the mill. Due to the complexity of the estimation process and the number of steps involved, among other things, actual recoveries can vary from estimates, and the amount of the variation could be significant and could have a material adverse impact on our financial condition and results of operations.

Resource and other mineralized material statements are estimates only, and are subject to uncertainty due to factors including metal prices, inherent variability of the mineralized material and recoverability of metal in the mining and beneficiation processes.

Our reports of mineral resources and other mineralized material depend upon geological interpretation and statistical inferences or assumptions drawn from drilling and sampling analysis, which may prove to be unpredictable. There is a degree of uncertainty attributable to the calculation of mineral resources and corresponding grades. Until mineral resources and other mineralized materials are actually mined and processed, the quantity of mineralized material and grades must be considered as an estimate only. In addition, the quantity of mineral resources and mineral reserves may vary depending on metal prices. Any material change in the quantity of mineral resources, mineral reserves, mineralization, grade or stripping ratio may affect the economic viability of our properties. In addition, we can provide no assurance that gold recoveries or other metal recoveries experienced in small-scale laboratory tests will be duplicated in larger scale tests under on-site conditions or during production.

Our mining and metal production depends on the availability of sufficient water supplies.

Our mining and milling operations require significant quantities of water for mining, processing and related support facilities. Continuous production at our mines and mill is dependent on our ability to maintain our water rights and claims, and the continuing physical availability of the water.

We may experience increased costs or losses resulting from the hazards and uncertainties associated with mining.

The exploration for natural resources and the development and production of mining operations are activities that involve a high level of uncertainty. These can be difficult to predict and are often affected by risks and hazards outside of our control. These factors include, but are not limited to:

· surface or underground fires or floods;

· ground and water conditions;

· fall-of-ground accidents in underground operations;

· failure of mining pit slopes and tailings dam walls;

· seismic activity; and

Table of contents

Climate Change could negatively impact our operations and financial performance.

Climate change is expected to create more extreme weather patterns that can increase frequency of droughts and increase the amount of rainfall, circumstances that require careful water management. Potential key material physical risks to the Company from climate change include, but are not limited to: increased volumes of mine contact water requiring storage and treatment, increased design requirements for stormwater diversion and associated water management systems, and reduced freshwater availability due to potential drought conditions. We have identified opportunities and risks with the advent of technologies that support decarbonization and renewable energy sources, such as: electric vehicles and energy storage that may require the metals we produce seek to produce in the future. These technologies may not have the same reliability as conventional technologies and costs may increase to produce such technologies, which could negatively impact our financial performance.

Risks Related to Our Company

The cost of our exploration, development and acquisition activities is substantial, and there is no assurance that the quantities of minerals and metals we discover, acquire or recover will justify commercial operations or replace reserves.

Mineral exploration, development and beneficiation, particularly for gold and other strategic metals, is highly speculative in nature and frequently is nonproductive. There can be no assurance that our exploration, development and/or acquisition activities will be commercially successful. Substantial expenditures are required to acquire existing gold properties, to establish mineral reserves through drilling and analysis, to develop metallurgical processes to extract metal from the mineralized material and, in the case of new properties, to develop the processing facilities and infrastructure at any site chosen for mineral exploration. There can be no assurance that any gold reserves or mineralized material that may be discovered or acquired in the future, if any, will be in sufficient quantities or of adequate grade to justify continued commercial operations, or that the funds required for mineral production operation can be obtained on a timely or reasonable basis, if at all. Mining companies must continually replace mineral reserves depleted by production. There can be no assurance that we will be successful in replacing any reserves or mineralized material acquired or established in the future.

The prices of gold and other strategic metals fluctuate on a regular basis and a downturn in price could negatively impact our operations and cash flow.

Our operations will be significantly affected by changes in the market price of gold. Gold prices can fluctuate widely and may be affected by numerous factors, such as expectations for inflation, levels of interest rates, currency exchange rates, purchases and sales by governments and central banks, monetary policies employed by the world’s major central banks, fiscal policies employed by the world’s major industrialized economies, forward selling or other hedging activities, demand for diversified precious and strategic metals, global or regional political and economic crises, and production costs in major gold-producing regions, such as but not limited to South Africa and the Russian Federation. The aggregate effect of these factors, all of which are beyond our control, is impossible for us to predict. If gold prices decline substantially, it could adversely affect the realizable value of our assets and, potentially, future results of operations and cash flow.

As opportunities rise, we expect to continue to acquire properties with gold and strategic metals reserves or mineralized material with exploration potential. The price that we pay to acquire these properties will be influenced, in large part, by the price of gold and other strategic metals at the time of the acquisition. We expect our potential future revenues to be derived from the production and sale of gold and strategic metals from these properties or from the sale of some of these properties. The value of any mineralized material, and the value of any potential mineral production therefrom, will vary in direct proportion to variations in those mineral prices. The price of gold and strategic metals has fluctuated widely as a result of numerous factors beyond our control. The effect of these factors on the price of gold and strategic metals, and therefore the economic viability of our projects, cannot accurately be predicted. Any drop in the price of gold or strategic metals would negatively affect our asset values, cash flows, potential revenues and profits.

The use of hedging instruments may not prevent losses being realized on subsequent price decreases or may prevent gains being realized from subsequent price increases.

We may from time to time sell some future production of gold pursuant to hedge positions. If the gold price rises above the price at which future production has been committed under these hedge instruments, we will have an opportunity loss. If the gold price falls below that committed price, we may experience losses if a hedge counterparty defaults under a contract when the contract price exceeds the gold price.

Table of contents

Competition from other mineral exploration and mining companies with greater resources may impact us.

We compete with other mineral exploration and mining companies or individuals, including large, established metals and mining companies with substantial capabilities and far greater financial resources, to acquire rights to mineral properties, metal processing technology and other methods for extracting and processing precious, and other metals and minerals. There is a limited supply of desirable lands available for claim staking, lease or other acquisition. There can be no assurance that we will be able to acquire such properties when competing against competitors with substantially greater financial resources than we have. Increases in the amount of gold and associated minerals sold by competitors of the Company may also result in price reductions and/or reduced margins, and the Company may not be able to compete effectively against current and future competitors.

The construction of our mines are subject to all of the risks inherent in start-up operations.

These risks include potential delays, cost overruns, shortages of material or labor, construction defects, and injuries to persons and property. We expect to engage or hire on employees in order to continue the development of our claims. While we anticipate taking all measures which we deem reasonable and prudent in connection with the production phase, there is no assurance that the risks described above will not cause delays or cost overruns in connection with such development, production, or operation. Any delays would postpone our anticipated receipt of revenue and adversely affect our operations, which in turn may adversely affect the price of our stock.

Our business requires substantial capital investment and we may be unable to raise additional funding on favorable terms.

The construction and operation of potential future projects and various exploration projects will require significant funding. Our operating cash flow and other sources of funding may become insufficient to meet all of these requirements, depending on the timing and costs of development of these and other projects. As a result, new sources of capital may be needed to meet the funding requirements of these investments and fund our ongoing business activities. Our ability to raise and service significant new sources of capital will be a function of macroeconomic conditions, future gold and strategic metal prices, our operational performance and our current cash flow and debt position, among other factors. In the event of lower gold and strategic metal prices, unanticipated operating or financial challenges, or a further dislocation in the financial markets as experienced in recent years, our ability to pursue new business opportunities, invest in existing and new projects, fund our ongoing operations and retire or service all of our outstanding debt could be significantly constrained.

Owning real estate and water rights carries inherent risks.

We are susceptible to the following real estate industry risks beyond our control:

· Changes in national, regional and local economic conditions and outlook;

· Economic downturns in the areas where the properties are located;

· Changes in zoning, regulatory restrictions or tax laws;

· Changes in interest rates or availability of financing.

These conditions could adversely affect our financial position, results of operations and cash flows, or the market price of our stock.

Illiquidity of real estate investments could significantly impede our ability to respond to changes in economic and other conditions.

Our ability to sell one or more of our properties in response to changing economic, financial and investment conditions may be limited. We cannot predict whether we will be able to sell any of our properties for the price or terms set by us, or whether any price or other terms offered by a prospective buyer would be acceptable to us. We also cannot predict the length of time needed to find a willing buyer and to the close the sale of an asset. The real estate market is affected by many factors that are beyond our control.

Table of contents

We may undertake joint ventures, investments, joint projects and other strategic alliances and such undertakings may be unsuccessful and may have an adverse effect on our business.

We continually evaluate and explore strategic opportunities as they arise, including product, technology, business or asset transactions. Such undertakings may not be successful or may take a substantially longer period than initially expected to become successful, and we may never recover our investments or achieve desired synergies or economies from these undertakings. Nevertheless, we may in the future to seek to grow our operations in part by entering into joint ventures, or undertaking investments, joint projects or other strategic alliances with third parties in diversified precious and strategic metals production and processing industries. These activities involve challenges and risks in negotiation, execution, valuation and integration, and closing of the transactions could be delayed or prevented by regulatory approval requirements, including permitting issues, or other conditions.

Any future agreements that we may enter into also could expose us to new operational, regulatory, market, litigation and geographical risks as well as risks associated with significant capital requirements, the diversion of management and financial resources, unforeseen operating difficulties and expenditures, sharing of proprietary information, loss of control over day-to-day operations, non-performance by a counterparty, potential competition and conflicts of interest. In addition, we may not be successful in finding suitable targets on terms that are favorable to us, or at all. Even if successfully negotiated and closed, expected synergies from a joint venture, investment or other strategic alliance may not materialize, may not advance our business strategy, may fall short of expected return-on-investment targets or may not prove successful or effective for our business. We may also encounter difficulty integrating the operations, personnel and financial and operating systems of an acquired business into our current business.

We may need to raise additional debt funding or sell additional equity securities to enter into such joint ventures or make such acquisitions. However, we may not be able to obtain such debt funding or sell equity securities on terms that are favorable to us, or at all. The raising of additional debt funding by us, if required and available, would result in increased debt service obligations and could result in additional operating and financing covenants, or liens on our assets, that would restrict our operations. The sale of additional equity securities, if required and available, could result in dilution to our shareholders.

Our business depends on a limited number of key personnel, the loss of whom could negatively affect us.

Our officers and employees are important to our success. If any of them becomes unable or unwilling to continue in their respective positions, and we are unable to find suitable replacements, our business and financial results could be materially negatively affected.

Legal, Regulatory and Compliance Risks

Our ability to execute our strategic plans depends upon our success in obtaining a variety of required governmental approvals that may be opposed by third parties.

Our operations may be delayed, hindered, or prevented to the extent that we are unable to obtain the governmental permits or approvals necessary to conduct the full extent of the operations contemplated by our strategic plan in a timely fashion or at all. This inability may occur due to a variety of factors, including opposition by third parties, such as members of the public or environmental groups. We expect that future permit and approval applications and issuances will meet with similar opposition. We may encounter delays and added costs if permits and approvals are challenged.

The Company is subject to complex laws and regulations, including environmental regulations that can adversely affect the cost, manner or feasibility of doing business.

The Company’s production, development and exploratory mining operations are subject to numerous federal, state and local laws and regulations governing the operations, discharge, emission, or release of materials into the environment and the protection of the environment and human health and safety, including the Federal Clean Water Act (“CWA”), Clean Air Act (“CAA”), Endangered Species Act, Safe Drinking Water Act, Migratory Bird Treaty Act, National Environmental Policy Act, Resource Conservation and Recovery Act (“RCRA”), and Comprehensive Environmental Response, Compensation and Liability Act (“CERCLA”). Federal initiatives are often also administered and enforced through state agencies operating under parallel state statutes and regulations. Failure to comply with such rules and regulations could result in substantial penalties or construction or operational delays or requirements to cease production and have an adverse effect on the Company. These laws and regulations may, among other things:

Table of contents

· Limit or prohibit mining work on protected areas.

Under these laws and regulations, the Company could be liable for personal injury and clean-up costs and other environmental and property damages, as well as administrative, civil and criminal penalties. The Company maintains limited insurance coverage for sudden and accidental environmental damages. Accordingly, the Company may be subject to liability, or it may be required to cease production from properties in the event of environmental damages. Compliance with environmental laws and regulations and future changes in these laws and regulations may require significant capital outlays, cause material changes or delays in the Company’s current and planned operations and future activities and reduce the profitability of operations.

At the state level, surface mining operations in Idaho are regulated by the Idaho Department of Lands (“IDL”). The surface mining regulations require water monitoring to protect surface and ground water and results are submitted to the Idaho Department of Environmental Quality (IDEQ). If any degradation of existing water quality is found, regulations require the Company to work with the state regulators to mitigate any impacts on water quality. In addition, we are required to hold Idaho reclamation permits required under Idaho law. These permits mandate concurrent and post-mining reclamation of mines and require the posting of reclamation bonds sufficient to guarantee the cost of mine reclamation. Other Idaho regulations govern operating and design standards for the construction and operation of any source of air contamination and landfill operations. Any changes to these laws and regulations could have a negative impact on our financial performance and results of operations by, for example, requiring changes to operating constraints, technical criteria, fees or surety requirements.

It is possible that future changes in these laws or regulations could increase operating costs or require capital expenditures in order to remain in compliance. Any such changes could have an adverse effect on the Company’s business, financial condition and results of operations.

The Company is subject to the Federal Mine Safety and Health Act of 1977 and regulations promulgated thereto, which impose stringent health and safety standards on numerous aspects of their operations.

The Company’s exploration, development and mining is subject to the Federal Mine Safety and Health Act of 1977, which imposes stringent health and safety standards on numerous aspects of mineral extraction and processing operations, including the training of personnel, operating procedures, operating equipment and other matters, and the costs associated with compliance with such laws and regulations can be substantial. The Company’s failure to comply with these standards could have a material adverse effect on their business, financial condition or otherwise impose significant restrictions on their ability to conduct mining work.

Regulations and pending legislation governing issues involving climate change could result in increased operating costs which could have a material adverse effect on our business.

A number of governments or governmental bodies have introduced or are contemplating regulatory changes in response to various climate change interest groups and the potential impact of climate change. Legislation and increased regulation regarding climate change could impose significant costs on us, our partners and our suppliers, including costs related to increased energy requirements, capital equipment, environmental monitoring and reporting and other costs to comply with such regulations. Any adopted future climate change regulations could also negatively impact our ability to compete with companies situated in areas not subject to such limitations. Given the emotion, political significance and uncertainty around the impact of climate change and how it should be dealt with, we cannot predict how legislation and regulation will affect our financial condition, operating performance and ability to compete. Furthermore, even without such regulation, increased awareness and any adverse publicity in the global marketplace about potential impacts on climate change by us or other companies in our industry could harm our reputation. The potential physical impacts of climate change on our operations are highly uncertain and would be particular to the geographic circumstances in areas in which we operate. These may include changes in rainfall and storm patterns and intensities, water shortages, changing sea levels and changing temperatures. These impacts may adversely impact the cost, production, and financial performance of our operations.

Our activities are inherently hazardous and any exposure may exceed our insurance limits or may not be insurable.

The Company’s business is subject to a number of risks and hazards generally, including adverse environmental conditions, environmental or industrial accidents, labor disputes, unusual or unexpected geological conditions, ground or slope failures, cave-ins, changes in the regulatory environment and natural phenomena, such as inclement weather conditions, floods, hurricanes and earthquakes. Such occurrences could result in damage to mineral properties or production facilities, personal injury or death, environmental damage to our properties or the property of others, delays in construction or mining, monetary losses, and possible legal liability.

Table of contents

The nature of these risks is such that liabilities might exceed any applicable liability insurance policy limits. It is also possible that the liabilities and hazards might not be insurable, or we could elect not to insure ourselves against such liabilities because of the high premium costs, in which event, we could incur significant costs that could have a material adverse effect on our financial condition.

Our insurance and surety bonds for environmental-related issues are limited.

Our insurance and surety bonds against environmental risks are limited as to the maximum protection against potential liability for pollution or other hazards as a result of the disposal of waste products occurring from exploration and production. Further, there is no assurance that insurance carriers or surety bond providers will be able to meet their obligations under our arrangements with them. In the event that our environmental liabilities and costs exceed the coverage provided by our insurance carriers and surety bond providers, or such parties are unable to meet their obligations, we would have limited funds available to us to remedy such liabilities or costs, or for future operations. If we are unable to fund the cost of remedying an environmental problem, we also might be required to enter into an interim compliance measure pending completion of the required remedy.

We are subject to federal and state laws that require environmental assessments and the posting of bonds, which add significant costs to our operations and delays in our projects.

Mining companies must post a bond or other surety to guarantee the cost of post-mining reclamation. These requirements could add significant additional cost and delays to any mining project undertaken by us. Our mineral exploration operations are required to be covered by reclamation bonds deemed adequate by regulators to cover these risks.

We may be subject to litigation.

We may be subject to legal proceedings. Due to the nature of our business, we may be subject to a variety of regulatory investigations, claims, lawsuits and other proceedings in the ordinary course of our business. The results of these legal proceedings cannot be predicted with certainty due to the uncertainty inherent in litigation, including the effects of discovery of new evidence or advancement of new legal theories, the difficulty of predicting decisions of judges, and juries and the possibility that decisions may be reversed on appeal. There can be no assurances that these matters will not have a material adverse effect on our business.

Title claims against our properties could require us to compensate parties making such claims, if successful, and divert management’s time from operations.

There may be challenges to our title in the properties in which we hold material interests. If there are title defects with respect to any of our properties, we might be required to compensate other persons or perhaps reduce our interest in the affected property. The validity of unpatented mineral claims, which constitute most of our strategic mineral holdings in the United States, is often uncertain and may be contested by the federal government and other parties. The validity of an unpatented mineral claim, in terms of both its location and its maintenance, depends on strict compliance with a complex body of federal and state, statutory and decisional law. Although we have attempted to acquire satisfactory title to our properties, we have not obtained title opinions or title insurance with respect to the acquisition of the unpatented mineral claims. The investigation and resolution of title issues would divert management’s time from ongoing exploration programs.

We are exposed to global health, economic and market risks that are beyond our control, which could adversely affect our financial results and capital requirements.

If any of our facilities or the facilities of our suppliers, third-party service providers, or customers is affected by natural disasters, such as earthquakes, floods, fires, power shortages or outages, public health crises (such as pandemics and epidemics), political crises (such as terrorism, war, political instability or other conflict), or other events outside of our control, our operations or financial results could suffer. Any of these events could materially and adversely impact us in a number of ways, including through decreased production, increased costs, decreased demand for our products due to reduced economic activity or other factors, or the failure by counterparties to perform under contracts or similar arrangements.

For example, the outbreak of the novel strain of coronavirus, specifically identified as “COVID-19”, resulted in governments worldwide enacting emergency measures to combat the spread of the virus. These measures, including the implementation of travel bans, quarantine periods and social distancing, have caused material disruptions to global business and an economic downturn. Global equity markets have experienced significant volatility and weakness. Governments and their central banks have reacted with significant fiscal and monetary interventions designed to mitigate the impacts and stabilize economic conditions.

Table of contents

Attempts to mitigate global health, economic and market risks of natural disasters may result in decreased economic activity which would adversely affect the broader global economy. Pandemics or other significant public health events will most likely have a material adverse effect on our business and results of operations. It is not currently possible to reliably estimate the length and severity of the impact on the Company’s financial condition, and that of its subsidiaries and partners in future periods.

Uncertainties regarding the global economic and financial environment could lead to an extended national or global economic recession. A slowdown in economic activity caused by a recession would likely reduce demand for assets that we hold for sale and result in lower commodity prices for long periods of time. Costs of exploration, development and production have not yet adjusted to current economic conditions, or in proportion to the significant reduction in product prices.

Mineral operations are subject to applicable law and government regulation. Even if we discover a mineral reserve in a commercially exploitable quantity, these laws and regulations could restrict or prohibit the exploitation of that mineral reserve. If we cannot exploit any mineral reserve that we might discover on our properties, our business may fail and you may lose your investment.

Both mineral development and extraction may require permits from various foreign, federal, state, and local governmental authorities and are governed by laws and regulations, including those with respect to prospecting, mine development, mineral production, transport, export, taxation, labor standards, occupational health, waste disposal, toxic substances, land use, environmental protection, mine safety, and other matters. There can be no assurance that we will be able to obtain or maintain any of the permits required for the continued exploration of our mineral properties or for the construction and operation of a mine on our properties at economically viable costs. If we cannot accomplish these objectives, our business could face difficulty and/or fail.

We believe that we are in compliance with all material laws and regulations that currently apply to our activities but there can be no assurance that we can continue to do so. Current laws and regulations could be amended, and we might not be able to comply with them, as amended. Further, there can be no assurance that we will be able to obtain or maintain all permits necessary for our future operations, or that we will be able to obtain them on reasonable terms. To the extent such approvals are required and are not obtained, we may be delayed or prohibited from proceeding with planned development or production of our mining activity.

Environmental hazards unknown to us, which have been caused by previous or existing owners or operators of the properties, may exist on the properties in which we hold an interest. Many of our properties in which we have ownership rights are located within the Coeur d’Alene Mining District, which is currently the site of a Federal Superfund cleanup project. It is possible that environmental cleanup or other environmental restoration procedures could remain to be completed or mandated by law, causing unpredictable and unexpected liabilities to arise. At the date of this Annual Report, the Company is not aware of any environmental issues or litigation relating to the properties.

The laws of the State of Idaho and our Articles of Incorporation may protect the Company’s directors from certain types of lawsuits.

The laws of the State of Idaho provide that the Company’s directors will not be liable to us or our shareholders for monetary damages for all but certain types of conduct as directors of the Company. The Company’s Articles of Incorporation permit the Company to indemnify its directors and officers against all damages incurred in connection with its business to the fullest extent provided or allowed by law. The exculpation provisions may have the effect of preventing shareholders from recovering damages against the Company’s directors caused by director negligence, poor judgment, or other circumstances. The indemnification provisions may require the Company to use its limited assets to defend its directors and officers against claims, including claims arising out of the Company’s negligence, poor judgment, or other circumstances.

Risks Related to Investments in Our Common Stock

The price of the Company’s common stock has and may continue to fluctuate significantly, which could negatively affect the Company and holders of its common stock.

The market price of our common shares is subject to volatility, has fluctuated, and may continue to fluctuate significantly due to, among other things, changes in market sentiment regarding our operations, financial results or business prospects, the mining, metals, or environmental remediation industries generally, coordinated trading activities, large derivative positions or the macroeconomic outlook. The price of our common stock has been, and may continue to be, highly volatile. Certain events or changes in the market or our industries generally are beyond our control.

Table of contents

In addition to the other risk factors contained or incorporated by reference herein, factors that could impact our trading price include:

· developments in our business or operations or our industry sectors generally;

· any future offerings by us of our common stock;

· proposed or final regulatory changes or developments;

If securities or industry analysts do not publish research, or publish inaccurate or unfavorable research about our business, our stock price and trading volume could decline.

The trading market for our common stock will depend in part on the research and reports that securities or industry analysts publish about us or our business. We have relatively little research coverage by securities and industry analysts. If no additional industry analysts commence coverage of the Company, the trading price for our common stock could be negatively impacted. If one or more of the analysts who cover us downgrades our common stock, or publishes inaccurate or unfavorable research about our business, our stock price would likely decline. If one or more of these analysts cease coverage of us or fail to publish reports on us regularly, demand for our common stock could decrease, which could cause our stock price and trading volume to decline.

We do not expect to pay any cash dividends for the foreseeable future.

We expect to retain all available funds and future earnings, if any, for use in the operation and growth of our business and do not anticipate paying any cash dividends in the foreseeable future. Any future determination to pay cash dividends will be at the discretion of our board, subject to compliance with applicable law, our organizational documents and any contractual provisions, including under agreements for indebtedness we may incur, that restrict or limit our ability to pay dividends, and will depend upon, among other factors, our results of operations, financial condition, earnings, capital requirements and other factors that our board deems relevant. Investors seeking cash dividends in the foreseeable future should not purchase our common stock.

Table of contents

The Company may issue additional common stock or other equity securities in the future that could dilute the ownership interest of existing shareholders.

The Company is currently authorized to issue 200,000,000 shares of common stock, of which 12,098,070 shares were issued and outstanding as of December 31, 2022, and 1,000,000 shares of preferred stock, of which no Preferred Shares are outstanding as of December 31, 2022. To maintain its capital at desired levels or to fund future growth, the board may decide from time to time to issue additional shares of common stock, or securities convertible into, exchangeable for or representing rights to acquire shares of common stock. New investors in other equity securities issued by the Company in the future may also have rights, preferences and privileges senior to, that may adversely impact, the Company’s current shareholders.

If a large number of shares of our common stock are sold in the public market, the sales could reduce the trading price of our common stock and impede our ability to raise future capital.

We cannot predict what effect, if any, future issuances by us of our common stock or other equity will have on the market price of our common stock. Any shares that we may issue may not have any resale restrictions, and therefore could be immediately sold by the holders. The market price of our common stock could decline if certain large holders of our common stock, or recipients of our common stock, sell all or a significant portion of their shares of common stock or are perceived by the market as intending to sell these shares other than in an orderly manner. In addition, these sales could also impair our ability to raise capital through the sale of additional common stock in the capital markets.

Table of contents

ITEM 2. DESCRIPTION OF PROPERTIES

Note on New SEC Mining Disclosure Rules

Information concerning our mining properties in this Annual Report on Form 10-K/A has been prepared in accordance with the requirements of subpart 1300 of Regulation S-K, which first became applicable to us for the fiscal year ended December 31, 2021. These requirements differ significantly from the previously applicable disclosure requirements of SEC Industry Guide 7. Among other differences, subpart 1300 of Regulation S-K requires us to disclose our mineral resources, in addition to our mineral reserves, as of the end of our most recently completed fiscal year both in the aggregate and for each of our individually material mining properties. Readers are cautioned that mineral resources do not have demonstrated economic value. Mineral resources are subject to further exploration and development, are subject to additional risks, and no assurance can be given that they will eventually convert to mineral reserves. Inferred resources have more uncertainty than Measured or Indicated as the estimation parameters assume mineralized continuity over greater distances which may not accurately reflect the actual mineralization.

Summary

The map below shows the locations of our operations and our exploration Properties.

Figure 1 - Property Location Map

Table of contents

The following table summarizes our aggregate metal quantities produced and sold, which only includes the quantities produced and sold from the Golden Chest Mine (the Company’s only producing mine) for the last three years:

Year Ended December 31,

The following table summarizes the Company’s total in-situ proven and probable mineral reserves (the Golden Chest Mine is the Company’s only property with calculated reserves) as of December 31, for the last three years:

The following table summarizes the Company’s total in-situ mineral resources (the Golden Chest Mine is the Company’s only property with calculated mineral resources) as of December 31, 2022.

The year ending December 31, 2022 was the first year the Company calculated a mineral resource for the Golden Chest Mine. An historic resource report was completed by a third party in 2012, but it was not an SK-1300 compliant resource. More information on the Company’s mineral reserves and resources is provided in Exhibit 96.1, the Technical Report Summary on the Golden Chest Mine, prepared by the Qualified Persons (QP) under Section 1300 of SEC Regulation S-K, Grant A. Brackebusch, P.E., and Robert J. Morgan, PG, PLS.

Table of contents

The table below summarizes the Company’s production and exploration-stage properties.

Table of contents

GOLDEN CHEST MINE

Figure 2 – Aerial Photo of Golden Chest Mine in February 2020

The Golden Chest Mine is the Company’s only Production Stage mine and is comprised of an underground mine, an open pit mine, and an exploration property located about 1.5 miles east of Murray, Idaho. The Golden Chest Mine includes 86 patented mining claims (1,322 acres) and 217 unpatented claims (4,300 acres). The open pit mine is permitted with the Idaho Department of Lands and the Company has posted a reclamation bond for an approved reclamation plan. IDR is the operator and owns 100% of the Golden Chest LLC (owner of the Golden Chest Mine). Production from the Golden Chest and an adjacent Area of Interest is subject a 2% NSR payable to Marathon Gold Corporation (Marathon). The mineralization occurs as gold-quartz veins associated with an orogenic deposit type. Ore from the Golden Chest Mine is processed off-site at the New Jersey Mill in Kellogg, Idaho. For more information concerning the Golden Chest Mine, please refer to the information set forth under the caption “Individual Properties-MATERIAL OPERATING PROPERTIES” and under the caption “Golden Chest Mine” in this Item 2.

NEW JERSEY MILL

Property Location

The New Jersey Mill is a fully permitted, 360-tonne per day, flotation mill and concentrate leach plant (“CLP”) located two miles east of Kellogg, Idaho, in the Coeur d’Alene Mining District. The CLP is permitted with Idaho Department of Environmental Quality (IDEQ). The mill is located on the same property as the New Jersey Mine, adjacent to U.S. Interstate Highway 90 and easily accessed year-round by local roads. Three-phase electrical power is supplied to the New Jersey Mill by Avista Utilities.

Property Ownership and Operation

The New Jersey Mill is operated by IDR. In 2011, IDR signed a joint venture (“JV”) agreement with Crescent Silver LLC (Crescent) to increase the capacity of the New Jersey Mill. Crescent funded the mill expansion in return for a 35% interest in JV assets plus the right to process 7,000 tonnes of its ore per month. IDR is the JV manager and retains a 65% interest in JV assets as well as the right to process its own ore at the rate of 3,000 tonnes per month and to allocate unused and excess capacity in its role as manager. The property covered by the JV agreement includes the crushing circuit, grinding circuit, gravity circuit, flotation circuit, CLP, buildings, and surface rights over the patented mill site claim. Unpatented mill site claims are also part of the JV.

Table of contents

Present Condition of Plant & Equipment

Mill Expansion and Crescent Ore Processing

The mill expansion was completed in 2012, rendering the mill capable of processing 360 tonnes of sulfide ore per day to produce a single flotation concentrate. The expansion cost approximately $3.2 million, all of which was funded by Crescent under terms of the JV (Ex. 10.1). The expansion project included the installation of a new cone crusher, a new fine ore bin, new conveyors, a new 2.4-meter by 4.0-meter ball mill, additional flotation cells, a new paste thickener, associated pumps, and a new building.

Current Ore Processing Operations

In October 2016, the Company resumed operations at the New Jersey Mill, processing ore extracted from open pit and underground at the Golden Chest. In 2022, the New Jersey Mill processed 42,260 tonnes at an average head grade of 4.33 gpt gold with 89.8% gold recovery. Since restarting operations at the Golden Chest in October 2016, the Company has milled a total of 249,240 tonnes at the New Jersey Mill.

The mill recycles process water and utilizes a paste tailings disposal process patented by IDR founder Fred Brackebusch to minimize impacts to the environment. By implementing paste tailings processing methods, IDR can recycle process water and prevent the discharge of process water to surface waters. At full capacity, this method saves more than 50 million gallons of water per year. IDR was recognized as a “Pollution Prevention Champion” by the Idaho Department of Environmental Quality (IDEQ) in 2014 for its efforts to reduce pollution at the mill. The Company submitted a permit for an expansion of its existing tailings storage facility (TSF) which was approved. The expansion has enough tailings storage capacity for at least four years, and possibly more if a paste backfill system is constructed. The Company has also submitted a Closure Plan for its cyanide leach circuit which is under review by the Idaho DEQ.

As of December 31, 2022, the Company had a net capital cost of $3,704,977 associated with the New Jersey Mill.

Permit Requirements

The New Jersey Mill has all the required environmental permits to operate currently and into the foreseeable. Some permits may require modification if operating conditions change, but typically these changes can be completed without impeding the milling operation. A summary of the permits held by the Company are found in following table:

Permit Descriptions

Permit Description Reference

RARE EARTH OVERVIEW

Idaho Strategic Resources controls and operates three rare earth elements properties known as Diamond Creek, Roberts, and Lemhi Pass. The three properties together make up approximately 18,030 acres of unpatented lode mining claims, and one State of Idaho mineral lease, within Idaho’s 70-mile long Rare Earth Elements–Thorium (REE-Th) Belt. All three of Idaho Strategic’s properties have seen substantive historic exploration conducted by the United States Geological Survey in the 1950s, and more recently by the Idaho Geological Survey. IDR has completed numerous geologic mapping programs, surface sampling programs, and has completed one drill program to date on its rare earth elements land holdings. While each of the three properties IDR controls are early-stage, the Company considers the properties material to its business due to qualitative factors such as the potential for the company’s properties to be advanced toward future production on an unknown timeline, and the potential importance of rare earth elements in low-carbon technology and national defense technologies, which could see increased demand in the future. To date, Idaho Strategic has not established any known resources or reserves on its rare earth elements properties and plans to continue to advance the projects as funding and permitting allows. For more information concerning the Diamond Creek, Roberts, and Lemhi Pass REE properties, please refer to the information set forth under the caption “Individual Properties-MATERIAL EXPLORATION PROPERTIES” and under their respective caption in this Item 2.

Table of contents

Individual Properties – MATERIAL OPERATING PROPERTIES

GOLDEN CHEST MINE

Figure 3 - Golden Chest Mine Location Map

Property and Location

The Golden Chest Mine is a gold Production Stage property comprised of an underground mine, an open pit mine, and an exploration property located about 1.5 miles east of Murray, Idaho, and 115 km east of the city of Coeur d’Alene, Idaho at Latitude 47o37’14” North and Longitude 115o49’43” West. The Golden Chest Mine includes 86 patented mining claims (1,322 acres) and 217 unpatented claims (4,300 acres). The surface mine is permitted with the Idaho Department of Lands and has posted a reclamation bond for an approved reclamation plan. Surface water monitoring is completed as a condition of the permit. The mine is along Forest Highway 9 and is accessible by several improved dirt roads from the paved highway. A three-phase power line was installed at the property in 2014 with power supplied by Avista Utilities.

Property Ownership

IDR owns 100% of the Golden Chest LLC (owner of the Golden Chest Mine). The core of the Golden Chest Mine is a contiguous group of 26 patented claims where all modern mining has taken place to date. The Company owns the rights to both the surface and subsurface mineral on all patented claims directly and through its 100% held subsidiary Golden Chest LLC (GCLLC), excluding the Joe Dandy Claim where IDR owns only the subsurface mineral rights. West of the mine proper, the Company owns an additional 80 patented claims. The total patented claim position covers 1,322 acres. As these patented claims are considered private lots, legal access is allowed. Property taxes on patented claims are assessed by Shoshone County each year and IDR has paid the taxes in full.

IDR currently maintains 217 unpatented mining claims covering 4,300 acres. The claims have been filed with the United States Bureau of Land Management (BLM) agency and at the Shoshone County Courthouse. Annual maintenance fees are paid to the BLM by September 1, and the Golden Chest unpatented claim fees have been paid and are in good standing.

Production from the Golden Chest and an adjacent Area of Interest is subject a 2% NSR payable to Marathon Gold Corporation (Marathon).

Property History

The Golden Chest Mine was developed in the late 1800’s through the early 1900’s as part of the first gold production from the Coeur d’Alene Mining District. Historical accounts vary, but the district is believed to have produced approximately 300,000 ounces of gold from placer sources. It is estimated that the historic hard rock mining at the Golden Chest (prior to IDR’s ownership) produced approximately 65,000 ounces of gold, primarily from shallow, underground, high-grade veins. The Golden Chest Mine is considered to be the largest historic lode producer of gold in northern Idaho.

Table of contents

Modern exploration of the Golden Chest area began in the late 1970’s with several companies, including Cominco-American and Golden Chest Inc. (“GCI”), targeting gold and massive sulfides. Drill tests by GCI included a 200-foot hole from surface that intersected a 60-foot zone containing multiple low-grade gold-bearing quartz veins.

Newmont Exploration Ltd. followed GCI’s discovery by evaluating the veins for bulk mineable potential in the late-1980’s. Newmont drilled 35 shallow reverse-circulation and five core holes. In 2010 and 2011, a joint venture between IDR and Marathon Gold drilled 18,300 meters of core and published a resource report in accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101).

In September 2013, the Skookum Shoot portion of the Golden Chest property was leased to Juniper Mining Company. Juniper began construction in Q3 2014, spending an estimated $7 to $9 million on mine development and infrastructure, building a modern gold mine that reached production in May 2015. Mining activities continued until September 2015 when Gold Hill ceased operations and terminated its lease, forfeiting the mine and infrastructure back to Golden Chest LLC.

Present Condition, Work Completed, and Exploration Plans

Current Underground Operations

The Golden Chest underground mine is accessed by primary decline ramp (MAR) with a complimentary escape-way incline ramp, and a series of ventilation raises. The primary mining method is underhand drift-and-fill utilizing cemented rock-fill (CRF). During 2022, IDR mined a total of 25,000 tonnes of ore at an average grade of 5.35 gpt gold. The ore came from stopes on the Skookum Shoot and from exploration drifting in the Klondike area. The decline (MAR) was extended at depth during 2022 to the 794 sublevel which required about 175 meters of ramp development and one exhaust ventilation raise was completed by IDR miners.

Current Open-Pit Operations

In 2022, IDR continued its open pit mining operation which commenced in August of 2016. Mining in the Klondike pit was completed in June. A small pit on the Jumbo vein was mined intermittently during 2022 also. A total of 8,400 tonnes of ore at average grade of 4.55 gpt gold and 80,200 tonnes of waste were mined during the year. Ore tonnes and grade in the Klondike Pit were lower than modeled because of unmapped, historic stopes in the Klondike where high-grade material had been mined out by the old-timers.

Exploration Plans and Results

Modern exploration, including over 30,000 meters of drilling, reveals six NW-trending ore shoots at Golden Chest that demonstrate strong periodicity, consistent width and spacing, along the Idaho Fault. Most historic production came from the northernmost of these shoots, the Katie-Dora and the Klondike. Current underground mining occurs within the Skookum Shoot. Excellent exploration potential remains in unmined portions of the northern shoots as well as in the unmined Paymaster and Joe Dandy shoots to the south. During 2022, a total of 6,353 meters of core drilling was completed with drilling at the Klondike, Paymaster, Skookum, Argus, Evans, Ida, and Badger areas. Highlights of the 2022 drilling included drillhole GC 22-212 which intersected 8.77 gpt gold over 9.2 meters in the Klondike area, and GC 22-223 which intersected 16.6 gpt gold over 1.23 meters in the Paymaster area. A majority of the drilling was intended to upgrade and further define mineral resources, however some grassroots exploration drilling also took place in the western portion of the property. A highlight of the grassroots exploration was the discovery of a shallow, broad, low-grade zone at the Argus prospect where AG 22-2 assayed 0.56 gpt gold over 24 meters. The Argus is located about 2.8 kilometers northwest of the active mining area at Golden Chest.

Present Condition of Plant & Equipment

The Golden Chest underground mine is accessed by primary decline ramp (MAR) with a complimentary escape-way incline ramp and ventilation raises. The MAR was originally developed in 2013 at nominal 4-meter by 4.5-meter cross-section. Additional development by IDR in the MAR has been completed recently. There are several metal buildings on the mine surface constructed from 2012 through 2021 including a core shed with offices, a mine shop, and associated mine dry and warehouse. The mine electrical service is a three-phase, 500 kVA installation supplied by Avista Utilities.

As of December 31, 2022, the Company had a capitalized development and investment cost of $5,810,490 associated with the Golden Chest.

Geology & Mineralization

Gold mineralization occurs in veins associated with multiple faulting and folding events in the Coeur d’Alene Mining District. The mineralization occurs as gold- quartz veins associated with an orogenic deposit type. The orogenic system at the Golden Chest appears to have an association with igneous rock activity. Hence, the vein deposits may be described as intrusion-related orogenic gold. The principal vein being exploited at the Golden Chest Mine is associated with the Idaho Fault, which juxtaposes the quartzites of the upper Prichard Formation against finer-grained argillites, also of the upper Prichard Formation.

Table of contents

Veins occur adjacent to the Idaho Fault both in its footwall, and in its hanging wall. The mineralization occurs in two types of quartz veins, banded and massive. These veins are generally conformable to bedding in the Proterozoic age Prichard Formation. The banded veins, which occur primarily in argillite, contain, pyrite, arsenopyrite, galena, sphalerite, and visible gold. Thicker, massive veins occur in quartzite and contain pyrite, galena, chalcopyrite, sphalerite, scheelite and visible gold.

The table below summarizes the Company’s Mineral Reserves for the past three years. Note that proven and probable reserves were not reported separately for 2021 and 2020.

Notes:

3. Mineral Reserves are 100% attributable to Idaho Strategic Resources

4. Mineral Reserves are estimated at a cutoff of 2 Au PPM (grams/tonne)

6. An average mining width of 3 m was used for the Reserves reporting.

8. Numbers may not add due to rounding.

The 2022 mineral reserve increased over the previous year due to increased core drilling below the previous year’s reserves and a spatial expansion of stopes in the reserve area which provided more muck sampling data which allowed more of the vein to be classified as mineral reserves.

Two cut-off grades are used for stope planning, the go/no-go cut-off and the in-stope cut-off. The go/no-go cut-off represents any material that has the potential to be mined but does not have to be mined as part of the operational plan. The go/no-go cut-off is used for initial stope planning as any given stope or sublevel does not have to be mined and should only be mined if it is economic. The go/no-go cut-off is equation is presented in Equation 1.

Equation 1 go/no-go cut-off

Equation 1 yields a value of 3.61 gpt for the cut-off and was rounded down to 3.6 gpt for a more natural break.

Table of contents

The in-stope cut-off is used when material in a defined stope must be mined to reach higher grades. In this scenario the mining cost is considered sunk and is omitted from Equation 1 as the cost was incurred regardless of the ore/waste determination at the face. Evaluating equation 1 omitting mining cost yields a value of 2.03 gpt which was rounded to 2.0 gpt.

The table below summarizes the Company’s mineral resources for the year ending December 31, 2022. Resources were not calculated by the Company for the prior two years. An historic resource report was completed by a third party in 2012, but it was not an SK-1300 compliant resource.

Notes:

5. Revenues produced at the Golden Chest are subject to a 2% NSR Royalty.

9. Numbers may not add due to rounding.

For more information, see Section 12-2 of Exhibit 96.1, the Technical Report Summary on the Golden Chest Mine, Idaho, prepared for the Company by the Qualified Persons under Section 1300 of SEC Regulation S-K (QP), Grant Brackebusch, P.E. and Robert J. Morgan, PG, PLS.

Permit Requirements

The Golden Chest Mine has all the required environmental permits to operate currently and into the foreseeable future. Some permits may require modification if operating conditions change, but typically these changes can be completed without impeding the mining operation. A summary of the permits held by the Company are found in the following table:

Table of contents

Permit Descriptions

Permit Description Reference

In 2022, MSHA did not issue any citations for Section 104 S&S violations associated with the Golden Chest Mine or New Jersey Mill. Reference is made to Exhibit 95 to this report.

Table of contents

Individual Properties–MATERIAL EXPLORATION PROPERTIES

DIAMOND CREEK

Overview & History

The Diamond Creek Project is a rare earth element (REE) Exploration Stage property located approximately 13 kilometers (8 miles) north-northwest of the town of Salmon, Idaho. Diamond Creek is operated by IDR and consists of 244 unpatented lode mining claims situated in the Eureka Mining District Lemhi County, Idaho in Township 23N, Range 21E, Sections 2, 3, 10, 11, 14, 15, 23,25, 26, 27,34,35; Township 22N, Range 21E, Sections 1 and 2 (Boise Meridian) and makes up approximately 4,554 acres.

The Diamond Creek Project is located in the central portion of the Idaho Rare Earth Element – Thorium (REE-Th) Belt. The Diamond Creek mineral claims are located on public lands managed by the United States Forest Service (“USFS”). The claims require an annual maintenance fee of $165 per claim per year which must be paid to the Bureau of Land Management (“BLM”) by September 1 of each year. The claims fees necessary to obtain and hold the mineral rights at Diamond Creek as well as the investments to explore the project are expensed each year that they are paid. Therefore, Diamond Creek does not show on the Company’s books and does not qualify as a Material Property for financial purposes, rather the Company considers Diamond Creek material to its business due to qualitative factors such as the potential for the company’s projects to be advanced toward future production on an unknown timeline, and the potential importance of rare earth elements in low-carbon technology, which could see increased demand in the future. To date, Idaho Strategic has not established any known mineral reserves or resources on the Diamond Creek property.

Idaho Strategic initially staked the mining claims comprising the Diamond Creek Project in April 2020 and added claims to the group in January 2023. The unpatented lode claims are wholly owned by IDR and there are no underlying royalties on the unpatented lode claims. The Lemhi Pass mineral claims are located on Bureau of Land Management (“BLM”) land and require an annual maintenance fee of $165 per claim per year which must be paid to the BLM by September 1 of each year.

The Diamond Creek Project was historically prospected for gold, until the 1950’s when U.S. government sponsored country-wide exploration for raw materials related to nuclear power resulted in the discovery the unique thorium and REE mineralization at Diamond Creek by the United States Geologic Survey (USGS) and the Idaho Geological Survey. Several other companies have undertaken minor rare earths exploration programs on the property including one stage of limited core drilling with some notable REE mineralization encountered. Diamond Creek is mentioned in numerous reports including a USGS report written in 1979 by M.H. Staatz.

Geology and Mineralization

The REE mineralization at Diamond Creek is found in two types: fracture filling and replacement veins/bodies. The replacement bodies are composed of bright and varied oxides. There are at least eight known veins, and they range in width from 0.15 m to 7.6 m in thickness. Vein widths appear best developed in the metasediments and can be traced on the surface for distances ranging from 33.5 m to 780 m. The known rare earth elements mineralization occurs along a 2-mile stretch of the Diamond Creek Fault. The Project consists of four distinct areas identified from north to south as: Contact, Lucky Gem, Simer, and Frank Burch.

Table of contents

Samples taken by the USGS show total REE oxide contents ranging from 0.59% to 5.5%. Work by the USGS in 1979 reported that three samples cut across one of the larger veins were assayed for gold and contained 0.5, 2.4 and 11.9 grams per tonne Au. Down-dip extensions of these mineralized veins have never been sufficiently tested.

Infrastructure and Facilities

The Diamond Creek Project currently does not contain any facilities on-site. The Project is easily accessible by road for approximately 8 months out of the year by nearly any vehicle and is accessible year-round by properly equipped vehicles. There are numerous well maintained forest service roads which provide access to all four distinct areas of the Project. There is power nearby to the Project including a powerline which runs along U.S. Highway 93 approximately 3 miles from Diamond Creek. Idaho Strategic utilizes a combined shop and office building located in the town of Salmon, Idaho to stage equipment, log and process drill core, house company employees, and conduct all other rare earth exploration activities relating to Diamond Creek.

Present Condition & Recent Activities

To date, Idaho Strategic has conducted surface sampling programs and geologic mapping throughout its ownership of the mineral claims from 2020 to present. On November 3, 2022, IDR completed its inaugural 12-hole Diamond Creek drill program which targeted REE mineralization on the northern portion of the Project known as the Contact and Lucky Gem areas. The positive results of the drill program were reported, and highlights from hole DC 22-8 drilled from the Lucky Gem area in the north-central portion of the Project, were reported to include 11.3 meters (m) of 1.3% total rare earth oxide (“TREO”) from 2.9 m to 14.2 m. The drill results included intervals of 1.1 m from 13.1 m to 14.2 m which returned grades of 2.2% TREO. Also discovered in hole DC 22-8 were significant concentrations of niobium. The Company reported 0.7% niobium over 10.1 m from 2.9 m to 13.0 m including the following higher-grade interval of 1.0% niobium over 0.5 m from 9.6 m to 10.1 m. Hole DC 22-8 drilled down dip through the shallow dipping replacement body where mineralization continued for 50.3 meters before the hole was lost.

In addition to the Company’s drill program, Idaho Strategic conducted surface sampling along a 32-meter trench that exposed REE mineralization at the surface during drill pad reclamation at the Lucky Gem drill pad located in the north-central portion of the Project. Vertical channel samples were taken every 1 meter for the first 20 meters of exposure, then every 2 meters for the last 12 meters. The exposed geology displayed evidence of dynamic fluid movement along shears and fracture zones forming both replacement and fracture-filling type deposits.

The results include 32 continuous meters averaging 1.28% TREO, including high values of 2.0% TREO at 8 m and 12 m. In addition to REEs, 12 m niobium mineralization that assayed greater than 0.5% Nb was located between 5 and 16 m.

As part of the Company’s ongoing participation in the Idaho Global Entrepreneurial Mission (“IGEM”) Program, Idaho Strategic was able to provide approximately sixty 5-gallon buckets of surface material from its Diamond Creek drill pad reclamation efforts to the University of Idaho for their continued studies regarding alternative, environmentally friendly REE extraction and separation methods.

The Company previously obtained all necessary permits to drill the Diamond Creek Project in 2022. After drilling, all reclamation was completed and the approved by the USFS. An additional drilling Plan of Operations (POO) has been submitted to the USFS for the 2023-2024 field year. The new POO will expand on the 2022 results at Lucky Gem and Contact areas as well as additional drilling targeting REE mineralization on the southern end of the Diamond Creek Project in the area known as Simer. There is no timeline for drill permit approval or projected timing of work. To date, there has not been a technical report, feasibility study, or resource estimate conducted by Idaho Strategic. The Company has provided a summary of exploration activities in order to provide an overview of Diamond Creek and why the Company views this project favorably. Idaho Strategic has excluded exploration results from this report which either did not return the targeted mineralization, did not aid in providing a brief overview of the Project, or for which the Company has not received the results back from lab testing.

Quality Control Procedures

The procedures taken to ensure quality and reliability of the Company’s samples and assays are as follows:

Representative surface outcrop samples collected over time, in the normal course of business and reported by the company, come from favorable geologic outcrops identified during surface reconnaissance and are mapped/recorded by on-site professional geologist. The samples are identified by a “one-of-a-kind” label and bagged for secure “chain-of-command” transport to a certified assay laboratory. Idaho Strategic geologists use the assay results to interpret geologic mapping, geophysics and geochemistry in order to make an informed decision for targeting purposes. The samples that Company geologists determined warranted further analysis were sent for assay to ALS Minerals. ALS Minerals utilized Ore Grade Rare Earth Element analysis (ME-MS81h).

Table of contents

Drill core samples at Diamond Creek were taken from the drill rig to a secure, Company-owned facility prior to logging by Company geologists. The core is then logged and samples for assay are obtained by sawing the core in half longitudinally while trying to ensure a representative sample is submitted to the laboratory for analysis. All the samples that have been publicly released were analyzed by ALS Minerals using Ore Grade Rare Earth Elements analysis (ME-MS81h) and reported niobium results were analyzed using Fusion XRF- NB Ore Grade (Nb-XRF10).

ROBERTS

Overview & History

The Roberts Project is a rare earth element (REE) Exploration Stage property located approximately 48 kilometers (30 miles) northwest of the town of Salmon, Idaho. Roberts is operated by IDR and consists of 109 unpatented lode mining claims situated in the Mineral Hill district in Sections 3,4,9,10,11,13,14,15,16,22,23,24, Township 24 North, Range 19 East and makes up approximately 2,051 acres. The Project is located in the northern portion of the Idaho Rare Earth Element – Thorium (REE-Th) Belt. The Roberts mineral claims are located on US Public Domain Land, which is managed by the United States Forest Service (“USFS”). The claims require an annual maintenance fee of $165 per claim per year which must be paid to the Bureau of Land Management (“BLM”) by September 1 of each year. The claims fees necessary to obtain and hold the mineral rights at Roberts as well as the investments to explore the project are expensed each year that they are paid. Therefore, Roberts does not show on the Company’s books and does not qualify as a material Property for financial purposes, rather the Company considers Roberts material to its business due to qualitative factors such as the potential for the company’s projects to be advanced toward future production on an unknown timeline, and the potential importance of rare earth elements in low-carbon technology, which could see increased demand in the future. To date, Idaho Strategic has not established any known reserves on the Roberts property.

Idaho Strategic initially staked the mining claims comprising the Roberts Project in early 2020. Throughout Idaho Strategic’s ownership of the Project, the Company has staked additional claims at its discretion based upon exploration conducted to date. The unpatented lode claims are wholly owned by IDR and there are no underlying royalties.

The Roberts Project and the Mineral Hill district was historically prospected for gold and copper in the early 1900’s. In the early 1950’s rare earth mineralization was discovered and documented by Abbott (1954) and Anderson (1958) from the Idaho Geological Survey and Kaiser (1956) with the US Geological Survey. Abbott (1954) reported cutting a 2.5-foot sample across the lode at the Robert Lode which returned 21.5% combined rare earth oxides and thoria.

Geology and Mineralization

The REE mineralization at the Roberts property is associated with a unique group of igneous rocks known as carbonatites. Carbonatites are carbonate rocks sourced from magmatic origins, with primary carbonate compositions exceeding 50%. The Roberts property contains two of the eight known carbonatite occurrences within the Mineral Hill District. The first carbonatite can be found in a northwest-trending seam which measures approximately 400 meters (1,300 feet) long and 90 meters (300 feet) wide; the second occurrence appears to be a smaller carbonatite plug, measuring about 200 meters in diameter.

Table of contents

Infrastructure and Facilities

The Roberts Project currently does not contain any facilities on-site. The Project is accessible by road for approximately 8 months out of the year via National Forest Road 036 (Indian Creek Road). Idaho Strategic utilizes a combined shop and office building located in the town of Salmon, Idaho, to stage equipment, log and process samples, house company employees, and conduct all other rare earth exploration activities relating to Roberts.

Present Condition & Recent Activities

From 2020 to present, Idaho Strategic has conducted surface sampling, geophysical surveys and geologic mapping is select areas of its mineral claims. The Roberts Project has two carbonatite prospects with REE mineralization, the “Upper Roberts” and the “Lower Roberts”, which are located about 500 meters apart. The Upper Roberts occurrence outcrops along a northwest strike for greater than 400 meters and demonstrates high-grade REE mineralization in a number of surface samples. One sample taken by Company geologists returned assays of combined rare earth elements in excess of 12%, including 1.67% neodymium. The company’s samples show critical REEs like neodymium, praseodymium, and samarium in abundance. Similarly, as with IDR’s Diamond Creek property, REE’s are not the only valuable commodities. Gold and niobium may also be in profitable concentration as by-products. Recent samples collected from the Roberts’ property, show assays with gold values up to 8.8 grams per ton and niobium as high as 0.50%. Exploration plans include further geologic mapping, sampling, and geophysical surveys in order to prepare the project for its inaugural drill program. The permitting process for a drill program at Roberts is underway and any future drilling activities will be subject to permit approval and funding.

Moving forward, Idaho Strategic plans to advance the Roberts Project by developing drill targets aimed at verifying the extent and grade of the two carbonatites that the Company’s geologists have identified and mapped from the surface. There is no timeline for drill permit approval or projected timing of work. To date, there has not been a technical report, feasibility study, or resource estimate conducted by Idaho Strategic. The Company has provided a summary of exploration activities in order to provide an overview of Roberts and why the Company views this project favorably. Idaho Strategic has excluded exploration results from this report which either did not return the targeted mineralization, did not aid in providing a brief overview of the Project, or for which the Company has not received the results back from lab testing.

Quality Control Procedures

The procedures taken to ensure quality and reliability of the Company’s samples and assays are as follows:

Representative surface outcrop samples collected over time, in the normal course of business and reported by the company, come from favorable geologic outcrops identified during surface reconnaissance and are mapped/recorded by on-site professional geologist. The samples are identified by a “one-of-a-kind” label and bagged for secure “chain-of-command” transport to a certified assay laboratory. Idaho Strategic geologists use the assay results to interpret geologic mapping, geophysics and geochemistry in order to make an informed decision for targeting purposes. The samples that Company geologists determined warranted further analysis were sent for assay to ALS Minerals. ALS Minerals utilized Ore Grade Rare Earth Element analysis (ME-MS81h).

Table of contents

LEMHI PASS

Overview & History

The Lemhi Pass Project is a rare earth element (REE) and thorium Exploration Stage property located approximately 41 kilometers (25 miles) southeast of the town of Salmon, Idaho and stretches into Montana. Lemhi Pass is operated by IDR and consists of 568 total unpatented lode mining claims situated in the McDevitt Mining District, Lemhi County, Idaho in Township 19N, Range 24E, Sections 1, 2, 11, 12, 13, 14, 24; Township 19N, Range 25E, Sections 4, 5, 6, 7, 8, 9, 10, 15, 21, 22 (Boise Meridian) and in the Bloody Dick Mining District, Beaverhead County, Montana in Township 10S, Range 15W, Sections 20, 21, 22, 27, 28, 29, 34, 35 and Township 11S, Range 15W, Sections 10, 11, 14, 15, PB 38. Additionally, IDR has a mineral lease for a 565-acre mineral lease with the State of Idaho for T19N, Range 25E, Section 16. The Project is located in the southern portion of the Idaho Rare Earth Element – Thorium (REE-Th) Belt and straddles the ID-MT border. The property package is mainly contiguous and makes up approximately 11,425 acres. Approximately 407 (7,820 acres) unpatented lode claims are situated in Idaho, while the remaining 161 (3,040 acres) unpatented lode claims are situated in Montana.

The claims fees and lease fees necessary to obtain and hold the mineral rights at Lemhi Pass as well as the investments to explore the project are expensed each year that they are paid. Therefore, Lemhi Pass does not show on the Company’s books and does not qualify as a material Property for financial purposes, rather the Company considers Lemhi Pass material to its business due to qualitative factors such as the potential for the company’s projects to be advanced toward future production on an unknown timeline, and the potential importance of rare earth elements and thorium in low-carbon technology, which could see increased demand in the future. To date, Idaho Strategic has not established any known reserves on the Lemhi Pass Project.

Idaho Strategic initially staked the mining claims comprising the Lemhi Pass Project in October 2021 and have added claims, based upon exploration, to the group in February 2022 and again in January 2023. The unpatented lode claims are wholly owned by IDR and there are no underlying royalties on the unpatented lode claims. The Lemhi Pass mineral claims are located on Bureau of Land Management (“BLM”) land and require an annual maintenance fee of $165 per claim per year which must be paid to the BLM by September 1 of each year. The State of Idaho mineral lease has a term of 20 years with an annual rent of $1,695, increased annually by 3%. The State of Idaho mineral lease has a minimum annual royalty of $1,000 years 1 through 5; $2,500 years 6 through 20.

The Lemhi Pass Project was historically prospected for gold and copper until 1949 when its unique geologic setting was recognized by the United States Geologic Survey (USGS) and the Idaho Geological Survey during the U.S. government sponsored country-wide exploration for raw materials related to nuclear power. These campaigns resulted in the discovery of thorium in several areas of Lemhi County, including the REE occurrences in the Lemhi Pass area. Several other companies have undertaken minor thorium-related exploration programs on the property, including historic reports of past thorium production. Lemhi Pass is mentioned in numerous reports including the 2009 USGS Circular 1336 titled “Thorium Deposits of the United States – Energy Resources for the Future?” which features parts of the Company’s Lemhi Pass Project on its cover page.

Table of contents

Geology and Mineralization

The Company initially staked the Lemhi Pass Project to target an area with the greatest concentration of known veins where the Lemhi Pass, Dan Patch, and Bull Moose faults intersect or approach one another. REE and thorium mineralization at Lemhi Pass is found in the REE mineral monazite. Monazite is a phosphate mineral and most of the Company’s strongest REE values are associated with phosphorus. The monazite at Lemhi Pass occurs as opaque, subhedral, yellow-green to reddish-brown crystals which are mostly microscopic in size, making it hard to detect with the naked eye. Samples taken by the USGS of 31 vein samples, showed total REE-oxide contents ranging from 0.073% to 2.20% Staatz (1972a). IDR sampling in 2022 showed total rare earths assays up to 4.26% validating company belief that the Lemhi Pass District is largely underexplored for REE’s; since their discovery in the district was ancillary, to the government’s search for nuclear related fuels in the 1950’s.

Infrastructure and Facilities

The Lemhi Pass Project currently does not contain any facilities on-site. Portions of the Lemhi Pass Project are accessible year-round by properly equipped vehicles. There are numerous well maintained forest service roads which provide further access to the Project; however, those roads are not well maintained during the winter months. There is power nearby to the Project including a regional powerline which runs across the Project. Idaho Strategic utilizes a combined shop and office building located in the town of Salmon, Idaho to stage equipment, log and process samples, house company employees, and conduct all other rare earth and thorium exploration activities relating to Lemhi Pass.

Present Condition & Recent Activities

To date, Idaho Strategic has conducted surface sampling programs and geologic mapping throughout its ownership of the mineral claims from 2021 to present. Select Idaho Strategic sample results have revealed rare earth grades ranging from 0.67% TREO to 4.26% TREO from areas of the project that had not been well tested for rare earth elements in the past.

Moving forward, Idaho Strategic will continue its surface exploration efforts in order to gather enough information to warrant a drill program. The land stewardship in the Lemhi Pass District has areas under both BLM, USFS and State jurisdiction. The Company in is the process of permitting trenching and drilling work on BLM lands in 2023 and on the USFS lands in 2024. To date, there has not been a technical report, feasibility study, or resource estimate conducted by Idaho Strategic. The Company has provided a summary of exploration activities in order to provide an overview of Lemhi Pass and why the Company views this project favorably. Idaho Strategic has excluded exploration results from this report which either did not return the targeted mineralization, did not aid in providing a brief overview of the Project, or for which the Company has not received the results back from lab testing.

Quality Control Procedures

The procedures taken to ensure quality and reliability of the Company’s samples and assays are as follows:

Representative surface outcrop samples collected over time, in the normal course of business and reported by the company, come from favorable geologic outcrops identified during surface reconnaissance and are mapped/recorded by on-site professional geologist. The samples are identified by a “one-of-a-kind” label and bagged for secure “chain-of-command” transport to a certified assay laboratory. Idaho Strategic geologists use the assay results to interpret geologic mapping, geophysics and geochemistry in order to make an informed decision for targeting purposes. The samples that Company geologists determined warranted further analysis were sent for assay to ALS Minerals. ALS Minerals utilized Ore Grade Rare Earth Element analysis (ME-MS81h).

Internal Controls

Exploration and development drilling programs are performed using industry standard quality control methods for drilling, logging, sampling, and analytical procedures. The laboratory used by IDR for sample preparation and analyses is: American Analytical Services, Inc. (AAS), 59148 Silver Valley Rd, Osburn, ID 83849. American Analytical is ISO 17025 Certified for Mineral and Ore Chemical Testing. Fire assaying is the only method used to quantify gold in core samples and muck samples. Occasionally Atomic Absorptions (AA) is use for multi-element analysis.

IDR’s QA/QC program has been in place since the GCLCC joint venture in 2011. The QA/QC program consists of inserting blanks and commercially certified standards into the sample stream. A blank or a standard is inserted into the sample sequence at least every 10 samples. All standards are commercially certified and have been prepared in advance by accredited labs. The QP’s reviewed the results of blank assay and only 2 of 241 samples returned an assay greater than the detection limit for fire assay, < 0.060 gpt gold.

For all the samples processed by AAS on behalf of GCLLC/IDR, the following methods were used to obtain a fire assay for gold. Samples received at the American Analytical are sorted and coded. They are then placed in the sample drying room and dried at 60°C. All drill samples are collected from the rig daily by Mine staff and transported to the locked and secure Mine Office/Core Shed building. Sample security has relied upon the fact that the samples were always attended or locked in appropriate sample storage areas. Samples remain within the custody of staff up to the moment the samples are delivered to the laboratory at which time AAS assumes custody. Chain of custody procedures include filling out sample submittal forms that are sent to the laboratory with sample shipments to make certain that all samples are received by the laboratory.

Table of contents

The sampling methods meet industry standard practices and are adequate for mineral resource and mineral reserve estimation and mine planning purposes. Sampling was conducted by appropriately qualified personnel under direct supervision of appropriately qualified geologists.Sample collection procedures used meet industry best practices. Sample preparation procedures meet industry best practices. QA/QC results produce acceptable results. Security procedures are consistent with industry standards. The databases are managed in a secure area using modern, commonly used software by trained staff. The staff are experienced in the nuances of narrow vein mining and treat the model with their experience in mind.

Drillhole logs are completed using Microsoft Excel and are only accessible by mine technical staff and timestamped at the last time of change. Geologic interpretation and solid modeling are accomplished using Leapfrog. Survey volumes, block modeling, and estimation of Mineral Reserves is accomplished using Maptek’s Vulcan. Data is stored at the mine site and backed up to a separate server stored at the corporate office quarterly.

ITEM 3. LEGAL PROCEEDINGS

None

ITEM 4. MINE SAFETY DISCLOSURES

The information concerning mine safety violations or other regulatory matters required by Section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act and Item 104 of Regulation S-K is included in exhibit 95 to this report.

Table of contents

PART II

ITEM 5. MARKET FOR COMMON EQUITY AND RELATED STOCKHOLDER MATTERS

Market Information

The Company's Common Stock currently trades on the American tier of the NYSE Market under the symbol "IDR".

As of March 1, 2023, there were approximately 1,200 shareholders of record of the Company's Common Stock.

Dividend Policy

The Company has not declared or paid cash dividends or made distributions in the past and the Company does not anticipate that it will pay cash dividends or make distributions in the foreseeable future. The Company currently intends to retain and reinvest future earnings, if any, to finance its operations.

Transfer Agent

The transfer agent for the Company's Common Stock is Nevada Agency Trust 50 West Liberty, Suite 880 Reno, Nevada 89501.

Securities Authorized for Issuance Under Equity Compensation Plans

In April 2014 the Board of Directors of the Company established a stock option plan to authorize the granting of stock options to officers and employees. Upon exercise of the options shares are issued from the available authorized shares of the Company.

No additional fees are paid for attendance at Board of Directors’ meetings, committee membership or committee chairmanship.

Equity Compensation Plan Information

(a) (b) (c)

Equity compensation plans approved by the board 535,953 $5.47 0

Equity compensation plans not approved by the board 0 0 0

Recent Sales of Unregistered Securities

Occasionally, the Company pays for goods and services with restricted common stock. Our policy is to determine the fair value of the goods or services, and then issue the number of corresponding shares using an agreed upon price for our common stock that considers the bid/offer price as quoted by the NYSE-American.

In the first quarter of 2022, 23,057 shares were issued in exchange for outstanding warrants for net proceeds of $68,006. In the second quarter of 2022, 70,919 shares were issued in exchange for outstanding warrants for net proceeds of $397,147. In the third quarter of 2022, 100,893 shares were issued in exchange for outstanding warrants for net proceeds of $565,005.

In the first quarter of 2022 the Company issued 3,572 shares of common stock at $9.05 per share for services provided for a total value of $32,326.

In 2022 the Company issued 392,866 shares of the Company’s Stock in exchange for $1,950,000 of convertible debt at $4.96 per share.

In 2022, the Company issued 67,355 shares of its common stock in exchange for 116,078 outstanding options in a cashless option exercise to non-management employees with a fair value at the time of exercise of $677,928.

The Company closed a private placement in October 2021. Under the private placement, the Company sold 471,436 units at $4.20 per unit for net proceeds of $1,980,000. Each unit consisted of one share of the Company’s stock and one half of one stock purchase warrant with each whole warrant exercisable for one share of the Company’s stock at $5.60 for 24 months. The Company closed a private placement in November 2021. Under the private placement, the Company sold 107,143 units at $5.60 per unit for net proceeds of $600,000. Each unit consisted of one share of the Company’s stock and one half of one stock purchase warrant with each whole warrant exercisable for one share of the Company’s stock at $7.00 for 24 months. The transactions were strictly limited to persons who met certain minimum financial (accredited investors) or sophistication requirements. In management’s opinion, the securities were issued pursuant to exemption from registration under Section 4(2) of the Securities Act of 1933, as amended.

Table of contents

In June of 2021, 291,667 shares of the Company’s stock were issued to holders of convertible debt at a rate of $2.52 per share in exchange for $735,000 in debt. In July of 2021, 39,682 shares of the Company’s stock were issued to holders of convertible debt at a rate of $2.52 per share in exchange for $100,000 in debt.

In the second quarter of 2021, 19,841 shares were issued in exchange for outstanding warrants for net proceeds of $50,000. In the third quarter of 2021, 26,786 shares were issued in exchange for outstanding warrants for net proceeds of $67,500.

In the first quarter of 2021, the Company issued 28,195 shares of its common stock in exchange for 44,643 outstanding options in a cashless option exercise to non-management employees. In the second quarter of 2021, the Company issued 3,572 shares of its common stock in exchange for 7,143 outstanding options in a cashless option exercise to non-management employees. In the fourth quarter of 2021, the Company issued 38,958 shares of its commons stock in exchange for 50,000 outstanding options in a cashless option exercise, of these 29,048 shares with a fair value at the time of exercise of $217,862 were issued to management and the remaining 9,910 shares with a fair value at the time of exercise of $63,428 were issued to other employees.

In the first quarter of 2021 the Company issued 715 shares of the Company’s common stock valued at $3.22 per share for services received of $2,300. In the second quarter of 2021 the Company issued 1,072 shares of the Company’s common stock valued at $3.92 per share for services received of $4,200. In the fourth quarter of 2021 the Company issued 2,749 shares of the Company’s common stock valued at $6.09 per share for services received of $16,748. In the fourth quarter of 2021 the Company issued 6,190 shares of the Company’s common stock valued at $7.50 per share for services received of $46,425.

In the third quarter of 2021 the Company issued 45,940 shares of the Company’s common stock for 22% of Buckskin Gold and Silver with a fair market value at the time of purchase of $192,946. In the fourth quarter of 2021 the Company issued 30,358 shares of the Company’s common stock for an additional 15% of Buckskin Gold and Silver with a fair market value at the time of purchase of $136,000.

ITEM 6. SELECTED FINANCIAL DATA

Not required for smaller reporting companies.

Table of contents

ITEM 7. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Plan of Operation

Idaho Strategic Resources, Inc. is a gold producer focused on diversifying and building its asset base and cash flows through a portfolio of mineral properties located in historic producing gold districts in Idaho and Montana.

The Company’s plan of operation is to generate positive cash flow, increase its gold production and asset base over time while being mindful of corporate overhead. The Company’s management is focused on utilizing its in-house technical and operating skills to build a portfolio of producing mines and milling operations with a focus on gold and exploration for Rare Earth elements (REE).

The Company’s properties include: the Golden Chest Mine (currently in production), and the New Jersey Mill (majority ownership interest). Recently, the Company added three rare earth element properties in Idaho to its portfolio of exploration properties in an effort to diversify its holdings towards the anticipated demand for these elements in the electrification of motorized vehicles.

Critical Accounting Estimates

The SEC has requested that all registrants address their most critical accounting policies. The SEC has indicated that a “critical accounting policy” is one which is both important to the representation of the registrant’s financial condition and results and requires management’s most difficult, subjective, or complex judgments, often as a result of the need to make estimates about the effect of matters that are inherently uncertain. We base our estimates on past experience and on various other assumptions our management believes to be reasonable under the circumstances, the results of which form the basis for making judgments about carrying values of assets and liabilities that are not readily apparent from other sources. Actual results will differ and may differ materially from these estimates under different assumptions or conditions. Additionally, changes in accounting estimates could occur in the future from period to period. Our management has discussed the development and selection of our most critical financial estimates with the Audit and Finance Committee of our Board of Directors. The following paragraphs identify our most critical accounting policies:

Our concentrate sales sometimes involve variable consideration, as they can be subject to changes in metals prices between the time of shipment and their final settlement. However, we are able to reasonably estimate the transaction price for the concentrate sales at the time of shipment using forward prices for the estimated month of settlement, and previously recorded sales and accounts receivable are adjusted to estimated settlement metals prices until final settlement for financial reporting purposes. The embedded derivative contained in our concentrate sales is adjusted to fair value through earnings each period prior to final settlement. It is unlikely a significant reversal of revenue for any one concentrate lot will occur. As such, we use the expected value method to price the concentrate until the final settlement date occurs, at which time the final transaction price is known. At December 31, 2022, metals that had been sold but not final settled included 5,361 ounces of gold of which 2,500 ounces were sold at a predetermined price with the remaining 2,861 ounces exposed to future price changes. The Company has received provisional payments on the sale of these ounces with the remaining amount due reflected in gold sales receivable.

The asset retirement obligation and asset on our balance sheet is based on an estimate of the future cost to recover and remediate our properties as required by our permits upon cessation of our operations and may differ when we cease operations. At December 31, 2022, we made an estimate that the cost of the machine and man hours probable to be needed to put our properties in the condition required by our permits once we cease operations would be $103,906 for the Golden Chest property and $203,600 for the New Jersey Mine and Mill. For purposes of the estimate, we evaluated the expected life in years and costs that, initially, are comparable to rates that we would incur at the present. We are adding to the liability each year, and amortizing the asset over the estimated life, which decreases our net income in total each year. We make periodic reviews of the remaining life of the mine and other operations, and the estimated remediation costs upon closure, and adjust our account balances accordingly. At this time, we think that an adjustment in our asset recovery obligation is not required, and an adjustment in future periods would not have a material impact in the year of adjustment but would change the amount of the annual accretion and amortization costs charged to our expenses by an undetermined amount.

Highlights for 2022 include:

Table of contents

Results of Operations

Our financial performance for the years ended December 31, 2022, and 2021 is summarized below:

Table of contents

Cash Costs and All In Sustaining Costs Reconciliation to GAAP

Reconciliation of cost of sales and other direct production costs and depreciation, depletion, and amortization (GAAP) to cash cost per ounce and all-in sustaining costs (AISC) per ounce (non-GAAP).

The table below presents reconciliations between the most comparable GAAP measure of cost of sales and other direct production costs and depreciation, depletion, and amortization to the non-GAAP measures of cash cost per ounce produced and all in sustaining costs per ounce produced for the Company’s gold production for the years ended December 31, 2022, and 2021. The cost per ounce calculations are based on ounces produced. Upon sale, the Company typically receives payment at an average rate of 87% of ounces produced after smelting and refining charges are deducted.

Cash cost per ounce is an important operating measure that we utilize to measure operating performance. AISC per ounce is an important measure that we utilize to assess net cash flow after costs for pre-development, exploration, reclamation, and sustaining capital. Current GAAP measures used in the mining industry, such as cost of goods sold do not capture all the expenditures incurred to discover, develop, and sustain gold production.

December 31,

Depreciation, depletion, and amortization (984,083 ) (814,422 )

Less stock-based compensation and other non-cash items (649,409 ) (1,153,466 )

All in sustaining cost (AISC) per ounce $ 1,777.14 $ 1,818.22

Financial Condition and Liquidity

For the Years Ended December 31,

Net change in cash and cash equivalents (338,487 ) (563,427 )

The Company has accumulated deficit of approximately $18.4 million at December 31, 2022 and incurred a consolidated net loss in 2022 of $2,631,092. The Company’s working capital at December 31, 2022 is $1,729,983. The Company is currently producing from the open-pit and underground at the Golden Chest. During 2022, production generated negative cash flow from operations of $1,817,090 compared to a negative cash flow used in operations of $1,351,027 in 2021. Planned production for the next 18 months indicates a positive cash flow from operations will be renewed as underground mining overtakes the open pit as the primary source of mineralized material. In prior years, the Company has been successful in raising required funds for ongoing operations from sale of its common stock or borrowing. Management believes it has the ability to meet its contractual obligations with continuing cash flows from operations, existing cash, and potential financings for the next 18 months.

ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

Not required for smaller reporting companies.

Table of contents

ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the shareholders and the board of directors of Idaho Strategic Resources, Inc.

Opinion on the Financial Statements

We have audited the accompanying consolidated balance sheets of Idaho Strategic Resources, Inc. (the "Company") as of December 31, 2022 and 2021, the related consolidated statements of operations, changes in stockholders’ equity and cash flows for each of the years then ended, and the related notes (collectively referred to as the "financial statements"). In our opinion, the financial statements present fairly, in all material respects, the financial position of the Company as ofDecember 31, 2022 and 2021, and the results of its operations and its cash flows for each of the years then ended, in conformity with accounting principles generally accepted in the United States of America.

Basis for Opinion

These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on the Company's financial statements based on our audits. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) ("PCAOB") and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement, whether due to error or fraud. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. As part of our audits we are required to obtain an understanding of internal control over financial reporting but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control over financial reporting. Accordingly, we express no such opinion.

Our audits included performing procedures to assess the risks of material misstatement of the financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the financial statements. We believe that our audits provide a reasonable basis for our opinion.

Critical Audit Matter

The critical audit matter communicated below is a matter arising from the current-period audit of the financial statements that was communicated or required to be communicated to the audit committee and that (1) relates to accounts or disclosures that are material to the financial statements and (2) involved our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the financial statements, taken as a whole, and we are not, by communicating the critical audit matter below, providing a separate opinion on the critical audit matter or on the accounts or disclosures to which it relates.

The Impact of Ore Reserves on Mineral Properties

As discussed in Note 2 to the consolidated financial statements, the Company’s ore reserves are estimated by management’s specialists based on the amount of metals that could be economically and legally extracted or produced at the time of the reserve determination. Management’s calculations of ore reserves are based on financial, engineering and geological estimates, including future metals prices and operating costs.

We identified the assessment of the impact of ore reserves as a critical audit matter. Costs of developing ore reserves are capitalized and amortized using the units-of-production method over estimated recoverable reserves. Reserves also serve as the basis for assessing the recoverability of the carrying value of Company’s mineral properties.

The reserve estimates are based on several significant assumptions that are developed internally by management’s specialists, including the amount of metals to be extracted, future operating costs, and estimated future capital expenditures. Auditing these elements involved especially challenging and subjective auditor judgment due to the nature and extent of audit effort required to address these matters.

Table of contents

The primary procedures we performed to address this critical audit matter included:

Assure CPA, LLC

We have served as the Company's independent auditor since 2003.

Spokane, Washington

March 31, 2023

Firm ID 444

Table of contents

Idaho Strategic Resources, Inc.

Table of Contents

Page

Notes to Financial Statements 50-62

Table of Contents

ASSETS

Current assets:

Mineral properties, net of accumulated amortization 6,527,561 5,843,186

LIABILITIES AND STOCKHOLDERS’ EQUITY

Current liabilities:

Notes payable related parties, current portion 12,226 10,543

Commitments and Contingencies - -

Stockholders’ equity:

The accompanying notes are an integral part of these consolidated financial statements.

Table of Contents

Cost of sales:

Other operating expenses:

Loss on write-off of equipment 68,641 -

Other (income) expense:

Gain on forgiveness of SBA loan (10,000 ) -

Equity income on investment in Buckskin (1,524 ) (3,782 )

Timber revenue - (4,338 )

Source: SEC EDGAR (public domain) · 10-K for the period ended 2022-12-31, filed 2023-03-31 · accession 0001654954-23-003968

Filing HTML rendered to line-structured narrative text by the shipped reducer (datafeeds.edgar_fulltext.visible_text, keep_table_headers=True): scripts and inline-XBRL headers are dropped, and table content is reduced to its short label cells — numeric table data is not rendered and is therefore not counted. The same rendering is used for every year, so a year-over-year comparison is like for like.

The text is our rendering of the filing, not a facsimile: original pagination, typography and tables are not reproduced, and the numbers live in the financial statements (FA).

The outline locates item HEADINGS in this document. Only Items 1A and 7 have certified boundaries elsewhere in the terminal (the redline and the narrative-overlap number); every span here runs from one heading found to the next heading found.

How the outline was chosen. It is the longest chain of item headings that runs forward through both the document and the standard item order: 20 headings are on that chain and 15 further heading-shaped lines are not — the table-of-contents echo of every item, cross-references and exhibit-list mentions. Each entry's length is measured from its heading to the next heading on the chain.