Skip to content
KStart free
AI InfrastructureDefenseQuantumAll studies →

ED US Equity

Consolidated Edison IncUtilities · Electric & Other Services Combined · CIK 1047862 · FY ends Dec 31
$106.35
-1.96 (-1.81%)
USD · as of 2026-08-21 · marketstack

ED · 10-K · period ended 2021-12-31

← all ED documents
filed 2022-02-17 · EDGAR original ↗

Our rendering of the filing — original pagination and typography are not reproduced, and tables are reduced to their short label cells (the figures live on FA). Nothing is summarized: every line below is the filing's own text.

blocks 1600 of 2,904592k characters rendered

ed-20211231

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, D.C. 20549

___________________________________________________

FORM 10-K

___________________________________________________

☒ Annual Report Pursuant To Section 13 or 15(d) of the Securities Exchange Act of 1934

FOR THE FISCAL YEAR ENDED DECEMBER 31, 2021

OR

☐ Transition Report Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934

For the transition period from to

___________________________________________________

Commission File Number 1-14514

Consolidated Edison, Inc.

Exact name of registrant as specified in its charter

and principal office address and telephone number

State of Incorporation I.R.S. EmployerID. Number

4 Irving Place,

___________________________________________________

Commission File Number 1-1217

Consolidated Edison Company of New York, Inc.

Exact name of registrant as specified in its charter

and principal office address and telephone number

State of Incorporation I.R.S. EmployerID. Number

4 Irving Place,

___________________________________________________

CON EDISON ANNUAL REPORT 2021 1

Securities Registered Pursuant to Section 12(b) of the Act:

Title of each class Trading Symbol Name of each exchangeon which registered

Consolidated Edison, Inc., ED New York Stock Exchange

Common Shares ($.10 par value)

Securities Registered Pursuant to Section 12(g) of the Act: None

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.

Consolidated Edison, Inc. (Con Edison) Yes ̈ No x

Consolidated Edison Company of New York, Inc. (CECONY) Yes x No ̈

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.

Con Edison Yes ̈ No x

CECONY Yes ̈ No x

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Con Edison Yes x No ̈

CECONY Yes x No ̈

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).

Con Edison Yes x No ̈

CECONY Yes x No ̈

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer”, “accelerated filer,” “smaller reporting company,” and "emerging growth company" in Rule 12b-2 of the Exchange Act.

Con Edison

Large accelerated filer x Accelerated filer ̈

Non-accelerated filer ̈ Smaller reporting company ☐

Emerging growth company ☐

CECONY

Large accelerated filer ̈ Accelerated filer ̈

Non-accelerated filer x Smaller reporting company ☐

Emerging growth company ☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ̈

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. ☒

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act).

Con Edison Yes ☐ No x

CECONY Yes ☐ No x

The aggregate market value of the common equity of Con Edison held by non-affiliates of Con Edison, as of June 30, 2021, was approximately $25.3 billion.

2 CON EDISON ANNUAL REPORT 2021

As of January 31, 2022, Con Edison had outstanding 354,090,402 Common Shares ($.10 par value).

All of the outstanding common equity of CECONY is held by Con Edison.

Documents Incorporated By Reference

Portions of Con Edison’s definitive proxy statement for its Annual Meeting of Stockholders to be held on May 16, 2022, to be filed with the Commission pursuant to Regulation 14A, not later than 120 days after December 31, 2021, is incorporated in Part III of this report.

Filing Format

This Annual Report on Form 10-K is a combined report being filed separately by two different registrants: Consolidated Edison, Inc. (Con Edison) and Consolidated Edison Company of New York, Inc. (CECONY). CECONY is a wholly-owned subsidiary of Con Edison and, as such, the information in this report about CECONY also applies to Con Edison. CECONY meets the conditions set forth in General Instruction (I)(1)(a) and (b) of Form 10-K and is therefore filing this Form 10-K with the reduced disclosure format.

As used in this report, the term the “Companies” refers to Con Edison and CECONY. However, CECONY makes no representation as to the information contained in this report relating to Con Edison or the subsidiaries of Con Edison other than itself.

CON EDISON ANNUAL REPORT 2021 3

Glossary of Terms

The following is a glossary of abbreviations or acronyms that are used in the Companies’ SEC reports:

Con Edison Companies

Con Edison Consolidated Edison, Inc.

CECONY Consolidated Edison Company of New York, Inc.

CET Electric Consolidated Edison Transmission, LLC

CET Gas Con Edison Gas Pipeline and Storage, LLC

O&R Orange and Rockland Utilities, Inc.

RECO Rockland Electric Company

The Companies Con Edison and CECONY

The Utilities CECONY and O&R

Regulatory Agencies, Government Agencies and Other Organizations

EPA U.S. Environmental Protection Agency

FASB Financial Accounting Standards Board

FERC Federal Energy Regulatory Commission

IASB International Accounting Standards Board

IRS Internal Revenue Service

NJBPU New Jersey Board of Public Utilities

NJDEP New Jersey Department of Environmental Protection

NYISO New York Independent System Operator

NYPA New York Power Authority

NYSDEC New York State Department of Environmental Conservation

NYSDPS New York State Department of Public Service

NYSERDA New York State Energy Research and Development Authority

NYSPSC New York State Public Service Commission

NYSRC New York State Reliability Council, LLC

PJM PJM Interconnection LLC

SEC U.S. Securities and Exchange Commission

Accounting

AFUDC Allowance for funds used during construction

ASU Accounting Standards Update

GAAP Generally Accepted Accounting Principles in the United States of America

HLBV Hypothetical Liquidation at Book Value

NOL Net Operating Loss

OCI Other Comprehensive Income

VIE Variable Interest Entity

4 CON EDISON ANNUAL REPORT 2021

Environmental

CO2 Carbon dioxide

GHG Greenhouse gases

MGP Sites Manufactured gas plant sites

PCBs Polychlorinated biphenyls

PRP Potentially responsible party

RGGI Regional Greenhouse Gas Initiative

Units of Measure

AC Alternating current

Bcf Billion cubic feet

Dt Dekatherms

kV Kilovolt

kWh Kilowatt-hour

MDt Thousand dekatherms

Mlb Thousands of pounds

MMlb Million pounds

MVA Megavolt ampere

MW Megawatt or thousand kilowatts

MWh Megawatt hour

Other

AMI Advanced Metering Infrastructure

CLCPA Climate Leadership and Community Protection Act

COSO Committee of Sponsoring Organizations of the Treadway Commission

COVID-19 Coronavirus Disease 2019

DER Distributed energy resources

Fitch Fitch Ratings

LTIP Long Term Incentive Plan

Moody’s Moody’s Investors Service

REV Reforming the Energy Vision

S&P S&P Global Ratings

TCJA The federal Tax Cuts and Jobs Act of 2017, as enacted on December 22, 2017

VaR Value-at-Risk

CON EDISON ANNUAL REPORT 2021 5

TABLE OF CONTENTS

PAGE

Introduction 7

Available Information 10

Forward-Looking Statements 10

Non-GAAP Financial Measures 10

Part I

Item 1: Business 15

Item 1A: Risk Factors 44

Item 1B: Unresolved Staff Comments 47

Item 2: Properties 48

Item 3: Legal Proceedings 48

Item 4: Mine Safety Disclosures 48

Information about our Executive Officers 49

Part II

Item 6: [Reserved] 51

Item 7A: Quantitative and Qualitative Disclosures about Market Risk 95

Item 8: Financial Statements and Supplementary Data 96

Item 9A: Controls and Procedures 196

Item 9B: Other Information 196

Item 9C: Disclosure Regarding Foreign Jurisdictions that Prevent Inspections 196

Part III

Item 10: Directors, Executive Officers and Corporate Governance 197

Item 11: Executive Compensation 197

Item 14: Principal Accounting Fees and Services 197

Part IV

Item 15: Exhibits and Financial Statement Schedules 199

6 CON EDISON ANNUAL REPORT 2021

Introduction

This introduction contains certain information about Con Edison and its subsidiaries, including CECONY. This introduction is not a summary and should be read together with, and is qualified in its entirety by reference to, the more detailed information appearing elsewhere or incorporated by reference in this report.

Con Edison’s mission is to provide energy services to our customers safely, reliably, efficiently and in keeping with our vision for a clean energy future; to provide a workplace that embraces diversity and inclusion and allows employees to realize their full potential; to provide a fair return to our investors; and to improve the quality of life in the communities we serve. The company has ongoing programs designed to support each component of its mission, including initiatives focused on safety, operational excellence and the customer experience.

Con Edison is a holding company that owns:

•Consolidated Edison Company of New York, Inc. (CECONY), which provides electric service and gas service in New York City and Westchester County and steam service in parts of Manhattan;

•Orange & Rockland Utilities, Inc., which along with its utility subsidiary, Rockland Electric Company (together referred to herein as O&R), provides electric service in southeastern NY and northern NJ and gas service in southeastern NY (O&R, together with CECONY referred to as the Utilities);

•Con Edison Clean Energy Businesses, Inc., which through its subsidiaries, develops, owns and operates renewable and sustainable energy infrastructure projects and provides energy-related products and services to wholesale and retail customers (Con Edison Clean Energy Businesses, Inc., together with its subsidiaries referred to as the Clean Energy Businesses); and

•Con Edison Transmission, Inc., which through its subsidiaries, invests in electric transmission projects supporting Con Edison’s effort to transition to clean, renewable energy and manages, through joint ventures, both electric and gas assets while seeking to develop electric transmission projects (Con Edison Transmission, Inc., together with its subsidiaries referred to as Con Edison Transmission).

Con Edison anticipates that the Utilities, which are subject to extensive regulation, will continue to provide substantially all of its earnings over the next few years. The Utilities have approved rate plans that are generally designed to cover each company’s cost of service, including capital and other costs of each company’s energy delivery systems. The Utilities recover from their full-service customers (who purchase energy from them), generally on a current basis, the cost the Utilities pay for energy and charge all of their customers the cost of delivery service. See "Utility Regulation" in Item 1, "Risk Factors" in Item 1A and "Rate Plans" in Note B to the financial statements in Item 8.

Significant Developments and Outlook

•Con Edison reported 2021 net income of $1,346 million or $3.86 a share compared with $1,101 million or $3.29 a share in 2020. Adjusted earnings were $1,528 million or $4.39 a share in 2021 compared with $1,399 million or $4.18 a share in 2020. See “Results of Operations” in Item 7 and “Non-GAAP Financial Measures” below.

•In 2021, the Utilities invested $3,635 million to upgrade and reinforce their energy delivery systems, the Clean Energy Businesses invested $298 million in renewable electric projects and Con Edison Transmission invested $31 million primarily in the electric transmission business. For 2022, 2023 and 2024 the Utilities expect to invest $4,134 million, $5,015 million and $5,203 million, respectively, for their energy delivery systems, the Clean Energy Businesses expect to invest $400 million, $400 million and $400 million, respectively, in renewable electric projects and Con Edison Transmission expects to invest $73 million, $42 million and $10 million, respectively, primarily in the electric transmission business. See "Capital Requirements and Resources - Capital Requirements" in Item 1.

•Con Edison is considering strategic alternatives with respect to the Clean Energy Businesses, which through its subsidiaries, develops, owns and operates renewable and sustainable energy infrastructure projects and provides energy-related products and services to wholesale and retail customers. See "Clean Energy Businesses" in Item 1.

•Con Edison plans to meet its capital requirements for 2022 through 2024, through internally-generated funds and the issuance of long-term debt and common equity. See “Capital Requirements and Resources - Capital Requirements” in Item 1. The company's plans include the issuance of between $800 million and $1,400 million of long-term debt, primarily at the Utilities, in 2022 and approximately $2,500 million in aggregate of long-term debt, including for maturing securities, primarily at the Utilities, during 2023 and 2024. The planned debt

CON EDISON ANNUAL REPORT 2021 7

issuance is in addition to the issuance of long-term debt secured by the Clean Energy Businesses’ renewable electric projects. The company's plans also include the issuance of up to $850 million of common equity in 2022 and approximately $750 million in aggregate of common equity during 2023 and 2024, in addition to common equity under its dividend reinvestment, employee stock purchase and long-term incentive plans. Con Edison’s financing plans do not include the impact, if any, that may result from its evaluation of strategic alternatives with respect to the Clean Energy Businesses. See "Clean Energy Businesses" in Item 1.

•CECONY forecasts average annual growth in peak demand in its service area at design conditions over the next five years for electricity, gas and steam to be approximately 0.4 percent, 1.3 percent and 0.1 percent, respectively. O&R forecasts an average annual decrease in electric peak demand in its service area at design conditions over the next five years to be approximately 0.3 percent and average annual growth in gas peak demand in its service area over the next five years at design conditions to be approximately 0.1 percent. See “The Utilities” in Item 1.

•In July 2021, the NYSPSC approved a settlement agreement among CECONY, O&R and the New York State Department of Public Service (NYSDPS) that fully resolves all issues and allegations that have been raised or could have been raised by the NYSPSC against CECONY and O&R with respect to: (1) the July 2018 rupture of a CECONY steam main located on Fifth Avenue and 21st Street in Manhattan; (2) the July 2019 electric service interruptions to approximately 72,000 CECONY customers on the west side of Manhattan and to approximately 30,000 CECONY customers primarily in the Flatbush area of Brooklyn; (3) the August 2020 electric service interruptions to approximately 330,000 CECONY customers and approximately 200,000 O&R customers following Tropical Storm Isaias; and (4) the August 2020 electric service interruptions to approximately 190,000 customers resulting from faults at CECONY’s Rainey substation following Tropical Storm Isaias. See "Other Regulatory Matters" in Note B to the financial statements in Item 8.

•In October 2021, O&R, the NYSDPS and other parties entered into a joint proposal for new electric and gas rate plans for the three-year period January 2022 through December 2024. The joint proposal is subject to NYSPSC approval and provides for electric rate increases of $4.9 million, $16.2 million and $23.1 million, effective January 1, 2022, 2023, and 2024, respectively. The joint proposal provides for gas rate increases of $0.7 million, $7.4 million and $9.9 million, effective January 1, 2022, 2023, and 2024, respectively. The joint proposal includes certain COVID-19 provisions, such as: recovery of 2020 late payment charges over three years ($2.8 million); reconciliation of late payment charges to amounts reflected in rates for years 2021 through 2024; and reconciliation of write-offs of customer accounts receivable balances to amounts reflected in rates from January 1, 2020 through December 31, 2024. See "Rate Plans" in Note B to the financial statements in Item 8.

•In November 2021, the NYSPSC issued an order establishing a surcharge recovery mechanism for CECONY to collect $43 million and $7 million for electric and gas, respectively, of late payment charges and fees that were not billed for the year ended December 31, 2020. The company recorded such amounts as revenue for the year ended December 31, 2021, as permitted under the accounting rules for regulated utilities, and also accrued such amounts as a current asset at December 31, 2021. Pursuant to the November 2021 order, the company also established a recovery mechanism for CECONY to collect $19 million and $4 million for electric and gas, respectively, of late payment charges and fees that were not billed for the year ended December 31, 2021 and the company recorded such amounts as revenue for the year ended December 31, 2021, as permitted under the accounting rules for regulated utilities, and also accrued such amounts as a current asset at December 31, 2021. In addition, pursuant to the November 2021 order CECONY established a reserve of $7 million toward addressing customer arrearages for the year ended December 31, 2021. The order also established a surcharge recovery or surcredit mechanism for any fee deferrals for 2022. CECONY resumed late payment charges for commercial and residential customers who have not experienced a change in financial circumstances due to the COVID-19 pandemic on September 3, 2021 and October 1, 2021, respectively. O&R resumed late payment charges for commercial and residential customers who have not experienced a change in financial circumstances due to the COVID-19 pandemic on October 1, 2021. See "COVID-19 Regulatory Matters" in Note B to the financial statements in Item 8.

•Pursuant to their current electric and gas rate plans, CECONY and O&R recorded $92 million and $2 million of earnings for the year ended December 31, 2021, respectively, of earnings adjustment mechanisms and positive incentives, primarily reflecting the achievement of certain energy efficiency measures, as compared with $50 million and $3 million for CECONY and O&R, respectively, for the year ended December 31, 2020. See "Rate Plans" in Note B to the financial statements in Item 8.

8 CON EDISON ANNUAL REPORT 2021

•The NYSPSC continued its focused operations audit of the Utilities related to income tax accounting. The audit is investigating the Utilities’ inadvertent understatement of a portion, the amount of which may be material, of their calculation of total federal income tax expense for ratemaking purposes. The understatement was related to the calculation of plant retirement-related cost of removal. See "Other Regulatory Matters" in Note B to the financial statements in Item 8.

•In January 2022, CECONY filed a request with the NYSPSC for electric and gas rate increases of $1,199 million and $503 million, respectively, effective January 2023. See "Rate Plans" in Note B to the financial statements in Item 8.

•The Clean Energy Businesses installed 446 MW AC of new renewable energy projects in 2021, resulting in a year-end total installed capacity of 3,061 MW AC, bringing the annual renewable energy production for 2021 to more than 7.5 terawatt hours. See "Clean Energy Businesses" in Item 1.

•During 2021, a subsidiary of Con Edison Gas Pipeline and Storage, LLC (CET Gas) completed the sale of its 50 percent interest in Stagecoach Gas Services LLC for $629 million and recorded a pre-tax impairment loss on its 50 percent interest of $212 million ($147 million after-tax). See “Con Edison Transmission,” in Item 1 and “Investments” in Note A and Note W to the financial statements in Item 8.

•CET Gas recorded a pre-tax impairment loss of $231 million ($162 million after-tax) for the year ended December 31, 2021 that reduced the carrying value of its investment in Mountain Valley Pipeline LLC (MVP), a joint venture developing a proposed 300-mile gas transmission project in West Virginia and Virginia, from $342 million to $111 million. A goodwill impairment loss of $7 million was recorded related to CET Gas’ and CECONY’s investment in Honeoye Storage Corporation for the year ended December 31, 2021, of which $5 million was attributed to CET Gas. See “Investments” in Note A and Note K to the financial statements in Item 8.

CON EDISON ANNUAL REPORT 2021 9

Available Information

Con Edison and CECONY file annual, quarterly and current reports and other information, and Con Edison files proxy statements, with the Securities and Exchange Commission (SEC). The SEC maintains an Internet site at www.sec.gov that contains reports, proxy statements, and other information regarding issuers (including Con Edison and CECONY) that file electronically with the SEC.

This information the Companies file with the SEC is also available free of charge on or through the investor information section of their websites as soon as reasonably practicable after the reports are electronically filed with, or furnished to, the SEC. Con Edison’s internet website is at: www.conedison.com; and CECONY’s is at: www.coned.com.

The "About Us - Corporate Governance" section of Con Edison’s website includes the company’s Standards of Business Conduct (its code of ethics) and amendments or waivers of the standards for executive officers or directors, corporate governance guidelines and the charters of the following committees of the company’s Board of Directors: Audit Committee, Corporate Governance and Nominating Committee, Management Development and Compensation Committee, and Safety, Environment, Operations, and Sustainability Committee. This information is available in print to any shareholder who requests it. Requests should be directed to: Corporate Secretary, Consolidated Edison, Inc., 4 Irving Place, New York, NY 10003.

The "About Us - Sustainability Report” section of Con Edison’s website includes “Our Sustainable Future,” the company’s 2019 sustainability report.

Information on the Companies’ websites is not incorporated herein.

Forward-Looking Statements

This report contains forward-looking statements that are intended to qualify for the safe-harbor provisions of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Forward-looking statements are statements of future expectation and not facts. Words such as "forecasts," "expects," "estimates," "anticipates," "intends," "believes," "plans," "will," "target," "guidance," "potential," "consider" and similar expressions identify forward-looking statements. The forward-looking statements reflect information available and assumptions at the time the statements are made, and accordingly speak only as of that time. Actual results or developments might differ materially from those included in the forward-looking statements because of various factors including, but not limited to, those discussed under “Risk Factors,” in Item 1A.

Non-GAAP Financial Measures

Adjusted earnings and adjusted earnings per share are financial measures that are not determined in accordance with generally accepted accounting principles in the United States of America (GAAP). These non-GAAP financial measures should not be considered as an alternative to net income for common stock or net income per share, respectively, each of which is an indicator of financial performance determined in accordance with GAAP. Adjusted earnings and adjusted earnings per share exclude from net income and net income per share, respectively, certain other items that the company does not consider indicative of its ongoing financial performance. Management uses these non-GAAP financial measures to facilitate the analysis of the company's financial performance as compared to its internal budgets and previous financial results and to communicate to investors and others the company’s expectations regarding its future earnings and dividends on its common stock. Management believes that these non-GAAP financial measures are also useful and meaningful to investors to facilitate their analysis of the company's financial performance. The following table is a reconciliation of Con Edison’s reported net income for common stock to adjusted earnings and reported earnings per share to adjusted earnings per share.

10 CON EDISON ANNUAL REPORT 2021

(Millions of Dollars, except per share amounts) 2019 2020 2021

Reported net income for common stock – GAAP basis $1,343 $1,101 $1,346

Income taxes (b) — (97) (69)

Loss from sale of a renewable electric project (pre-tax) — — 4

Income taxes (b) — — (1)

Loss from sale of a renewable electric project (net of tax) — — 3

Income taxes (b) — — (65)

Income taxes — — —

HLBV effects (pre-tax) (e) 98 44 (142)

HLBV effects (net of tax) (e) 74 32 (98)

Net mark-to-market effects (pre-tax) 27 57 (53)

Income taxes (g) (6) (14) 16

Net mark-to-market effects (net of tax) 21 43 (37)

Reported earnings per share – GAAP basis (basic) $4.09 $3.29 $3.86

Income taxes (b) — (0.29) (0.19)

Loss from sale of a renewable electric project (pre-tax) — — 0.01

Income taxes (b) — — —

Loss from sale of a renewable electric project (net of tax) — — 0.01

Income taxes (b) — — (0.19)

Income taxes — — —

HLBV effects (net of tax) (e) 0.22 0.10 (0.29)

Net mark-to-market effects (pre-tax) 0.10 0.18 (0.15)

Adjusted earnings per share (Non-GAAP) $4.38 $4.18 $4.39

(a)Losses recognized with respect to the partial impairments of CET Gas' investment in Mountain Valley Pipeline, LLC. See "Investments - 2020 and 2021 Partial Impairments of Investment in Mountain Valley Pipeline, LLC (MVP)" in Note A to the financial statements in Item 8.

(b)The amount of income taxes was calculated using a combined federal and state income tax rate between 26-30% for the year ended December 31, 2021 and a combined federal and state income tax rate of 30% for the year ended December 31, 2020.

(c)Loss recognized with respect to the partial impairment of CET Gas’ investment in Stagecoach Gas Services LLC. See "Investments - Partial Impairment of Investment in Stagecoach Gas Services" in Note A and Note W.

(d)Loss recognized with respect to the goodwill impairment of CET Gas’ investment in Honeoye Storage Corporation. See Note K.

(e)Income attributable to the non-controlling interest of a tax-equity investor in renewable electric projects accounted for under the hypothetical liquidation at book value (HLBV) method of accounting. See Note S to the financial statements in Item 8.

(f)The amount of income taxes was calculated using a combined federal and state income tax rate of 31%, 27%, and 24% for the year ended December 31, 2021, 2020 and 2019, respectively. Adjusted earnings and adjusted earnings per share for 2021 exclude the tax impact on the parent company of HLBV accounting ($9 million and $0.02 for the year ended December 31, 2021) of the Clean Energy Businesses. Adjusted earnings and adjusted earnings per share for 2020 and 2019 do not exclude the tax impact on the parent company of HLBV accounting (($3) million and ($0.01) and ($6) million and ($0.02) for the year ended December 31, 2020 and 2019, respectively) of the Clean Energy Businesses.

(g)The amount of income taxes was calculated using a combined federal and state income tax rate of 32%, 25% and 22% for the year ended December 31, 2021, 2020 and 2019, respectively. Adjusted earnings and adjusted earnings per share for 2021 exclude the tax impact on

CON EDISON ANNUAL REPORT 2021 11

the parent company of the mark-to-market effects ($3 million and $0.01 for the year ended December 31, 2021) of the Clean Energy Businesses. Adjusted earnings and adjusted earnings per share for 2020 and 2019 do not exclude the tax impact on the parent company of the mark-to-market effects (($4) million and ($0.01) and ($2) million and $0.00 for the year ended December 31, 2020 and 2019, respectively) of the Clean Energy Businesses.

12 CON EDISON ANNUAL REPORT 2021

Item 1: Business

Contents of Item 1 Page

Overview 15

Electric 15

Electric 16

Clean Energy Businesses 16

Con Edison Transmission 16

Utility Regulation 16

State Utility Regulation 16

Regulators 16

New York Utility Industry 17

Rate Plans 17

Liability for Service Interruptions 18

Generic Proceedings 18

Federal Utility Regulation 19

New York Independent System Operator (NYISO) 19

Competition 19

The Utilities 20

Electric Operations 20

Electric Facilities 20

Electric Sales and Deliveries 21

Electric Peak Demand 21

Electric Supply 22

Gas Operations 22

Gas Facilities 22

Gas Sales and Deliveries 23

Gas Peak Demand 23

Gas Supply 24

Steam Operations 24

Steam Facilities 24

Steam Sales and Deliveries 24

Steam Peak Demand and Capacity 24

Steam Supply 25

Electric Operations 25

Electric Facilities 25

Electric Sales and Deliveries 25

Electric Peak Demand 26

Electric Supply 26

Gas Operations 26

Gas Facilities 26

Gas Sales and Deliveries 26

Gas Peak Demand 27

Gas Supply 27

CON EDISON ANNUAL REPORT 2021 13

Contents of Item 1 Page

Clean Energy Businesses 28

Renewable Electric Generation 29

Energy-Related Products and Services 30

Con Edison Transmission 30

CET Electric 30

Capital Requirements and Resources 31

Environmental Matters 35

Clean Energy Future 35

Climate Change 37

Environmental Sustainability 38

Other Federal, State and Local Environmental Provisions 42

State Anti-Takeover Law 43

Human Capital 43

Incorporation By Reference

Information in any item of this report as to which reference is made in this Item 1 is hereby incorporated by reference in this Item 1. The use of terms such as “see” or “refer to” shall be deemed to incorporate into Item 1 at the place such term is used the information to which such reference is made.

14 CON EDISON ANNUAL REPORT 2021

PART I

Item 1: Business

Overview

Consolidated Edison, Inc. (Con Edison), incorporated in New York State in 1997, is a holding company that owns all of the outstanding common stock of Consolidated Edison Company of New York, Inc. (CECONY), Orange and Rockland Utilities, Inc. (O&R), Con Edison Clean Energy Businesses, Inc. and Con Edison Transmission, Inc. As used in this report, the term the “Companies” refers to Con Edison and CECONY.

Con Edison

CECONY O&R Clean Energy Businesses Con Edison Transmission

•RECO •CET Electric•CET Gas

Con Edison’s principal business operations are those of CECONY, O&R, the Clean Energy Businesses and Con Edison Transmission. CECONY’s principal business operations are its regulated electric, gas and steam delivery businesses. O&R’s principal business operations are its regulated electric and gas delivery businesses. The Clean Energy Businesses develop, own and operate renewable and sustainable energy infrastructure projects and provide energy-related products and services to wholesale and retail customers. Con Edison is considering strategic alternatives with respect to the Clean Energy Businesses. Con Edison Transmission invests in electric transmission projects and manages both electric and gas assets while seeking to develop electric transmission projects. During 2021, Con Edison Transmission completed the sale of its 50 percent interest in Stagecoach Gas Services LLC (Stagecoach). For the year ended December 31, 2021, Con Edison Transmission recorded pre-tax impairment losses on its investments in Stagecoach, Mountain Valley Pipeline, LLC and Honeoye Storage Corporation. See "Investments" in Note A, Note K and Note W to the financial statements in Item 8.

Con Edison seeks to provide shareholder value through continued dividend growth, supported by earnings growth in regulated utilities and contracted electric and gas assets. The company invests to provide reliable, resilient, safe and clean energy critical for its NY customers. The company is an industry leading owner and operator of contracted, large-scale solar generation in the United States. Con Edison is a responsible neighbor, helping the communities it serves become more sustainable.

CECONY

Electric

CECONY provides electric service to approximately 3.5 million customers in all of New York City (except a part of Queens) and most of Westchester County, an approximately 660 square mile service area with a population of more than nine million.

Gas

CECONY delivers gas to approximately 1.1 million customers in Manhattan, the Bronx, parts of Queens and most of Westchester County.

Steam

CECONY operates the largest steam distribution system in the United States by producing and delivering approximately 16,884 MMlb of steam annually to approximately 1,555 customers in parts of Manhattan.

CON EDISON ANNUAL REPORT 2021 15

O&R

Electric

O&R and its utility subsidiary, Rockland Electric Company (RECO) (together referred to herein as O&R) provide electric service to approximately 0.3 million customers in southeastern NY and northern NJ, an approximately 1,300 square mile service area.

Gas

O&R delivers gas to over 0.1 million customers in southeastern NY.

Clean Energy Businesses

Con Edison Clean Energy Businesses, Inc., together with its subsidiaries, are referred to in this report as the Clean Energy Businesses. The Clean Energy Businesses develop, own and operate renewable and sustainable energy infrastructure projects and provide energy-related products and services to wholesale and retail customers. The Clean Energy Businesses have approximately 3,000 megawatts (AC) of renewable energy projects in the U.S. Con Edison is considering strategic alternatives with respect to the Clean Energy Businesses.

Con Edison Transmission

Con Edison Transmission, Inc. invests in electric transmission projects and manages both electric and gas assets through its wholly-owned subsidiaries, Consolidated Edison Transmission, LLC (CET Electric) and Con Edison Gas Pipeline and Storage, LLC (CET Gas). CET Electric owns a 45.7 percent interest in New York Transco LLC, which owns and has been selected to build additional electric transmission assets in NY. CET Gas and CECONY own 71.2 percent and 28.8 percent interests, respectively, in Honeoye Storage Corporation (Honeoye), which operates a gas storage facility in upstate NY. In addition, CET Gas owns a 10.2 percent interest (that is expected to be reduced to 8.5 percent based on the current project cost estimate and CET Gas’ previous capping of its cash contributions to the joint venture) in Mountain Valley Pipeline LLC (MVP), a joint venture developing a proposed 300-mile gas transmission project in WV and VA. During 2021, CET Gas sold its 50 percent interest in Stagecoach Gas Services LLC (Stagecoach), a gas pipeline and storage business located in northern PA and southern NY.See Note A and Note W to the financial statements in Item 8. For the year ended December 31, 2021, CET Gas recorded impairment losses on its investments in Stagecoach, Honeoye and MVP. See "Investments in Note A, Note K and Note W to the financial statements in Item 8 and “Con Edison Transmission,” below. Con Edison Transmission, Inc., together with CET Electric and CET Gas, are referred to in this report as Con Edison Transmission.

Utility Regulation

State Utility Regulation

Regulators

The Utilities are subject to regulation by the NYSPSC, that under the New York Public Service Law, is authorized to set the terms of service and the rates the Utilities charge for providing service in NY. See “Rate Plans,” below and in Note B to the financial statements in Item 8. The NYSPSC also approves the issuance of the Utilities’ securities and transactions between the Utilities and Con Edison and its other subsidiaries. See “Capital Resources,” below and Note U to the financial statements in Item 8. The NYSPSC exercises jurisdiction over the siting of electric transmission lines in NY State (see “Con Edison Transmission,” below) and approves mergers or other business combinations involving NY utilities.

In addition, under the New York Public Service Law, the NYSPSC has the authority to (i) impose penalties on NY utilities, which could be material, for violating state utility laws and regulations and its orders; (ii) review, at least every five years, an electric utility’s capability to provide safe, adequate and reliable service, order the utility to comply with additional and more stringent terms of service than existed prior to the review, assess the continued operation of the utility as the provider of electric service in its service territory and propose, and act upon, such measures as are necessary to ensure safe and adequate service; and (iii) based on findings of repeated violations of the New York Public Service Law or rules or regulations adopted thereto that demonstrate a failure of a combination gas and electric utility to continue to provide safe and adequate service, revoke or modify an operating certificate issued to the utility by the NYSPSC (following consideration of certain factors, including public interest and standards deemed necessary by the NYSPSC to ensure continuity of service, and due process). See "Risk Factors" in Item 1A and “Other Regulatory Matters” and "COVID-19 Regulatory Matters" in Note B to the financial statements in Item 8. O&R’s NJ subsidiary, RECO, is subject to regulation by the New Jersey Board of Public Utilities (NJBPU). The NYSPSC, together with the NJBPU, are referred to herein as state utility regulators.

16 CON EDISON ANNUAL REPORT 2021

New York Utility Industry

Restructuring in the 1990s

In the 1990s, the NYSPSC restructured the electric utility industry in the state. In accordance with NYSPSC orders, the Utilities sold all of their electric generating facilities other than those that also produce steam for CECONY’s steam business (see "Electric Operations – Electric Facilities," below) and provided all of their customers the choice to buy electricity or gas from the Utilities or other suppliers (see "Electric Operations – Electric Sales and Deliveries" and "Gas Operations – Gas Sales and Deliveries," below). In 2021, 60 percent of the electricity and 35 percent of the gas CECONY delivered to its customers, and 54 percent of the electricity and 29 percent of the gas O&R delivered to its customers, was purchased by the customers from other suppliers. In addition, the Utilities no longer control and operate their bulk power electric transmission facilities. See “New York Independent System Operator (NYISO),” below.

Following industry restructuring, there were several utility mergers as a result of which substantially all of the electric and gas delivery service in NY State is now provided by one of five investor-owned utility companies – Con Edison, National Grid plc, Avangrid, Inc. (an affiliate of Iberdrola, S.A.), National Fuel Gas Company or CH Energy Group, Inc. (a subsidiary of Fortis Inc.) – or one of two state authorities – New York Power Authority (NYPA) or Long Island Power Authority.

Rate Plans

Investor-owned utilities in the United States provide delivery service to customers according to the terms of tariffs approved by the appropriate state utility regulator. The tariffs include schedules of rates for service that limit the rates charged by the utilities to amounts that the utilities recover from their customers costs approved by the regulator, including capital costs, of providing service to customers as defined by the tariff. The tariffs implement rate plans adopted by state utility regulators in rate orders issued at the conclusion of rate proceedings. The utilities’ earnings depend on the limits on rates authorized in, and the other provisions of, their rate plans and their ability to operate their businesses in a manner consistent with such rate plans.

The utilities’ rate plans cover specified periods, but rates determined pursuant to a plan generally continue in effect until a new rate plan is approved by the state utility regulator. In NY, either the utility or the NYSPSC can commence a proceeding for a new rate plan, and a new rate plan filed by the utility will generally take effect automatically in approximately 11 months unless prior to such time the NYSPSC approves a rate plan.

In each rate proceeding, rates are determined by the state utility regulator following the submission by the utility of testimony and supporting information, which are subject to review by the staff of the regulator. Other parties with an interest in the proceeding can also review the utility’s proposal and become involved in the rate proceeding. In NY State, the review process is overseen by an administrative law judge who is employed by the NYSPSC. After an administrative law judge issues a recommended decision that generally considers the interests of the utility, the regulatory staff, other parties and legal requisites, the regulator will issue a rate order. The utility and the regulator’s staff and interested parties may enter jointly into a proposed settlement agreement prior to the completion of this administrative process, in which case the agreement could be approved by the regulator with or without modification.

For each rate plan, the revenues needed to provide the utility a return on invested capital is determined by multiplying the utilities’ rate base by the pre-tax weighted average cost of capital determined in the rate plan. In general, rate base, as reflected in a utility's rate plans, is the sum of the utility’s net plant, working capital and certain regulatory assets less deferred taxes and certain regulatory liabilities. The NYSPSC uses a forecast of the average rate base for the year that new rates would be in effect (rate year). The NJBPU uses the rate base balances that exist at the end of the historical 12-month period on which base rates are set. The capital structure used in the weighted average cost of capital is determined using actual and forecast data for the same time periods as rate base. The costs of long-term debt, customer deposits and the allowed return on common equity represent a combination of actual and forecast financing information. The allowed return on common equity is determined by each state’s respective utility regulator. The NYSPSC’s current methodology for determining the allowed return on common equity assigns a one-third weight to an estimate determined from a capital asset pricing model applied to a peer group of utility companies and a two-thirds weight to an estimate determined from a dividend discount model using stock prices and dividend forecasts for a peer group of utility companies. Both methodologies employ market measurements of equity capital to estimate returns rather than the accounting measurements to which such estimates are applied in setting rates.

Pursuant to the Utilities’ rate plans, there generally can be no change to the rates charged to customers during the respective terms of the rate plans other than specified adjustments provided for in the rate plans.

For information about the Utilities’ rate plans, see Note B to the financial statements in Item 8.

CON EDISON ANNUAL REPORT 2021 17

Liability for Service Interruptions

The tariff provisions under which CECONY provides electric, gas and steam service, and O&R provides electric and gas service, limit each company’s liability to pay for damages resulting from service interruptions to circumstances resulting from its gross negligence or willful misconduct. Under RECO's tariff provisions for electric service, the company is not liable for interruptions that are due to causes beyond its control.

CECONY’s tariff for electric service also provides for reimbursement to electric customers for spoilage losses resulting from service interruptions in certain circumstances. In general, the company is obligated to reimburse affected residential and commercial customers for food spoilage of up to approximately $500 and $10,000, respectively, and reimburse affected residential customers for prescription medicine spoilage losses without limitation on amount per claim. The company’s maximum aggregate liability for such reimbursement for an incident is $15 million. The company is not required to provide reimbursement to electric customers for outages attributable to generation or transmission system facilities or events beyond its control, such as storms, provided the company makes reasonable efforts to restore service as soon as practicable.

NY electric and steam utilities are required to provide credits to customers who are without service for more than three days. The credit to a customer would equal the portion of the monthly customer charge attributable to the period the customer was without service. If an extraordinary event occurs, the NYSPSC may direct NY gas utilities to implement the same policies.

The NYSPSC has approved a scorecard for use as a guide to assess electric utility performance in restoring electric service during outages that result from a major storm. The scorecard could also be applied by the NYSPSC for other outages or actions. The scorecard includes performance metrics in categories for preparation, operations response, and communications.

Each NY electric utility is required to submit to the NYSPSC annually an emergency response plan for the reasonably prompt restoration of service in the case of widespread outages in the utility’s service territory due to storms or other events beyond the control of the utility. If, after evidentiary hearings or other investigatory proceedings, the NYSPSC finds that the utility failed to reasonably implement its plan during an event, the NYSPSC may impose penalties or deny recovery of any part of the service restoration costs caused by such failure. In July 2021, the NYSPSC approved emergency response plans for CECONY and O&R. In December 2021, CECONY and O&R each submitted updated plans for 2022.

In December 2021, the New York State legislature amended the New York State Public Service Law, effective April 2022, to require NY electric utilities, including CECONY and O&R, to provide compensation to residential and small business customers that experience widespread prolonged outages lasting more than seventy-two consecutive hours, subject to certain exceptions, including: a bill credit of $25 for each twenty-four hour period beyond the seventy-two consecutive hour outage; reimbursement of customers for food spoilage up to $500; and reimbursement of affected residential customers for prescription medicine spoilage losses without limitation. Any such costs incurred by CECONY and O&R are not recoverable from customers unless the utility files a petition with the NYSPSC requesting recovery and such petition is granted by the NYSPSC.The NYSPSC is required to develop rules for the law’s implementation.

Generic Proceedings

The NYSPSC from time to time conducts “generic” proceedings to consider issues relating to all electric and gas utilities operating in NY State. Proceedings include clean energy and related implementation proceedings, and proceedings relating to energy affordability, data access, retail access, gas planning, energy efficiency and renewable energy programs and climate change risk disclosure. The Utilities are typically active participants in such proceedings.

18 CON EDISON ANNUAL REPORT 2021

Federal Utility Regulation

The Federal Energy Regulatory Commission (FERC), among other things, regulates the transmission and wholesale sales of electricity in interstate commerce and the transmission and sale of natural gas for resale in interstate commerce. In addition, the FERC has the authority to impose penalties, which could be substantial, including penalties for the violation of reliability and cyber security rules. Certain activities of the Utilities, the Clean Energy Businesses and Con Edison Transmission are subject to the jurisdiction of the FERC. The Utilities are subject to regulation by the FERC with respect to electric transmission rates and to regulation by the NYSPSC with respect to electric and gas retail commodity sales and local delivery service. As a matter of practice, the NYSPSC has approved delivery service rates for the Utilities that include both transmission and distribution costs. Wholesale energy and capacity products sold by the Clean Energy Businesses to the regional electric markets are subject to FERC jurisdiction as defined by the independent system operator tariffs. The electric and gas transmission projects in which CET Electric and CET Gas invest are also subject to regulation by the FERC. See “Con Edison Transmission,” below.

New York Independent System Operator (NYISO)

The NYISO is a not-for-profit organization that controls and directs the operation of most of the electric transmission facilities in NY State, including those of the Utilities, as an integrated system. It also administers wholesale markets for electricity in NY State and facilitates the construction of new transmission it considers necessary to meet identified reliability, economic or public policy needs. The New York State Reliability Council (NYSRC) promulgates reliability standards subject to FERC oversight, and the NYISO has agreed to comply with those standards. Pursuant to a requirement that is set annually by the NYSRC, the NYISO requires that entities supplying electricity to customers in NY State have generating capacity (owned, procured through the NYISO capacity markets or contracted for) in an amount equal to the peak demand of their customers plus the applicable reserve margin. In addition, the NYISO has determined that entities that serve customers in New York City must procure sufficient capacity from resources that are electrically located in New York City to cover a substantial percentage of the peak demands of their New York City customers. The NYISO also requires entities that serve customers in the Lower Hudson Valley and New York City customers that are served through the Lower Hudson Valley to procure sufficient capacity from resources electrically located in the Lower Hudson Valley. These requirements apply both to regulated utilities such as CECONY and O&R for the customers they supply under regulated tariffs and to other load serving entities that supply customers on market terms. RECO, O&R’s NJ subsidiary, provides electric service in a portion of its service territory that has a different independent system operator – PJM Interconnection LLC (PJM). See “CECONY – Electric Operations – Electric Supply” and “O&R – Electric Operations – Electric Supply,” below.

Competition

The subset of distributed energy resources (DER) that produce electricity are collectively referred to as distributed generation (DG). DG includes solar energy production facilities, fuel cells, gas turbines, reciprocating engines and micro-turbines, and provides an alternative source of electricity for the Utilities’ electric delivery customers. Energy storage, though not a form of DG, is also a source of electricity for the Utilities’ electric delivery customers. Typically, customers with DG remain connected to the utility’s delivery system and pay a different rate. Gas delivery customers have electricity, oil and propane as alternatives, and steam customers have electricity, oil and natural gas as alternative sources for heating and cooling their buildings. Micro-grids and community-based micro-grids enable DG to serve multiple locations and multiple customers. Demand reduction and energy efficiency investments provide ways for energy consumers within the Utilities’ service areas to lower their energy usage. The Companies expect DERs and electric alternatives to gas and steam, to increase, and for gas and steam usage to decrease, as the Climate Leadership and Community Protection Act enacted by New York State and the Climate Mobilization Act enacted by New York City in 2019 continue to be implemented. In December 2021, New York City enacted a law that will phase-out the use of natural gas in certain new construction buildings, including major renovations, in New York City. See “Environmental Matters – Clean Energy Future,” below. CECONY’s smart solutions for gas customers include energy efficiency and heating electrification programs. See “CECONY- Gas Operations - Gas Peak Demand,” below. The following table shows the aggregate capacities of the DG projects connected to the Utilities’ distribution systems at the end of the last five years:

CON EDISON ANNUAL REPORT 2021 19

Technology CECONY O&R

Steam turbines 6 6 6 6 6 — — — — —

Landfill — — — — — 2 2 2 2 2

The Clean Energy Businesses participate in competitive renewable and sustainable energy infrastructure projects and provide energy-related products and services that are subject to different risks than those found in the businesses of the Utilities. See "Clean Energy Businesses," below. Con Edison Transmission invests in electric transmission projects and manages both electric and gas assets, the current and prospective customers of which may have competitive alternatives. See "Con Edison Transmission," below.

The Utilities do not consider it reasonably likely that another company would be authorized to provide utility delivery service of electricity, gas or steam where the company already provides service. Any such other company would need to obtain NYSPSC consent, satisfy applicable local requirements, install facilities to provide the service, meet applicable services standards and charge customers comparable taxes and other fees and costs imposed on the service. A new delivery company would also be subject to extensive ongoing regulation by the NYSPSC. See “Utility Regulation – State Utility Regulation – Regulators,” above, "The Companies Are Extensively Regulated And Are Subject To Substantial Penalties" in Item 1A and “Other Regulatory Matters” in Note B to the financial statements in Item 8.

The Utilities

CECONY

CECONY, incorporated in New York State in 1884, is a subsidiary of Con Edison and has no significant subsidiaries of its own. Its principal business segments are its regulated electric, gas and steam businesses.

For a discussion of the company’s operating revenues and operating income for each segment, see “Results of Operations” in Item 7. For additional information about the segments, see Note P to the financial statements in Item 8.

Electric Operations

Electric Facilities

CECONY’s capitalized costs for utility plant, net of accumulated depreciation, for distribution facilities were $21,240 million and $20,366 million at December 31, 2021 and 2020, respectively. For its transmission facilities, the costs for utility plant, net of accumulated depreciation, were $3,658 million and $3,496 million at December 31, 2021 and 2020, respectively, and for its portion of the steam-electric generation facilities, the costs for utility plant, net of accumulated depreciation, were $559 million and $572 million, at December 31, 2021 and 2020, respectively. See "CECONY – Steam Operations – Steam Facilities," below.

Distribution Facilities

CECONY owns 62 area distribution substations and various distribution facilities located throughout New York City and Westchester County. At December 31, 2021, the company’s distribution system had a transformer capacity of 33,413 MVA, with 37,477 miles of overhead distribution lines and 98,806 miles of underground distribution lines. The underground distribution lines represent the single longest underground electric delivery system in the United States.

20 CON EDISON ANNUAL REPORT 2021

Transmission Facilities

CECONY’s transmission facilities are located in New York City and Westchester, Orange, Rockland, Putnam and Dutchess counties in New York State. At December 31, 2021, the company owned or jointly owned 569 miles of overhead circuits operating at 138, 230, 345 and 500 kV and 755 miles of underground circuits operating at 69, 138 and 345 kV. The company’s 40 transmission substations and 62 area stations are supplied by circuits operated at 69 kV and above. CECONY’s transmission facilities interconnect with those of National Grid, Central Hudson Gas & Electric Corporation, O&R, New York State Electric & Gas, Connecticut Light & Power Company, Long Island Power Authority, NYPA and Public Service Electric and Gas Company.

Generating Facilities

CECONY’s electric generating facilities consist of plants located in Manhattan whose primary purpose is to produce steam for the company's steam business. The facilities have an aggregate capacity of 718 MW. The company expects to have sufficient amounts of gas and fuel oil available in 2022 for use in these facilities.

Electric Sales and Deliveries

CECONY delivers electricity to its full-service customers who purchase electricity from the company. The company also delivers electricity to its customers who choose to purchase electricity from other suppliers (retail choice program). In addition, the company delivers electricity to state and municipal customers of NYPA.

The company charges all customers in its service area for the delivery of electricity. The company generally recovers, on a current basis, the cost of the electricity that it buys and then sells to its full-service customers. It does not make any margin or profit on the electricity it sells. CECONY’s electric revenues are subject to a revenue decoupling mechanism. As a result, its electric delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. CECONY’s electric sales and deliveries for the last five years were:

Year Ended December 31,

Electric Energy Delivered (millions of kWh)

Electric Energy Delivered ($ in millions)

Average Revenue per kWh Sold (Cents)

For further discussion of the company’s electric operating revenues and its electric results, see “Results of Operations” in Item 7. For additional segment information, see Note P to the financial statements in Item 8.

Electric Peak Demand

The electric peak demand in CECONY’s service area occurs during the summer air conditioning season. CECONY’s 2021 service area actual hourly peak demand was 11,997 MW, which occurred on June 30, 2021. “Design Weather Conditions” for the electric system is a standard to which the actual hourly peak demand is adjusted for evaluation and planning purposes. Since NYISO-invoked demand reduction programs can only be called upon under specific circumstances, Design Weather Conditions do not include these programs’ potential impact. However, the CECONY forecasted hourly peak demand at design conditions does include the impact of certain demand reduction programs. The company estimates that, under Design Weather Conditions, the 2022 service area hourly peak demand will be 12,570 MW. As of January 2022, the company forecasts an average annual increase in hourly electric peak demand in its service area at Design Weather Conditions over the next five years to be approximately 0.4 percent per year, including the effect of certain electric energy efficiency programs and the anticipated phase-out of natural gas in certain new construction buildings, including major renovations, in

CON EDISON ANNUAL REPORT 2021 21

New York City. See “Environmental Matters – Clean Energy Future,” below. The five-year forecast in peak demand is used by the company for electric supply planning purposes.

Electric Supply

Most of the electricity sold by CECONY to its full-service customers in 2021 was purchased under firm power contracts or through the wholesale electricity market administered by the NYISO. The company expects that these resources will again be adequate to meet the requirements of its customers in 2022. The company plans to meet its continuing obligation to supply electricity to its full-service customers through a combination of electricity purchased under contracts, purchased through the NYISO’s wholesale electricity market, or generated from its electricity generating facilities. For information about the company’s contracts for electric generating capacity, see Notes I and Q to the financial statements in Item 8. To reduce the volatility of its full-service customers’ electric energy costs, the company has contracts to purchase electric energy and enters into derivative transactions to hedge the costs of a portion of its expected purchases under these contracts and through the NYISO’s wholesale electricity market.

CECONY owns generating stations in New York City associated primarily with its steam system. The generating stations have a combined electric capacity of approximately 725 MW, based on 2021 summer test ratings. For information about electric generating capacity owned by the company, see “Electric Operations – Electric Facilities – Generating Facilities,” above.

In general, the Utilities recover their costs of purchasing power for full-service customers, including the cost of hedging purchase prices, pursuant to rate provisions approved by the state public utility regulatory authority having jurisdiction. See “Financial and Commodity Market Risks – Commodity Price Risk” in Item 7 and “Recoverable Energy Costs” in Note A to the financial statements in Item 8.

CECONY monitors the adequacy of the electric capacity resources and related developments in its service area, and works with other parties on long-term resource adequacy within the framework of the NYISO reliability planning process. The NYISO process includes obligations on transmission owners (such as CECONY) to construct facilities that may be needed for system reliability if the market does not solve a reliability need identified by the NYISO. See “New York Independent System Operator,” above. In a July 1998 order, the NYSPSC indicated that it “agree(s) generally that CECONY need not plan on constructing new generation as the competitive market develops,” but considers “overly broad” and did not adopt CECONY’s request for a declaration that, solely with respect to providing generating capacity, it will no longer be required to engage in long-range planning to meet potential demand and, in particular, that it will no longer have the obligation to construct new generating facilities, regardless of the market price of capacity.

In 2019, the New York State Department of Environmental Conservation issued regulations that may require the retirement or seasonal unavailability of fossil-fueled electric generating units owned by CECONY and others in New York City. Compliance with the rule will impact approximately 1,400 MW of generating units in CECONY's service territory, of which 86 MW is owned by CECONY. In January 2021, CECONY updated its Local Transmission Plan (LTP) to address identified reliability needs on its local system as a result of the regulation through the construction of three transmission projects, the Reliable Clean City (RCC) projects. In addition, CECONY continues to monitor forecasted system voltage performance and will propose solutions in a future LTP update if a need for support persists in the forecast. In April 2021, the NYSPSC approved CECONY’s December 2020 petition to recover $780 million of costs to construct the RCC projects to solve the local reliability needs.

Gas Operations

Gas Facilities

CECONY’s capitalized costs for utility plant, net of accumulated depreciation, for gas facilities, which are primarily distribution facilities, were $9,748 million and $8,522 million at December 31, 2021 and 2020, respectively.

Natural gas is delivered by pipeline to CECONY at various points in or near its service territory and is distributed to customers by the company through an estimated 4,350 miles of mains and 377,971 service lines. The company owns a natural gas liquefaction facility and storage tank at its Astoria property in Queens, NY. The plant can store 1,062 MDt of which a maximum of about 240 MDt can be withdrawn per day. The company has approximately 1,226 MDt of additional natural gas storage capacity available to it at a field in upstate NY, owned and operated by Honeoye Storage Corporation, a corporation 71.2 percent owned by CET Gas and 28.8 percent owned by CECONY.

22 CON EDISON ANNUAL REPORT 2021

Gas Sales and Deliveries

CECONY delivers gas to its full-service customers who purchase gas from the company. The company generally recovers the cost of the gas that it buys and then sells to its full-service customers. It does not make any margin or profit on the gas it sells. The company also delivers gas to its customers who choose to purchase gas from other suppliers (retail choice program). CECONY’s gas delivery revenues are subject to a weather normalization clause and a revenue decoupling mechanism. As a result, its gas delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. CECONY’s gas sales and deliveries for the last five years were:

Year Ended December 31,

Gas Delivered (MDt)

Firm sales

Transportation of customer-owned gas

Gas Delivered ($ in millions)

Firm sales

Transportation of customer-owned gas

Other (mainly generating plants and interruptible transportation) 56 57 54 55 59

Off-system sales — — — — —

Other operating revenues (mainly regulatory amortizations) 148 28 114 74 111

Average Revenue per Dt Sold

(a)Includes 3,816, 3,326, 5,484, 3,510 and 1,920 MDt for 2017, 2018, 2019, 2020 and 2021, respectively, which are also reflected in firm transportation and other.

For further discussion of the company’s gas operating revenues and its gas results, see “Results of Operations” in Item 7. For additional segment information, see Note P to the financial statements in Item 8.

Gas Peak Demand

The gas actual peak day demand for firm gas customers in CECONY’s service area occurs during the winter heating season and during the winter of 2021/2022 (through January 31, 2022) occurred on January 29, 2022 when the firm gas customers' demand reached approximately 1,268 MDt. “Design Weather Conditions” for the gas system is a standard to which the actual peak demand is adjusted for evaluation and planning purposes. The company estimates that, under Design Weather Conditions, the 2022/2023 service area peak day demand for firm gas customers will be 1,701 MDt. The forecasted peak day demand for firm gas customers at design conditions does not include gas used by interruptible gas customers including electric and steam generating stations. As of January 2022, the company forecasts an average annual growth of the gas peak day demand for firm gas customers over the next five years at design conditions to be approximately 1.3 percent in its service area, including the effect of certain gas energy efficiency programs and the anticipated phase-out of natural gas in certain new construction buildings, including major renovations, in New York City. See “Environmental Matters – Clean Energy Future,” below. The five-year forecast in peak demand is used by the company for gas supply planning purposes.

CON EDISON ANNUAL REPORT 2021 23

In March 2019, due to gas supply constraints, CECONY established a temporary moratorium on new applications for firm gas service in most of Westchester County. In July 2020, CECONY filed a gas planning analysis with the NYSPSC that stated the moratorium could be lifted when increased pipeline capacity is achieved upon completion of the Tennessee Gas Pipeline’s East 300 Update Project or peak demand is reduced through efficiency and other demand side reductions to a level that would enable the company to lift the moratorium. Assuming timely regulatory approvals, the Tennessee Gas Pipeline project is expected to be completed by November 2023. CECONY's gas planning analysis also stated that the company is monitoring gas supply constraint in the New York City portion of its service territory.

Gas Supply

CECONY and O&R have combined their gas requirements, and contracts to meet those requirements, into a single portfolio. The combined portfolio is administered by, and related management services are provided by, CECONY (for itself and as agent for O&R) and costs are allocated between the Utilities in accordance with provisions approved by the NYSPSC. See Note U to the financial statements in Item 8.

Charges from suppliers for the firm purchase of gas, which are based on formulas or indexes or are subject to negotiation, are generally designed to approximate market prices. The Utilities have contracts with interstate pipeline companies for the purchase of firm transportation from upstream points where gas has been purchased to the Utilities’ distribution systems, and for upstream storage services. Charges under these transportation and storage contracts are approved by the FERC. The Utilities are required to pay certain fixed charges under the supply, transportation and storage contracts whether or not the contracted capacity is actually used. These fixed charges amounted to approximately $392.8 million in 2021, including $346.7 million for CECONY. See “Contractual Obligations,” below. At December 31, 2021, the contracts were for various terms extending to 2025 for supply and 2043 for transportation and storage. During 2021, CECONY entered into one new transportation and storage contract. In addition, the Utilities purchase gas on the spot market and contract for interruptible gas transportation. See “Recoverable Energy Costs” in Note A, Note Q and Note U to the financial statements in Item 8.

Steam Operations

Steam Facilities

CECONY’s capitalized costs for utility plant, net of accumulated depreciation, for steam facilities, including steam's portion of the steam-electric generation facilities, were $1,924 million and $1,854 million at December 31, 2021 and 2020, respectively. See "CECONY – Electric Operations – Electric Facilities," above.

CECONY generates steam at one steam-electric generating station and four steam-only generating stations and distributes steam to its customers through approximately 105 miles of transmission, distribution and service piping.

Steam Sales and Deliveries

CECONY’s steam sales and deliveries for the last five years were:

Year Ended December 31,

Steam Sold (MMlb)

Steam Sold ($ in millions)

For further discussion of the company’s steam operating revenues and its steam results, see “Results of Operations” in Item 7. For additional segment information, see Note P to the financial statements in Item 8.

Steam Peak Demand and Capacity

The steam actual hourly peak demand in CECONY’s service area occurs during the winter heating season and during the winter of 2021/2022 (through January 31, 2022) occurred on January 21, 2022 when the actual hourly demand reached approximately 6.9 MMlb per hour. “Design Weather Conditions” for the steam system is a standard

24 CON EDISON ANNUAL REPORT 2021

to which the actual hourly peak demand is adjusted for evaluation and planning purposes. The company’s estimate for the winter of 2022/2023 hourly peak demand of its steam customers is about 8.3 MMlb per hour under Design Weather Conditions. The company forecasts an average annual increase in steam hourly peak demand in its service area at Design Weather Conditions over the next five years to be approximately 0.1 percent.

On December 31, 2021, the steam system was capable of delivering approximately 11.4 MMlb of steam per hour, and CECONY estimates that the system will have the same capability in the 2022/2023 winter.

Steam Supply

30 percent of the steam produced by CECONY in 2021 was supplied by the company’s steam-only generating assets; 50 percent was produced by the company’s steam-electric generating assets, where steam and electricity are primarily cogenerated; and 20 percent was purchased under an agreement with Brooklyn Navy Yard Cogeneration Partners L.P.

O&R

Electric Operations

Electric Facilities

O&R’s capitalized costs for utility plant, net of accumulated depreciation, for distribution facilities were $1,178 million and $1,115 million at December 31, 2021 and 2020, respectively. For its transmission facilities, the costs for utility plant, net of accumulated depreciation, were $297 million and $290 million at December 31, 2021 and 2020, respectively.

O&R and RECO own, in whole or in part, transmission and distribution facilities which include 533 circuit miles of transmission lines, 15 transmission substations, 64 distribution substations, 87,564 in-service line transformers, 3,924 pole miles of overhead distribution lines and 2,291 miles of underground distribution lines. O&R’s transmission system is part of the NYISO system except that portions of RECO’s system are located within the transmission area controlled by PJM.

Electric Sales and Deliveries

O&R delivers electricity to its full-service customers who purchase electricity from the company. The company also delivers electricity to its customers who purchase electricity from other suppliers through the company’s retail choice program.

The company charges all customers in its service area for the delivery of electricity. O&R generally recovers, on a current basis, the cost of the electricity that it buys and then sells to its full-service customers. It does not make any margin or profit on the electricity it sells. O&R’s NY electric revenues (which accounted for 76 percent of O&R’s electric revenues in 2021) are subject to a revenue decoupling mechanism. As a result, O&R’s NY electric delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. O&R’s electric sales in NJ are not subject to a revenue decoupling mechanism. O&R’s electric sales and deliveries for the last five years were:

Year Ended December 31,

Electric Energy Delivered (millions of kWh)

Electric Energy Delivered ($ in millions)

Other operating revenues 8 (12) 14 1 5

Average Revenue Per kWh Sold (Cents)

For further discussion of the company’s electric operating revenues and its electric results, see “Results of Operations” in Item 7. For additional segment information, see Note P to the financial statements in Item 8.

CON EDISON ANNUAL REPORT 2021 25

Electric Peak Demand

The electric peak demand in O&R’s service area occurs during the summer air conditioning season. The weather during the summer of 2021 was cooler than design conditions. O&R’s 2021 service area actual hourly peak demand was 1,520 MW, which occurred on June 30, 2021. “Design Weather Conditions” for the electric system is a standard to which the actual hourly peak demand is adjusted for evaluation and planning purposes. Since NYISO-invoked demand reduction programs can only be called upon under specific circumstances, Design Weather Conditions do not include these programs’ potential impact. However, the O&R forecasted hourly peak demand at design conditions does include the impact of certain demand reduction programs. The company estimates that, under Design Weather Conditions, the 2022 service area peak demand will be 1,570 MW. The company forecasts an average annual decrease in hourly electric peak demand in its service area at design conditions over the next five years to be approximately 0.3 percent, including the effect of certain electric energy efficiency programs. The five-year forecast in peak demand is used by the company for electric supply planning purposes.

Electric Supply

The electricity O&R sold to its full-service customers in 2021 was purchased under firm power contracts or through the wholesale electricity market. The company expects that these resources will again be adequate to meet the requirements of its customers in 2022. O&R does not own any electric generating capacity. The company plans to meet its continuing obligation to supply electricity to its customers through a combination of electricity purchased under contracts or purchased through the wholesale electricity market. To reduce the volatility of its customers’ electric energy costs, the company has contracts to purchase electric energy and enters into derivative transactions to hedge the costs of a portion of its expected purchases. For information about the company’s contracts, see Note Q to the financial statements in Item 8.

In general, the Utilities recover their costs of purchasing power for full service customers, including the cost of hedging purchase prices, pursuant to rate provisions approved by the state public utility regulatory authority having jurisdiction. See “Financial and Commodity Market Risks – Commodity Price Risk,” in Item 7 and “Recoverable Energy Costs” in Note A to the financial statements in Item 8. From time to time, certain parties have petitioned the NYSPSC to review these provisions, the elimination of which could have a material adverse effect on the Companies’ financial position, results of operations or liquidity.

Gas Operations

Gas Facilities

O&R’s capitalized costs for utility plant, net of accumulated depreciation for gas facilities, which are primarily distribution facilities, were $725 million and $684 million at December 31, 2021 and 2020, respectively. Natural gas is delivered by pipeline to O&R at various points in or near its service territory and is distributed to customers by the company through an estimated 1,882 miles of mains and 106,574 service lines.

Gas Sales and Deliveries

O&R delivers gas to its full-service customers who purchase gas from the company. O&R generally recovers the cost of the gas that it buys and then sells to its full-service customers. It does not make any margin or profit on the gas it sells. The company also delivers gas to its customers who choose to purchase gas from other suppliers (retail choice program). O&R’s gas delivery revenues are subject to a weather normalization clause and to a revenue decoupling mechanism. As a result, its gas delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. O&R’s gas sales and deliveries for the last five years were:

26 CON EDISON ANNUAL REPORT 2021

Year Ended December 31,

Gas Delivered (MDt)

Firm sales

Transportation of customer-owned gas

Sales to electric generating stations 9 1 4 59 26

Year Ended December 31,

Gas Delivered ($ in millions)

Firm sales

Interruptible Sales 7 6 6 6 6

Transportation of customer-owned gas

Sales to electric generating stations — — — — —

Average Revenue Per Dt Sold

For further discussion of the company’s gas operating revenues and its gas results, see “Results of Operations” in Item 7. For additional segment information, see Note P to the financial statements in Item 8.

Gas Peak Demand

The gas actual peak day demand for firm sales customers in O&R’s service area occurs during the winter heating season and during the winter of 2021/2022 (through January 31, 2022) occurred on January 15, 2022 when the firm sales customers' demand reached approximately 192 MDt. “Design Weather Conditions” for the gas system is a standard to which the actual peak demand is adjusted for evaluation and planning purposes. The company estimates that, under Design Weather Conditions, the 2022/2023 service area peak day demand for firm sales customers will be 234 MDt. The forecasted peak day demand at design conditions does not include gas used by interruptible gas customers including electric generating stations. The company forecasts an average annual growth of the gas peak day demand for firm sales customers over the next five years at design conditions to be approximately 0.1 percent in its service area, including the effect of certain gas energy efficiency programs. The five-year forecast in peak demand is used by the company for gas supply planning purposes.

Gas Supply

O&R and CECONY have combined their gas requirements and purchase contracts to meet those requirements into a single portfolio. See “CECONY – Gas Operations – Gas Supply” above.

CON EDISON ANNUAL REPORT 2021 27

Clean Energy Businesses

The following table provides information about the Clean Energy Businesses' renewable electric projects that are in operation and/or in construction at December 31, 2021. Unless otherwise noted, the projects listed in the table below or the Clean Energy Businesses' equity interest in these projects have been pledged as security for project debt financing.

Utility Scale

Solar

New England assets (c) 24 Various 2011/2017 MA/RI Various

Texas Solar 4 40 25 2014 TX City of San Antonio

Mesquite Solar 3 (d) 150 23 2018 AZ WAPA (U.S. Navy)

Great Valley Solar (d) 200 17 2018 CA MCE/SMUD/PG&E/SCE

Water Strider Solar (d) 80 20 2021 VA VEPCO

Battle Mountain Solar/Battery Energy Storage System (d) 101 25 2021 NV SPP

Other (c) 26 Various Various Various Various

Wind

Wind Holdings 180 Various Various SD/MT NWE/Basin Electric

Adams Rose Wind 23 7 2016 MN Dairyland

Other (c) 42 Various Various Various Various

Total MW (AC) in Operation 2,996

Total MW (AC) in Construction (c) 8

Total MW (AC) Utility Scale 3,004

Behind the Meter

Total MW (AC) in Operation (c) 65

Total MW (AC) in Construction (c) 4

Total MW Behind the Meter 69

(a)Represents PPA contractual term or remaining term from the date of acquisition.

(b)Solar renewable energy credit hedges are in place, in lieu of PPAs, through 2025.

(c)Projects have generally not been pledged as security for project debt financing.

(d)Projects are financed with tax equity. See Note S to the financial statements in Item 8.

28 CON EDISON ANNUAL REPORT 2021

Renewable Electric Generation

The Clean Energy Businesses develop, own and operate renewable and sustainable energy infrastructure projects. In December 2018, the Clean Energy Businesses acquired Sempra Solar Holdings, LLC to expand the company's renewable energy asset portfolio. The Clean Energy Businesses focus their efforts on utility scale renewable electric projects. The output of most of the projects is sold under long-term power purchase agreements (PPA) with utilities and municipalities. The following table shows the generating capacity (MW AC) of the Clean Energy Businesses' utility scale renewable electric projects in operation at the end of the last five years:

Renewable electric volumes produced by utility scale assets at the end of the last five years were:

Millions of kWh Produced

For the Years Ended December 31,

Renewable electric projects

Energy-Related Products and Services

The Clean Energy Businesses provide services to manage the dispatch, fuel requirements and risk management activities for 11,127 MW of generating plants and merchant transmission in the northeastern United States owned by unrelated parties, manage energy supply assets leased from others and provide wholesale hedging and risk management services to renewable electric projects owned by their subsidiaries.

The Clean Energy Businesses also provide energy-efficiency services to government and commercial customers. The services include the design and installation of lighting retrofits, high-efficiency heating, ventilating and air conditioning equipment and other energy saving technologies.

For information about the Clean Energy Businesses' results, see "Results of Operations" in Item 7 and Note P to the financial statements in Item 8.

CON EDISON ANNUAL REPORT 2021 29

Con Edison Transmission

CET Electric

CET Electric owns a 45.7 percent interest in New York Transco LLC (NY Transco). Affiliates of certain other New York transmission owners own the remaining interests.

NY Transco's Transmission Owner Transmission Solutions (TOTS) projects were approved by the NYSPSC in October 2013. In April 2015, the FERC issued an order granting certain transmission incentives for the NY Transco TOTS projects. In March 2016, the FERC approved a November 2015 settlement agreement that provides, in relation to the TOTS projects described above, a 10 percent return on common equity (which is comprised of 9.5 percent base return on equity plus an additional 50 basis points) and a maximum actual common equity ratio of 53 percent. The revenues for these TOTS projects costs are collected by the NYISO and allocated across NYISO transmission customers in NY State, with 63 percent allocated to load serving entities in the CECONY and O&R service areas.

In December 2015, the NYSPSC issued an order in its competitive proceeding to select AC transmission projects that would relieve transmission congestion between upstate and downstate. The NYSPSC determined that there was a public policy need for new transmission to address congestion and directed the NYISO, under its FERC-approved public policy planning process, to request developers to submit transmission project proposals for two segments of the transmission system. In April 2019, the New York Independent System Operator (NYISO) selected a project that was jointly proposed by National Grid and NY Transco ($600 million estimated cost, excluding certain interconnection costs that are not yet determined) that would increase transmission capacity by 1,850 MW between upstate and downstate when combined with another developer’s project that was also selected by the NYISO. The siting, construction and operation of the projects will require approvals and permits from appropriate governmental agencies and authorities, including the NYSPSC. The NYISO and National Grid/NY Transco entered into an agreement for the development and operation of the project, referred to as the New York Energy Solution (NYES) project, that is scheduled for entry into service by December 2023. In November 2017, FERC approved a settlement agreement with respect to the National Grid/NY Transco project that provides for a 10.65 percent return on common equity (which is comprised of a 9.65 percent base ROE, with 100 basis points added for congestion reduction and a cost containment mechanism applicable to certain capital costs) and a maximum actual common equity ratio of 53 percent. Revenues for the NYES project are collected by the NYISO including 100 percent of construction work-in-progress, and are allocated across NYISO transmission customers in NY State with 84 percent allocated to load serving entities in the CECONY and O&R service areas.

CET Gas

CET Gas, through its subsidiaries, owns a 71.2 percent interest in Honeoye Storage Corporation (Honeoye), a company that operates a gas storage facility in upstate NY and in which CECONY owns the remaining interest. A goodwill impairment loss of $7 million was recorded related to CET Gas’ and CECONY’s investment in Honeoye Storage Corporation for the year ended December 31, 2021, of which $5 million was attributed to CET Gas. See Note K to the financial statements in Item 8.

In addition, CET Gas owns a 10.2 percent interest (that is expected to be reduced to 8.5 percent based on the current project cost estimate and CET Gas’ previous capping of its cash contributions to the joint venture) in Mountain Valley Pipeline, LLC (MVP). MVP is a joint venture with four other partners to construct and operate a proposed 300-mile gas transmission project in WV and VA. CET Gas recorded pre-tax impairment losses on its interest in MVP of $231 million ($162 million after-tax) and $320 million ($223 million after-tax) for the years ended December 31, 2021 and December 31, 2020, respectively. In May 2021, the operator of the Mountain Valley Pipeline indicated that, subject to receipt of certain authorizations and resolution of certain challenges, it is targeting an in-service date for the project of summer 2022 at an overall project cost of approximately $6,200 million excluding allowance for funds used during construction. See "Investments - 2020 and 2021 Partial Impairments of Investment in Mountain Valley Pipeline, LLC (MVP)" in Note A to the financial statements in Item 8.

During 2021, CET Gas sold its 50 percent interest in Stagecoach Gas Services LLC (Stagecoach), a gas pipeline and storage business located in northern PA and southern NY for $629 million. CET Gas recorded pre-tax impairment losses of $212 million ($147 million after-tax). See "Investments - Partial Impairment of Investment in Stagecoach Gas Services" in Note A and Note W to the financial statements in Item 8.

For information about Con Edison Transmission's results, see "Results of Operations" in Item 7 and Note P to the financial statements in Item 8.

30 CON EDISON ANNUAL REPORT 2021

Capital Requirements and Resources

Capital Requirements

The following table contains the Companies’ capital requirements for the years 2019 through 2021 and their current estimate of amounts for 2022 through 2024:

Actual Estimate

CECONY (a)(b)

O&R

Con Edison Transmission

Retirement of long-term securities

O&R 62 — — — — —

(a)CECONY’s capital investments for environmental protection facilities and related studies were $507 million, $491 million and $731 million in 2019, 2020 and 2021, respectively, and are estimated to be $670 million in 2022.

(b)Amounts shown do not include amounts for the energy efficiency, demand reduction and combined heat and power programs.

(c)Estimates shown for 2022, 2023 and 2024 do not include the impact, if any, that may result from Con Edison’s evaluation of strategic alternatives with respect to the Clean Energy Businesses. See "Clean Energy Businesses" in Item 1.

The Utilities have an ongoing need to make substantial capital investments primarily to maintain the safety, reliability and resilience of their electric, gas and steam delivery systems. Their estimated construction expenditures also reflect programs that will give customers greater control over their energy usage and bills, help integrate customers' new clean energy technologies into the Utilities’ electric delivery systems, and invest in efforts that will mitigate and adapt to the impact of climate change.

Estimated capital investments for Con Edison Transmission primarily reflect planned investments in electric transmission projects. Estimated capital investments for the Clean Energy Businesses primarily reflect planned investments in renewable electric projects. Actual capital investments for Con Edison Transmission and the Clean Energy Businesses could increase or decrease significantly from the amounts estimated depending on opportunities.

Contractual Obligations

The following table summarizes the Companies’ material obligations at December 31, 2021 to make payments pursuant to contracts. Long-term debt, capital lease obligations and other noncurrent liabilities are included on their balance sheets. Operating leases and electricity purchase agreements (for which undiscounted future annual payments are shown) are described in the notes to the financial statements.

CON EDISON ANNUAL REPORT 2021 31

Payments Due by Period

(Millions of Dollars) Total 1 yearor less Years2 & 3 Years4 & 5 After 5years

Long-term debt (Statement of Capitalization)

Finance lease obligations (Note J)

CECONY 1 — 1 — —

O&R 1 — — — 1

Total capital lease obligations 2 — 1 — 1

Operating leases (Note J)

O&R 1 1 — — —

Purchase obligations

Electricity power purchase agreements – Utilities (Note I)

CECONY

O&R

Energy and Capacity (b) 94 61 33 — —

Natural gas supply, transportation, and storage contracts – Utilities (c)

CECONY

O&R

Natural gas supply 38 30 8 — —

Other purchase obligations

(a)Includes interest on variable rate debt calculated at rates in effect at December 31, 2021.

(b)Included in these amounts is the cost of minimum quantities of energy that the Utilities are obligated to purchase at both fixed and variable prices.

(c)Included in these amounts is the cost of minimum quantities of natural gas supply, transportation and storage that the Utilities are obligated to purchase at both fixed and variable prices.

(d)Amounts shown for other purchase obligations, which reflect capital and operations and maintenance costs incurred by the Utilities in running their day-to-day operations, were derived from the Utilities’ purchasing system as the difference between the amounts authorized and the amounts paid (or vouchered to be paid) for each obligation. For many of these obligations, the Utilities are committed to purchase less than the amount authorized. Payments for the “Other Purchase Obligations” are generally assumed to be made ratably over the term of the obligations. Long-term Purchase Obligations, which comprises $3,379 million of "Other Purchase Obligations," were derived from the Utilities' purchasing system by using a method that identifies the remaining purchase obligations. The Utilities believe that unreasonable effort and expense would be involved to enable them to report their “Other Purchase Obligations” in a different manner.

(e)Amounts represent commitments by the Clean Energy Businesses to purchase minimum quantities of electric energy and capacity, renewable energy certificates, natural gas, natural gas pipeline capacity, energy efficiency services and construction services. The Clean Energy Businesses have also entered into power purchase agreements for the sale of power from their renewable electric projects, provisions of which provide for penalties to be paid by the Clean Energy Businesses in the event certain minimum production quantities are

32 CON EDISON ANNUAL REPORT 2021

not met. The future minimum production quantities and the amount of the penalties, if any, are not estimable and are not included in the amounts shown on the table.

The Companies’ commitments to make payments in addition to these contractual commitments include their other liabilities reflected on their balance sheets, any funding obligations for their pension and other postretirement benefit plans, financial hedging activities, their collective bargaining agreements and Con Edison’s and the Clean Energy Business' guarantees of certain obligations. See Notes E, F, Q and “Guarantees” in Note H to the financial statements in Item 8.

Capital Resources

Con Edison is a holding company that operates only through its subsidiaries and has no material assets other than its interests in its subsidiaries. Con Edison finances its capital requirements primarily through internally-generated funds, the sale of its common shares or external borrowings. Con Edison’s ability to make payments on external borrowings and dividends on its common shares depends on receipt of dividends from its subsidiaries, proceeds from the sale of additional common shares or its interests in its subsidiaries or additional external borrowings. See "Con Edison's Ability To Pay Dividends Or Interest Depends On Dividends From Its Subsidiaries" in Item 1A and Note U to the financial statements in Item 8.

For information about restrictions on the payment of dividends by the Utilities and significant debt covenants, see Note C to the financial statements in Item 8.

For information on the Companies’ commercial paper program and revolving credit agreements with banks, see Note D to the financial statements in Item 8.

The Companies require access to the capital markets to fund capital requirements that are substantially in excess of available internally-generated funds. See “Capital Requirements,” above and "The Companies Require Access To Capital Markets to Satisfy Funding Requirements” in Item 1A. Each of the Companies believes that it will continue to be able to access capital, although capital market conditions may affect the timing and cost of the Companies’ financing activities. The Companies monitor the availability and costs of various forms of capital, and will seek to issue Con Edison common shares and other securities when it is necessary or advantageous to do so. See “Coronavirus Disease 2019 (COVID-19) Impacts – Liquidity and Financing” in Item 7. For information about the Companies’ long-term debt and short-term borrowing, see Notes C and D to the financial statements in Item 8.

The Utilities finance their operations, capital requirements and payment of dividends to Con Edison from internally-generated funds, contributions of equity capital from Con Edison, if any, and external borrowings. See "Liquidity and Capital Resources" in Item 7.

Con Edison plans to meet its capital requirements for 2022 through 2024, through internally-generated funds and the issuance of long-term debt and common equity. See “Capital Requirements and Resources - Capital Requirements," in Item 1. The company's plans include the issuance of between $800 million and $1,400 million of long-term debt, primarily at the Utilities, in 2022 and approximately $2,500 million in aggregate of long-term debt, including for maturing securities, primarily at the Utilities, during 2023 and 2024. The planned debt issuance is in addition to the issuance of long-term debt secured by the Clean Energy Businesses’ renewable electric projects. The company's plans also include the issuance of up to $850 million of common equity in 2022 and approximately $750 million in aggregate of common equity during 2023 and 2024, in addition to common equity under its dividend reinvestment, employee stock purchase and long-term incentive plans. Con Edison’s financing plans do not include the impact, if any, that may result from its evaluation of strategic alternatives with respect to the Clean Energy Businesses. See "Clean Energy Businesses" in Item 1.

In 2021, the NYSPSC authorized CECONY, through 2025, to issue up to $4,025 million of debt securities ($750 million of which the company had issued as of December 31, 2021). In 2020, the NYSPSC authorized O&R, through 2023, to issue up to $165 million of debt securities ($150 million of which the company had issued as of December 31, 2021). The NYSPSC also authorized CECONY and O&R for such periods to issue debt securities to refund existing debt securities of up to $2,500 million and $125 million, respectively. As of December 31, 2021, the Utilities had not refunded any securities pursuant to these authorizations. In January 2022, O&R filed a petition with the NYSPSC for authorization to issue up to $285 million of debt securities prior to December 31, 2025.

The Clean Energy Businesses have financed their operations and capital requirements primarily with capital contributions and borrowings from Con Edison, internally-generated funds and external borrowings. See Con Edison's Consolidated Statement of Capitalization in Item 8 and Note Q to the financial statements in Item 8.

Con Edison Transmission has financed its operations and capital requirements primarily with capital contributions and borrowings from Con Edison and internally-generated funds. See "Liquidity and Capital Resources" in Item 7.

CON EDISON ANNUAL REPORT 2021 33

For each of the Companies, the common equity ratio for the last five years was:

Common Equity Ratio(Percent of total capitalization)

The credit ratings assigned by Moody’s, S&P and Fitch to the senior unsecured debt and commercial paper of Con Edison, CECONY and O&R are as follows:

Moody's S&P Fitch

Con Edison

Senior Unsecured Debt Baa2 BBB+ BBB+

Commercial Paper P-2 A-2 F2

CECONY

Senior Unsecured Debt Baa1 A- A-

Commercial Paper P-2 A-2 F2

Source: SEC EDGAR (public domain) · 10-K for the period ended 2021-12-31, filed 2022-02-17 · accession 0001047862-22-000039

Filing HTML rendered to line-structured narrative text by the shipped reducer (datafeeds.edgar_fulltext.visible_text, keep_table_headers=True): scripts and inline-XBRL headers are dropped, and table content is reduced to its short label cells — numeric table data is not rendered and is therefore not counted. The same rendering is used for every year, so a year-over-year comparison is like for like.

The text is our rendering of the filing, not a facsimile: original pagination, typography and tables are not reproduced, and the numbers live in the financial statements (FA).

The outline locates item HEADINGS in this document. Only Items 1A and 7 have certified boundaries elsewhere in the terminal (the redline and the narrative-overlap number); every span here runs from one heading found to the next heading found.

How the outline was chosen. It is the longest chain of item headings that runs forward through both the document and the standard item order: 22 headings are on that chain and 17 further heading-shaped lines are not — the table-of-contents echo of every item, cross-references and exhibit-list mentions. Each entry's length is measured from its heading to the next heading on the chain.