Skip to content
KStart free
AI InfrastructureDefenseQuantumAll studies →

AVA US Equity

Avista CorpUtilities · Electric & Other Services Combined · CIK 104918 · FY ends Dec 31
$37.57
-0.66 (-1.73%)
USD · as of 2026-08-21 · marketstack

AVA · 10-K · period ended 2023-12-31

← all AVA documents
filed 2024-02-21 · EDGAR original ↗

Our rendering of the filing — original pagination and typography are not reproduced, and tables are reduced to their short label cells (the figures live on FA). Nothing is summarized: every line below is the filing's own text.

blocks 1600 of 2,852424k characters rendered

10-K

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

Form 10-K

(Mark One)

FOR THE FISCAL YEAR ENDED December 31, 2023 OR

FOR THE TRANSITION PERIOD FROM TO

Commission file number 001-03701

AVISTA CORPORATION

(Exact name of Registrant as specified in its charter)

1411 East Mission Avenue, Spokane, WA99202-2600

(Address of principal executive offices, including zip code)

Registrant’s telephone number, including area code: 509-489-0500

Web site: http://www.avistacorp.com

Securities registered pursuant to Section 12(b) of the Act:

Title of Each Class Trading Symbol(s) Name of Each Exchange on Which Registered

Common Stock AVA NYSE

Securities registered pursuant to Section 12(g) of the Act:

Title of Class

Preferred Stock, Cumulative, Without Par Value

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes ☒ No ☐

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or 15(d) of the Act. Yes ☐ No ☒

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the Registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days: Yes ☒ No ☐

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☒ No ☐

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act. (Check one):

Large Accelerated Filer ☒ Accelerated Filer ☐

Non-accelerated Filer ☐ Smaller reporting company ☐

Emerging growth company ☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. ☒

If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements. ☐

Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b). ☐

Indicate by check mark whether the Registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act): Yes ☐ No ☒

The aggregate market value of the Registrant’s outstanding Common Stock, no par value (the only class of voting stock), held by non-affiliates is $3,005,104,706 based on the last reported sale price thereof on the consolidated tape on June 30, 2023.

As of January 31, 2024, 78,161,596 shares of Registrant’s Common Stock, no par value (the only class of common stock), were outstanding.

Documents Incorporated By Reference

Document Part of Form 10-K into WhichDocument is Incorporated

AVISTA CORPORATION

INDEX

ItemNo. PageNo.

Acronyms and Terms iv

Forward-Looking Statements 1

Available Information 5

Part I

1 Business 6

Company Overview 6

Avista Utilities 8

General 8

Electric Operations 8

Electric Requirements 9

Electric Resources 9

Hydroelectric Licenses 12

Future Resource Needs 13

Natural Gas Operations 15

Utility Regulation 17

Federal Laws Related to Wholesale Competition 18

Regional Transmission Planning 18

Regional Energy Markets 18

Reliability Standards 18

Vulnerability to Cyberattack 19

Avista Utilities Operating Statistics 20

Alaska Electric Light and Power Company 22

Alaska Electric Light and Power Company Operating Statistics 24

Other Businesses 25

1A. Risk Factors 26

1B. Unresolved Staff Comments 35

1C. Cybersecurity 35

Avista Utilities 36

Alaska Electric Light and Power Company 37

3 Legal Proceedings 38

4 Mine Safety Disclosures 38

Part II

6 Removed and Reserved 39

Business Segments 40

Executive Level Summary 40

Regulatory Matters 41

Results of Operations - Overall 44

i

AVISTA CORPORATION

Non-GAAP Financial Measures 46

Results of Operations - Avista Utilities 46

Results of Operations - Alaska Electric Light and Power Company 53

Results of Operations - Other Businesses 53

Accounting Standards to Be Adopted in 2024 53

Critical Accounting Policies and Estimates 53

Liquidity and Capital Resources 55

Overall Liquidity 55

Review of Consolidated Cash Flow Statement 56

Capital Resources 57

Utility Capital Expenditures 59

Non-Regulated Investments and Capital Expenditures 60

Pension Plan 60

Credit Ratings 61

Dividends 61

Competition 61

Economic Conditions and Utility Load Growth 62

Environmental Issues and Other Contingencies 63

Colstrip 66

Enterprise Risk Management 67

7A. Quantitative and Qualitative Disclosures about Market Risk 74

8. Financial Statements and Supplementary Data 74

Report of Independent Registered Public Accounting Firm (PCAOB ID No. 34) 75

Financial Statements 77

Consolidated Statements of Income 77

Consolidated Statements of Comprehensive Income 78

Consolidated Balance Sheets 79

Consolidated Statements of Cash Flows 80

Consolidated Statements of Equity 82

Notes to Consolidated Financial Statements 83

Note 1. Summary of Significant Accounting Policies 83

Note 2. New Accounting Standards 89

Note 3. Balance Sheet Components 90

Note 4. Revenue 91

Note 5. Leases 95

Note 6. Variable Interest Entities 98

Note 7. Equity Investments 98

Note 8. Derivatives and Risk Management 99

Note 9. Jointly Owned Electric Facilities 103

Note 10. Property, Plant and Equipment 104

Note 11. Asset Retirement Obligations 104

Note 12. Pension Plans and Other Postretirement Benefit Plans 105

Note 13. Accounting for Income Taxes 110

ii

AVISTA CORPORATION

Note 14. Energy Purchase Contracts 111

Note 15. Short-Term Borrowings 112

Note 16. Long-Term Debt 114

Note 17. Long-Term Debt to Affiliated Trusts 115

Note 20. Accumulated Other Comprehensive Loss 121

Note 21. Earnings per Common Share 121

Note 22. Commitments and Contingencies 121

Note 23. Regulatory Matters 127

Note 24. Information by Business Segments 131

9A. Controls and Procedures 133

9B. Other Information 135

9C. Disclosure Regarding Foreign Jurisdictions that Prevent Inspections 135

Part III

10. Directors, Executive Officers and Corporate Governance 136

11. Executive Compensation 137

14. Principal Accounting Fees and Services 138

Part IV

15. Exhibits, Financial Statement Schedules 139

Exhibit Index 140

* = not an applicable item in the 2023 calendar year for Avista Corp.

iii

AVISTA CORPORATION

ACRONYMS AND TERMS

(The following acronyms and terms are found in multiple locations within the document)

Acronym/Term Meaning

ASC - Accounting Standards Codification

Avista Corp. - Avista Corporation, the Company

BPA - Bonneville Power Administration

CCA - Climate Commitment Act, Washington

CEIP - Clean Energy Implementation Plan, Washington

CETA - Clean Energy Transformation Act, Washington

CPP - Climate Protection Program, Oregon

Colstrip - The coal-fired Colstrip Generating Plant in southeastern Montana

CT - Combustion turbine

EIM - Energy Imbalance Market

EPA - Environmental Protection Agency

iv

AVISTA CORPORATION

FERC - Federal Energy Regulatory Commission

GAAP - Generally Accepted Accounting Principles

GHG - Greenhouse gas

GS - Generating station

IPUC - Idaho Public Utilities Commission

IRP - Integrated Resource Plan

kV - Kilovolt (1000 volts): a measure of capacity on transmission lines

MPSC - Public Service Commission of the State of Montana

MW, MWh - Megawatt: 1000 KW. Megawatt-hour: 1000 KWh

NERC - North American Electricity Reliability Corporation

NorthWestern - NorthWestern Corporation

OPUC - The Public Utility Commission of Oregon

PGA - Purchased Gas Adjustment

PPA - Power Purchase Agreement

PUD - Public Utility District

RCA - The Regulatory Commission of Alaska

REC - Renewable energy credit

ROE - Return on equity

ROR - Rate of return on rate base

ROU - Right-of-use lease asset

SEC - U.S. Securities and Exchange Commission

Talen - Talen Montana, LLC, an indirect subsidiary of Talen Energy Corporation.

WUTC - Washington Utilities and Transportation Commission

v

AVISTA CORPORATION

Forward-Looking Statements

From time to time, we make forward-looking statements such as statements regarding projected or future:

financial performance;

cash flows;

capital expenditures;

dividends;

capital structure;

other financial items;

strategic goals and objectives;

business environment; and

plans for operations.

These statements are based upon underlying assumptions (many of which are based, in turn, upon further assumptions). Such statements are made both in our reports filed under the Securities Exchange Act of 1934, as amended (including this Annual Report on Form 10-K), and elsewhere. Forward-looking statements are all statements except those of historical fact including, without limitation, those that are identified by the use of words that include “will,” “may,” “could,” “should,” “intends,” “plans,” “seeks,” “anticipates,” “estimates,” “expects,” “forecasts,” “projects,” “predicts,” and similar expressions.

Forward-looking statements (including those made in this Annual Report on Form 10-K) are subject to a variety of risks, uncertainties and other factors. Most of these factors are beyond our control and may have a significant effect on our operations, results of operations, financial condition or cash flows, which could cause actual results to differ materially from those anticipated in our statements. Such risks, uncertainties and other factors include, among others:

Utility Regulatory Risk

state and federal regulatory decisions or related judicial decisions that affect our ability to recover costs and earn a reasonable return including, but not limited to, disallowance or delay in the recovery of capital investments, operating costs, commodity costs, the ordering of refunds to customers and discretion over allowed return on investment;

the loss of regulatory accounting treatment, which could require the write-off of regulatory assets and the loss of regulatory deferral and recovery mechanisms;

Operational Risk

weather conditions, which affect both energy demand and electric generating capability, including the impact of precipitation and temperature on hydroelectric resources, the impact of wind patterns on wind-generated power, weather-sensitive customer demand, and similar impacts on supply and demand in the wholesale energy markets;

wildfires ignited, or allegedly ignited, by our equipment or facilities could cause significant loss of life and property or result in liability for resulting fire suppression costs and/or damages, thereby causing serious operational and financial harm;

severe weather or natural disasters, including, but not limited to, avalanches, wind storms, wildfires, earthquakes, extreme temperature events, snow and ice storms that could disrupt energy generation, transmission and distribution, as well as the availability and costs of fuel, materials, equipment, supplies and support services;

political unrest and/or conflicts between foreign nation-states, which could disrupt the global, national and local economy, result in increases in operating and capital costs, impact energy commodity prices or our ability to access energy resources, create disruption in supply chains, disrupt, weaken or create volatility in capital markets, and

1

AVISTA CORPORATION

increase cyber and physical security risks. In addition, any of these factors could negatively impact our liquidity and limit our access to capital, among other implications;

explosions, fires, accidents, mechanical breakdowns or other incidents that could impair assets and may disrupt operations of our generation facilities, transmission, and electric and natural gas distribution systems or other operations and may require us to purchase replacement power or incur costs to repair our facilities;

interruptions in the delivery of natural gas by our suppliers, including physical problems with pipelines themselves, can disrupt our service of natural gas to our customers and/or impair our ability to operate gas-fired electric generating facilities;

explosions, fires, accidents or other incidents arising from or allegedly arising from our operations that could cause injuries to the public or property damage;

blackouts or disruptions of interconnected transmission systems (the regional power grid);

terrorist attacks, cyberattacks or other malicious acts that could disrupt or cause damage to our utility assets or to the national or regional economy in general, including effects of terrorism, cyberattacks, ransomware, or vandalism that damage or disrupt information technology systems;

pandemics, which could disrupt our business, as well as the global, national and local economy, resulting in a decline in customer demand, deterioration in the creditworthiness of our customers, increases in operating and capital costs, workforce shortages, losses or disruptions in our workforce due to vaccine mandates, delays in capital projects, disruption in supply chains, and disruption, weakness and volatility in capital markets. In addition, any of these factors could negatively impact our liquidity and limit our access to capital, among other implications;

work-force issues, including changes in collective bargaining unit agreements, strikes, work stoppages, the loss of key executives, availability of workers in a variety of skill areas, and our ability to recruit and retain employees;

changes in the availability and price of purchased power, fuel and natural gas, as well as transmission capacity;

increasing costs of insurance, more restrictive coverage terms and our ability to obtain insurance;

delays or changes in construction costs, and/or our ability to obtain required permits and materials for present or prospective facilities;

increasing health care costs and cost of health insurance provided to our employees and retirees;

increasing operating costs, including effects of inflationary pressures;

third party construction of buildings, billboard signs, towers or other structures within our rights of way, or placement of fuel containers within close proximity to our transformers or other equipment, including overbuilding atop natural gas distribution lines;

the loss of key suppliers for materials or services or other disruptions to the supply chain;

adverse impacts to our Alaska electric utility (AEL&P) that could result from an extended outage of its hydroelectric generating resources or their inability to deliver energy, due to their lack of interconnectivity to other electrical grids and the availability or cost of replacement power (diesel);

changing river or reservoir regulation or operations at hydroelectric facilities not owned by us, which could impact our hydroelectric facilities downstream;

Climate Change Risk

increasing frequency and intensity of severe weather or natural disasters resulting from climate change, that could disrupt energy generation, transmission and distribution, as well as the availability and costs of fuel, materials, equipment, supplies and support services;

2

AVISTA CORPORATION

change in the use, availability or abundancy of water resources and/or rights needed for operation of our hydroelectric facilities, including impacts resulting from climate change;

changes in the long-term climate and weather could materially affect, among other things, customer demand, the volume and timing of streamflows required for hydroelectric generation, costs of generation, transmission and distribution. Increased or new risks may arise from severe weather or natural disasters, including wildfires as well as their increased occurrence and intensity related to changes in climate;

Cybersecurity Risk

cyberattacks on the operating systems used in the operation of our electric generation, transmission and distribution facilities and our natural gas distribution facilities, and cyberattacks on such systems of other energy companies with which we are interconnected, which could damage or destroy facilities or systems or disrupt operations for extended periods of time and result in the incurrence of liabilities and costs;

cyberattacks on the administrative systems used in the administration of our business, including customer billing and customer service, accounting, communications, compliance and other administrative functions, and cyberattacks on such systems of our vendors and other companies with which we do business, resulting in the disruption of business operations, the release of private information and the incurrence of liabilities and costs;

Technology Risk

changes in costs that impede our ability to implement new information technology systems or to operate and maintain current production technology;

changes in technologies, possibly making some of the current technology we utilize obsolete or introducing new cyber security risks and other new risks inherent in the use, by either us or our counterparties, of new technologies in the developmental stage including, without limitation, generative artificial intelligence;

changes in the use, perception, or regulation of generative artificial intelligence technologies, which could limit our ability to utilize such technology, create risk of enhanced regulatory scrutiny, generate uncertainty around intellectual property ownership, licensing or use, or which could otherwise result in risk of damage to our business, reputation or financial results;

insufficient technology skills, which could lead to the inability to develop, modify or maintain our information systems;

Strategic Risk

growth or decline of our customer base due to new uses for our services or decline in existing services, including, but not limited to, the effect of the trend toward distributed generation at customer sites;

the potential effects of negative publicity regarding our business practices, whether true or not, which could hurt our reputation and result in litigation or a decline in our common stock price;

changes in our strategic business plans, which could be affected by any or all of the foregoing, including the entry into new businesses and/or the exit from existing businesses and the extent of our business development efforts where potential future business is uncertain;

wholesale and retail competition including alternative energy sources, growth in customer-owned power resource technologies that displace utility-supplied energy or may be sold back to the utility, and alternative energy suppliers and delivery arrangements;

non-regulated activities may increase earnings volatility and result in investment losses;

the risk of municipalization or other forms of service territory reduction;

3

AVISTA CORPORATION

External Mandates Risk

changes in environmental laws, regulations, decisions and policies, including, but not limited to, regulatory responses to concerns regarding climate change, efforts to restore anadromous fish in areas currently blocked by dams, more stringent requirements related to air quality, water quality and waste management, present and potential environmental remediation costs and our compliance with these matters;

the potential effects of initiatives, legislation or administrative rulemaking at the federal, state or local levels, including possible effects on our generating resources, prohibitions or restrictions on new or existing services, or restrictions on greenhouse gas emissions to mitigate concerns over climate changes, including future limitations on the usage and distribution of natural gas;

political pressures or regulatory practices that could constrain or place additional cost burdens on our distribution systems through accelerated adoption of distributed generation or electric-powered transportation or on our energy supply sources, such as campaigns to halt fossil fuel-fired power generation and opposition to other thermal generation, wind turbines or hydroelectric facilities;

failure to identify changes in legislation, taxation and regulatory issues that could be detrimental or beneficial to our overall business;

policy and/or legislative changes in various regulated areas, including, but not limited to, environmental regulation, healthcare regulations and import/export regulations;

Financial Risk

our ability to obtain financing through the issuance of debt and/or equity securities and access to our funds held with financial institutions, which could be affected by various factors including our credit ratings, interest rates, other capital market conditions and global economic conditions;

changes in interest rates that affect borrowing costs, variable interest rate borrowing and the extent to which we recover interest costs through retail rates collected from customers;

volatility in energy commodity markets that affect our ability to effectively hedge energy commodity risks, including cash flow impacts and requirements for collateral;

volatility in the carbon emissions allowances market that could result in increased compliance costs;

changes in actuarial assumptions, interest rates and the actual return on plan assets for our pension and other postretirement benefit plans, which could affect future funding obligations, pension and other postretirement benefit expense and the related liabilities;

the outcome of legal proceedings and other contingencies;

economic conditions in our service areas, including the economy's effects on customer demand for utility services;

economic conditions nationally may affect the valuation of our unregulated portfolio companies;

declining electricity demand related to customer energy efficiency, conservation measures and/or increased distributed generation and declining natural gas demand related to customer energy efficiency, conservation measures and/or increased electrification;

industry and geographic concentrations which could increase our exposure to credit risks due to counterparties, suppliers and customers being similarly affected by changing conditions;

deterioration in the creditworthiness of our customers;

activist shareholders may result in additional costs and resources required in response to activist actions;

4

AVISTA CORPORATION

Energy Commodity Risk

volatility and illiquidity in wholesale energy markets, including exchanges, the availability of willing buyers and sellers, changes in wholesale energy prices that could affect operating income, cash requirements to purchase electricity and natural gas, value received for wholesale sales, collateral required of us by individual counterparties and/or exchanges in wholesale energy transactions and credit risk from such transactions, and the market value of derivative assets and liabilities;

default or nonperformance on the part of parties from whom we purchase and/or sell capacity or energy;

potential environmental regulations or lawsuits affecting our ability to utilize or resulting in the obsolescence of our power supply resources;

explosions, fires, accidents, pipeline ruptures or other incidents that could limit energy supply to our facilities or our surrounding territory, which could result in a shortage of commodities in the market that could increase the cost of replacement commodities from other sources;

Compliance Risk

changes in laws, regulations, decisions and policies at the federal, state or local levels, which could materially impact both our electric and gas operations and costs of operations; and

the ability to comply with the terms of the licenses and permits for our hydroelectric or thermal generating facilities at cost-effective levels.

Our expectations, beliefs and projections are expressed in good faith. We believe they are reasonable based on, without limitation, an examination of historical operating trends, our records and other information available from third parties. There can be no assurance that our expectations, beliefs or projections will be achieved or accomplished. Furthermore, any forward-looking statement speaks only as of the date on which such statement is made. We undertake no obligation to update any forward-looking statement or statements to reflect events or circumstances that occur after the date on which such statement is made or to reflect the occurrence of unanticipated events. New risks, uncertainties and other factors emerge from time to time, and it is not possible to predict all such factors, nor can we assess the effect of each such factor on our business or the extent that any such factor or combination of factors may cause actual results to differ materially from those contained in any forward-looking statement.

Available Information

We file annual, quarterly and current reports and proxy statements with the SEC. The SEC maintains a website that contains these documents at www.sec.gov. We make annual, quarterly and current reports and proxy statements available on our website, https://investor.avistacorp.com, as soon as practicable after electronically filing these documents with the SEC. Except for SEC filings or portions thereof specifically referred to in this report, information contained on these websites is not part of this report.

5

AVISTA CORPORATION

PART I

ITEM 1. BUSINESS

COMPANY OVERVIEW

Avista Corp., incorporated in the territory of Washington in 1889, is primarily an electric and natural gas utility with certain other business ventures. Our mission is to improve our customers’ lives through innovative energy solutions, safely, responsibly and affordably. Our corporate headquarters is in Spokane, Washington, the second-largest city in Washington. Spokane serves as the business, transportation, medical, industrial and cultural hub of the Inland Northwest region (eastern Washington and northern Idaho). Regional services include government and higher education, medical services, retail trade and finance. Through our subsidiary AEL&P, we also provide electric utility services in Juneau, Alaska.

As of December 31, 2023, we have two reportable business segments as follows:

Avista Utilities – an operating division of Avista Corp., comprising the regulated utility operations in Washington, Idaho, Oregon and Montana. Avista Utilities provides electric distribution and transmission, and natural gas distribution services in parts of eastern Washington and northern Idaho. Avista Utilities also provides natural gas distribution service in parts of northeastern and southwestern Oregon. Avista Utilities has electric generating facilities in Washington, Idaho, Oregon and Montana. Avista Utilities also supplies electricity to a small number of customers in Montana. Avista Utilities also engages in wholesale purchases and sales of electricity and natural gas as an integral part of energy resource management and its load-serving obligation.

AEL&P – a regulated utility providing electric services in Juneau, Alaska that is a wholly-owned subsidiary and the primary operating subsidiary of AERC.

We have other businesses, including venture fund investments, real estate investments, as well as certain other investments made by Avista Capital, which is a direct, wholly owned subsidiary of Avista Corp. These activities do not represent a reportable business segment and are conducted by various direct and indirect subsidiaries of Avista Corp.

Total Avista Corp. shareholders’ equity was $2.5 billion as of December 31, 2023, which includes a $145.6 million investment in Avista Capital and a $119.6 million investment in AERC.

See “Note 24 of the Notes to Consolidated Financial Statements” for information with respect to the operating performance of each business segment (and other subsidiaries).

Human Capital

Our approach to people is a critical strategy and the priorities for this strategy include, among other things:

attracting, developing, and retaining a diverse, engaged and skilled workforce,

providing opportunities for continuous learning, development, career growth, and movement within the Company,

supporting and rewarding our employees through competitive pay and benefits,

encouraging and supporting a community-minded culture, and

investing in the physical, emotional and financial health and safety of our employees.

The following is an overview of some of our key human capital initiatives intended to foster the overall well-being of our employees and other stakeholders, such as our customers and business partners.

Equity, Inclusion and Diversity

We strive to foster a culture that values trust, and respect based on equity, inclusion and diversity, and offering all employees the opportunity to enrich their lives and careers through challenging and meaningful work - all in an equal opportunity workplace surrounded by a supportive and inclusive environment. Our equity, inclusion, and diversity (EID) initiatives are focused on equity in our systems and processes, employee recruitment, employee training and development, and employee

6

AVISTA CORPORATION

engagement, including participation in employee resource groups. Employee resource groups are voluntary, employee-led groups fostering a diverse and inclusive workplace aligned with our organizational mission, values and goals and business practices. We continued to sponsor employee resource groups in 2023 which include: Women of Avista, Veterans of Avista, Diversity Awareness, Connections, and History of Avista.

Additional employee-focused EID efforts include active engagement in employment system and practice reviews to uncover and correct systemic inequities and/or barriers for a more fulsome approach to EID. Projects include overhauling and updating all job descriptions ensuring equity among similar positions regardless of the department, a pay equity project and developing a robust inclusive recruiting initiative to address direct recruiting activities and processes, recruiting systems and future workforce pipeline development.

On December 31, 2023, Avista Utilities employed 1,858 individuals with an employee profile of:

Women Under-Represented Groups (a)

Bargaining Unit 3% 6%

Non-bargaining Unit 45% 11%

Executives (b) 17% 17%

(a)

As defined by our Affirmative Action Plan and through employee self-identification.

(b)

Executive is defined as vice president or higher.

Employee data represents all regular full-time and part-time employees, including temporary workers and student interns.

Bargaining Unit employees comprise 36 percent of Avista Utilities’ employees.

People Development, Retention and Attraction

We strive to hire and retain talented people who are innovative and skilled so we can continue to provide safe, reliable and affordable service to our customers and advance the Company at the same time. Retention of our talented people is a focal strategy addressed through employee engagement efforts and the pay equity project. In 2022, we held our biennial employee experience survey and prioritized initiatives focusing on enhancing our employee experience.

Continuous learning plays a large part in fostering collaboration and innovation among our employees and is pervasive throughout the Company. Our development opportunities are created to prepare our employees at all levels to ensure they have the skills, knowledge and experience to perform today and well into the future. Keeping our workforce equipped to succeed is imperative to meet the emerging challenges that lay ahead. We develop training that is relevant, necessary and in demand for our organization. Training is delivered through instructor-led courses, self-service topics, computer-based learning modules, and field-based, hands-on workshop models covering the range of our operations. Training programs include craft apprenticeship programs, engineering development programs, leadership development, communication skills, cross-functional learning and EID topics. We also provide opportunities for our employees to attend industry events and certification programs, courses or programs offered through energy-related organizations such as the Western Energy Institute, the American Gas Association and the Edison Electric Institute, as well as through our local colleges and universities.

Workplace Safety

Safety is an essential part of our mission. A variety of programs and initiatives are in place to help employees complete their work safely through heightened vigilance, hazard recognition, defensive strategies, lessons learned, human and organizational performance and other tools intended to ensure resilience in varying and unpredictable conditions. We work with our employees to reinforce personal responsibility regarding safety and health, and to implement measures to create and maintain a safe work environment.

7

AVISTA CORPORATION

Additional Information

Additional information highlighting our commitment to corporate responsibility, including our commitment to our environment, our people, our customers and communities and ethical governance, is available on our website at www.avistacorp.com/corporate-responsibility/our-commitment. Material on our website is not part of this report.

AVISTA UTILITIES

General

At the end of 2023, Avista Utilities supplied retail electric service to approximately 416,000 customers and retail natural gas service to approximately 381,000 customers across its service territory. Avista Utilities' service territory covers 30,000 square miles with a population of 1.7 million.

Electric Operations

General

Avista Utilities generates, transmits and distributes electricity, serving electric customers in eastern Washington and northern Idaho and a small number of customers in Montana.

Avista Utilities generates electricity from facilities that we own and purchases capacity, energy and fuel for generation under long-term and short-term contracts to meet customer load obligations. We also sell electric capacity and energy, as well as surplus fuel in the wholesale market in connection with our resource optimization activities as described below.

As part of Avista Utilities' resource procurement and management operations in the electric business, we engage in an ongoing process of resource optimization, which involves the selection from available energy resources to serve our load obligations and the use of these resources to capture economic value through wholesale market transactions. These include sales and purchases of electric capacity and energy, fuel for electric generation, and derivative contracts related to capacity, energy, fuel and fuel transportation. Such transactions are part of the process of matching available resources with load obligations and hedging a portion of the related financial risks. To implement this process, we make continuing projections of:

electric loads at various points in time (ranging from intra-hour to multiple years) based on, among other things, estimates of customer usage and weather, historical data, contract terms, and emerging trends and climate modeling results, and

resource availability at these points in time based on, among other things, fuel choices and fuel markets, estimates of snowpack and streamflows, availability of generating units, historic and forward market information, contract terms and experience.

Based on these projections, we make purchases and sales of electric capacity and energy, fuel for electric generation, and related derivative contracts to match expected resources to expected electric load requirements and reduce our exposure to electricity (or fuel) market price changes. The process of resource optimization involves scheduling and dispatching available resources as well as the following:

purchasing fuel for generation,

when economical, selling fuel and substituting wholesale electric purchases, and

other wholesale transactions to capture the value of generating resources, transmission contract rights and fuel delivery (transport) capacity contracts.

This optimization process includes entering into hedging transactions to manage risks. Transactions include both physical energy contracts and related derivative instruments, and the terms range from intra-hour up to multiple years.

Avista Utilities' generation assets are interconnected through the regional transmission system and are operated on a coordinated basis to enhance load-serving capability and reliability. We acquire both long-term and short-term transmission

8

AVISTA CORPORATION

capacity to facilitate our energy and capacity transactions. We provide transmission and ancillary services in eastern Washington, northern Idaho and western Montana.

Electric Requirements

Avista Utilities' peak electric native load requirement for 2023 was 1,809 MW, which occurred on August 15, 2023. In 2022, our peak electric native load was 1,860 MW, which occurred during the winter, and in 2021, it was 1,889 MW, which occurred during the summer.

Electric Resources

Avista Utilities has a diverse electric resource mix of Company-owned and contracted hydroelectric, thermal, wind and solar generation facilities, and other contracts for power purchases and exchanges. As of December 31, 2023, Avista Utilities' electric generation resource mix (including contracts for power purchases) was approximately 48 percent hydroelectric, 43 percent thermal and 9 percent other renewables. See “Item 2. Properties” for detailed information on Company-owned generating facilities.

Hydroelectric Resources

Avista Utilities owns and operates Noxon Rapids and Cabinet Gorge on the Clark Fork River and six smaller hydroelectric projects on the Spokane River. Hydroelectric generation is typically our lowest cost source per MWh of electric energy and the availability of hydroelectric generation has a significant effect on total power supply costs. Under normal streamflow and operating conditions, we estimate that we would be able to meet approximately one-half of our total average electric requirements (both retail and long-term wholesale) with the combination of our hydroelectric generation and long-term hydroelectric purchase contracts (including those with certain PUDs in the state of Washington). Our estimate of normal annual hydroelectric generation for 2024 (including resources purchased under long-term hydroelectric contracts with certain PUDs) is 563.1 aMW (or 4.95 million MWhs).

See “Item 2. Properties - Avista Utilities - Generation Properties” for the present generating capabilities of the above hydroelectric resources.

9

AVISTA CORPORATION

The following graph shows Avista Utilities' hydroelectric generation (in thousands of MWhs) during the year ended December 31:

(1)

Normal hydroelectric generation is determined by reference to the effect of upstream dam regulation on median natural water flow. Natural water flow is the flow of the rivers without the influence of dams, whereas regulated water flow reflects water flow changes from upstream dams due to releasing or holding back water. The calculation of normal varies annually due to the timing of upstream dam regulation throughout the year, as well as changes in PUD contracts.

Thermal Resources

Avista Utilities owns the following thermal generating resources:

the combined cycle natural gas-fired CT, known as Coyote Springs 2, located near Boardman, Oregon,

a 15 percent interest in Units 3 and 4 of Colstrip, a coal-fired boiler generating facility located in southeastern Montana. We have an agreement with NorthWestern to transfer our ownership at the end of 2025; see “Note 22 of the Notes to Consolidated Financial Statements” for discussion of our Colstrip transaction with NorthWestern,

a wood waste-fired boiler generating facility known as the Kettle Falls GS in northeastern Washington,

a two-unit natural gas-fired CT generating facility in northeastern Spokane (Northeast CT),

a two-unit natural gas-fired CT generating facility in northern Idaho (Rathdrum CT), and

two small natural gas-fired generating facilities (Boulder Park GS and Kettle Falls CT).

Coyote Springs 2, which is operated by Portland General Electric Company, is supplied with natural gas under a combination of term contracts and spot market purchases, including transportation agreements with bilateral renewal rights.

Colstrip, which is operated by Talen, is supplied with fuel from adjacent coal reserves under coal supply and transportation agreements. Several of the co-owners of Colstrip, including us, have a coal contract that runs through December 31, 2025. See

10

AVISTA CORPORATION

“Item 7. Management's Discussion and Analysis – Colstrip” for discussion regarding environmental and other issues surrounding Colstrip.

The primary fuel for the Kettle Falls GS is wood waste generated as a by-product and delivered by trucks from forest industry operations within 100 miles of the plant. A combination of long-term contracts and spot purchases has provided, and is expected to meet, fuel requirements for the Kettle Falls GS.

The Northeast CT, Rathdrum CT, Boulder Park GS and Kettle Falls CT generating units are primarily used to meet peaking electric requirements. We also operate these facilities when marginal costs are below prevailing wholesale electric prices. These generating facilities have access to natural gas supplies that are adequate to meet their respective operating needs.

See “Item 2. Properties - Avista Utilities - Generation Properties” for the present generating capabilities of the above thermal resources.

The Lancaster Plant is a 270 MW natural gas-fired combined cycle combustion turbine plant located in northern Idaho, owned by an unrelated third-party. We have a PPA for the output from the Lancaster Plant through December 31, 2041. Under the terms of the PPA, we make the dispatch decisions, provide all natural gas fuel and receive the electric energy output. Therefore, we consider the Lancaster Plant to be a baseload resource. See “Note 5 of the Notes to Consolidated Financial Statements” for further discussion of this PPA.

See "Natural Gas Operations - Natural Gas Supply" for information regarding our supply of natural gas for both fuel and delivery to natural gas customers.

The following graph shows Avista Utilities' thermal generation (in thousands of MWhs) during the year ended December 31:

Wind Resources

We have exclusive rights to the capacity of Palouse Wind, a wind generation project developed, owned and managed by an unrelated third-party and located in Whitman County, Washington. Under the PPA, which expires in 2042, we purchase the power and renewable attributes produced by the project at a fixed price per MWh with a fixed escalation of the price over the term of the agreement. The project has a nameplate capacity of 105 MW. We have an annual option to purchase the wind project, which we have not exercised. The purchase price is a fixed price per KW of in-service capacity with a fixed decline in the price per KW over the remaining 20-year term of the PPA.

11

AVISTA CORPORATION

We have exclusive rights to the capacity of Rattlesnake Flat Wind project developed, owned and managed by an unrelated third party and located in Adams County, Washington. The facility has a nameplate capacity of 144 MW. The 20-year PPA began in December 2020 and we purchase the power and renewable attributes produced by the project at a fixed price per MWh with a fixed escalation of the price over the term of the agreement.

Solar Resources

We have exclusive rights to the capacity of the Lind Solar Farm, a solar generation project developed, owned and managed by an unrelated third-party and located in Lind, Washington. Under a PPA, which expires in 2038, we purchase the power and renewable attributes produced by the project at a fixed price per MWh. The project has a nameplate capacity of 28 MW.

Other Purchases, Exchanges and Sales

In addition to the resources described above, we purchase and sell power under various long-term contracts, and we enter into short-term purchases and sales. Further, pursuant to The Public Utility Regulatory Policies Act of 1978, as amended, we are required to purchase generation from qualifying facilities. This includes, among other resources, hydroelectric projects, cogeneration projects and wind generation projects at rates approved by the WUTC and the IPUC.

See “Avista Utilities Electric Operating Statistics – Electric Operations” below for annual quantities of purchased power, wholesale power sales and power from exchanges in 2023, 2022 and 2021. See “Electric Operations” above for additional information on the use of wholesale purchases and sales as part of our resource optimization process and see “Future Resource Needs” below for the magnitude of these power purchase and sales contracts in future periods.

Regional Capacity Issues

Purchases of capacity and energy at any time are dependent upon the availability of excess capacity in the west region at that time. Many coal-fired electric generating stations throughout the western United States are scheduled for retirement in the next several years. Depending upon a variety of factors, these retirements could have an impact upon the availability and price of purchased power in, and the dynamics of, the market in which we conduct our wholesale purchases and sales. After December 31, 2025, we are prohibited by Clean Energy Transformation Act (CETA) from using energy produced by coal-fired plants to serve our retail customers in Washington. We entered into an agreement with NorthWestern to transfer our interest in Colstrip at the end of 2025. To the extent necessary, we will obtain energy produced by other resources. See “Item 7. Management's Discussion and Analysis – Environmental Matters and Contingencies – Climate Change – Washington Legislation and Regulatory Actions – Clean Energy Transformation Act” and “Colstrip.”

In addition to retirement of coal-fired generating stations, some other generation plants in the region are being considered for possible closure due to environmental and other concerns. The reduction of regional generating capacity will have to be offset by the addition of new generating resources and energy storage facilities.

Hydroelectric Licenses

Avista Corp. is a licensee under the Federal Power Act (FPA) as administered by the FERC, which includes regulation of hydroelectric generation resources. Excluding the Little Falls Hydroelectric Generating Project (Little Falls), our other seven hydroelectric plants are regulated by the FERC through two project licenses. The licensed projects are subject to the provisions of Part I of the FPA. These provisions include payment for headwater benefits, condemnation of licensed projects upon payment of just compensation, and take-over by the federal government of such projects after the expiration of the license upon payment of the lesser of “net investment” or “fair value” of the project, in either case, plus severance damages. In the unlikely event that a take-over occurs, it could lead to either the decommissioning of the hydroelectric project or offering the project to another party (likely through sale and transfer of the license).

Cabinet Gorge and Noxon Rapids are under one 45-year FERC license expiring in 2046. This license embodies a settlement agreement relating to project operations and resource protection and mitigation efforts over the license term.

Five of our six hydroelectric projects on the Spokane River (Long Lake, Nine Mile, Upper Falls, Monroe Street and Post Falls) are under one 50-year FERC license expiring in 2059 and are referred to collectively as the Spokane River Project. The license

12

AVISTA CORPORATION

includes numerous natural and cultural resource protection measures that are subject to ongoing regulatory interpretation. The sixth, Little Falls, is operated under separate Congressional authority and is not licensed by the FERC. It is the subject of a 50-year agreement with the Spokane Tribe, expiring in 2044.

Future Resource Needs

Avista Utilities has operational strategies to provide sufficient resources to meet our energy requirements under a range of operating conditions. These operational strategies consider the amount of energy needed, which varies because of the factors that influence demand over intra-hour, hourly, daily, monthly and annual durations. Our average hourly load was 1,115 aMW in 2023, 1,142 aMW in 2022 and 1,113 aMW in 2021.

The following graph shows our forecast of our average annual energy requirements and our available resources for 2024 through 2027:

(1)

The combined maximum capacity of Boulder Park GS, Kettle Falls CT, Northeast CT and Rathdrum CT is 278 MW, with estimated available energy production as indicated for each year.

(2)

Other contracts for power purchases includes power purchase agreements for solar and wind energy.

(3)

The forecast assumes near normal hydroelectric generation.

(4)

Includes the Lancaster Plant PPA. Excludes Boulder Park GS, Kettle Falls CT, Northeast CT and Rathdrum CT, as these are considered peaking facilities and are generally not used to meet our base load requirements.

We are required to file an Integrated Resource Plan (IRP) or Washington Progress Report with the WUTC and IPUC every two years. The WUTC and IPUC review the IRP and give the public the opportunity to comment. The WUTC and IPUC do not approve or disapprove of the content in the IRP; rather, they acknowledge that the IRP was prepared in accordance with applicable standards if that is the case. The IRP details projected growth in demand for energy and the new resources needed to serve customers over the next 20 years. We regard the IRP as a tool for resource evaluation, rather than an acquisition plan for a particular project.

In June 2023, we filed our 2023 Electric IRP with the WUTC and the IPUC. We anticipate our next IRP to be filed in 2025.

13

AVISTA CORPORATION

Highlights of the 2023 Electric IRP include the following expectations and/or assumptions:

The forecast for growth in energy requirements increased to 0.9 percent per year, from 0.2 percent in the 2021 IRP. Higher growth largely reflects higher residential and commercial electric vehicle forecasts and new building electrification.

We have entered into PPAs for several renewable resources, and an expected divestiture (Colstrip at the end of 2025) since our 2021 IRP.

The resource strategy selected in the IRP is designed to achieve an 80 percent reduction in GHG emissions by 2045.

We need long-duration storage to serve customers in peak hours after 2035.

We created a Named Community Investment Fund to increase energy-related investments in disadvantaged communities. The fund will increase distributed energy resources such as energy efficiency, small-scale renewables, and energy storage.

We are subject to the Washington State Energy Independence Act, which requires us to obtain a portion of our electricity from qualifying renewable resources or through purchase of RECs and acquiring all cost effective conservation measures. Future generation resource decisions will be affected by legislation for restrictions on greenhouse gas emissions and renewable energy requirements.

See “Item 7. Management’s Discussion and Analysis of Financial Condition – Environmental Issues and Contingencies” and “Colstrip” for information related to existing and proposed laws and regulations, and issues relating to Colstrip.

Additional generating resources required will either be owned by us or be owned by other parties who will sell us the capacity and energy under PPAs. The decision as to ownership will be made as to each project at the appropriate time and will depend on, among other things, the type of project and the related economics, including tax and ratemaking treatment.

Electric Clean Energy Goals

We have an aspirational goal to serve our customers with 100 percent clean electricity by 2045. To help achieve this goal and add to our clean electricity portfolio, we have implemented renewable energy projects, including entering into various PPAs for solar, wind and hydroelectric resources. These resources are in addition to our existing clean hydroelectric generation, biomass generation, and additional wind and solar projects.

To achieve our clean energy goals, we expect energy storage and other technologies, which are either not currently available or are not cost-effective under the lowest reasonable cost regulatory standard, will advance to allow us to meet our goals while maintaining reliability and affordability for our customers. If the required technology is not available or not affordable in the future, we may not meet our goals in the desired timeframe. Meeting our clean energy goals may also require accommodation from regulatory agencies. See the discussion under “Electric Resources” for more information on our existing clean electricity sources and efforts to achieve these goals. See “Item 7. Management’s Discussion and Analysis of Financial Condition – Environmental Issues and Contingencies” for further discussion on clean energy, including applicable regulations.

Wildfire Resiliency Plan

We are implementing additional measures to enhance our ability to mitigate the potential for, and impact of, wildfires within our service territories. Building on prevention and response strategies in place for many years, in 2020 we created a comprehensive 10-year Wildfire Resiliency Plan that includes improved defense strategies and operating practices for a more resilient system. This plan is periodically updated and informed by observed experience as well as changes in observed landscape and climatic conditions.

We developed the Wildfire Resiliency Plan through a series of internal workshops, industry research and engagement with state and local fire agencies. Improvements to infrastructure and operational practices were identified as key components to the plan.

14

AVISTA CORPORATION

These key components are categorized into the following categories: grid hardening, vegetation management, situational awareness, operations and emergency response, and worker and public safety.

We expect to spend $437 million ($124 million of which was spent through 2023) implementing the plan components over the life of the 10-year plan that began in 2020. The IPUC and WUTC approved deferral of certain costs of the wildfire resiliency plan, and we will continue to seek recovery of costs in future rate filings.

See “Note 22 of the Notes to Consolidated Financial Statements” for further discussion on wildfires.

Natural Gas Operations

General

Avista Utilities provides natural gas distribution services to retail customers in parts of eastern Washington, northern Idaho, and northeastern and southwestern Oregon.

Market prices for natural gas, like other commodities, can be volatile. Our natural gas procurement strategy is to provide a reliable supply to our customers with some level of price certainty. We procure natural gas from various supply basins and over varying time periods. The resulting portfolio is a diversified mix of forward fixed price purchases, index and spot market purchases, and utilizing physical and financial derivative instruments. We also use natural gas storage to support high demand periods and the procurement of natural gas when prices may be lower. Securing prices throughout the year and even into subsequent years provides a level of price certainty and can mitigate price volatility to customers between years.

Weather is a key component of our natural gas customer load. This load is highly variable and daily natural gas loads can differ significantly from the monthly forecasted load projections. We make continuing projections of our natural gas loads and assess available natural gas resources. Based on these projections, we plan and execute a series of transactions to hedge a portion of our customers' projected natural gas requirements through forward market transactions and derivative instruments. These transactions may extend for multiple years into the future. We also leave a portion of our natural gas supply requirements unhedged for purchase in the short-term spot markets.

Our purchase of natural gas supply is governed by our procurement plan and is reviewed and approved annually by the Risk Management Committee (RMC), which is comprised of certain officers and other management personnel. Once approved, the plan is implemented and monitored by our gas supply and risk management groups.

The plan’s progress is presented to the WUTC and IPUC staff in semi-annual meetings, and updates are given to the OPUC staff quarterly. The RMC is provided with an update on plan results and changes in their monthly meetings. These activities provide transparency for the natural gas supply procurement plan. Material changes to the plan are documented and communicated to RMC members.

As part of the process of balancing natural gas retail load requirements with resources, we engage in the wholesale purchase and sale of natural gas. We plan for sufficient natural gas delivery capacity to serve our retail customers for a theoretical peak day event. We generally have more pipeline and storage capacity than what is needed during periods other than a peak day. We optimize our natural gas resources by using market opportunities to generate economic value that helps mitigate fixed costs. Wholesale sales are delivered through wholesale market facilities outside of our natural gas distribution system. Natural gas resource optimization activities include, but are not limited to:

wholesale market sales of surplus natural gas supplies,

purchases and sales of natural gas to optimize use of pipeline and storage capacity, and

participation in the transportation capacity release market.

We also provide distribution transportation service to qualified, large commercial and industrial natural gas customers who purchase natural gas through third-party marketers. For these customers, we receive their purchased natural gas from such third-party marketers into our distribution system and deliver it to the customers’ premises. These customers generally pay the same rates as other customers in the same class, without charge for the cost of the natural gas delivered.

15

AVISTA CORPORATION

Optimization transactions that we engage in throughout the year are included in our annual purchased gas cost adjustment filings with the various commissions and are subject to review for prudence during this process.

Natural Gas Clean Energy Goals

We have an aspirational goal for our natural gas operations to be carbon neutral by 2045. Examples of carbon emissions reduction strategies include the following:

Diversify or transition from fossil fuel-based natural gas to renewable natural gas,

Reduce natural gas consumption via conservation, energy efficiency and new technologies, and

Purchase carbon offsets as necessary.

See “Item 7. Management’s Discussion and Analysis of Financial Condition – Environmental Issues and Contingencies” for further discussion on clean energy, including applicable regulations.

We have several contracts for RNG, including agreements with Pine Creek RNG to purchase an expected output of approximately 9.7 million therms annually from various projects.

Natural Gas Supply

We purchase natural gas, for both fuel for generation and delivery to natural gas customers, in wholesale markets and are connected to multiple supply basins in the western United States and Canada through firm capacity transportation rights on six different pipeline networks. Access to this diverse portfolio of natural gas resources allows for natural gas procurement decisions that benefit our natural gas customers. These interstate pipeline transportation rights provide the capacity to serve approximately 25 percent of peak natural gas customer demands from domestic sources and 75 percent from Canadian sources. Natural gas prices in the Pacific Northwest are affected by global energy markets, as well as supply and demand factors in other regions of the United States and Canada. Future prices and delivery constraints may cause our resource mix to vary.

Natural Gas Storage

Avista Utilities owns a one-third interest in Jackson Prairie, an underground aquifer natural gas storage field located near Chehalis, Washington. Jackson Prairie has a total peak day deliverability of 12 million therms, with a total working natural gas capacity of 256 million therms. Our share is one-third of the peak day deliverability and total working capacity. We also contract for additional storage capacity and delivery at Jackson Prairie from Northwest Pipeline for a portion of their one-third share of the storage project.

We optimize our natural gas storage capacity throughout the year by executing transactions that capture favorable market price spreads. Natural gas buyers identify opportunities to purchase lower cost natural gas in the immediate term to inject into storage, and then sell the gas in a forward market to be withdrawn later. The reverse of this type of transaction also occurs. These transactions lock in incremental value for customers. Jackson Prairie is also used as a variable peaking resource, and to protect from extreme daily price volatility during cold weather or other events affecting the market.

Future Resource Needs

In March 2023, we filed our 2023 Natural Gas IRP with the WUTC, the IPUC and the OPUC. The IRP details projected growth in demand for energy and the new resources needed to serve customers over the next 20 years. We regard the IRP as a tool for resource evaluation, rather than an acquisition plan for a particular project.

Highlights of the 2023 natural gas IRP include the following expectations and/or assumptions:

We anticipate having sufficient natural gas resources to meet expected loads with our current transportation contracts for natural gas.

Customer forecasts are increasingly difficult to model due to a variety of rules and codes.

16

AVISTA CORPORATION

Emissions compliance with various environmental laws greatly impact our resource strategy, including the use of renewable natural gas, synthetic methane, and credits or allowances.

Our Idaho preferred resource strategy continues to utilize a least cost basis.

We monitor these assumptions on an on-going basis and adjust our resource requirements accordingly.

See “Item 7. Management’s Discussion and Analysis of Financial Condition – Environmental Issues and Contingencies” for further discussion of environmental laws, including impacts to our business.

We are required to file a natural gas IRP every two years and we anticipate our next IRP to be filed in 2025.

Utility Regulation

General

As a public utility, Avista Corp. is subject to regulation by state utility commissions for retail electric and natural gas rates, accounting, the issuance of securities and other matters. The retail electric and natural gas operations are subject to the jurisdiction of the WUTC, IPUC, OPUC and MPSC. Approval of the issuance of securities is not required from the MPSC. We are subject to the jurisdiction of the FERC for licensing of hydroelectric generation resources, and for electric transmission services and wholesale sales.

Since Avista Corp. is a “holding company” (in addition to being itself an operating utility), we are subject to the jurisdiction of the FERC under the Public Utility Holding Company Act of 2005, which imposes certain reporting and record-keeping requirements on Avista Corp. and its subsidiaries. We and our subsidiaries are required to make books and records available to the FERC and the state utility commissions. In addition, upon the request of any jurisdictional state utility commission, the FERC would have the authority to review assignment of costs of non-power goods and administrative services among us and our subsidiaries. The FERC has the authority generally to require that rates subject to its jurisdiction be just and reasonable and, in this context, would continue to be able to, among other things, review transactions of an affiliated company.

Our rates for retail electric and natural gas services (other than specially negotiated retail rates for industrial or large commercial customers, which are subject to regulatory review and approval) are generally determined on a “cost of service” basis.

Retail rates are designed to provide an opportunity to recover allowable operating expenses and earn a return of and a reasonable return on “rate base.” Rate base is generally determined by reference to the original cost (net of accumulated depreciation) of utility plant in service, subject to various adjustments for deferred income taxes and other items. Over time, rate base is increased by additions to utility plant in service and reduced by depreciation and write-offs as authorized by the utility commissions. Our operating expenses and rate base are allocated or directly assigned to five regulatory jurisdictions: electric in Washington and Idaho, and natural gas in Washington, Idaho and Oregon. In general, requests for new retail rates are made based on revenues, operating expenses and net investment for a test year that ended prior to the date of the request, subject to possible adjustments, which differ among the various jurisdictions, designed to reflect the expected revenues, operating expenses and net investment during the period new retail rates will be in effect. The retail rates approved by the state commissions in a rate proceeding may not provide sufficient revenues to provide recovery of costs and a reasonable return on investment for a number of reasons, including, but not limited to, ongoing capital expenditures and unexpected changes in revenues and expenses following the time new retail rates are requested in the rate proceeding (known as “regulatory lag”), the denial by the commission of recovery, or timely recovery, of certain expenses or investment and the limitation by the commission of the authorized return on investment. In 2021, Washington enacted a multi-year rate plan and performance-based rate making regulations. See “Item 7. Management’s Discussion and Analysis – Regulatory Matters – General Rate Cases” for further information.

Our rates for wholesale electric sales and electric transmission services, as well as certain natural gas transportation services, are based on either “cost of service” principles or market-based rates as set forth by the FERC. See “Notes 1, 13 and 23 of the

17

AVISTA CORPORATION

Notes to Consolidated Financial Statements” for additional information about regulation (including power cost deferrals, purchased gas adjustments and decoupling mechanisms), depreciation and deferred income taxes.

See “Item 7. Management’s Discussion and Analysis – Regulatory Matters” for information on general rate cases.

Federal Laws Related to Wholesale Competition

Federal law promotes practices that foster competition in the electric wholesale energy market. The FERC requires electric utilities to transmit power and energy to or for wholesale purchasers and sellers, and requires electric utilities to enhance or construct transmission facilities to create additional transmission capacity for the purpose of providing these services. Public utilities (through subsidiaries or affiliates) and other entities may participate in the development of independent electric generating plants for sales to wholesale customers.

Public utilities operating under the FPA are required to provide open and non-discriminatory access to their transmission systems to third parties and establish an Open Access Same-Time Information System to provide an electronic means by which transmission customers can obtain information about available transmission capacity and purchase transmission access. The FERC also requires each public utility subject to the rules to operate its transmission and wholesale power merchant operating functions separately and to comply with standards of conduct designed to ensure that all wholesale users, including the public utility’s power merchant operations, have equal access to the public utility’s transmission system. Our compliance with these standards has not had a substantive impact on the operation, maintenance and marketing of our transmission system or our ability to provide service to customers.

See “Item 7. Management’s Discussion and Analysis – Competition” for further information.

Regional Transmission Planning

Beginning with FERC Order No. 888 and continuing with subsequent rulemakings and policies, the FERC has encouraged better coordination and operational consistency aimed to capture efficiencies that might otherwise be gained through the formation of a Regional Transmission Organization or an independent system operator.

We meet our FERC requirements to coordinate transmission planning activities with other regional entities through NorthernGrid. Launched January 1, 2020, NorthernGrid is an association of all major transmission providers throughout the Pacific Northwest and Intermountain West, with facilities in California, Idaho, Montana, Oregon, Utah, Washington and Wyoming. Through our participation in NorthernGrid, we meet the regional transmission planning requirements of FERC Order Nos. 890 and 1000, and follow-on orders. NorthernGrid and its members also work with other western organizations, including WestConnect and the California Independent System Operator (CAISO), to address broader interregional planning. Neither the costs nor requirements of participating in NorthernGrid’s coordinated transmission planning activities are expected to materially impact our operations or financial performance.

Regional Energy Markets

The CAISO operates the Western Energy Imbalance Market (EIM) in the western United States. All investor-owned utilities in the Pacific Northwest are participants in the Western EIM. We commenced Western EIM operations in March 2022. The Western EIM, among other things, facilitates regional load balancing by allowing certain generating plants to receive automated dispatch signals from the CAISO in five-minute intervals.

Reliability Standards

Among its other provisions, the U.S. Energy Policy Act provides for the implementation of mandatory reliability standards and authorizes the FERC to assess penalties for non-compliance with these standards and other FERC regulations.

The FERC certified the NERC as the single Electric Reliability Organization authorized to establish and enforce reliability standards and delegate authority to regional entities for the purpose of establishing and enforcing reliability standards, including but not limited to cybersecurity measures. The FERC approves NERC Reliability Standards, including western region standards that make up the set of legally enforceable standards for the United States bulk electric system. We are required to self-certify our compliance with these standards on an annual basis and undergo regularly scheduled periodic reviews by the NERC and its

18

AVISTA CORPORATION

Source: SEC EDGAR (public domain) · 10-K for the period ended 2023-12-31, filed 2024-02-21 · accession 0000950170-24-017421

Filing HTML rendered to line-structured narrative text by the shipped reducer (datafeeds.edgar_fulltext.visible_text, keep_table_headers=True): scripts and inline-XBRL headers are dropped, and table content is reduced to its short label cells — numeric table data is not rendered and is therefore not counted. The same rendering is used for every year, so a year-over-year comparison is like for like.

The text is our rendering of the filing, not a facsimile: original pagination, typography and tables are not reproduced, and the numbers live in the financial statements (FA).

The outline locates item HEADINGS in this document. Only Items 1A and 7 have certified boundaries elsewhere in the terminal (the redline and the narrative-overlap number); every span here runs from one heading found to the next heading found.

How the outline was chosen. It is the longest chain of item headings that runs forward through both the document and the standard item order: 22 headings are on that chain and 0 further heading-shaped lines are not — the table-of-contents echo of every item, cross-references and exhibit-list mentions. Each entry's length is measured from its heading to the next heading on the chain.