10-K
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 10-K
(Mark One)
FOR THE FISCAL YEAR ENDED December 31, 2021 OR
FOR THE TRANSITION PERIOD FROM TO
Commission file number 001-03701
AVISTA CORPORATION
(Exact name of Registrant as specified in its charter)
1411 East Mission Avenue, Spokane, WA99202-2600
(Address of principal executive offices, including zip code)
Registrant’s telephone number, including area code: 509-489-0500
Web site: http://www.avistacorp.com
Securities registered pursuant to Section 12(b) of the Act:
Title of Each Class Trading Symbol(s) Name of Each Exchange on Which Registered
Common Stock AVA NYSE
Securities registered pursuant to Section 12(g) of the Act:
Title of Class
Preferred Stock, Cumulative, Without Par Value
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes ☒ No ☐
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or 15(d) of the Act. Yes ☐ No ☒
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the Registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days: Yes ☒ No ☐
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☒ No ☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and "emerging growth company" in Rule 12b-2 of the Exchange Act. (Check one):
Large Accelerated Filer ☒ Accelerated Filer ☐
Non-accelerated Filer ☐ Smaller reporting company ☐
Emerging growth company ☐
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. ☒
Indicate by check mark whether the Registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act): Yes ☐ No ☒
The aggregate market value of the Registrant’s outstanding Common Stock, no par value (the only class of voting stock), held by non-affiliates is $2,972,676,681 based on the last reported sale price thereof on the consolidated tape on June 30, 2021.
As of January 31, 2022, 71,572,570 shares of Registrant’s Common Stock, no par value (the only class of common stock), were outstanding.
Documents Incorporated By Reference
Document Part of Form 10-K into WhichDocument is Incorporated
AVISTA CORPORATION
INDEX
ItemNo. PageNo.
Acronyms and Terms iv
Forward-Looking Statements 1
Available Information 4
Part I
1 Business 5
Company Overview 5
Avista Utilities 7
General 7
Electric Operations 7
Electric Requirements 8
Electric Resources 8
Hydroelectric Licenses 11
Future Resource Needs 12
Natural Gas Operations 14
Utility Regulation 17
Federal Laws Related to Wholesale Competition 18
Regional Transmission Planning 18
Regional Energy Markets 18
Reliability Standards 19
Vulnerability to Cyberattack 19
Avista Utilities Operating Statistics 20
Alaska Electric Light and Power Company 22
Alaska Electric Light and Power Company Operating Statistics 24
Other Businesses 25
1A. Risk Factors 26
1B. Unresolved Staff Comments 35
Avista Utilities 36
Alaska Electric Light and Power Company 37
3 Legal Proceedings 38
4 Mine Safety Disclosures 38
Part II
6 Removed and Reserved 39
Business Segments 40
Executive Level Summary 40
Regulatory Matters 42
Results of Operations - Overall 46
Non-GAAP Financial Measures 48
i
AVISTA CORPORATION
Results of Operations - Avista Utilities 48
Results of Operations - Alaska Electric Light and Power Company 54
Results of Operations - Other Businesses 54
Accounting Standards to Be Adopted in 2022 54
Critical Accounting Policies and Estimates 54
Liquidity and Capital Resources 56
Overall Liquidity 56
Review of Consolidated Cash Flow Statement 57
Capital Resources 58
Utility Capital Expenditures 60
Non-Regulated Investments and Capital Expenditures 61
Pension Plan 61
Credit Ratings 62
Dividends 62
Competition 62
Economic Conditions and Utility Load Growth 63
Environmental Issues and Other Contingencies 65
Colstrip 69
Enterprise Risk Management 70
7A. Quantitative and Qualitative Disclosures about Market Risk 78
8. Financial Statements and Supplementary Data 78
Report of Independent Registered Public Accounting Firm (PCAOB ID No. 34) 79
Financial Statements 81
Consolidated Statements of Income 81
Consolidated Statements of Comprehensive Income 82
Consolidated Balance Sheets 83
Consolidated Statements of Cash Flows 84
Consolidated Statements of Equity 86
Notes to Consolidated Financial Statements 87
Note 1. Summary of Significant Accounting Policies 87
Note 2. New Accounting Standards 94
Note 3. Balance Sheet Components 94
Note 4. Revenue 95
Note 5. Leases 99
Note 6. Variable Interest Entities 102
Note 7. Derivatives and Risk Management 103
Note 8. Jointly Owned Electric Facilities 107
Note 9. Property, Plant and Equipment 108
Note 10. Asset Retirement Obligations 108
Note 11. Pension Plans and Other Postretirement Benefit Plans 109
Note 12. Accounting for Income Taxes 114
Note 13. Energy Purchase Contracts 116
Note 14. Committed Lines of Credit 117
ii
AVISTA CORPORATION
Note 15. Credit Agreement 118
Note 16. Long-Term Debt 119
Note 17. Long-Term Debt to Affiliated Trusts 120
Note 20. Accumulated Other Comprehensive Loss 125
Note 22. Commitments and Contingencies 126
Note 23. Regulatory Matters 130
Note 24. Information by Business Segments 134
Note 25. Termination of Proposed Acquisition by Hydro One 135
Note 26. Sale of METALfx 135
9A. Controls and Procedures 136
9B. Other Information 138
9C. Disclosure Regarding Foreign Jurisdictions that Prevent Inspections 138
Part III
10. Directors, Executive Officers and Corporate Governance 139
11. Executive Compensation 141
14. Principal Accounting Fees and Services 142
Part IV
15. Exhibits, Financial Statement Schedules 143
Exhibit Index 144
* = not an applicable item in the 2021 calendar year for Avista Corp.
iii
AVISTA CORPORATION
ACRONYMS AND TERMS
(The following acronyms and terms are found in multiple locations within the document)
Acronym/Term Meaning
AM&D - Advanced Manufacturing and Development, doing business as METALfx
ASC - Accounting Standards Codification
ASU - Accounting Standards Update
Avista Corp. - Avista Corporation, the Company
BPA - Bonneville Power Administration
CEIP - Clean Energy Implementation Plan, Washington
CETA - Clean Energy Transformation Act, Washington
CPP - Climate Protection Program, Oregon
Colstrip - The coal-fired Colstrip Generating Plant in southeastern Montana
CT - Combustion turbine
Ecology - The State of Washington’s Department of Ecology
EIM - Energy Imbalance Market
EPA - Environmental Protection Agency
iv
AVISTA CORPORATION
FASB - Financial Accounting Standards Board
FERC - Federal Energy Regulatory Commission
GAAP - Generally Accepted Accounting Principles
GHG - Greenhouse gas
GS - Generating station
Hydro One - Hydro One Limited, based in Toronto, Ontario, Canada.
IPUC - Idaho Public Utilities Commission
IRP - Integrated Resource Plan
Juneau - The City and Borough of Juneau, Alaska
kV - Kilovolt (1000 volts): a measure of capacity on transmission lines
LNG - Liquefied Natural Gas
MPSC - Public Service Commission of the State of Montana
MW, MWh - Megawatt: 1000 KW. Megawatt-hour: 1000 KWh
NERC - North American Electricity Reliability Corporation
NorthWestern - NorthWestern Corporation
OPUC - The Public Utility Commission of Oregon
PGA - Purchased Gas Adjustment
PGE - Portland General Electric Company
PPA - Power Purchase Agreement
PSE - Puget Sound Energy, Inc.
PUD - Public Utility District
RCA - The Regulatory Commission of Alaska
REC - Renewable energy credit
ROE - Return on equity
ROR - Rate of return on rate base
ROU - Right-of-use lease asset
SEC - U.S. Securities and Exchange Commission
Talen - Talen Montana, LLC, an indirect subsidiary of Talen Energy Corporation.
v
AVISTA CORPORATION
WUTC - Washington Utilities and Transportation Commission
vi
AVISTA CORPORATION
Forward-Looking Statements
From time to time, we make forward-looking statements such as statements regarding projected or future:
•
financial performance;
•
cash flows;
•
capital expenditures;
•
dividends;
•
capital structure;
•
other financial items;
•
strategic goals and objectives;
•
business environment; and
•
plans for operations.
These statements are based upon underlying assumptions (many of which are based, in turn, upon further assumptions). Such statements are made both in our reports filed under the Securities Exchange Act of 1934, as amended (including this Annual Report on Form 10-K), and elsewhere. Forward-looking statements are all statements except those of historical fact including, without limitation, those that are identified by the use of words that include “will,” “may,” “could,” “should,” “intends,” “plans,” “seeks,” “anticipates,” “estimates,” “expects,” “forecasts,” “projects,” “predicts,” and similar expressions.
Forward-looking statements (including those made in this Annual Report on Form 10-K) are subject to a variety of risks, uncertainties and other factors. Most of these factors are beyond our control and may have a significant effect on our operations, results of operations, financial condition or cash flows, which could cause actual results to differ materially from those anticipated in our statements. Such risks, uncertainties and other factors include, among others:
Utility Regulatory Risk
•
state and federal regulatory decisions or related judicial decisions that affect our ability to recover costs and earn a reasonable return including, but not limited to, disallowance or delay in the recovery of capital investments, operating costs, commodity costs, interest rate swap derivatives, the ordering of refunds to customers and discretion over allowed return on investment;
•
the loss of regulatory accounting treatment, which could require the write-off of regulatory assets and the loss of regulatory deferral and recovery mechanisms;
Operational Risk
•
pandemics (including the current COVID-19 pandemic), which could disrupt our business, as well as the global, national and local economy, resulting in a decline in customer demand, deterioration in the creditworthiness of our customers, increases in operating and capital costs, workforce shortages, losses or disruptions in our workforce due to vaccine mandates, delays in capital projects, disruption in supply chains, and disruption, weakness and volatility in capital markets. In addition, any of these factors could negatively impact our liquidity and limit our access to capital, among other implications;
•
wildfires ignited, or allegedly ignited, by Avista Corp. equipment or facilities could cause significant loss of life and property or result in liability for resulting fire suppression costs, thereby causing serious operational and financial harm;
•
severe weather or natural disasters, including, but not limited to, avalanches, wind storms, wildfires, earthquakes, extreme temperature events, snow and ice storms, and the potential increasing frequency and intensity of such events due to climate change, that could disrupt energy generation, transmission and distribution, as well as the availability and costs of fuel, materials, equipment, supplies and support services;
•
explosions, fires, accidents, mechanical breakdowns or other incidents that could impair assets and may disrupt operations of any of our generation facilities, transmission, and electric and natural gas distribution systems or other operations and may require us to purchase replacement power or incur costs to repair our facilities;
1
AVISTA CORPORATION
•
explosions, fires, accidents or other incidents arising from or allegedly arising from our operations that could cause injuries to the public or property damage;
•
blackouts or disruptions of interconnected transmission systems (the regional power grid);
•
terrorist attacks, cyberattacks or other malicious acts that could disrupt or cause damage to our utility assets or to the national or regional economy in general, including any effects of terrorism, cyberattacks, ransomware, or vandalism that damage or disrupt information technology systems;
•
work-force issues, including changes in collective bargaining unit agreements, strikes, work stoppages, the loss of key executives, availability of workers in a variety of skill areas, and our ability to recruit and retain employees;
•
changes in the availability and price of purchased power, fuel and natural gas, as well as transmission capacity;
•
increasing costs of insurance, more restrictive coverage terms and our ability to obtain insurance;
•
delays or changes in construction costs, and/or our ability to obtain required permits and materials for present or prospective facilities;
•
increasing health care costs and cost of health insurance provided to our employees and retirees;
•
increasing operating costs, including effects of inflationary pressures;
•
third party construction of buildings, billboard signs, towers or other structures within our rights of way, or placement of fuel containers within close proximity to our transformers or other equipment, including overbuilding atop natural gas distribution lines;
•
the loss of key suppliers for materials or services or other disruptions to the supply chain;
•
adverse impacts to our Alaska electric utility (AEL&P) that could result from an extended outage of its hydroelectric generating resources or their inability to deliver energy, due to their lack of interconnectivity to any other electrical grids and the availability or cost of replacement power (diesel);
•
changing river or reservoir regulation or operations at hydroelectric facilities not owned by us, which could impact our hydroelectric facilities downstream;
•
change in the use, availability or abundancy of water resources and/or rights needed for operation of our hydroelectric facilities;
Cyber and Technology Risk
•
cyberattacks on the operating systems that are used in the operation of our electric generation, transmission and distribution facilities and our natural gas distribution facilities, and cyberattacks on such systems of other energy companies with which we are interconnected, which could damage or destroy facilities or systems or disrupt operations for extended periods of time and result in the incurrence of liabilities and costs;
•
cyberattacks on the administrative systems that are used in the administration of our business, including customer billing and customer service, accounting, communications, compliance and other administrative functions, and cyberattacks on such systems of our vendors and other companies with which we do business, resulting in the disruption of business operations, the release of private information and the incurrence of liabilities and costs;
•
changes in costs that impede our ability to implement new information technology systems or to operate and maintain current production technology;
•
changes in technologies, possibly making some of the current technology we utilize obsolete or introducing new cyber security risks;
•
insufficient technology skills, which could lead to the inability to develop, modify or maintain our information systems;
2
AVISTA CORPORATION
Strategic Risk
•
growth or decline of our customer base due to new uses for our services or decline in existing services, including, but not limited to, the effect of the trend toward distributed generation at customer sites;
•
the potential effects of negative publicity regarding our business practices, whether true or not, which could hurt our reputation and result in litigation or a decline in our common stock price;
•
changes in our strategic business plans, which could be affected by any or all of the foregoing, including the entry into new businesses and/or the exit from existing businesses and the extent of our business development efforts where potential future business is uncertain;
•
wholesale and retail competition including alternative energy sources, growth in customer-owned power resource technologies that displace utility-supplied energy or that may be sold back to the utility, and alternative energy suppliers and delivery arrangements;
•
entering into or growth of non-regulated activities may increase earnings volatility;
•
the risk of municipalization or other forms of service territory reduction;
External Mandates Risk
•
changes in environmental laws, regulations, decisions and policies, including, but not limited to, regulatory responses to concerns regarding climate change, efforts to restore anadromous fish in areas currently blocked by dams, more stringent requirements related to air quality, water quality and waste management, present and potential environmental remediation costs and our compliance with these matters;
•
the potential effects of initiatives, legislation or administrative rulemaking at the federal, state or local levels, including possible effects on our generating resources, prohibitions or restrictions on new or existing services, or restrictions on greenhouse gas emissions to mitigate concerns over global climate changes;
•
political pressures or regulatory practices that could constrain or place additional cost burdens on our distribution systems through accelerated adoption of distributed generation or electric-powered transportation or on our energy supply sources, such as campaigns to halt fossil fuel fired power generation and opposition to other thermal generation, wind turbines or hydroelectric facilities;
•
failure to identify changes in legislation, taxation and regulatory issues that could be detrimental or beneficial to our overall business;
•
policy and/or legislative changes in various regulated areas, including, but not limited to, environmental regulation, healthcare regulations and import/export regulations;
Financial Risk
•
weather conditions, which affect both energy demand and electric generating capability, including the impact of precipitation and temperature on hydroelectric resources, the impact of wind patterns on wind-generated power, weather-sensitive customer demand, and similar impacts on supply and demand in the wholesale energy markets;
•
our ability to obtain financing through the issuance of debt and/or equity securities, which could be affected by various factors including our credit ratings, interest rates, other capital market conditions and global economic conditions;
•
changes in interest rates that affect borrowing costs, our ability to effectively hedge interest rates for anticipated debt issuances, variable interest rate borrowing and the extent to which we recover interest costs through retail rates collected from customers;
•
changes in actuarial assumptions, interest rates and the actual return on plan assets for our pension and other postretirement benefit plans, which could affect future funding obligations, pension and other postretirement benefit expense and the related liabilities;
•
the outcome of legal proceedings and other contingencies;
•
economic conditions in our service areas, including the economy's effects on customer demand for utility services;
3
AVISTA CORPORATION
•
economic conditions nationally may affect the valuation of our unregulated portfolio companies;
•
declining energy demand related to customer energy efficiency, conservation measures and/or increased distributed generation;
•
changes in the long-term climate and weather could materially affect, among other things, customer demand, the volume and timing of streamflows required for hydroelectric generation, costs of generation, transmission and distribution. Increased or new risks may arise from severe weather or natural disasters, including wildfires as well as their increased occurrence and intensity related to changes in climate;
•
industry and geographic concentrations which could increase our exposure to credit risks due to counterparties, suppliers and customers being similarly affected by changing conditions;
•
deterioration in the creditworthiness of our customers;
Energy Commodity Risk
•
volatility and illiquidity in wholesale energy markets, including exchanges, the availability of willing buyers and sellers, changes in wholesale energy prices that could affect operating income, cash requirements to purchase electricity and natural gas, value received for wholesale sales, collateral required of us by individual counterparties and/or exchanges in wholesale energy transactions and credit risk to us from such transactions, and the market value of derivative assets and liabilities;
•
default or nonperformance on the part of any parties from whom we purchase and/or sell capacity or energy;
•
potential environmental regulations or lawsuits affecting our ability to utilize or resulting in the obsolescence of our power supply resources;
•
explosions, fires, accidents, pipeline ruptures or other incidents that could limit energy supply to our facilities or our surrounding territory, which could result in a shortage of commodities in the market that could increase the cost of replacement commodities from other sources;
Compliance Risk
•
changes in laws, regulations, decisions and policies at the federal, state or local levels, which could materially impact both our electric and gas operations and costs of operations; and
•
the ability to comply with the terms of the licenses and permits for our hydroelectric or thermal generating facilities at cost-effective levels.
Our expectations, beliefs and projections are expressed in good faith. We believe they are reasonable based on, without limitation, an examination of historical operating trends, our records and other information available from third parties. There can be no assurance that our expectations, beliefs or projections will be achieved or accomplished. Furthermore, any forward-looking statement speaks only as of the date on which such statement is made. We undertake no obligation to update any forward-looking statement or statements to reflect events or circumstances that occur after the date on which such statement is made or to reflect the occurrence of unanticipated events. New risks, uncertainties and other factors emerge from time to time, and it is not possible for us to predict all such factors, nor can we assess the effect of each such factor on our business or the extent that any such factor or combination of factors may cause actual results to differ materially from those contained in any forward-looking statement.
Available Information
We file annual, quarterly and current reports and proxy statements with the SEC. The SEC maintains a website that contains these documents at www.sec.gov. We make annual, quarterly and current reports and proxy statements available on our website, https://investor.avistacorp.com, as soon as practicable after electronically filing these documents with the SEC. Except for SEC filings or portions thereof that are specifically referred to in this report, information contained on these websites is not part of this report.
4
AVISTA CORPORATION
PART I
ITEM 1. BUSINESS
COMPANY OVERVIEW
Avista Corp., incorporated in the territory of Washington in 1889, is primarily an electric and natural gas utility with certain other business ventures. Our mission is to improve our customers’ lives through innovative energy solutions, safely, responsibly and affordably. Our corporate headquarters is in Spokane, Washington, the second-largest city in Washington. Spokane serves as the business, transportation, medical, industrial and cultural hub of the Inland Northwest region (eastern Washington and northern Idaho). Regional services include government and higher education, medical services, retail trade and finance. Through our subsidiary AEL&P, we also provide electric utility services in Juneau, Alaska.
As of December 31, 2021, we have two reportable business segments as follows:
•
Avista Utilities – an operating division of Avista Corp., comprising the regulated utility operations in Washington, Idaho, Oregon and Montana. Avista Utilities provides electric distribution and transmission, and natural gas distribution services in parts of eastern Washington and northern Idaho. Avista Utilities also provides natural gas distribution service in parts of northeastern and southwestern Oregon. Avista Utilities has electric generating facilities in Washington, Idaho, Oregon and Montana. Avista Utilities also supplies electricity to a small number of customers in Montana, most of whom are employees who operate Avista Utilities' Noxon Rapids generating facility. Avista Utilities also engages in wholesale purchases and sales of electricity and natural gas as an integral part of energy resource management and its load-serving obligation.
•
AEL&P – a regulated utility providing electric services in Juneau, Alaska that is a wholly-owned subsidiary and the primary operating subsidiary of AERC.
We have other businesses, including venture fund investments, real estate investments, as well as certain other investments made by Avista Capital, which is a direct, wholly owned subsidiary of Avista Corp. These activities do not represent a reportable business segment and are conducted by various direct and indirect subsidiaries of Avista Corp.
Total Avista Corp. shareholders’ equity was $2.2 billion as of December 31, 2021, which includes a $117.5 million investment in Avista Capital and a $108.5 million investment in AERC.
See “Note 24 of the Notes to Consolidated Financial Statements” for information with respect to the operating performance of each business segment (and other subsidiaries).
Human Capital
Our approach to people is a critical strategy and the priorities for this strategy include, among other things:
•
developing, retaining and attracting a diverse and skilled workforce,
•
providing opportunities for continuous learning, development, career growth, and movement within the Company,
•
supporting and rewarding our employees through competitive pay and benefits,
•
encouraging and supporting a community-minded Company culture, and
•
investing in the physical, emotional and financial health and safety of our employees.
The following is an overview of some of our key human capital initiatives intended to foster the overall well-being of our employees and other stakeholders, such as our customers and business partners.
Equity, Inclusion, and Diversity
We strive to create a workplace culture that values trust and respect and helps guide our overall commitment to doing what is right and offering all employees the opportunity to enrich their lives and careers through challenging and meaningful work – all
5
AVISTA CORPORATION
in an equal opportunity workplace that is surrounded by a supportive and inclusive environment. With a strong workplace culture as a foundation, we actively engage and listen to our employees, customers and communities in order to help measure and inform our equity, inclusion, diversity, and racial and social justice practices. Our equity, inclusion, and diversity initiatives are focused on employee recruitment, employee training and development, and employee engagement, including participation in employee resource groups. Employee resource groups are voluntary, employee led groups that foster a diverse and inclusive workplace aligned with our organizational mission, values and goals and business practices.
On December 31, 2021, Avista Utilities employed 1,809 with an employee profile of:
Women Under Represented Groups (a)
Bargaining Unit 3% 6%
Non-bargaining Unit 45% 9%
Executives (b) 17% 8%
(a)
As defined by our Affirmative Action Plan and through employee self-identification.
(b)
Executive is defined as vice president or higher.
Employee data represents all regular full-time and part-time employees, including temporary workers and student interns.
Bargaining Unit employees comprise 38 percent of Avista Utilities’ employees.
People Development, Retention and Attraction
We strive to hire and retain talented people who are innovative and skilled so that we can continue to provide safe, reliable and affordable service to our customers and advance our Company at the same time.
Continuous learning plays a large part in fostering collaboration and innovation among our employees and is embedded throughout the Company. Our development opportunities are created to prepare our employees at all levels to ensure they have the skills, knowledge and experience to perform today and well into the future. Keeping our workforce equipped to succeed is imperative in order to meet the emerging challenges that lay ahead. We develop training that is relevant, necessary and in demand for our organization. Training may be delivered through instructor-led courses, self-service topics, computer-based learning modules, and field based, hands-on workshop models that cover the range of our operations. These programs encompass craft apprenticeship programs, engineering development programs, leadership development, communication skills, cross-functional learning and equity, inclusion and diversity topics. In addition to our internally led courses, we also provide opportunities for our employees to attend industry events and certification programs, courses or programs offered through energy related organizations such as the Western Energy Institute, the American Gas Association and the Edison Electric Institute, as well as to our local colleges and universities.
Workplace Safety
Safety is an essential part of our mission. We have a variety of programs and initiatives in place that are intended to help employees complete their work safely through heightened vigilance, hazard recognition, defensive strategies, lessons learned, human and organizational performance improvement and other tools intended to ensure resilience in varying and unpredictable conditions. We work with our employees to reinforce personal responsibility regarding safety and health, and to implement measures to create and maintain a safe work environment.
During the COVID-19 Pandemic, we have transitioned through various stages of response designed to protect the health and safety of our employees and meet compliance obligations, while continuing to provide essential services to our customers. We have focused on care and concern for our employees, customers and other key stakeholders, proactively communicating about the risks and relying on facts and credible information from our regional, state and federal health and safety organizations. This focus included providing options to employees and customers to best protect themselves from COVID-19 when engaging in our work.
6
AVISTA CORPORATION
Additional Information
Additional information highlighting the Company's commitments to corporate responsibility, including the Company’s commitments to our environment, our people, our customers and communities and ethical governance, is available on the Company’s website at www.avistacorp.com. Material on the Company’s website is not part of this report.
AVISTA UTILITIES
General
At the end of 2021, Avista Utilities supplied retail electric service to approximately 406,000 customers and retail natural gas service to approximately 372,000 customers across its service territory. Avista Utilities' service territory covers 30,000 square miles with a population of 1.7 million. See “Item 2. Properties” for further information on our utility assets. See “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations – Economic Conditions and Utility Load Growth” for information on economic conditions in our service territory.
Electric Operations
General Avista Utilities generates, transmits and distributes electricity, serving electric customers in eastern Washington and northern Idaho and a small number of customers in Montana, most of whom are employees who operate Avista Utilities' Noxon Rapids generating facility.
Avista Utilities generates electricity from facilities that we own and purchases capacity, energy and fuel for generation under long-term and short-term contracts to meet customer load obligations. We also sell electric capacity and energy, as well as surplus fuel in the wholesale market in connection with our resource optimization activities as described below.
As part of Avista Utilities' resource procurement and management operations in the electric business, we engage in an ongoing process of resource optimization, which involves the selection from available energy resources to serve our load obligations and the use of these resources to capture economic value through wholesale market transactions. These include sales and purchases of electric capacity and energy, fuel for electric generation, and derivative contracts related to capacity, energy, fuel and fuel transportation. Such transactions are part of the process of matching available resources with load obligations and hedging a portion of the related financial risks. In order to implement this process, we make continuing projections of:
•
electric loads at various points in time (ranging from intra-hour to multiple years) based on, among other things, estimates of customer usage and weather, historical data, contract terms, and emerging trends and climate modeling results, and
•
resource availability at these points in time based on, among other things, fuel choices and fuel markets, estimates of snowpack and streamflows, availability of generating units, historic and forward market information, contract terms and experience.
On the basis of these projections, we make purchases and sales of electric capacity and energy, fuel for electric generation, and related derivative contracts to match expected resources to expected electric load requirements and reduce our exposure to electricity (or fuel) market price changes. The process of resource optimization involves scheduling and dispatching available resources as well as the following:
•
purchasing fuel for generation,
•
when economical, selling fuel and substituting wholesale electric purchases, and
•
other wholesale transactions to capture the value of generating resources, transmission contract rights and fuel delivery (transport) capacity contracts.
This optimization process includes entering into hedging transactions to manage risks. Transactions include both physical energy contracts and related derivative instruments, and the terms range from intra-hour up to multiple years.
7
AVISTA CORPORATION
Avista Utilities' generation assets are interconnected through the regional transmission system and are operated on a coordinated basis to enhance load-serving capability and reliability. We acquire both long-term and short-term transmission capacity to facilitate all of our energy and capacity transactions. We provide transmission and ancillary services in eastern Washington, northern Idaho and western Montana.
Electric Requirements
Avista Utilities' peak electric native load requirement for 2021 was 1,889 MW, which occurred on June 30, 2021. In 2020, our peak electric native load was 1,721 MW, which occurred during the summer, and in 2019, it was 1,656 MW, which occurred during the summer.
Electric Resources
Avista Utilities has a diverse electric resource mix of Company-owned and contracted hydroelectric, thermal and wind generation facilities, and other contracts for power purchases and exchanges. As of December 31, 2021, Avista Utilities' electric generation resource mix (including contracts for power purchases) was approximately 49 percent hydroelectric, 42 percent thermal and 9 percent other renewables. See “Item 2. Properties” for detailed information on Company-owned generating facilities.
Hydroelectric Resources Avista Utilities owns and operates Noxon Rapids and Cabinet Gorge on the Clark Fork River and six smaller hydroelectric projects on the Spokane River. Hydroelectric generation is typically our lowest cost source per MWh of electric energy and the availability of hydroelectric generation has a significant effect on total power supply costs. Under normal streamflow and operating conditions, we estimate that we would be able to meet approximately one-half of our total average electric requirements (both retail and long-term wholesale) with the combination of our hydroelectric generation and long-term hydroelectric purchase contracts with certain PUDs in the state of Washington. Our estimate of normal annual hydroelectric generation for 2022 (including resources purchased under long-term hydroelectric contracts with certain PUDs) is 579 aMW (or 5.1 million MWhs).
See "Item 2. Properties - Avista Utilities - Generation Properties" for the nameplate rating and present generating capabilities of the above hydroelectric resources.
8
AVISTA CORPORATION
The following graph shows Avista Utilities' hydroelectric generation (in thousands of MWhs) during the year ended December 31:
(1)
"Normal" hydroelectric generation is determined by reference to the effect of upstream dam regulation on median natural water flow. Natural water flow is the flow of the rivers without the influence of dams, whereas regulated water flow takes into account any water flow changes from upstream dams due to releasing or holding back water. The calculation of "normal" varies annually due to the timing of upstream dam regulation throughout the year, as well as changes in PUD contracts.
Thermal Resources Avista Utilities owns the following thermal generating resources:
•
the combined cycle natural gas-fired CT, known as Coyote Springs 2, located near Boardman, Oregon,
•
a 15 percent interest in Units 3 & 4 of Colstrip, a coal-fired boiler generating facility located in southeastern Montana; see “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations – Colstrip” for discussion on Colstrip,
•
a wood waste-fired boiler generating facility known as the Kettle Falls GS in northeastern Washington,
•
a two-unit natural gas-fired CT generating facility in northeastern Spokane (Northeast CT),
•
a two-unit natural gas-fired CT generating facility in northern Idaho (Rathdrum CT), and
•
two small natural gas-fired generating facilities (Boulder Park GS and Kettle Falls CT).
Coyote Springs 2, which is operated by Portland General Electric Company, is supplied with natural gas under a combination of term contracts and spot market purchases, including transportation agreements with bilateral renewal rights.
Colstrip, which is operated by Talen Montana, is supplied with fuel from adjacent coal reserves under coal supply and transportation agreements. Several of the co-owners of Colstrip, including us, have a coal contract that runs through December
9
AVISTA CORPORATION
31, 2025. See “Item 7. Management's Discussion and Analysis – Colstrip " for discussion regarding environmental and other issues surrounding Colstrip.
The primary fuel for the Kettle Falls GS is wood waste generated as a by-product and delivered by trucks from forest industry operations within 100 miles of the plant. A combination of long-term contracts and spot purchases has provided, and is expected to meet, fuel requirements for the Kettle Falls GS.
The Northeast CT, Rathdrum CT, Boulder Park GS and Kettle Falls CT generating units are primarily used to meet peaking electric requirements. We also operate these facilities when marginal costs are below prevailing wholesale electric prices. These generating facilities have access to natural gas supplies that are adequate to meet their respective operating needs.
See "Item 2. Properties - Avista Utilities - Generation Properties" for the nameplate rating and present generating capabilities of the above thermal resources.
We have the exclusive rights to all the capacity of the Lancaster Plant, a 270 MW natural gas-fired combined cycle combustion turbine plant located in northern Idaho, owned by an unrelated third-party. All of the output from the Lancaster Plant is contracted to us through 2026 under a PPA. Under the terms of the PPA, we make the dispatch decisions, provide all natural gas fuel and receive all of the electric energy output from the Lancaster Plant; therefore, we consider this plant in our baseload resources. See "Note 6 of the Notes to Consolidated Financial Statements" for further discussion of this PPA.
The following graph shows Avista Utilities' thermal generation (in thousands of MWhs) during the year ended December 31:
Wind Resources We have exclusive rights to all the capacity of Palouse Wind, a wind generation project developed, owned and managed by an unrelated third-party and located in Whitman County, Washington. The PPA expires in 2042 and requires us to acquire all of the power and renewable attributes produced by the project at a fixed price per MWh with a fixed escalation of the price over the term of the agreement. The project has a nameplate capacity of 105 MW. Generation from Palouse Wind was 360,783 MWhs in 2021, 370,142 MWhs in 2020 and 302,136 MWhs in 2019. We have an annual option to purchase the wind project beginning in December 2022. The purchase price is a fixed price per KW of in-service capacity with a fixed decline in the price per KW over the remaining 20-year term of the PPA. Under the terms of the PPA, we do not have any input into the day-to-day operation of the project, including maintenance decisions. All such rights are held by the owner.
10
AVISTA CORPORATION
We have exclusive rights to all of the capacity of Rattlesnake Flat Wind project developed, owned and managed by an unrelated third party and located in Adams County, Washington. The facility has a nameplate capacity of 144 MW. The PPA is a 20-year agreement that began in December 2020 and requires us to acquire all of the power and renewable attributes produced by the project at a fixed price per MWh with a fixed escalation of the price over the term of the agreement. Generation from Rattlesnake Flat Wind was 423,510 MWhs in 2021. Under the terms of the PPA, we do not have any input into the day-to-day operation of the project, including maintenance decisions. All such rights are held by the owner.
Solar ResourcesWe have exclusive rights to all the capacity of the Lind Solar Farm, a solar generation project developed, owned and managed by an unrelated third-party and located in Lind, Washington. The PPA expires in 2038 and requires us to acquire all the power and renewable attributes produced by the project at a fixed price per MWh. The project has a nameplate capacity of 28 MW. The facility generated 43,328 MWhs in 2021, 45,281 MWhs in 2020, and 42,346 MWhs in 2019. Under the terms of the PPA, we do not have any input into the day-to-day operation of the project, including maintenance decisions. All such rights are held by the owner.
Other Purchases, Exchanges and Sales In addition to the resources described above, we purchase and sell power under various long-term contracts, and we also enter into short-term purchases and sales. Further, pursuant to The Public Utility Regulatory Policies Act of 1978, as amended, we are required to purchase generation from qualifying facilities. This includes, among other resources, hydroelectric projects, cogeneration projects and wind generation projects at rates approved by the WUTC and the IPUC.
See “Avista Utilities Electric Operating Statistics – Electric Operations” below for annual quantities of purchased power, wholesale power sales and power from exchanges in 2021, 2020 and 2019. See “Electric Operations” above for additional information with respect to the use of wholesale purchases and sales as part of our resource optimization process and also see "Future Resource Needs" below for the magnitude of these power purchase and sales contracts in future periods.
Avista Corp. understands that there are many coal-fired electric generating stations throughout the western United States that are scheduled for retirement in the next several years. Depending upon a variety of factors, these retirements could have an impact upon the availability and price of purchased power in, and the dynamics of, the market in which we conduct our wholesale purchases and sales. At the same time, the retirement of Colstrip Units 3 & 4, if it were effected, could increase the volume of energy that we are required to purchase in this marketplace. However, after December 31, 2025, we will be effectively prohibited by Clean Energy Transformation Act (CETA) from using energy produced by coal-fired plants to serve our retail customers in Washington, and, to the extent necessary for that purpose, we will have to obtain energy produced by other resources. See “Item 7. Management's Discussion and Analysis – Environmental Matters and Contingencies – Climate Change – Washington Legislation and Regulatory Actions – Clean Energy Transformation Act” and “Colstrip."
Hydroelectric Licenses
Avista Corp. is a licensee under the Federal Power Act (FPA) as administered by the FERC, which includes regulation of hydroelectric generation resources. Excluding the Little Falls Hydroelectric Generating Project (Little Falls), our other seven hydroelectric plants are regulated by the FERC through two project licenses. The licensed projects are subject to the provisions of Part I of the FPA. These provisions include payment for headwater benefits, condemnation of licensed projects upon payment of just compensation, and take-over by the federal government of such projects after the expiration of the license upon payment of the lesser of “net investment” or “fair value” of the project, in either case, plus severance damages. In the unlikely event that a take-over occurs, it could lead to either the decommissioning of the hydroelectric project or offering the project to another party (likely through sale and transfer of the license).
Cabinet Gorge and Noxon Rapids are under one 45-year FERC license issued in 2001. This license embodies a settlement agreement relating to project operations and resource protection and mitigation efforts over the license term. See “Item 7. Management's Discussion and Analysis – Environmental Issues and Contingencies" for discussion of dissolved atmospheric gas levels that exceed the state of Idaho and federal numeric water quality standards downstream of Cabinet Gorge during periods
11
AVISTA CORPORATION
when we must divert excess river flows over the spillway, as well as efforts related to bull trout, a threatened species under the Endangered Species Act.
Five of our six hydroelectric projects on the Spokane River (Long Lake, Nine Mile, Upper Falls, Monroe Street and Post Falls) are under one 50-year FERC license issued in 2009 and are referred to collectively as the Spokane River Project. The license includes numerous natural and cultural resource protection measures that are subject to ongoing regulatory interpretation. The sixth, Little Falls, is operated under separate Congressional authority and is not licensed by the FERC. It is the subject of a 50-year agreement with the Spokane Tribe, signed in 1994.
Future Resource Needs
Avista Utilities has operational strategies to provide sufficient resources to meet our energy requirements under a range of operating conditions. These operational strategies consider the amount of energy needed, which varies widely because of the factors that influence demand over intra-hour, hourly, daily, monthly and annual durations. Our average hourly load was 1,113 aMW in 2021, 1,064 aMW in 2020 and 1,081 aMW in 2019.
The following graph shows our forecast of our average annual energy requirements and our available resources for 2022 through 2025:
(1)
The contracts for power sales decrease due to certain contracts expiring in each of these years. We are evaluating the future plan for the additional resources made available due to the expiration of these contracts.
(2)
The combined maximum capacity of Boulder Park GS, Kettle Falls CT, Northeast CT and Rathdrum CT is 278 MW, with estimated available energy production as indicated for each year.
(3)
Other contracts for power purchases includes power purchase agreements for solar and wind energy.
(4)
The forecast assumes near normal hydroelectric generation.
(5)
Includes the Lancaster Plant PPA. Excludes Boulder Park GS, Kettle Falls CT, Northeast CT and Rathdrum CT, as these are considered peaking facilities and are generally not used to meet our base load requirements.
We are required to file an Integrated Resource Plan (IRP) with the WUTC and IPUC every two years. The WUTC and IPUC review the IRP and give the public the opportunity to comment. The WUTC and IPUC do not approve or disapprove of the
12
AVISTA CORPORATION
content in the IRP; rather, they acknowledge that the IRP was prepared in accordance with applicable standards if that is the case. The IRP details projected growth in demand for energy and the new resources needed to serve customers over the next 20 years. We regard the IRP as a tool for resource evaluation, rather than an acquisition plan for a particular project.
In April 2021, we filed our 2021 Electric IRP with the WUTC and the IPUC. Later that same month, we filed an amended IRP to include the results of the 2020 Renewable Request for Proposal (RFP).
Highlights of the 2021 IRP include the following expectations and/or assumptions:
•
We have adequate resources between owned and contractually controlled generation, when combined with conservation and market purchases, to meet customer demand through October 2026. Our first long-term capacity deficit, net of energy efficiency, begins in October 2026 and is 247 MW by January 2027.
•
The resource strategy reduces greenhouse gas emissions between 80-90 percent from present levels.
•
We anticipate customer load growth of 0.3 percent per year.
•
Assumes Colstrip will exit the portfolio by 2025 (see “Item 7. Management’s Discussion and Analysis of Financial Condition – Environmental Issues and Contingencies” for further discussion of Colstrip in relation to the Washington Clean Energy Transformation Act).
•
New natural gas-fired peaking units are the most economic means to meet the capacity shortfall in 2027 since long-term energy storage is not yet available at a cost effective price.
•
Demand response programs begin in 2025 and grow to 72 MW by 2045.
•
Our first new renewable resource identified in the IRP is in 2025, as a wind project located in Montana. Actual resource selection will be determined by a future RFP.
The resource strategy embodied in the IRP is intended to move us closer to achieving our corporate clean electricity goal to provide customers with 100 percent net clean electricity by 2027. Net clean energy is defined as either 100 percent non-carbon emitting resources or investing in or acquiring carbon offsets to net-out emissions created from carbon emitting resources. The addition of natural gas peaking units in 2027 would require us to purchase carbon offsets.
We are subject to the Washington State Energy Independence Act, which requires us to obtain a portion of our electricity from qualifying renewable resources or through purchase of RECs and acquiring all cost effective conservation measures. Future generation resource decisions will be affected by legislation for restrictions on greenhouse gas emissions and renewable energy requirements.
See “Item 7. Management’s Discussion and Analysis of Financial Condition – Environmental Issues and Contingencies” and “Colstrip” for information related to existing and proposed laws and regulations, and issues relating to Colstrip.
Additional generating resources that we will require will either be owned by us or be owned by other parties who will sell the capacity and energy to us under PPAs. The decision as to ownership will be made as to each project at the appropriate time and will depend on, among other things, the type of project and the related economics, including tax and ratemaking treatment.
Request for Proposals for Renewable Energy
We sought proposals from renewable energy project developers who are capable of constructing, owning and operating up to 120 aMWs whether through one or multiple proposals with a minimum net annual output of 20 aMW. We did not consider a self-build option for this facility or facilities.
Our intent was to secure the output from renewable generation resources, including electricity, capacity and associated environmental attributes. Our interest in acquiring renewable energy resources was to offset market purchases and fossil-fuel thermal generation. Final bidders were selected for review in October 2020 and the Company successfully negotiated a fixed
13
AVISTA CORPORATION
cost contract for a 5 percent share of output (88 MW / 51 aMW) of Chelan PUD’s Chelan hydro system (Rocky Reach and Rock Island hydro projects) signed in March 2021 and an additional contract for a 10 percent share (177 MW) in December 2021. The December 2021 contract starts with a 5 percent share from 2026 to 2030, and increases to a 10 percent share from 2031 to 2045.
Clean Energy Goals
In April 2019, we announced a goal to serve our customers with 100 percent clean electricity by 2045 and to have a carbon-neutral supply of electricity by the end of 2027. To help achieve our goals and add to our clean electricity portfolio, in the last three years, we have implemented renewable energy projects on behalf of our customers including entering into PPAs for the Solar Select project (28 MW) in Lind, Washington and the Rattlesnake Flat Wind project (144 MW) in Adams County, Washington. We also entered into two power purchase contracts with Chelan County Public Utility District for a percentage share of the output of their Rocky Reach and Rock Island hydro projects for 22 years starting in 2024 (88-264 MW). These resources are in addition to our existing clean hydroelectric generation, biomass generation, and additional wind and solar projects.
To achieve our clean energy goals, we expect that energy storage and other technologies, which are either not currently available or are not cost-effective under the lowest reasonable cost regulatory standard, will advance such that it will allow us to meet our goals while also maintaining reliability and affordability for our customers. If the required technology is not available or not affordable in the future, we may not meet our goals in the desired timeframe. Meeting our clean energy goals may also require accommodation from regulatory agencies insofar as we may need to acquire emission offsets to meet our goals. See the discussion in Item 1 under “Electric Resources” for more information on our existing clean electricity sources and efforts to achieve these goals. See “Item 7. Management’s Discussion and Analysis of Financial Condition – Environmental Issues and Contingencies” for further discussion on clean energy, including applicable regulations.
Wildfire Resiliency Plan
We are implementing additional measures to enhance our ability to mitigate the potential for, and impact of, wildfires within our service territories. Building on prevention and response strategies that have been in place for many years, we created a new comprehensive 10-year Wildfire Resiliency Plan that includes improved defense strategies and operating practices for a more resilient system. This plan will be periodically updated and informed by observed experience as well as changes in observed landscape and climatic conditions.
We have developed the Wildfire Resiliency Plan through a series of internal workshops, industry research and engagement with state and local fire agencies. Improvements to infrastructure and operational practices were identified as key components to the plan. These key components are categorized into the following categories: grid hardening, vegetation management, situational awareness, operations and emergency response, and worker and public safety.
We expect to spend approximately $330 million implementing the plan components over the life of the 10-year plan. The IPUC and WUTC have approved deferral of certain costs of the wildfire resiliency plan and seek recovery in future rate filings.
See “Note 22 of the Notes to Consolidated Financial Statements” for further discussion on wildfires.
Natural Gas Operations
General Avista Utilities provides natural gas distribution services to retail customers in parts of eastern Washington, northern Idaho, and northeastern and southwestern Oregon.
Market prices for natural gas, like other commodities, can be volatile. Our natural gas procurement strategy is to provide a reliable supply to our customers with some level of price certainty. We procure natural gas from various supply basins and over varying time periods. The resulting portfolio is a diversified mix of forward fixed price purchases, index and spot market purchases, and utilizing physical and financial derivative instruments. We also use natural gas storage to support high demand
14
AVISTA CORPORATION
periods and to procure natural gas when prices may be lower. Securing prices throughout the year and even into subsequent years provides a level of price certainty and can mitigate price volatility to customers between years.
Weather is a key component of our natural gas customer load. This load is highly variable and daily natural gas loads can differ significantly from the monthly forecasted load projections. We make continuing projections of our natural gas loads and assess available natural gas resources. On the basis of these projections, we plan and execute a series of transactions to hedge a portion of our customers' projected natural gas requirements through forward market transactions and derivative instruments. These transactions may extend for multiple years into the future. We also leave a portion of our natural gas supply requirements unhedged for purchase in the short-term spot markets.
Our purchase of natural gas supply is governed by our procurement plan and is reviewed and approved annually by the Risk Management Committee (RMC), which is comprised of certain officers and other management personnel. Once approval is received, the plan is implemented and monitored by our gas supply and risk management groups.
The plan’s progress is also presented to the WUTC and IPUC staff in semi-annual meetings, and updates are given to the OPUC staff quarterly. The RMC is provided with an update on plan results and changes in their monthly meetings. These activities provide transparency for the natural gas supply procurement plan. Any material changes to the plan are documented and communicated to RMC members.
As part of the process of balancing natural gas retail load requirements with resources, we engage in the wholesale purchase and sale of natural gas. We plan for sufficient natural gas delivery capacity to serve our retail customers for a theoretical peak day event. We generally have more pipeline and storage capacity than what is needed during periods other than a peak day. We optimize our natural gas resources by using market opportunities to generate economic value that helps mitigate fixed costs. Wholesale sales are delivered through wholesale market facilities outside of our natural gas distribution system. Natural gas resource optimization activities include, but are not limited to:
•
wholesale market sales of surplus natural gas supplies,
•
purchases and sales of natural gas to optimize use of pipeline and storage capacity, and
•
participation in the transportation capacity release market.
We also provide distribution transportation service to qualified, large commercial and industrial natural gas customers who purchase natural gas through third-party marketers. For these customers, we receive their purchased natural gas from such third-party marketers into our distribution system and deliver it to the customers’ premises. These customers generally pay the same rates as other customers in the same class, without any charge for the cost of the natural gas delivered.
Optimization transactions that we engage in throughout the year are included in our annual purchased gas cost adjustment filings with the various commissions and are subject to review for prudence during this process.
Clean Energy Goals
In April 2021, we announced an aspirational goal to reduce carbon emissions for natural gas 30 percent by 2030 and 100 percent by 2045. Examples of carbon emissions reduction strategies include the following:
•
Diversify or transition from fossil fuel-based natural gas to renewable natural gas,
•
Reduce natural gas consumption via conservation, energy efficiency and new technologies, and
•
Purchase carbon offsets as necessary.
Achieving the carbon emission reductions for the natural gas system will involve various pathways. The initial primary pathways include renewable natural gas (RNG), energy efficiency, customer voluntary RNG and carbon offset programs. See
15
AVISTA CORPORATION
“Item 7. Management’s Discussion and Analysis of Financial Condition – Environmental Issues and Contingencies” for further discussion on clean energy, including applicable regulations.
Natural Gas Supply Avista Utilities purchases all of its natural gas in wholesale markets. We are connected to multiple supply basins in the western United States and Canada through firm capacity transportation rights on six different pipeline networks. Access to this diverse portfolio of natural gas resources allows us to make natural gas procurement decisions that benefit our natural gas customers. These interstate pipeline transportation rights provide the capacity to serve approximately 25 percent of peak natural gas customer demands from domestic sources and 75 percent from Canadian sourced supply. Natural gas prices in the Pacific Northwest are affected by global energy markets, as well as supply and demand factors in other regions of the United States and Canada. Future prices and delivery constraints may cause our resource mix to vary.
Natural Gas Storage Avista Utilities owns a one-third interest in Jackson Prairie, an underground aquifer natural gas storage field located near Chehalis, Washington. Jackson Prairie has a total peak day deliverability of 12 million therms, with a total working natural gas capacity of 256 million therms. As an owner, our share is one-third of the peak day deliverability and total working capacity. We also contract for additional storage capacity and delivery at Jackson Prairie from Northwest Pipeline for a portion of their one-third share of the storage project.
We optimize our natural gas storage capacity throughout the year by executing transactions that capture favorable market price spreads. Natural gas buyers identify opportunities to purchase lower cost natural gas in the immediate term to inject into storage, and then sell the gas in a forward market to be withdrawn at a later time. The reverse of this type of transaction also occurs. These transactions lock in incremental value for customers. Jackson Prairie is also used as a variable peaking resource, and to protect from extreme daily price volatility during cold weather or other events affecting the market.
Future Resource Needs In April 2021, we filed our 2021 Natural Gas IRP with the WUTC, the IPUC and the OPUC. The IRP details projected growth in demand for energy and the new resources needed to serve customers over the next 20 years. We regard the IRP as a tool for resource evaluation, rather than an acquisition plan for a particular project. The IPUC and OPUC have formally acknowledged our IRP; the WUTC is still processing the IRP.
Highlights of the 2021 natural gas IRP include the following expectations and/or assumptions:
•
We anticipate having sufficient natural gas resources during the 20-year planning horizon.
•
Due to expected carbon legislation at the state levels through a cap and reduce mechanism (Oregon) or a social cost of carbon tax mechanism (Washington), we expect our retail natural gas rates to include a carbon price adder in Oregon and Washington, but not in Idaho.
•
Regional supply constraints are beginning to increase in their likelihood causing prices to act in a more volatile fashion. This volatility in pricing paired with supply side resource availability has made our procurement plan an increasingly important piece to manage customer rates, diversity of supply and peak day demand.
•
LNG exports, power generation and exports to Mexico will continue to add demand for natural gas.
•
We expect lower use per customer and an increased amount of demand side management (DSM). The combination of low-priced natural gas in addition to carbon fees or other programs has led to a higher potential for DSM measures.
•
We view renewable natural gas and low carbon fuels as an important component of our corporate environment strategy and decarbonization goals.
We will monitor these assumptions on an on-going basis and adjust our resource requirements accordingly.
We are required to file a natural gas IRP every two years and we anticipate our next IRP to be filed in 2023.
16
AVISTA CORPORATION
Utility Regulation
General As a public utility, Avista Corp. is subject to regulation by state utility commissions for retail electric and natural gas rates, accounting, the issuance of securities and other matters. The retail electric and natural gas operations are subject to the jurisdiction of the WUTC, IPUC, OPUC and MPSC. Approval of the issuance of securities is not required from the MPSC. We are also subject to the jurisdiction of the FERC for licensing of hydroelectric generation resources, and for electric transmission services and wholesale sales.
Since Avista Corp. is a “holding company” (in addition to being itself an operating utility), we are also subject to the jurisdiction of the FERC under the Public Utility Holding Company Act of 2005, which imposes certain reporting and record-keeping requirements on Avista Corp. and its subsidiaries. We and our subsidiaries are required to make books and records available to the FERC and the state utility commissions. In addition, upon the request of any jurisdictional state utility commission, the FERC would have the authority to review assignment of costs of non-power goods and administrative services among us and our subsidiaries. The FERC has the authority generally to require that rates subject to its jurisdiction be just and reasonable and in this context would continue to be able to, among other things, review transactions of any affiliated company.
Our rates for retail electric and natural gas services (other than specially negotiated retail rates for industrial or large commercial customers, which are subject to regulatory review and approval) are generally determined on a “cost of service” basis.
Retail rates are designed to provide an opportunity for us to recover allowable operating expenses and earn a return of and a reasonable return on “rate base.” Rate base is generally determined by reference to the original cost (net of accumulated depreciation) of utility plant in service, subject to various adjustments for deferred income taxes and other items. Over time, rate base is increased by additions to utility plant in service and reduced by depreciation and write-offs as authorized by the utility commissions. Our operating expenses and rate base are allocated or directly assigned to five regulatory jurisdictions: electric in Washington and Idaho, and natural gas in Washington, Idaho and Oregon. In general, requests for new retail rates are made on the basis of revenues, operating expenses and net investment for a test year that ended prior to the date of the request, subject to possible adjustments, which differ among the various jurisdictions, designed to reflect the expected revenues, operating expenses and net investment during the period new retail rates will be in effect. The retail rates approved by the state commissions in a rate proceeding may not provide sufficient revenues to provide recovery of costs and a reasonable return on investment for a number of reasons, including, but not limited to, ongoing capital expenditures and unexpected changes in revenues and expenses following the time new retail rates are requested in the rate proceeding (known as “regulatory lag”), the denial by the commission of recovery, or timely recovery, of certain expenses or investment and the limitation by the commission of the authorized return on investment. In 2021, Washington enacted a multi-year rate plan and performance-based rate making. See “Item 7. Management’s Discussion and Analysis – Regulatory Matters – General Rate Cases” for further information.
Our rates for wholesale electric sales and electric transmission services, as well as certain natural gas transportation services, are based on either “cost of service” principles or market-based rates as set forth by the FERC. See “Notes 1, 12 and 23 of the Notes to Consolidated Financial Statements” for additional information about regulation, depreciation and deferred income taxes.
General Rate Cases Avista Utilities regularly reviews the need for electric and natural gas rate changes in each state in which we provide service. See “Item 7. Management’s Discussion and Analysis – Regulatory Matters – General Rate Cases” for information on general rate case activity.
Power Cost Deferrals Avista Utilities defers the recognition in the income statement of certain power supply costs that vary from the level currently recovered from our retail customers as authorized by the WUTC and the IPUC. See “Item 7. Management’s Discussion and Analysis – Regulatory Matters – Power Cost Deferrals and Recovery Mechanisms” and “Note 23 of the Notes to Consolidated Financial Statements” for information on power cost deferrals and recovery mechanisms in Washington and Idaho.
17
AVISTA CORPORATION
Purchased Gas Adjustments (PGA) Under established regulatory practices in each state, Avista Utilities defers the recognition in the income statement of the natural gas costs that vary from the level currently recovered from our retail customers as authorized by each of our jurisdictions. See “Item 7. Management’s Discussion and Analysis – Regulatory Matters – Purchased Gas Adjustments” and “Note 23 of the Notes to Consolidated Financial Statements” for information on natural gas cost deferrals and recovery mechanisms in Washington, Idaho and Oregon.
Decoupling Mechanisms Decoupling (also known as FCA in Idaho) is a mechanism designed to sever the link between a utility's revenues and consumers' energy usage. In each of its jurisdictions, Avista Utilities' electric and natural gas revenues are adjusted so as to be based on the number of customers in certain customer rate classes and assumed "normal" usage, rather than being based on actual usage. The difference between revenues based on the number of customers and "normal" sales and revenues based on actual usage is deferred and either surcharged or rebated to customers beginning in the following year. See “Item 7. Management’s Discussion and Analysis – Regulatory Matters – Decoupling and Earnings Sharing Mechanisms” for further discussion of these mechanisms.
Federal Laws Related to Wholesale Competition
Federal law promotes practices that foster competition in the electric wholesale energy market. The FERC requires electric utilities to transmit power and energy to or for wholesale purchasers and sellers, and requires electric utilities to enhance or construct transmission facilities to create additional transmission capacity for the purpose of providing these services. Public utilities (through subsidiaries or affiliates) and other entities may participate in the development of independent electric generating plants for sales to wholesale customers.
Public utilities operating under the FPA are required to provide open and non-discriminatory access to their transmission systems to third parties and establish an Open Access Same-Time Information System to provide an electronic means by which transmission customers can obtain information about available transmission capacity and purchase transmission access. The FERC also requires each public utility subject to the rules to operate its transmission and wholesale power merchant operating functions separately and to comply with standards of conduct designed to ensure that all wholesale users, including the public utility’s power merchant operations, have equal access to the public utility’s transmission system. Our compliance with these standards has not had any substantive impact on the operation, maintenance and marketing of our transmission system or our ability to provide service to customers.
See “Item 7. Management’s Discussion and Analysis – Competition” for further information.
Regional Transmission Planning
Beginning with FERC Order No. 888 and continuing with subsequent rulemakings and policies, the FERC has encouraged better coordination and operational consistency aimed to capture efficiencies that might otherwise be gained through the formation of a Regional Transmission Organization or an independent system operator (ISO).
The Company currently meets its FERC requirements to coordinate transmission planning activities with other regional entities through NorthernGrid. Launched January 1, 2020, NorthernGrid is an association of all major transmission providers throughout the Pacific Northwest and Intermountain West, with facilities in California, Idaho, Montana, Oregon, Utah, Washington and Wyoming. Through its participation in NorthernGrid, the Company is able to meet the regional transmission planning requirements of FERC Order Nos. 890 and 1000, and their follow-on orders. NorthernGrid and its members also work with other western organizations, including WestConnect and the California Independent System Operator (CAISO), to address broader interregional planning. Neither the costs nor requirements of participating in NorthernGrid’s coordinated transmission planning activities are expected to materially impact the Company’s operations or financial performance.
Regional Energy Markets
The CAISO operates the Western Energy Imbalance Market (EIM) in the western United States. Most investor-owned utilities in the Pacific Northwest are either participants in the Western EIM or plan to integrate into the market in the near future. The Company has announced its decision to participate in the Western EIM and is slated to commence EIM operations by March
18
AVISTA CORPORATION
2022. The decision to join the Western EIM was based on a number of factors, including the amount of expected variable generating resources the Company will need to integrate within its balancing authority area in the foreseeable future, and the expected costs and benefits associated with joining the Western EIM. The EIM, among other things, facilitates regional load balancing by allowing certain generating plants to receive automated dispatch signals from the CAISO in five-minute intervals.
Reliability Standards
Among its other provisions, the U.S. Energy Policy Act provides for the implementation of mandatory reliability standards and authorizes the FERC to assess penalties for non-compliance with these standards and other FERC regulations.
The FERC has certified the NERC as the single Electric Reliability Organization authorized to establish and enforce reliability standards and delegate authority to regional entities for the purpose of establishing and enforcing reliability standards, including but not limited to cybersecurity measures. The FERC approves NERC Reliability Standards, including western region standards that make up the set of legally enforceable standards for the United States bulk electric system. We are required to self-certify our compliance with these standards on an annual basis and undergo regularly scheduled periodic reviews by the NERC and its regional entity, the Western Electricity Coordinating Council (WECC). Failure to comply with NERC reliability standards could result in substantial financial penalties. We have a robust internal compliance program in place to manage compliance activities and mitigate the risk of potential noncompliance with these standards. We do not expect the costs associated with compliance with these standards to have a material impact on our financial results.
As both a balancing authority and transmission operator, the Company must operate under the oversight of a reliability coordinator per NERC reliability standards. RC West is the reliability coordinator of record for 41 balancing authorities and transmission operators in the Western Interconnection, including Avista Corp. RC West oversees grid compliance with federal and regional grid standards, and can determine measures to prevent or mitigate system emergencies in day-ahead or real-time operations.
Vulnerability to Cyberattack
The energy sector, particularly electric and natural gas utility companies in the United States and abroad, have become the subject of cyberattacks and ransomware attacks with increased frequency. The Company’s administrative and operating networks are targeted by hackers on a regular basis.
A successful attack on the Company’s administrative networks could compromise the security and privacy of data, including operating, financial and personal information. A successful attack on the Company’s operating networks could impair the operation of the Company’s electric and/or natural gas utility facilities, possibly resulting in the inability to provide electric and/or natural gas service for extended periods of time.
The Company continually reinforces and updates its defensive systems and is in compliance with NERC’s reliability standards. See “Reliability Standards," "Item 1A. Risk Factors – Cyber and Technology Risk Factors” and “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations – Enterprise Risk Management – Cyber and Technology Risks” for further information.
19